Optimal loading the systems for resource consumption in case of multiproduct and multipurpose batch chemical plants (theoretical aspects and software realization). B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences - PowerPoint PPT Presentation
Popular Tags:
20
B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences ul. Acad. G.Bonchev, 103, Sofia 1113 Fax: +(359)(2) 8-70-75-23 e-mail: [email protected] Optimal loading the systems for resource consumption in case of multiproduct and multipurpose batch chemical plants (theoretical aspects and software realization)
Transcript
Page 1: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

B.Ivanov, K.MintchevInstitute of Chemical engineering- Bulgarian academy of sciences

ul. Acad. G.Bonchev, 103, Sofia 1113Fax: +(359)(2) 8-70-75-23e-mail: [email protected]

Optimal loading the systems for resource consumption in case of multiproduct and multipurpose batch chemical plants

(theoretical aspects and software realization)

Page 2: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

The offered software package is created on the base of original author’s methods published in international journals. Its present version uses MATLAB 6.5 and is adopted for WINDOWS-XP.

1

The software package ECAM solves two main problems:

1.Control problem - for a group of compatible batch products

2.Simulation problem - for such of product group aiming to determine load parameters of resources supply systems.

Page 3: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

ECAM could be used for investigation of different manufacturing states and as well as for evaluation the affect of energy integration processes on the resources supply systems. Thus, the technology changes could be properly assessed that provides opportunities for creation of proper production schedules ensuring optimal load of resources supply systems.

2

Page 4: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Main principles during the build up of ECAM

• The menus principle is used • The principle of choices the data is used so

that the human mistakes be reduced. • Logical control about correctness the data• The results are visualized• All functions consist of subsidiary information

ECAM working under Windows’XP area• “Matlab 6.50” is used to build up the product

7

Page 5: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Exit programme

Help InformationAbout authors

RUN PROGRAMME

6

After activating (push the button ) the necessary information

(data base) is charged in the operative memory (RAM).

ECAM is started.

Information about authors and description of the theoretical base in which ECAM is made of.

Information gives a detailing account about different task classes and objects in which ECAM can be used.

Page 6: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

INPUT DATA BATCH PLANTSINPUT DATA TECHNOLOGY

INPUT DATA CAMPAIGNOPTIMAL

SHEDULINGVIZUALIZATION OF SHEDULING

PRINT SHEDULING

Module for creation a date base for a production system.

It ensures a proper description of the existing plant units and connection between themModule for creation a date base for technologies.

It ensures description of different technologies available

For processing in the plant.Module for automatically generation or customization of production campaign (group of compatible products) available to fulfill a given production demands.

Module for formulation of different classes controlling problems.

It involves definition of criteria for optimal control and set of constraints.Module for graphical interface for visualization the results obtained under optimal scheduling of campaign.

Module for formulation of different classes controlling problems.

It involves definition of criteria for optimal control and set of constraints.

7

Page 7: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

8

Data for the apparatus and connection between each other in material flow.

Charging the data base about existing apparatus and connection between them.

1.Short name of plant.2.Full name of plant.3.Number of apparatus in Data Base.Visualization of apparatus which include:

-short name of apparatus;-image of apparatus;-basic characterizations;-image of type apparatus;Creation the new connect or imaging of

the existing connects between apparatus.

Rule buttons:-add new apparatus;-delete the apparatus;-edit data base of current apparatus;-save data base of current apparatus;-exit form this module;-help.

Page 8: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

9

Data technology.

Buttons which charge data base of chosen technology:-number of stages;-obtainable profit for unit product.Description the data for each stage of

technology:-name of stages;-time of stage;-size factor;-type of apparatus.

Information about resources:-quantity of each resourcerequired to one unit final product;-apportionment of resources in time;-consumption quantity for the stage.

Rule buttons:-add new apparatus;-delete the apparatus;-edit data base ;-save data base ;-exit form this module;-help.

Page 9: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

10

Rule module for synthesis tasks of production variants and campaign.

Generation of given technology.Calculating available disposing in a given technology and parameters which are consist of:-Minimum batch size;-Maximum batch size;-Cycle time;-Minimum available manufacturing quantity;-Maximum available manufacturing quantity;

Manuel generation campaign;Design of manufacturing campaigns which a determinate group of manufacture.The program gives possibility to define the stages of each apparatus on given manufacture.After successful defining of all stages and manufactures the next step is to calculate evaluation of each variant which are included in given campaign.

Automatically generation campaign maximum lengthDefine the available manufacturing campaign , each one consist of :-maximal number manufactures which the manufacture program is made of.For obtainable manufacture campaign evaluate are given and also the variants of every manufacture which are included in relevant campaign.

Automatically generation sets full campaign Define maximal number of campaign in case that the manufacture are given.For each variant of manufacture campaign variant which are consist of are given.

Page 10: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

11

Define the variants of disposing of given technology

Lead in the data base of technology: -Short name of technology;-Full name of technology;-Number of stages.

Lead in the data base about planning horizon.

Lead in the data base about production demand: -Minimum demand of product;-Normal demand of product;-Maximum demand of product;

Lead in the data base about work regime:-Whit overlapping the cycle;-Without overlapping the cycle.

Define the variants in case of given data base.

Rule buttons:-delete the technology;-edit data technology ;-save technology to data base ;-exit form this module;-print variant;-help.

List of apparatus which are disposing on every stage of technology of considering variant.That also include information about:-Maximum batch size;-Minimum batch size;-Cycle time;

-Maximal and minimum product demand.

Page 11: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

12

Design the manufacturing campaign from the customer.

Read the campaigns data base

Choise the existing campaign from data base or lead in the data for new one. Choise of relevant product who will be

manufactured simultanuasly in campaign. Lead in the stage into relevant apparatus.

Choise tha apparatus in which the stage will carry out.

Vizualization of apparatus in which the stage will carry out.

Output information about the campaign:-Maximum batch size;-Minimum batch size;-Cycle time whitout overlapping;-Cycle time whit overlapping;

Rule buttons:-add new campaign;-delete campaign;-edit data base;-save to data base;-exit;-help.

Page 12: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

13

Synthesis of variants of campaigns with relatable size to number of manufacture which are included in a plan.

Lead in the data base of existing manufacture plan or including the new one. Choice the regime of manufacture:

-With overlapping the cycle or without overlapping the cycle;-Production demand for the product:

-minimum product quantity;-normal product quantity;-maximum product quantity;

-Include the planning horizont.

Calculating the all available campaigns which are consist of the maximum number manufacture working at the same time.

Output information about obtained variant of campaign:-list of apparatus which have to placed in relevant stage-basic characterization:

-maximum batch size, minimum batch size;-cycle time;-maximum demand,minimum demand;-maximum number of variants.

Rule buttons:-delete campaign;-edit data base of given campaign;-save to data base;-exit;-help.

Page 13: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Synthesis of maximal number independent campaigns.

14

Lead in the data base of existing manufacture plan or including the new one. Choice the regime of manufacture:-With overlapping the cycles or without overlapping the cycles;-Production demand for the product:

-minimum product quantity;-normal product quantity;-maximum product quantity;

-Include the planning horizon.

Calculating the all available campaigns which are consist of the maximum number manufacture working at the same time.

Generalize information of found campaign,Gives the maximum number of in depended campaign.

Rule buttons:-delete campaign;-edit data base of given campaign;-save to data base;-exit;-help.

Page 14: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Output the result of procedure of synthesis of maximal number independent campaigns in given manufacture plan.

15

Output the obtained results for given variants of campaign.

Choice the manufacture variant included in given campaign which will be show on.

List of apparatus in which have to placed the relevant stages.

Rule buttons:-delete campaign;-edit data base of given campaign;-save to data base;-exit;-help.

Page 15: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Module explaining different optimizing tasks.

16

Optimal use of resource.Optimal sheduling for given variant of canpaign-one criteria formulation.Optimal use of resource.Optimal sheduling for full variant of canpaign.One criteria formulation.Optimal scheduling.Optimal scheduling with possible one criteria.1.Minimum time poduction plane.2.Maximum profit.Restriction:1.Minimum demand;2.Minimum resource.

Optimal use of resource.Optimal sheduling for given variant of canpaign.Multicriteria formulation.

Optimal use of resource.Optimal sheduling for full variant of canpaign.Multicriteria formulation.

Optimal scheduling.Optimal scheduling multicriteria formulation.1.Minimum time production plane.2.Maximum profit.Restriction:1.Minimum demand;2.Minimum resource.

Page 16: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Optimal loading the system. /formulation the task/

17

Read the data base for existing plans and available campaign.

Choise the variant of campaign who will search optimal rule, in case of choosen criteria and defineded restrictions. Define the planning horizon in which a given

campaign have to be done. Define the quantity demand of each product.

Define the optimization criteria for chosen campaign who consist of:-resource for optimization;-choice the regime:

-variation-constant

Define the restrictions which are consist of:-restrictions about another resources;-minimum and maximum quantity in case of constant;-minimum and maximum quantity in case of variation.Start the optimization procedure

Output the results:-included technologies;-optimal start time;-optimal wait time;-optimal batch size.Of each manufacture

Page 17: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Optimal loading the system in case of given manufacture program.

18

Read the data base for existing plans and available campaign.

Choise the variant of campaign who will search optimal rule, in case of choosen criteria and defineded restrictions. Define the planning horizon in which a given

campaign have to be done. Define the quantity demand of each product.

Define the optimization criteria for chosen campaign who consist of:-resource for optimization;-choice the regime:

-variation-constant

Define the restrictions which are consist of:-restrictions about another resources;-minimum and maximum quantity in case of constant;-minimum and maximum quantity in case of variation.Start the optimization procedure

Output the results:-included technologies;-optimal start time;-optimal wait time;-optimal batch size.Of each manufacture

Page 18: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Optimal loading the system in case of given manufacture program.

Output the optimal parameters of each campaign which are consist of: -Service time;-Time duration campaign;-List of manufacture included in campaign;-Start times;-Wait time;-Cycle time;-Optimal batch size;-Optimal batch number;-Quantity which are manufactured during campaign.

Lead in the nesesary information which are consist of:-DB for existing plants;-Planning horizon;-Production demands for each product;-Optimization criteria;-Restrictions.

20

Page 19: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Visualization of obtainable scheduling.

19

Read data of manufacture plan.

Input the number of campaign

Choice the resource

Choice the solution which have to be vizualizated

Visualization the sum consumption curve of chosen resource in case of simultaneous working of all productions in given campaign.

The average curve of loading

The real curve of loading

Summarize data :-variation;-max pic;-min pic

Choice the production of given campaign

Choice the resource for visualization

The average curve of loading

The real curve of loading

Summarize data :-Batch size;-Start time;-variation;-wait time;-constant production;-horizon

Manual input the data :-Batch size;-Start time;-wait time;-horizon

Page 20: B.Ivanov, K.Mintchev Institute of Chemical engineering- Bulgarian academy of sciences

Thank you for your attention