Welcome!
Biosolids Strategy
& Wastewater
Treatment Master Plan
Public Consultation Event Fall 2017
December 5th: Region of Waterloo Museum, 5PM - 7:30PM December 7th: Waterloo Memorial Recreational Complex, 5PM - 7:30PM
December 14th: Cambridge City Hall, 5PM - 7:30PM
www.regionofwaterloo.ca/biosolids
Help the Region of Waterloo
develop its Biosolids Strategy
and Wastewater
Treatment Master Plan
Tonight’s Agenda
What’s Happening Tonight?
Open House
• Have a look at the project information on display and chat with the Project Team
• Review what we do with wastewater and biosolids today • Provide input on the evaluation of the short-listed alternatives • Review how the recommendations in both studies will be developed and implemented
Work will be completed to meet the requirements of the Environmental Assessment Act as outlined by the Municipal Engineers Association Municipal Class Environmental Assessment (Oct 2000, as amended in 2007, 2011 and 2015) process.
WASTEWATER TREATMENT
MASTER PLAN UPDATE
J
o
C
yAA
Township of WELLESLEY
Township of WILMOT
Township of WOOLWICH
Township of NORTH DUMFRIES
City of WATERLOO
City of KITCHENER City of
CAMBRIDGEHWY
24
IA
UU
E
S
o
ToToToToToToToToToToToToToTToT wnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnshshshshshshshshshshshshshsh ooooooooooooooffToToToToWIWIWIWIWIWIWIWIWIWWIWIWIWIWIWIWIWIWIWIWWW LMLMLMLMLMLMLMLMMLMLMLMLMLMLMLMLMLMLMMLMLMLMMLMO
UR
shshshshshshshshshshshshshshipipipipipipipipipipipipipipip oooooooooooooof ff f fffffffffhippipipipiipipipppp
CiTETE
KKI
Citytytytytytytytytytytytytytyyty oooooooooooooofffffffffffffffooooooooofffKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIK TCTCTCTCTCTCTCTCTCTCCTCTCTCTCTCTCTCTCKITTTTTTTTTTTTTTI
A
y ooofCiCiC fCiCiCiiAAAAAMBMM EEEEEEEEEEEEEEEEERAAAAA
HWY
7
HWY
7
HWY
85
HWY
85
HWY
86
HWY
8
HWY
8
HWY
401
HWY
8
DORKINGRKIN
LINWOODWOO
KINGWOODKI
ST. CLEMENTSNTS
LISBBONNNN
WELLESLEY BRESLAUREEE
REGION OF WATERLOO INTERNATIONAL AIRPORT
STREETST REESTREETT EE
G SG S
VICTOR
IICCTO
RI STR
EETTREE
T TT
REETET
RIA STR
RIA STRTT
NEW HAMBHEW HAM MBBUUUUU
ROSEVILLEOSEVILEE E
AYRAAYRAA AYR
CLYDEC
HAYSVILLEVILHAHAHAYSVV
EIMMANNHEMANNH HEIMHHHEHHHEIH
EENEW DUNDEEW
GPETERSBURGRRSBS
ST. AGATHAST. AGAGAG
BAMBERGMBERG
FLORADALER
ELMIRAELMIR
ST. JACOBSJST. JACOBSA
INGDALEBLOOMIOO INIOM
MARYHILLRYHILL
CHTONBRANCHTONCHTONH
HAWKESVILLEToToToToToToToToToToToToTTToTTT wnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnww shshshshshshshshshshshshshhshh ipipipipipipipipipipipipipipipip ooooooooooooooffffffffffffffffffoooooooooooowwwww WEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWWEE LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL ESESESESESESESESESESESESESESESESESEESE SESE LELELELELELELELELELELELELELELELELELELELELE EE YYYYYYYYYYYYYYYYYYYYYYYWWWWWWWWWWWWWWWWWW
CROSSHILLSSSHILLS
HTownship of WELLESLEY
TTT ww n hh ipipipipipipipipipipipipipipi p ffffffffffffffffppppppp oooooooooooooo ffffffffffffffffffffffffffToToTooToToToToTToToToTooToToToTTTT nnwnnwnwnwnwnwnwnwwnnww shhhhhhhhhhhhhiTTToT WW OTOTOTOTOTOTOTOTOTOOTOTOTOTOTOTOTOTOTTTOOTWIWWIWIWWWWWWWIWIWWIWWIWIWWWW MMLMMMLMLMLMMLMLMMMLMMLMMLMMMMMMOOOOOOOOOWIWIWIWWWWWWWIWWWWWWWWWWWWWWWWW
GURURRGGGGGURGG
PETERPETERPE SBURSBSBSSSETERPETPE Township of
WILMOT
ToToToToToToToToToToToToToToTTTT wnwnwnwnwnwnwnwwnwnwnwnwnwnwnwnww hhi fffwwwwwwwwwww i oooooooooooofffffffffffppppppppppppphhhhhhhhhhhhhh ipiipipippipipipipiippp WOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWWOWWW OLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOO WIWIWIWIWIWIWIWIWIWWIWIWIWIWIWIWIWWIWWWWWW CHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHHCHHHOOOOOOOOOOOOO IIIIIIIICCCCCCCCCOLOLOLLOLOLOLOLOLOLLOLOLLOLOLOLOLLLL WWWWWWWWWWWW Township of
WOOLWICH
ToToToToToToToToToToToToTTTTToToownwnwnwnwnwnwnwnwnwnwnwnnwnwnwnww shshshshshshshshshshshshshhhsh ipipipipipipipipipipipipipipipip oooooooooooooffffffffffffffffffToToTToTTToTToToToToT wwwwwwwwwwwww NONONONONONONONONONONONONONONONONONONNNN O ON N ORTRTRRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTTRTRTR HHHHHHHHHHHHHHHHHHHHHH DUDUDUDUDUDUDUDUDUDUDUDUDUDDUDUDUDUDUDUD DUDU MFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMMFM RIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRRRIESESESSESESESESESESESESESESESESESESESEEE SFRRRRRRRRRRRRRHHHHHHHHHHHHHHHH
Township of NORTH DUMFRIES
CiCiCiCiCiCiCiCiCiCiCiCiCiiitytytytytytytytytytytytytytytytyyy oooooooooooooo ffffffffffffffffftttttttttttttttCiCiCiCiCCiCiiCCC WAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWA TETETETETETETETETETETETETETETETETETETETEE RLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRRLR OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOWWWWWWWWWWWWWWWWWWWWW EEEEEEEEEEEEEE LLLLLLLLLLLLLLLOOOOLLLLLLLLLLLOOOOOOOLLLLLLTETETETETETEETETTETETETETEEEEE OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO OOOOOOOOOOOOOOOO
KKKINKINKINGKKINNNGKKKKINNNG
City of WATERLOO
CiCiCiCiCiCiCiCiCiCiCiCiCii yyy fffiCiCiCiiCiiiitytytytytytytytytyyyyyyyy oooooffffffffffffyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy oooooooffffffooooooooo I TT C HEHEHEHEHEHEHHEHEHEHEHEHEHEHEHEHEHEHEHEEHE NENENENENENENENENENENENENENNENENENENENENNENENENEN RRRRRRRRRRRRRRRRRRRRRKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKKITTKIKIKKIKIKIKIKIKIKIKIKKIKIIKKKK IIIIIKIIKIIII TCTCTCTCCTCTTTCCTCTCCCTCTCHHHHHHHHHHHHHHIIIIII EEEEEEEEEEEENNNNNNNNNNNNN EEEERRRRRRRRRRRRRRRRRNENEEENEEEEEEEEEEERRRRRRRRRRRRRTTTTTTTTTTTTTTTTTTTTT
AAA
City of KITCHENER CiCiCiCiCiCiCiCiCiCiCiCiCiCCiitytytytytytytytytytytytytytytyyy oooooooooofffffffffffffffCiCiCiCiCiCiCiCiCiCitytytytytytyyytytyytyttytyyy oooooooooooo fffffffffffffffyyyyyyyyyyyyyyyyyyy fffffffffCiCCCCCiCiCCCCCCCCCCCCC CiCiCiCiCiCiCiCiCi tytytytytytytytytytytytytytyy oooooooooooo offffffffffffffffyyyyyyyyyCiCiCiCiCiCiiiCiit
CACACACACACACACACACACACACACACACACACA A MBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMMBRIRIRIRIRIRIRIRIRIRIRIRIRRIRIRIRIRIRIRIRR DGDGDGDGDGDGDGDGDGDGDGDGDDGDGDGDGDGGDD GDGE EECCCCCCCCCCCCCCCCCCC BBBBBBBBBBBBBBRRRRRR DDDDDDDDDDDDDDD EEEEEEEEEEEEEEEEEEEAAAAAAAAAAAAMBMBMBMBMMMBMBMBMBMBMBMBMBMBMBMBMMMBMM RRRRRRRRRRBBBBBBBACAACACAAAAAAAAAAAAAAA AAAAAAAAAAAAAAA MMMCACACACACACACACACACACACACACAACACACAC C MMMMMMMMMMMMMMMMMMMMAACACAAACACACACACAACACCCCCCCCCCC HWY
24
City of CAMBRIDGE
6
12 11
2
4
3
1
8
5
9
10
7
13
LARGE TREATMENT PLANTS Processing Capacity > 50 Million Litres/day
1.
2.
3.
Kitchener
Waterloo
Galt
• 3 Cities
• 4 Townships
• Population serviced 535,000...and growing!
MID-SIZED TREATMENT PLANTS Processing Capacity 5 to 20 Million Litres/day
4.
5.
6.
7.
Preston
Hespeler
Elmira
New Hamburg
Ayr Heidelberg
St. Jacobs 12. Conestogo
10. Wellesley 13. Foxboro Green
SMALL TREATMENT PLANTS Processing Capacity < 5 Million Litres/day
8.
9.
11.
$ • 13 treatment plants • 10 Year Capital Budget
(2017-2026) of $618• 6 pump stations million
• 2 Regional collection • Annual wastewatersystems treatment operating budget of $25.6 million
• 5 receiving streams
• Targets for higher quality treated wastewater
Wastewater Treatment in Waterloo Region Today
1
*
Growth We are planning for the growth in Waterloo Region to the year 2051. Many treatment plants will need extra capacity to treat the additional wastewater.
Future Wastewater Flows in the Region Additional capacity is required for the Waterloo, St Jacobs, Elmira, Hespeler, and Wellesley plants before 2051.
Level of Treatment Needs The Region is committed to improving the water quality of the rivers that it discharges to.
Higher levels of treatment are expected to be required for the Waterloo, Preston, Hespeler, St Jacobs, Elmira and Wellesley plants before 2051.
Sustainability and Innovation The Region wants to be leaders in using innovative technologies to improve the sustainability of its wastewater treatment plants. New technologies can help with:
GREENHOUSE ENERGY REDUCING IMPROVING GAS EMISSION EFFICIENCY BIOSOLIDS LEVEL OF REDUCTIONS PRODUCTION TREATMENT
210
Why Are We Updating the Wastewater Treatment Master Plan?
Collect data, review existing conditions, and GHYHORS�ȵRZ�SURMHFWLRQV�IRU�IXWXUH�WUHDWPHQW� needs.
Develop a decision making framework, and a long list of wastewater treatment alternatives.
Identify and short-list alternatives that would work at each treatment plant based on contraints and opportunities for that plant.
Evaluate the short-listed strategies using detailed evaluation criteria to determine preferred alternatives for each treatment plant.
5HȴQH�WKH�SUHIHUUHG�DOWHUQDWLYHV�UHVXOWLQJ�IURP�WKH�GHWDLOHG� evaluation, and develop triggers for implementation.
2016
Needs & Opportunities
Long List of Treatment Alternatives
Short List of Treatment Alternatives
Preferred Alternatives
Master Plan
Detailed Evaluation Criteria
2017
2018
WE ARE
HER
E
Region of 5HJLRQ�RI�:DWHUORR�&RXQFLOO�ZLOO�PDNH�WKH�ȴQDO�GHFLVLRQ�WR� Waterloo Council adopt the strategy at the end of the process. Once adopted,
there will be a 30-day review period for public comment. for Approval
Roadmap to the Wastewater
Treatment Master Plan
3
Innovation
Growth
Regulatory Changes
II nn nn oovvaattiioonn
Addressing these aligns with the Region’s 2015-2018 Strategic Plan.
Here are a few of the considerations for updating the Region’s Wastewater Treatment Master Plan.
Waterloo Region is expected to grow VLJQLȴFDQWO\�LQ�WKH� years ahead. This means additional wastewater to be
treated.
En
vir
on
mental & Social Constrain
ts
Optimization Updates to
regulations can dictate how
wastewater must be treated to meet Provincial and
Federal standards.
Increasing Costs
$$The Region should consider feasible new technologies that
present opportunities for innovation.
Environmental and social constraints
must be considered, including protection of receiving waters, climate change, HQHUJ\�HɝFLHQF\�� greenhouse gas reductions, and
potential impacts on the community.
The Region has invested in existing infrastructure and optimizing this infrastructure is
critical in maintaining FRVW�HHFWLYH� treatment.
As the costs associated with wastewater treatment will
continue to rise, it is important to consider the best value to the
Region.
4
Important Considerations for the
Wastewater Treatment Master Plan
How Were Alternatives Evaluated?
7HFKQLFDO
• Compatibility with existing Regional infrastructure
• Reliability to treat wastewater
• Innovative technologies to enhance the level of treatment and reduce greenhouse gas emissions
/HJDO�DQG�-XULVGLFWLRQDO
• Approval requirements and risk to implement
• Land acquisition requirements
(QYLURQPHQWDO
• (QYLURQPHQWDO�HHFWV�RI�WKH� facility
• Climate change impacts (extreme high and low temperatures and weather events)
• Protection of natural features (woodlots, wetlands, vegetation and natural habitats) and the Region’s surface water and ground water resources
)LQDQFLDO
• Relative life cycle cost
• (FRQRPLF�EHQHȴW
• Cost impact on rates
Identify advantages and disadvantages
Assign a score
Determine best overall options
5
6RFLDO
• Community impacts (odour, QRLVH��WUXFN�WUDɝF��DQG� relative health risks posed to the public
• Accommodate future population growth
• Impacts to cultural or archaeological heritage features and First Nations Communities
*URZWK /HYHO�RI�7UHDWPHQW Alternatives that can provide additional wastewater treatment Alternatives that improve the quality of the water capacity to service Waterloo Region’s growing population. discharged to the river. An important consideration for the
level of treatment is removal of phosphorus.
7UHDWPHQW�DW�3ODQW�IRU�([SDQVLRQ�ZLWK�([LVWLQJ� 2SWLPL]DWLRQ�5H�5DWLQJ % 3KRVSKRUXV�5HPRYDO�A 7HFKQRORJ\�A ΖQVWDOO�ȴOWHUV�RU�HTXLYDOHQW�WHFKQRORJ\�Make changes to the way the plant at plant to remove phosphorus prior tois run to get a small amount of extraThe plants can be expanded using the discharge to River.capacity.same technologies currently in use.
3KRVSKRUXV�7UDGLQJ�%
Improve treatment at one plant that KDV�ȴOWHUV�WR�ORZHU�RYHUDOO�SKRVSKRUXV� to river.
'LYHUVLRQ�A ([SDQVLRQ�ZLWK�1HZ� 7HFKQRORJ\�A
Send wastewater from one plant to another that has capacity. Innovative new technologies can be
used to provide additional capacity. 3KRVSKRUXV�2�6HWWLQJ��%
Remove phosphorus from agricultural or other non-wastewater sources to ȊR�VHWȋ�SKRVSKRUXV�IURP�SODQW��
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
6
What Alternatives Were Evaluated?
E
EE
w
MAA
JJ
y ooyyy
ST REESTREETSTREETT EE
G SG S
VICTOR
IICCTO
RI STR
EETT TREE TTREETET
IARIA S
RIA STRTRTT
IN KKINKING KKKI NNN KKKKKINKINKINNNGNG
AA A A
Elmira WWTP Waterloo WWTP(Before 2030)
(Before 2030)
St Jacobs WWTP (Before 2030)
A Expansion A Optimize with new existing tertiary A Expansion with A New tertiary technology treatment new technology treatment process
A Expansion A Optimize B Opportunity forwith new existing tertiary Optimizationtechnology treatment Re-Rating
DORKINGRKIN
B Opportunity B Opportunity for 3KRVSKRUXV�R� FLORADALER
for Optimization Re-Rating setting with other
sources ELMIRAELMIREE HWY
86
TTTTToToToToToToToToToToToToToTownwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnww h ipip ffwwwwwwwwwwwww h oooooooooooooooooooooooooo ffffffffffffffffffffffffffffppppppppppppphhhhhhhhshshshshshshshshshshshshshshshshshshhhh iipipipipipipipipipipipipipipipipipipipipipipipipipipipipipiipppppppppTTownship ofownship of Hespeler WWTP
TTTTTTTTTTTTTTTT666 LINWOODWOO WW OW O IWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWWWWW I CHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCHC HHHHOOOOOOOOOOO IIIIIICCCCCCCCLLLLLLOLL WWWWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOWOOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLOLWICHWICH (Before 2040)WWWWWWWWWWWWWWWWWWWWWWWWWWWWW
HWY
85
ST. JACOBSJS
MARYHILLRYHILL
HAWKESVILLETTToToToToToToToToToToToToToToTT wwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnww shshshshshshshshshshshshshhhsh ipipipipipipipipipipipipipipipip oooooooooooooo ffffffffffffffffoooooooooooowwwww WEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEWEW LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL L ESESESESESESESESESESESESESESESESESESE SSEE LELELELELELELELELELELELELELELELELELELEEEL E YYYYYYYYYYYYYYYYYYYYYYYWWWWWWWWWWWWWWWWWWWWWW
CROSSHILLSSSHILLS
HTTownship ofownship of WELLESLEYWELLESLEY 12
11 A Expansion with new technology
A Optimize existing phosphorus1111111111111
1221112211111112 ST. JST. JACOBSACOBSA
99995 6
ST. CLEMENTSNTS removal process KINGWOODKI BLOO MINGDALEOOO INIOOMOOMOM
HWY
85
HWY
WELLESLEY BRESLAUREEEBAMBERGMBERG
CiC i ytytytytytytytytytytytytytytyyy oooooooooooooo ffffffffffffffffffttttttttttttCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiiCCCCity ofCity of 11111
222222 10111011000 WAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAATETETETETETETETETETETETETETETETETETETETETETETETETETETETETETETETETETETEEEEEEERLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLRLLLLLLLLLLLLLLLLLLLLLLLLLOOOOOOOOOOOOOOOO1 WWWWWWWWWWWWWWWWWWWWWWAATERLTERLOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOTTEEEEEEEEEEEEEEERRLLLLOOLLLLLLOOOOOOOOOOOOOOOOOOOOOOOOOOOOO11110 7
LISBBONNNNNN HWY
7 REGION OF WATERLOO INTERNATIONAL AIRPORTRT
ooooooooooooooooooooooooooooooooooooooooooffffffffffffffffffffffffffffffffffffffffff 5555555HWY
ST. AGATHAST. AGAGAGWellesley WWTP CCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiiiiiiittytytytytytytytytytytytytytytytytytytytytytytyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyCity ofCity ofC13111113331117 KIKKKKKKKKKKIKIKKKKIKIIIIIIIIIIIIIIIITTTTTTTTTTTIITTTTTTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTCTCTCTCTCTCCCCCCCCCCHEHEHEHEHEHEHEHEHEHEHEHEHEHEHEHEHEHEHEHHHHHHHHHHHHEEEEEENNNNNNENENENENENENENENENENENENENENENENENENENENENENENEEEEEEEEEEEEEEEEEEEEERRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRR
8
KITKITCHENERCHENERKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIKIIT HHEEEEEEEEEENNNNNNNNNNNNNNNN R CiCity ofCity ofCCCiiiiiitytytytytytytytytytytytyiiitttyyyyyyyyyyyyyyyyyyyyy ooooooooffffffffffCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCCCCCCCCCCCCCCCCCCCCCiCCCCCCCCCCCCCCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiCiiiiiiiiiitytytytytytytytytytytytytttttytttytytytytytytytytytyttytytytytytytytytytytytytytytytytttyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooofffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff(Before 2040) SBURGGRSSBSSSSBPETERPETERPETERSBURSBS HWYETERPET 8
TToToToToToToToToToToToTToToTTTToToToToToToToToToToToToToToTToToTownwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnw shshshshshshshshshshshshsh p fffffffffTTTTTTTTTTTTTTTTTToToToToToToownship ofownship ofTowwwnnnshshhhhhhhhhhhhhhiipipipipipipipipipipipipipipip ooooooooooooooppppppp ooooooooooooofffffffffffffffffffffffffffffff CAMBRIDCAMBRIDGEGECCCAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAMMMMMMMMMMMMMMMMMBBBRRRID EEEEEEEEEEEEEEDDDDDDDDDD EEEEEEEEEEEEEEEEECACACACACACACACACACACACACACACACACA B ECCCCCCCCCCCCCCCCCCCACACACACACACACACACACACACACACACACACACACACACACACACCCCCCCCCACACACACAAAAAAAAAAAAAAAAMMMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMMBMMMMMMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMBMMBBBBBBBBBBBBBBBBBBBBRRRRRRRRRRRRRRRRRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRRIRRIDGDGDGDGDGDGDGDGDGDGDGDGDGDGDGDGDGDGDDD EEEEEEE111111MANNHEHEHHEEIMMANNHHHHHHEIEIMWILMOWILMOTTWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWIWWWIIILMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMLMOOTTTLLWWWW LMMOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOOOOOOOOOOWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW MMMMMMMMMMMMMMMMMMM TT 444444 HWYHWY 44 242444 CLYD4 C
A Expansion with new technology
A Optimize existing tertiary treatment
W HAAMBHNEWEW HAM B UU
HAYSVILLEVIL
URGGMBMBBUUUUUUUUUUUU
VIHHAHAAYHAYHAYHAYHAYHAYHAYSHAYSHAYSVHAYSVH V
RRGGGGGGGURURURURURURURURURRRRGGGGGGGGGGGG
77773 NEW DUNDEEEEW
ROSEVILLEOSEVILEE E OUR
LOCATION
HWY
401
33333333333 2 HWY
8
B Opportunity for 3KRVSKRUXV�R�
TODAY TTT wnwnwnwnwnwnwnwnwnwnwnwnwnwnwnwnww shshshshshshshshshshshshshhhshipipipipipipipipipipipipipippp oooooooooooooo ffffffffffffffffffToToToToToToToToToToToToToToToToToToToToTTTToTTTTToT wwwwwwwwwwwww NONONONONONONONONONONONONONONONONONONONONNNN O ON TTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTRTR HHHHHHHHHHHHHHHHHHHHHH DUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDDD MFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFF R RIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRIRRI SEEEESESESESESESESESESESESESESESESESESEE SEF RRRRRRRRRRRRRHHHHHHHHHHHHHHHHHH
TTownship ofownship of NORNORTH DUMFRIESTH DUMFRIES
setting with other BRANCHTONCHTONCHTONH NNN sources
AYRAAYRAYRAAAAYRYR
8884 Preston WWTP (Before 2030)
1. Kitchener WWTPNote: 2. Galt WWTP No growth A Optimize existing$OO� WUHDWPHQW� SODQWV� LGHQWLȴHG� ZLWK� JUHHQ� phosphorus3. New Hamburg WWTP upgrades requireddots do not require any upgrades within the removal process4. Ayr WWTPplanning period.
5. Heidelberg WWTP These include: 6. Conestogo WWTP
7. Foxboro Green WWTP
A - Industry accepted approaches for expansion and upgrades
%���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
7
Preferred Wastewater Treatment Alternatives For Growth and Level of Treatment
Waterloo Wastewater Treatment Plant Preferred Strategy
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
*URZWK /HYHO�RI� 7UHDWPHQW
$���([SDQVLRQ�ZLWK�1HZ�7HFKQRORJ\
• Uses innovative technology
• Smaller footprint provides space for future needs
• Provides energy savings and greenhouse gas reductions
• More rigorous approvals
Estimated Capital Cost: $30 Million
%�Ȃ�2SSRUWXQLW\�IRU�2SWLPL]DWLRQ�5H�5DWLQJ
• Lowest cost alternative
• Makes good use of existing infrastructure
• 5HTXLUHV�WHVWLQJ�DQG�IXUWKHU�FRQVXOWDWLRQ�WR�FRQȴUP
Estimated Capital Cost: $1 Million
$�Ȃ�1HZ�7HUWLDU\�7UHDWPHQW�3URFHVV • Reliability in meeting level of treatment needed
• Protects water quality at the downstream Mannheim Water Treatment Plant intake
• Higher capital cost
Estimated Capital Cost: $30 Million
8
Preston Wastewater Treatment Plant Preferred Strategy
*URZWK /HYHO�RI� 7UHDWPHQW
1R�*URZWK�8SJUDGHV�5HTXLUHG $�Ȃ�2SWLPL]H�([LVWLQJ�6HFRQGDU\�7UHDWPHQW�3URFHVV • Reliability in meeting level of treatment needed
• Optimizes and utilizes existing infrastructure
• Lowest capital cost
No Capital Cost (Optimization Uses Existing Infrastructure)
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
9
Hespeler Wastewater Treatment Plant Preferred Strategy
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
*URZWK /HYHO�RI� 7UHDWPHQW
$���([SDQVLRQ�ZLWK�1HZ�7HFKQRORJ\
• Uses innovative technology
• Smaller footprint provides space for future needs
• Provides energy savings and greenhouse gas reductions
• More rigorous approvals
Estimated Capital Cost: $20 Million
$�Ȃ�2SWLPL]H�([LVWLQJ�6HFRQGDU\�7UHDWPHQW�3URFHVV • Reliability in meeting level of treatment needed
• Optimizes and utilizes existing infrastructure
• Lowest capital cost
• 7UHDWPHQW�WR�UHPRYH�DPPRQLD��UHIHUUHG�WR�DV�QLWULȴFDWLRQ��ZLOO�EH� included in the expansion with new technology to accommodate growth
No Capital Cost (Optimization Uses Existing Infrastructure)
10
Wellesley Wastewater Treatment Plant Preferred Strategy
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
*URZWK /HYHO�RI� 7UHDWPHQW
$���([SDQVLRQ�ZLWK�1HZ�7HFKQRORJ\
• Uses innovative technology
• Smaller footprint provides space for future needs
• Provides energy savings and greenhouse gas reductions
• More rigorous approvals
Estimated Capital Cost: $6 Million
$�Ȃ�([SDQG�([LVWLQJ�7HUWLDU\�7UHDWPHQW�3URFHVV • Reliability in meeting level of treatment needed
• Expansion of existing infrastructure
• Higher capital cost
Estimated Capital Cost: $2 Million
%�Ȃ��2SSRUWXQLW\�IRU�3KRVSKRUXV�2�6HWWLQJ
• Lowest cost alternative
• Innovative method to achieve overall watershed improvements
• More rigorous approvals
Estimated Capital Cost: $100,000
11
St Jacobs Wastewater Treatment Plant Preferred Strategy
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
*URZWK /HYHO�RI� 7UHDWPHQW
$���([SDQVLRQ�ZLWK�&RQYHQWLRQDO�7HFKQRORJ\� • Well understood treatment technology
• Utilizes existing infrastructure with some upgraded components
• Higher capital cost
Estimated Capital Cost: $9 Million
%��2SSRUWXQLW\�IRU�2SWLPL]DWLRQ�5H�5DWLQJ
• Lowest cost alternative
• Makes good use of existing infrastructure
• 5HTXLUHV�WHVWLQJ�DQG�IXUWKHU�FRQVXOWDWLRQ�WR�FRQȴUP
Estimated Capital Cost: $2 Million
$�Ȃ�([SDQG�([LVWLQJ�7HUWLDU\�7UHDWPHQW�3URFHVV • Reliability in meeting level of treatment needed
• Expansion of existing infrastructure
• Higher capital cost
Estimated Capital Cost: $3 Million
%�Ȃ��2SSRUWXQLW\�IRU�3KRVSKRUXV�2�6HWWLQJ
• Lowest cost alternative
• Innovative method to achieve overall watershed improvements
• More rigorous approvals
Estimated Capital Cost: $100,000
12
Elmira Wastewater Treatment Plant Preferred Strategy
$���ΖQGXVWU\�DFFHSWHG�DSSURDFKHV�IRU�H[SDQVLRQ�DQG�XSJUDGHV %���2SSRUWXQLWLHV�IRU�QHZ�DSSURDFKHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP
*URZWK /HYHO�RI� 7UHDWPHQW
$���([SDQVLRQ�ZLWK�1HZ�7HFKQRORJ\
• Uses innovative technology
• Smaller footprint provides space for future needs
• Provides energy savings and greenhouse gas reductions
• More rigorous approvals
Estimated Capital Cost: $15 Million
$�Ȃ�([SDQG�([LVWLQJ�7HUWLDU\�7UHDWPHQW�3URFHVV • Reliability in meeting level of treatment needed
• Expansion of existing infrastructure
• Slightly larger footprint requirements
Estimated Capital Cost: $3 Million
13
A
A
A B
A
A
B
A
A
The Region is also Looking into Many Options for Sustainability and Innovation
ΖQQRYDWLYH�WHFKQRORJLHV�FDQ�SURYLGH�PDQ\�EHQHȴWV
Greenhouse Gas Reduction
Upgrade automation to better control process
&KDQJH�SURFHVV�FRQȴJXUDWLRQ�WR�XVH� less energy and reduce greenhouse gas emissions
Reducing Biosolids Production
&KDQJH�SURFHVV�FRQȴJXUDWLRQ�
Add innovative treatment steps to further reduce biosolids and pathogens
(QHUJ\�(ɝFLHQF\�
Reduced aeration energy through automation upgrades
0RGLI\�SURFHVV�FRQȴJXUDWLRQ�WR�LPSURYH� treatment
Import oil and grease to increase gas production
Improving Level of Treatment
Automation upgrades to improve how wastewater treatment is controlled
Changes to chemical dosing amounts and locations
A - Short-term opportunities for implementation
%���/RQJ�WHUP�RSSRUWXQLWLHV�WKDW�UHTXLUH�IXUWKHU�VWXGLHV�RU�FRQVXOWDWLRQ�WR�FRQȴUP�EHQHȴWV
14
12
Next Steps
Upcoming Schedule WINTER 2018 • Finalize the Preferred Wastewater Treatment Strategy for all Regional wastewater treatment facilities
• Presentation of the Draft Wastewater Treatment Master Plan to Region Council
• 30-Day Public review period for the Draft Master Plan document
How You Can Help... Give us your feedback on the project objectives, evaluation criteria, and strategy DOWHUQDWLYHV��WR�KHOS�XV�DV�ZH�ȴQDOL]H�WKH�SODQ�
15
??? Ask questions today
Fill out the comment sheet and leave it here today or send it back to the contact below
Sign up for our contact list
Visit www.regionofwaterloo.ca/wastewater
And if you have questions or comments below, please do not hesitate to contact:
NICOLE SAPETA, P.Eng. Tel: 519-575-4757 ext. 3682Project Engineer Fax: 519-575-4452Water Services – The Regional Municipality of Waterloo TTY: 519-575-4608150 Frederick Street,7th Floor Email: [email protected], ON N2G 4J3