Company Presentation Year 2015 Irina Kostina Marketing manager 31.03.2015 TALLINN
Transcript
Page 1: BLRT Rekato presentation 31 03 2015

Company Presentation Year 2015 Irina Kostina

Marketing manager 31.03.2015 TALLINN

Page 2: BLRT Rekato presentation 31 03 2015

BLRT Rekato was established in 1996 as a subsidiary company of BLRT Grupp which is placed in Tallinn, Estonia

Company

Page 3: BLRT Rekato presentation 31 03 2015

Company

BLRT Rekato, with Head office in Tallinn, Estonia. Using our facilities and manufacturing areas in Tallinn (Estonia) and

Klaipeda (Lithuania) we are able to handle massive projects for different sectors

Tallinn Estonia

Klaipeda Lithuania

Page 4: BLRT Rekato presentation 31 03 2015

Pipe

line

Man

ufac

ture

r Company

BLRT Rekato is a well-known pipeline manufacturer all across Europe with over 17 years of experience Our skilled staff and extensive facilities are at your disposal 24/7 to solve problems fast, efficiently and reliably

We deliver what we promise and work hard to support Your goals!

Page 5: BLRT Rekato presentation 31 03 2015

Pipe

line

Man

ufac

ture

r Company

Strategic working areas: ship repair industrial sector

Production workshop area: 6 420 m2

Number of employees: 255

Capacity: 170 tons/ month

Certificates: ISO 9001 ISO 14001 OHSAS 18001

Germanischer Lloyd and

Russian Maritime Register of Shipping classifications

Page 6: BLRT Rekato presentation 31 03 2015

Production of any kind of pipelines hydraulic systems heat exchangers pressure vessels steel structures boilers valves

Protective coatings

hot dip galvanizing sand blasting Painting (external)

Materials used black steel stainless steel copper bronze any types of plastic pipes

Types of paint

epoxy alkyd acrylic polyurethane zink silicate

Pipe

line

Man

ufac

ture

r What We Do

Page 7: BLRT Rekato presentation 31 03 2015

Maximum length of pipes for hot dip galvanizing: standard up to 5 meters special up to 13 meters

Maximum length of pipes

for acid pickling: up to 5 meters

Cold and hot bending machines

for pipes and metal profiles diameters from 10 up to 273 mm wall thickness: 2 - 16 mm

Bending radius: 2-3 times of pipe's diameter. In case of induction bending – any radius Bending angle: 0 – 180 degrees

Pipe

line

Man

ufac

ture

r Production Capabilities

Page 8: BLRT Rekato presentation 31 03 2015

Pipes` connections: Flanges Fittings Welding

Plates` rolling: diameters 350 - 3500 mm wall thickness 3-15 mm

Any type of heat insulation

Pipe

line

Man

ufac

ture

r Production Capabilities

Page 9: BLRT Rekato presentation 31 03 2015

Pipe

line

Man

ufac

ture

r Production Capabilities

Welding processes: MIG/MAG, TIG, E-hand Orbimatic (automatic

welding equipment) All welders are certified

Welding seams examination:

by X-ray, Ultrasonic, LPT

hydraulic testing up to 300 bars own lab on Group premises

Page 10: BLRT Rekato presentation 31 03 2015

Complete control of received raw material Traceability of materials during production PMI (Positive Material Identification) testing Full time QC inspector in workshop 100% coordinate control 100% visual welds inspection Pneumatic testing Hydrostatic testing MPI, ultrasonic and radiographic testing Hardness Brinell testing NDTesting by third independent part

Pipe

line

Man

ufac

ture

r QC and Testing

Page 11: BLRT Rekato presentation 31 03 2015

Production Examples

In January 2015 BLRT Rekato has successfully completed manufacturing 2,5 tons of stainless steel piping. Pipelines will be installed on one of the cruise ships which is currently being built by Meyer Turku. Stainless steel piping project with diameters from DN60 up to DN250 lasted for 2 months and was performed on the premises in Tallinn.

Page 12: BLRT Rekato presentation 31 03 2015

Production Examples

Pipelines for Renewable Power sector. Years 2011-14. Over the years Rekato has been cooperating with ALSTOM Switzerland in various number of projects such as Robiei and Linthal. During these successful years we have achieved perfect understanding of our Partner, Partners needs and high quality requirements. DIA from 33,7 mm until 356 mm, wall thicknesses from 2 mm until 4 mm

Page 13: BLRT Rekato presentation 31 03 2015

Production Examples

Years 2013-2014. Hydraulic pipelines from DN 10 up to DN 60.

Installation of hydraulic pipeline systems from the manipulator to the hydraulic systems (hydraulic drives, parking bolts, hydraulic winches, hoist drives, telescopic cylinders) for National Oilwell Varco

Page 14: BLRT Rekato presentation 31 03 2015

Production Examples

Alfa Laval scrubber systems for Finnlines ships Finnhawk, Finnpulp, Finnmill,

Finnkraft. Overall around 600 meters of pipelines. Project took place in 2014. Fabrication and assembly of GRE pipes from DN25 up to DN600. GRE pipes assembly includes curing and lamination, connection of elbows and reducers

Page 15: BLRT Rekato presentation 31 03 2015

Production Examples

Pipelines for Power/ Thermal services. Years 2013 -2014. During these years BLRT Rekato has delivered around 100 tons of stainless steel production for ALSTOM France project such as Nant de Drance which is located in Switzerland. DIA from 14 mm until 457 mm, wall thicknesses from 1 mm until 15 mm

Page 16: BLRT Rekato presentation 31 03 2015

Production Examples

Insulated pipe units

Page 17: BLRT Rekato presentation 31 03 2015

Production Examples

Heat exchanger for Heavy Fuel Oil Heating area 166 m². Heating capacity 3,5 MW

Page 18: BLRT Rekato presentation 31 03 2015

Production Examples

AISI Heat exchanger Working pressure 200 bar. Weight 5 tons. Dimensions 5300x1800x1800mm

Page 19: BLRT Rekato presentation 31 03 2015

Gitte Henning S349 is a turnkey project. Fishing trawler was built in year 2014

Key facts: 86,3 m length and

17,6 m breadth more than 100 tons

of steel pipes installed 6,3 tons of plastic

pipes installed 6,9 tons of AISI

pipes installed

Cooperation Projects

Page 20: BLRT Rekato presentation 31 03 2015

Windlift1 was built in 2011. Ship is designed for wind farm construction and maintenance

Key facts: 101,8 m length and

36 m breadth weight over 8000 tons more than 13 km of

piping systems installed 3,45 km of hydraulic

piping systems installed

Cooperation Projects

Page 21: BLRT Rekato presentation 31 03 2015

Bard1 was built in 2009. Transformer platform which shall generate alternating electric current, produced by the North Sea Bard wind power park, into the constant current, and shall transmit it to the grid system

Key facts: 42,1 m length and

42 m breadth weight 3000 tons power 400 MW more than 8 km of

piping systems were installed

Cooperation Projects

Page 22: BLRT Rekato presentation 31 03 2015

Saaremaa was built in 2008. Ferry that operates between Estonian islands is fast and highly manoeuvrable – the steering mechanisms can rotate for 360°, they are easy to moor an unmoor from the quays

Cooperation Projects

Key facts: 97,9 m length

and 18,5 m breadth ferry capacity:

600 passengers and 150 cars

more than 10 km piping systems installed

Page 23: BLRT Rekato presentation 31 03 2015

Thank you for attention!

BLRT Rekato OÜ E-mail [email protected] Website www.blrtrekato.ee Phone +372 610 2504 Mobile +372 530 23 753 Address Kopli 103, 11712 Tallinn, Estonia JSC “Vakarų vamzdynų sistemos“ E-mail [email protected] Website www.wsy.lt/vvs Phone +370 630 04 250 Address Minijos street 180, Klaipeda, Lithuania

Pipe

line

Man

ufac

ture

r