Biomass gasifica+on The Piracicaba BioSynGas Project September 17, 2012 Dr. Fernando Landgraf CEO of IPT [email protected]
Transcript
Page 1: Biomass gasificaon The Piracicaba BioSynGas Project

Biomassgasifica+onThePiracicabaBioSynGasProjectSeptember17,[email protected]

Page 2: Biomass gasificaon The Piracicaba BioSynGas Project

  MarketcondiDons  Technologychoice  Economicviability  IPT’spilotplantproposal

2

Page 3: Biomass gasificaon The Piracicaba BioSynGas Project

Brazilenergyconsump+onperyear

106tonequivalentoil

Page 4: Biomass gasificaon The Piracicaba BioSynGas Project

FFVFlexFuelvehicules4

Page 5: Biomass gasificaon The Piracicaba BioSynGas Project

Today’sdifficul+eswithethanolprice

Page 6: Biomass gasificaon The Piracicaba BioSynGas Project

OilpriceevoluDon:ifpriceincreaseconDnues,ethanolstrives

6

Page 7: Biomass gasificaon The Piracicaba BioSynGas Project

Poten+alsugarcaneharvestgrowthgrowth

5%growthperyear

Year

SugarcaneharvestM

t/year

7

Page 8: Biomass gasificaon The Piracicaba BioSynGas Project

SugarcaneBiomasspowerpoten+alin2010

Pth=Mcane.Fbagasse+straw.LHV./8000h

$=(600Mt/year.0,20.17GJ/t.0,277MWh/GJ/8000h/year)=

=70GWth

InstaledcogeneraDoncapacityin2011:3GW

8

Page 9: Biomass gasificaon The Piracicaba BioSynGas Project

NewtechnologiesforabeHeruseofsugarcanebagasseandstraw

  Biochemicalroute  hydrolysis

  Thermochemicalroute  Improvementofboilerstechnology  GasificaDon

  Fluidizedbedtechnology  Entrainedflowtechnology

9

Page 10: Biomass gasificaon The Piracicaba BioSynGas Project

Gasifica+on

  Gasifica+onisaprocessthatconvertsorganicorfossilbasedcarbonaceousmaterialsintoagasmixtureofcarbonmonoxide,hydrogenandcarbondioxide,calledsynthesisgas,orsyngas.

  TheSyngascanbeusedtogenerateelectricalpower,liquidfuelsorchemicals.

10

Page 11: Biomass gasificaon The Piracicaba BioSynGas Project

Maingasifica+onconcepts

150kt/year 1500kt/year

Gasifierconceptsatdiferentscales

Choicedepends:

  Whichisthemostadequatescale

  Whichproductsaredesired

Page 12: Biomass gasificaon The Piracicaba BioSynGas Project

Scale

  AtypicalBraziliansugarcanemillharvests4Mt/yearofsugarcane.

  Eachtongives150kgofsugar,140kgofbagasseand60kgofavailablestraw.

  So,800ktofdrybiomass/yearisavailable.  Itispossibletoenvisionamillwhereallbiomassisgasifiedtoproducepowerandchemicalproducts.

  Forthisscale,EntrainedFlowGasificaDonisthebestsoluDon

12

Page 13: Biomass gasificaon The Piracicaba BioSynGas Project

CommercialGaseifica+onplant

13

Page 14: Biomass gasificaon The Piracicaba BioSynGas Project

Whychooseentrainedflowgasifica+on:  Largescalecommercialplantsforpetrochemicalwasteand

coalgasificaDonareinusetoday.  Qualityofgeneratedgases:lowtarandmethanelevelsdueto

highoperaDngtemperatures(greaterthan1300°C)andhighCOandH2levels.

  TheabilitytooperatewithliquidflowsorlowgranulometryparDculatematerials(bio‐oilandtorrifiedgroundedbiomass).

  Highpressuresandhighpower.  Theabilitytoremovemoltenashes

14

Page 15: Biomass gasificaon The Piracicaba BioSynGas Project

Poten+alforgasifica+onplantsthegreenfieldsofthe2020’s:

5%growthperyear

SugarcaneharvestM

t/year

Technologydevelopment15

Year

550Mtgrowthin10years140newmills

Page 16: Biomass gasificaon The Piracicaba BioSynGas Project

Presentsitua+onofBiomassgasifica+onintheworld

  Nocommercialplants  Severalpilotplantsandmanytechnologicalchallenges  LargeR&Dinvestments:Germany,USA,Sweden,  LargecoalgasificaDoncommercialplantsinChina(1Mtcoal/

year),SouthAfricaandUSA

ProjetoChemrec,Suécia ProjetoChoren,Alemanha ProjetoBioTfuel‐França

ComercialCarvão:China

16

Page 17: Biomass gasificaon The Piracicaba BioSynGas Project

17

Economicviability

Page 18: Biomass gasificaon The Piracicaba BioSynGas Project

Swansonetal(2010) Boerrigter(2006)

Biomass CornstoverWoodybiomassfromEuropeanforestchippedanddried

Pre‐treatment Grindinganddryingviasteam

TorrefacDonwithfixedcostof1,5Euro/GJ

Gascleaning Coldgascleaning;SWGS

RecDsol(CAPEX59MUS$2011)

Plantsize(MWth) 389 4.250

Method ASPENPlus&Icarus EngineeringanalogywithaGTLplant

Datafromliterature

18

Page 19: Biomass gasificaon The Piracicaba BioSynGas Project

InvestmentGasificaDonplantsize:800MT/year(100t/h)

19

Stages

Investment(MUS$2011)

Pretreatment 45GasificaDon 60GascleaningandcondiDoning 60

FischerTropschUnit 75

ASU(airseparaDonunit) 45

20MWElectricgeneraDonunit 65

OBL 340

total 690

Page 20: Biomass gasificaon The Piracicaba BioSynGas Project

Scenariosfor2020‐2030

scenario Bagassecost(US$/ton)

Discountrate

Dieselprice2020‐2030(US$/litro)

Op+mist 30 0,08 2,1probable 50 0,10 1,8Pessimist 70 0,12 1,5

20

Page 21: Biomass gasificaon The Piracicaba BioSynGas Project

647MWthgasifica+onplant800mtb/aFTFuelproducBon;Energyefficiency=55%

TCI(MUS$2010) NPV(MUS$) ROI

op+mist 549 786 286%

probable 689 334 114%

pessimist 917 ‐2 ‐1%TCI:TotalCapitalInvestment

21

Page 22: Biomass gasificaon The Piracicaba BioSynGas Project

BrazilianBiosyngasproject

  IPT(SãoPauloStateResearchInsDtute)iscoordinaDngaproposaltobuilda500kg/hbiomassgasificaDonpilotplantinPiracicaba(SP)

  ObjecDveistobeabletodefinetheConceptualDesignofa800kt/year(100t/h,470MWth)plantin2020,withCAPEXofUS500M

  5yearprojectbudgetisUS$40M.

  Threeindustrialpartners(Oxiteno,PetrobrasandVale)areinterestedindeveloping,outsidetheproject,thetechnologiesfromgastobiofuels,biochemicalsorElectricalEnergy.

Page 23: Biomass gasificaon The Piracicaba BioSynGas Project

PilotPlantgasifierspecifica+on

  2,5MWth,approx.500kgbiomass/hcapacity  “flex”:abletogasifypowderorbiooil  Oxygenblown  noheatrecovery  GascomposiDontargets:

  80%(CO+H2)  <0,5%CH4

  <1gtarr/Nm3

  <0,5%N2

23

Page 24: Biomass gasificaon The Piracicaba BioSynGas Project

GasificaDonBiomassProcess

Page 25: Biomass gasificaon The Piracicaba BioSynGas Project

Technicalchallenges

  Bagassedryingunitdesignchoice  BagassetorrefacDonunitdesignchoice  Gasifierdesignfor3%ashcontent  EarthseparaDonbeforegasifier,tolowerashsilicacontent

  Gascleaning

25

Page 26: Biomass gasificaon The Piracicaba BioSynGas Project

Projectstatus  3.5yearsofnegociaDonandplanning

  20workshopswithcompaniesandICTsforbusinessstructuring

  Partnersformallycommiued

  IPnegoDaDonscompleted

  Environmentallicencesgranted

  BNDESandFINEPapprovalinfinalstages

  SaoPauloStateresourcesavailable,tofundPlantBasicDesign

  Personnelhiringinprocess

  30researchersalreadyinvolved

Page 27: Biomass gasificaon The Piracicaba BioSynGas Project

Resultsfromthemodelingteam

Temperature streamlines

27

Page 28: Biomass gasificaon The Piracicaba BioSynGas Project

TimeChart.

2012 2013 2014 2015 2016 2017

Page 29: Biomass gasificaon The Piracicaba BioSynGas Project

Budget

Page 30: Biomass gasificaon The Piracicaba BioSynGas Project

Pilotplant:Piracicaba

EsalqCTC

Dedini

Cosan

Page 31: Biomass gasificaon The Piracicaba BioSynGas Project

PiracicabaIPTPlant–OldSugarCanePlantinESALQarea

Page 32: Biomass gasificaon The Piracicaba BioSynGas Project
Page 33: Biomass gasificaon The Piracicaba BioSynGas Project

Finalremarks

  GasificaDonisanimportantopDonforabeueruseofbagasseinthe2020’s,dependingonoilpriceevoluDon.

  EntrainedFlowgasificaDontechnologyisaviablealternaDve.

  Nocommercialtechnologyisavailable,soapilotplantisanecessarystep.

  TheteamwantstoincenDveBrazilianresearchgroupstojointheeffortandfacethescienDficchallengesthatlaybeforeus.

Page 34: Biomass gasificaon The Piracicaba BioSynGas Project

Partners