USACE - Orleans Canal New Orleans, Louisiana
Blue Iron Foundations and Shoring, LLCFlorida467 Lake Howell Rd #104Maitland, FL 32751
Louisiana125 Teal StreetSt Rose, LA 70087
Type of Project Canal Upgrades
Purpose of Piling Permanent Cutoff Wall
Site Location New Orleans, Louisiana
Duration of Work April 2011 - June 2011
Owner USACE
Main Contractor Integrated Pro Services, LLC (IPS)
Piling Contractor Blue Iron Foundations and Shoring, LLC
Equipment Used ECO 900 Silent Piler & ECO1400 S Silent Piler
Sheet Pile Material PZ27 & PZC18 L=65ft N=278pr
Sheet Pile Supplier Skyline Steel & LB Foster
Description The Press-In Method for sheeting installation was specified into the project plans due to the close proximity of the adjacent canal wall. The permanent steel sheet pile cutoff wall was installed alongside the existing wall as well as under an existing in-use highway bridge with headroom limitations which required the sheeting to be spliced a minimum of five times.
Blue Iron, Inc.CaliforniaPO Box 1679W. Sacramento, CA 95691
(916)441-3538
Borehole Data
Clay
PZ2
7 &
PZC
18
L=65
ft
Blue Iron, LLC
MAILING ADDRESSPO BOX 6W. SACRAMENTO, CA 95691