Information Session – May 30, 2019 – 120 Spaulding
Biological Sciences InitiativeSpaulding Hall
INFORMATION SESSION – MAY 30, 2019 – 120 SPAULDING
AGENDA
Project Overview Project Schedule Temporary Space Accommodations Bldg and Site Access During Construction Communication Plan Questions/Answers
Biological Sciences InitiativeSpaulding Hall
View from Morse Circle
Biological Sciences InitiativeSpaulding Hall
New southwest entry on Academic Way
Biological Sciences InitiativeSpaulding Hall
Academic Way facade
Biological Sciences InitiativeSpaulding Hall
Academic Way facade
Biological Sciences InitiativeSpaulding Hall
Southeast entry on Academic Way
Biological Sciences InitiativeSpaulding Hall
Southeast entry on Academic Way
Biological Sciences InitiativeSpaulding Hall
Façade facing Paul Creative Arts Center
Biological Sciences InitiativeSpaulding Hall
Façade facing Paul Creative Arts Center
Biological Sciences InitiativeSpaulding Hall
New northeast entry on Academic Way
Biological Sciences InitiativeSpaulding Hall
GROUND FLOOR PLAN
Biological Sciences InitiativeSpaulding Hall
Student Desks
Lab SupportTank Stor.
Student DesksStudent Desks
Lab Support Lab Support
Faculty Offices
Main Research Lab
Vivarium Testing
Vivarium Housing
Glasswash
Existing Large Lecture Hall
ExistingClassroom
Conf.
Faculty OfficesBehavioral Research
Mech.
Building Entrance
Building Entrance
Main Research LabMain Research Lab
Biological Sciences InitiativeSpaulding Hall
Commons
Existing Large Lecture Hall
COLSA Dry Research
Existing / Renovated Teaching LabsReceiving
DBS Office Suite
ClassroomEntrance Lobby
InsectLab
Collection
Herbarium Lab Collection
Collection Display and Workroom
Aquatics Core Lab
Gal
lery
Breakout
PrepPrep
Building Entrance
ServiceEntrance
Building EntranceBuilding
Entrance
Building Entrance
Organismal Teaching Lab
Cell CultureTeaching Lab
BL-2 MLS Teaching lab
Biochemistry Teaching Lab
Cold Room
Student Desks
FIRST FLOOR PLAN
Biological Sciences InitiativeSpaulding Hall
Student Desks
Breakout
Faculty Offices
Faculty Offices
Main Research Lab
TeachingLab Prep
EcologyTeaching
Lab
Prep
NeuroscienceTeaching
Lab
Lab Support
Faculty Offices
Student DesksStudent Desks
Lab Support Lab Support
Student Desks
Conference Room
Faculty Offices
Student Desks
Breakout
Conference Room
Breakout
Main Research Lab Main Research Lab
Main Research Lab
Procedural. Labs
SECOND FLOOR PLAN
TeachingLab
Interior Design - main entry - current
Interior Design – 1st floor commons space
Interior Design - Academic Way science on display
Interior Design – typical teaching lab entry
Interior Design – 2nd floor research lab corridor
SITE PLAN
Biological Sciences InitiativeSpaulding Hall
Project Schedule
Biological Sciences InitiativeSpaulding Hall
Phase 2018 2019 2020 2021 2022 ‘23
-
Prepared by Facilities - Campus Planning
22 Colovos Road, Durham, NH 03824-3515
Date:
Level
Scale:
Spaulding Hall 062
G
March 23, 2018
1" = 20'
SEE 335-G FOR CONTINUATION
BioChemInstr. LabInstruements
CE - Lakes Lay Monitoring Prog RO - Lecture
Closed fall 2019(Merge with other RO CRs)(Summer 2019 use is okay if needed)
RO Classroom
Closed summer 2019 (Skanska moves in week of May 13)
Remain in place
Remain in place; vibration isolation for instruments confirmed.
Phase 1 Swing SpaceGround Level
Fall 2019 - May 2021 December 6, 2018 rev.3 05/07/2019
UNH- CP
Reduced scheduling fall 2019
-
Prepared by Facilities - Campus Planning
22 Colovos Road, Durham, NH 03824-3515
Date:
Level
Scale:
Spaulding Hall 062
1
March 2, 2018
1" = 20'
Remain in Place
Remain in Place Discontinue FH.
Prof HaneyResearch Lab
Prof BrownResearch Lab
Prof FureyResearch Lab
Remain as Storage Moving to 161/163.
Remain in Place
Field Equipment Moving to Kendall Hall; as required.
Phase 1 Swing SpaceLevel 1
Fall 2019 - May 2021
December 6, 2018 rev.3 05/07/2019
UNH- CP
-
Prepared by Facilities - Campus Planning
22 Colovos Road, Durham, NH 03824-3515
Date:
Level
Scale:
Spaulding Hall 062
2
March 2, 2018
1" = 20'
Remain in Place fall 2019(Fume Hood off line for spring 2020)(Low use; lab sessions late in the day) (TBD for spring 2020)
Remain in Place Remain in place(Low use; lab sessions late in the day)
Prof GuerdatResearch Lab
General Instructional Lab
Neuro Sci Instructional Lab
Remain in Place
Ecology Instr. Lab
Fall 2019 - May 2021 December 6, 2018 rev.3 05/07/2019
UNH- CP
Phase 1 Swing SpaceLevel 2
-
Prepared by Facilities - Campus Planning
22 Colovos Road, Durham, NH 03824-3515
Date:
Level
Scale:
Spaulding Hall 062
G
March 23, 2018
1" = 20'
SEE 335-G FOR CONTINUATION
Herbarium1,844 ASFMove to Putnam Hall
Lakes Lay Monitoring Program(LLMP - Cooperative Extension)
CE - Plant DiagnosticsMove to Barton Hall
CE - SoilMove to Barton Hall
CE Move to Kendall Hall
RO Classroom
RO LectureRO Classroom
RO Lecture Hall
Phase 2 Swing SpaceGround Level
Summer 2021 - January 2023December 6, 2018 rev.4 05/28/2019UNH- CP
Bio ChemistryInstructional Labto Phase 1 Lvl 1
MLSInstructional Labto Phase 1 Lvl 1
Swing Classrooms - Standard Sizes Starting Fall 2019Kendall 106 - 30 seatsNesmith G13 - 40 seatsNesmith 310 - 30 seatsStarting Spring 2020Nesmith 322 - 25 seatsNesmith 323A - 25 seatsPutnam Hall - 2 @ 25-30 seats
Swing Lecture Halls - Count Increase Ideas1. Air Condition Horton G04 (summer project 20192. Visit priority concerns for departments residing in
buildings with large rooms - tip scales toSpaulding needs if required.
3. Consider temporary change in Common Examday/times.
-
Prepared by Facilities - Campus Planning
22 Colovos Road, Durham, NH 03824-3515
Date:
Level
Scale:
Spaulding Hall 062
1
March 2, 2018
1" = 20'
CEMove to Kendall Hall
Loading Dock Field EquipmentSwing to Kendall Hall
Aquatic Core Swing ??
Aquatic Instructional Lab
Animal A&P Instructional LabProposed Swing to Barton Hall (Vet Tech)
GeneralInstructional Lab
Registrar ControlledLecture Hall
Research Labs Starting Summer 2021Spaulding Addition - 2nd floorRudman HallKendall - 4th and 5th floorsNesmith - 3rd floorMorse HallBarton Hall
Phase 2 Swing SpaceLevel 1
-
Prepared by Facilities - Campus Planning
22 Colovos Road, Durham, NH 03824-3515
Date:
Level
Scale:
Spaulding Hall 062
2
March 2, 2018
1" = 20'
Insectarium 1,960 ASFSwing to Putnam Hall
RO ClassroomRO Classroom
CE
Neuro Science Instructional LabSwing to Phase 1Cell Culture(needs to be shared)
General Instructional LabLow use; merge with existing lab
Ecology Instructional Lab Move to Phase 1 Lvl 1(laptop cart to allow for sharing)
Human A&P Instructional LabSwing to Phase 1 Vivarium
Human A&P Instructional LabSwing to Phase 1 Vivarium
Core LabServiceSwing to Phase 1 Vivarium
Instructional LabsStarting Summer 2021Bio Chemistry - room G11 to Phase 1 AdditionMed Lab Science - room G27 to Phase 1 AdditionAquatics - room 140 to existing COLSA labAnimal A&P - room 150 to Barton HallGeneral - room 160 to existing COLSA labEcology - room 201 to Phase 1 AdditionHuman A&P - room 205 to Phase 1 Addition (swing - Vivarium)Human A&P - room 231 to Phase 1 Addition (swing - Vivarium)General - room 218 to existing COLSA labNeuro Science - room A234 to Phase 1 Addition (swing - Cell Culture)
Phase 2 Swing SpaceLevel 2
Construction Maphttps://maps.unh.edu/Html5Viewer/Index.html?viewer=unhconstruction
Biological Sciences InitiativeSpaulding Hall
Skanska’s Sidewalk Superintendent provides an innovative way to keep project stakeholders informed of your project’s progress - updating them on construction progress and scheduled activities
Skanska’s Sidewalk Superintendent provides an innovative way to keep project stakeholders informed of your project’s progress - updating them on construction progress and scheduled activities
QUESTIONS ??
Biological Sciences InitiativeSpaulding Hall