+ All Categories
Home > Documents > BLM Form 8400-4

BLM Form 8400-4

Date post: 05-Nov-2021
Category:
Upload: others
View: 14 times
Download: 0 times
Share this document with a friend
2
(Form 8400-4) Form 8400-4 (June 2018) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Date: District Office: VISUAL CONTRAST RATING WORKSHEET Field Office: Land Use Planning Area: SECTION A. PROJECT INFORMATION 1. Project Name 4. KOP Location (T.R.S) 5. Location Sketch 2. Key Observation Point (KOP) Name 3. VRM Class at Project Location (Lat. Long) SECTION B. CHARACTERISTIC LANDSCAPE DESCRIPTION 1. LAND/WATER 2. VEGETATION 3. STRUCTURES FORM LINE COLOR TEX- TURE SECTION C. PROPOSED ACTIVITY DESCRIPTION 1. LAND/WATER 2. VEGETATION 3. STRUCTURES FORM LINE COLOR TEX- TURE SECTION D. CONTRAST RATING SHORT TERM LONG TERM 1. DEGREE OF CONTRAST FEATURES 2. Does project design meet visual resource management objectives? Yes No (Explain on reverses side) 3. Additional mitigating measures recommended Yes No (Explain on reverses side) Evaluator’s Names Date LAND/WATER BODY (1) VEGETATION (2) STRUCTURES (3) STRONG MODERATE WEAK NONE STRONG MODERATE WEAK NONE STRONG MODERATE WEAK NONE ELEMENTS FORM LINE COLOR TEXTURE (Continued on Page 2)
Transcript
Page 1: BLM Form 8400-4

(Form 8400-4)

Form 8400-4 (June 2018) UNITED STATES

DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT

Date:

District Office:

VISUAL CONTRAST RATING WORKSHEET Field Office:

Land Use Planning Area:

SECTION A. PROJECT INFORMATION

1. Project Name 4. KOP Location (T.R.S)

5. Location Sketch

2. Key Observation Point (KOP) Name

3. VRM Class at Project Location (Lat. Long)

SECTION B. CHARACTERISTIC LANDSCAPE DESCRIPTION 1. LAND/WATER 2. VEGETATION 3. STRUCTURES

FOR

MLI

NE

CO

LOR

TEX

-TU

RE

SECTION C. PROPOSED ACTIVITY DESCRIPTION 1. LAND/WATER 2. VEGETATION 3. STRUCTURES

FOR

MLI

NE

CO

LOR

TEX

-TU

RE

SECTION D. CONTRAST RATING SHORT TERM LONG TERM 1.

DEGREE OF

CONTRAST

FEATURES 2. Does project design meet visual resource management objectives? Yes No

(Explain on reverses side)

3. Additional mitigating measures recommended Yes No (Explain on reverses side)

Evaluator’s Names Date

LAND/WATER BODY (1)

VEGETATION (2)

STRUCTURES (3)

STR

ON

G

MO

DER

ATE

WEA

K

NO

NE

STR

ON

G

MO

DER

ATE

WEA

K

NO

NE

STR

ON

G

MO

DER

ATE

WEA

K

NO

NE

ELEM

ENTS

FORM

LINE

COLOR

TEXTURE

(Continued on Page 2)

Page 2: BLM Form 8400-4

(Form 8400-4, Page 2)

SECTION D. (Continued)

Comments from item 2.

Additional Mitigating Measures (See item 3)


Recommended