GOVERNMENT OF INDIAMINISTRY OF MINES
INDIAN BUREAU OF MINESOFFICE OF THE REGIONAL CONTROLLER
No . I BM/GHY/M EG/EJ N H/LST/MS-7S
Registered PercelTelephone: (033) 23 67 3 6 | I
.*, [33]l 1121tr2i1E-mail : [email protected]
OF MINES
CP- 13, Sector VSalt Lake City
Kolkata 700 091Date: 29.07 .20152
ToShri Devender Bansal (Nominated Owner)M/s Cement Manufacturing Co. Ltd.VILL- Lumshnong, POST- KHLIEHRIATDistt.- EAST JAYANTIA HILLSMEGHALAYA .793200
Sub : Approval of Scheme of Mining along with Progressive Mine Closure Plan in respect ofAmalgamated Khub Limestone Mine over an area of 9.66 ha. in East Jaintia Hills district ofMeghalaya State submitted under rule 12 of MCDR, 1988.
Ref: i) Your lefter No. GSJ(KLT)/IBM (MSyl lBM/CMCL/9.66 Ha.12014-15 daled 2511112014.ii) This office lefter of even no. dated 19.03.2015.iii) Your RQP's letter NoGM/CMCL/MS/786/15 dated 1'1.04.2015.iv) This office letter of even no. dated 22.05.2015.v) Your RQP's letter No. GM/CMCL/MS/789/15 dated 1 1 .06.2015.vi) This office letter of even no. dated 30.06.2015.vii) Your RQP's letter No. GM(G)/CMCL/MS/IBM/790/15 dated 06.07.2015.ix) Your lefter No. NIL dated 07.07.2015.
Sir,ln exercise of the power conferred by Sub-rule (4) of Rule-l2 of Mineral Conservation &
Development Rules, 1988, I hereby approve the Scheme of Mining including ProgressiveMine Closure Plan of Amalgamated Khub Limestone Mine of M/s Cement ManufacturingCompany Ltd. over an area of 9.66 hects in East JAintia Hills district of Meghalaya Statesubmitted under rule 12 of MCDR, 1988. This approval is subject to the following conditions:
(i) The Scheme of mining is approved without prejudice to any other law applicable to themine area from time to time whether made by the Central Government, StateGovernment or any other authority and without prejudice to any order or direction fromany court of competent jurisdiction.
(ii) The proposals shown on the plates and/or given in the document is based on the leasemap /sketch submitted by the applicanU lessee and is applicable from the date ofapproval.
-2-No .lBM/GHY/MEG/EJNH/LST/MS-7S. Dated: 29107 12015.
(iii) lt is clarified that the approval of aforesaid Scheme of Mining does not in any way implythe approval of the Government in terms of any other provision of Mines & Minerals(Development & Regulation) Act, 1957, or the Mineral Concession Rules, 1960 and anyother laws including Forest (Conservation) Act, 1980, Environment (Protection) Act,1986 or the rules made there under, Mines Act, 1952 and Rule & Regulations madethere under.
(iv) lndian Bureau of mines has not undertaken verification of the mining lease boundary onthe ground and does not undertake any responsibility regarding correctness of theboundaries of the I asehold shown on the ground with reference to lease map & otherplans furnished by the applicant / lessee.
(v) At any stage, if it is observed that the information furnished, data incorporated in thedocument are incorrect or misrepresent facts, the approval of the document shall berevoked with immediate effect.
(vi) lf this approval conflicts with any other law or court order / Direction under any statute, itshall be revoked immediately.
(vii) ln case any adverse remarks / comments is received from the State Government onthe issues with respect to this office letter no. IBM/GHY/MEG/EJNH/LST/MS-75,daIed03J22014 ,copy of which has been endorsed to you, the approval of the documentwill be withdrawn w.e.f the date of receipt of such comments / remarks.
(viii) Validity of this document shall expire on 3110312020.
(ix) Next Financial Assurance shall be due for submission on 01/04/2020.
(x) lt is observed that the conditional orderfor amalgamation of the two lease has beenissued by the Govt. Of Meghalaya vide letter no. MG.98/2008/23 dated 01.04.2009. ltis observed that more than 6(six) years have elapsed. lt is advised to pursue with the
State Govt. and get the amalgamated lease deed with in a period of six months fromthe date of issue of this letter.
Encl: One copy of approved Scheme of Mining.
Copy for kind information to:
1. M/S Geomin Consultants (P) Ltd ., 102, Royale Residency, ptot No- VIP-48, IRC Village,Nayapalli Bhubaneswa r- 7 51 01 5, Odisha., E-mail: [email protected]
Yours faithfully,
(A.B.PARegional controller of Mines
2. The Director, Department of Mineral Resources,
-793 003, Meghalaya along with one copyREGISTERED PARCEL
Govt. of Meghalaya, Risa Colony, Shillongof approved Scheme Of Mining by
(A.8. IGRAHI)Regional controller of Mines
1 ::-
,(Und6i.Ru1b 23ts(2J of MQDR,'1'g BB)..r:'- : 'i
ffixme
G@ffipesey L€d"
,,i ":i
:1.
GEO.flfiIN COru$ULTA}-IT$ PVT. LTD,An ISO 9001:2008 Certified Gompany
102. Royal Residency, Plot No. VlP48, IRC Village, Nayapalli, Bhubaneswar-751015, Otlisha-
Tel. : 0674-2551 080, Fax : 0674'2551687. E-mail : [email protected]
ffi-mlIWffiI
rf
\
sG*&ffiffiffi &w w$nffiilffiffi(Under Rule 12 of MCDR-1988)
withFfrII&frE$SIIfE frIIIIE ETOSIIfrE PMil
(Under Rule 238(2) of MCDR, 1988)
.of&ma$gmmm&e# KFsms& fuEwws&msew ffi&me
Over an Area of 9.66 Hectaresln East Jaintia Hills District, Meghalaya.
I Khub-l (4.96 Ha) & Khub-ll
Forest land : NILNon-forest Land z 9.66Category of Mine : 'A'
For the Period of : 2015 - 16 to
for & on behalf ofMfs Sement lslanufactwring Gompany Ltd.
Prepared by:
GEOMIN SSN$ULTANT$ PVT. LTD.An ISO 9001:2008 Certified ComPanY
102, Royal Residency. Plot No. VlP48, IRC Village, Nayapalli, Bhubaneswar-751015, Odisha-
Tel. : 0674-2551080, Fax :0674-2551687, E-mail : [email protected]
-T,_-l.}
iF'Efr/Pt:yi*rtf'*,1,Rria/ pdre d.. gA
t, +4rrti.
ffi
,fv
r-
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
CONTENTS
CHAPTER PARTICULARSConsent Letter from the Applicant
Cerlihcate-I(From the Consultant to Indian Bureau of Mines)
Certificate-II(From Lessee to DGMS)
Introduction
PART - I.-i..- 1 Review of Mining Plan
PART - IIProposal Under Scheme of Mining for the Next 5
Years.
Reserve
Conceptual Mining Plan
Mining
Handling of Waste/sub-grade Material
Use of Mineral
Mineral Beneficiation
Environment Management PBflffim
'*llt#f
PAGE
04
10
t2
25
29
39
40
4l
42
01
2
J
4
5
6
7
8
9
I
l aH.s.!^r-<1flfKey Person I
M/s. Geonrin Consultants {P} Ltd,Regn, No.- RQP/cALl167 19218
CEMENT MANUFACTURING COMPANY LTD.
CONSENT LETTER FROM APPLICANT
The scheme of mining in respect of Amalgamated Khub Limestone Mine over an area of 9.66hectares for limestone in Lumshnong village District: East Jaintia Hills, State: Meghalaya has been
prepared by lvl/s Geomin Consultants (P) Ltd. Regd, No. RQP I CAL / 167 192 -8.
I request to Regional Controller of Mines, Indirn Bureru of Mines, Kolkata, to make furthercorrespondence regarding any modification of Scheme of Mining with the said recognized companyon the following address.
Itrl/s Geomin Consultants (P) Ltd.Mining & Geological Consultants,102, Royale Residency,Plot No. VIP - 48, IRC village, NayapalliBhubaneswar - 751015, Odisha.Tel:0674 - 2551080, Fax: 0674 - 2551687Email : geomingeo@ gmail.com
I hereby undertake that all the modification so made in the Scheme of Mining by the recognizedcompany be deemed to have been made with my knowledge and consent and shall be acceptable tome and binding on me in all respects.
Place: LumshnongDate: 30.03.2015
Mines Owner
,T!I,R'CEMEXT
Rcgd. Ofrice & lVorkr : Lumshnong, P O.: Khaliehriat, Distt.: Jaintia Hills, Meghalaya, Ph.: 03655-278215i l6/ 18. Fax : 03655-278217, e-mail : lumshnong@cmcl co.in
llN tso slllll, lsO l4illl & ollsAs 180,01 cBnTlrtDn 0llltpaNY
GEOMIN CONSULTANTS PVT. LTD.An ISO 9001:2008 Certified Company
102, Royale Residency, Plot No. VlP4B, IRC Village, Nayapalli, Bhubaneswar-7s1015, OdishaTel. : 067 4-2551 080, F ax : 067 4-2551 687, E-mail : geomin [email protected]
16 . o4.Zas, S a^raf)
I
z'=i- ,/, "..\'"'/r..)./
HH
CERTIFICATE - I
Certified that the provisions of Mineral Conservation & Development Rules, 1988
have been observed in Scheme of Mining on Amalgamated Khub Limestone
Mine over 9.66 hectares in East Jaintia Hills district, Meghalaya and whatever
specific permission are required the applicant will approach the Indian Bureau of
Mines (IBM).
Certified that the information furnished in the Scheme of Mining is correct to the
best of our knowledge.
Key Pe
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants.Regn. No. RQP/C ALI 167 192-8.
cLH ,s
rsons
Provide a total Sotution on GeotogicaI Exptoration, Mining, Forestry, Environment, Geo-hydrotogy,Socio-economic Survey, lndustrial Project Engineering, Assay & Environmental Parameter Anatysis
CEMENT MANUFACTURING COMPANY LTD.
CERTIFICATE - II
The provisions of Mines Act, 1952, Rules and Regulations made there under will be observed in the
Scheme of Mining of Amalgemated Khub Limestone Mine over an area of 9.66 hectares inhectares in East Jaintia Hills district , Meghalaya belonging to CMCL and where specificpermission are required , the applicant will approach the DGMS. Further, standards prescribed byDGMS in respect of miner's health will be strictly implemented.
Place: LumshongDate:30.03.2015
Signeture df the LesseBansal
Designatibn : Nominated Mines Ovmer
p
Rcad' oftcc & trlbrk : Lumshnong, P o.: Khdiekht, Dstt.: Jaintia Hills, Meghelar. Ph.: 01655-27g215116/lg, Fax : 03655-27g2 t7, e-mait : [email protected] tsO tltxlt, tst) t400t & Of,sa$ t8t)0t cBRTlrtED COilpANy
i'r!a,R,.\\CETENT
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
LIST OF PLATES
KeY PersonM/s. Geomin Consultants (P) Ltd'
li;;;. i;;.: noP' crut I 67/e2/B
PLATB NO. PARTICULARS SCALEI Location Plan 1 :10,000
il Surface Plan. 1 :1,000
ru Geological Plan 1:1,000
rrr (A) Geological Sections I :1,000
rv (A) 1't Year Development Plan with Section
1 :1,000
rv (B) 2"d Year Development Plan with S-ection*.IV (C)
rv (D) 4'n Year Developrtr$dltlJ- 's,iil F""W\sectionrv (E) 'lan ulithKection) /*,tV Key Plan ,($y 1:50,000
VI Environmen@,ffi{ff 1:5,000
VII Environment Management PlaSr 1:1,000
VIII Conceptual Plan 1:1,000
vrrr (A) Conceptual Sections 1:1000
IX Progressive Mine Closure Plan 1:1,000
#fuqd
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
LIST OF TABLES
p
'fable no. Particulars Page no.
1 Geological Reserve (Khub-I) 19
2 Mineable Reserve (Khub-I) 20
aJ Non-mineable Resource (Khub-I) zl
4 Geological Reserve (Khub-II) 22
5 Mineable Reserve (Khub-l I) 23
6 Non-mineable Resource (Khub-II) 24
7 Production Schedule (Khub-I & Khub-II) 38
B Yearwise Plantation Schedule 46
;i;_q;r1. fyq1., 1:, 1;pr
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
LIST OF ANNEXURES
LIST OF PHOTOGRAPHS
l. View of working of Khub Limestone Mine-I & Khub Limestone Mine-ll2. View of plantation around M.L area
,^
ANNEXURE NO NOMENCLATURE PAGEAnnexure - 1 Certificate of Incorporation of the Company.
Below the
text
[**rl
l
l
l
Annexure - 2 List of Board of Directors
Annexure - 3 Copy of Board of Directors Resolution Regarding Nomination ofOwner.
Annexure - 4 Copy of Photo ID of Lessee
Annexure - 5 Copy of Documentary Proof of Permanent and Present Address of the
Lessee
Annexure - 6 Copy of RQP Certificate rvith list of Approved Key Persons.
Annexure - 7 Copy of Borehole Litho Cheniical Logs (Kr-2A & K2-2A).
Annexure - B Chernical analysis report of 4 samples from amalgamated M.L area
(9.66ha.)
Annexure -9 Copy of Sale Deed of barrier zone between two M.L. areas.
Annexure -10 Copy of State Gow. letter No. MG.93l2008123 dtd. l" April 2009 © of letter of the Govt. of Meghalaya dated l0'h December 2010
Permitting Amalgamation of two lease & no objection for utilizingthe virgin area between two M.L areas.
Annexure -11 copy of Undertaking for
Map.
Submission of Geo-referenced CadastraldAnnexure -12 Copy of MCDR violations dated 19.03.14 & 26.05.14 At
compliances submitted vide latter no. dated 23.04.14 & 08.10S1rythe lessee.
Annexure -12 (a) Copy of Revocation of Mining operations letter of IBM dtd. 04.03.15
with reference to lessee letter dtd. 18.02.15.
Annexure -l 3 Copy of Feasibility Study Report.
Annexure -14 Copy of Approval letter of Mining Plan of Amalgamated Khub
I imestone mine-or'#'l..q91* agtgO 08.04.20 I I .
Annexure -15 copyCMC
of
Annexure -16 :iil:,ffiti,i,'ffiffi:.-,ffffiegarding intimation for drillinglmitted to IBM.
Annexure -17 Copy ofd mffif'h]bfiil {ata.
Annexure -18 i,n:,* w;:',i:ffi iliSi#'^141ff *
Annexure -19 Copy of Affidavit regarding name of the Nominated Owner.
Annexure -20 Copy of Undertaking regarding construction & upkeep of boundary
pillars by the lessed.
lv{/s. Geomin Consultanrs (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
TNTRODUCTION
Cements Manufacfuring Company Limited (hereinafter referred to as CMCL) is a
public limited company incorporated under Companies Act 1956 on 2nd November
2001. The name was changed as Cement Manufacturing Co. Ltd., on 10th
Novernber 2004. CMCL was granted license for setting up a 900 TPD Cement
Plant at Lumshnong village, East Jaintia Hills District, Meghalaya under single
rvindow clearance by the Government of Meghalaya in the year 2002. The
proposal for the cement project was conceived on the basis of reports of abundant
occulrence of high grade limestone around Lumshnong village by Geological
Survey of India and Directorate of Mineral Resources, Govt. of Meghalaya.
To supply limestone to the cement plant CMCL has obtained the following
PLsAvILs during preceding years.
1. PROSPECTING LICENCE (PL): ||
S. no. Location Area (Ha)Tlt:*,to ""
Reference to grant ofPL
I Khub 473.09
,i'ffiVide letterno.MG.2l/20031163 dt.13/1112003 Over an area
of 473.09 Ha.2. Wah pynkon 4.8s
WK*"H w/8/2A04: ii--iqi /'_c\',,1i
No.MG.2112003/244dt.g/612004
J. Wah pynkon 13.58 2qwagP6.__Ne, /f;ft!
22Flg0s6tt \\u)-z'
No.l09/2005/88dt.20/3/2006
4. Khub 1 55.1 58 'Applied-: File is with DMR yet tobe eranted
5. Tongseng 9.47 9/6t20r0 7/7120t0 No.MG.4/2008/87dt.09/06/20t0
KeY PersonM/s. Geomin Consultants (P) Ltd'
i;;;. Ho.- noPtcnL/16?/e2lB
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
2. MINING LEASES ML):
sr.No.
Location Area (Ha) Grantedon
Executed on Reference to grantedof ML
1 Khub-l 4.96 z0/t2t20a4 l7/u2a05 ML Deed No. l0 of2005. Date of opening-241v200s
2. Khub-ll 4.70 14/U2006 21612006 ML Deed No. 54 of2006. Date of opening-24l1/2007
-)- Wah Pynkon 4.85 4l7l20cs 216l2A0s ML Deed No. 53 of2006. Date of opening-241712007
4. Khub-lll 70.00 Formal grant vide letterNo. MG.54120091190,dtd. 2211212009,Subject to submissionof Minine Plan etc.
5. Wah Pynkon 13.58
,,6%ffiffi\ \,"\i
Formal grant vide letterNo. MG. 9612007/82,dtd. 221712010 subjectto submission ofMinins Plan etc.
Company's ProI :;tlI \L !'I e :'
.,.1,
rry::iegistered under Company' s actIt is a public 1956.
o Promoted by r.iiima't."6iiA well known business establishmentsmanufacturing Plywood, Ferro-alloys, sponge iron, steel.
o CMCL is the largest cement manufacturing company in North East
India.
o Plant spread over 40 acres of land in idyllic town of Lumshnong.
o CMCL is a7A.48o subsidiary of Century Ply board (INDIA) Limited.
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tWs. CMC Ltd.Mining Lessee
Plant:
0.60 MTPA integrated cement Plant is proximate to key raw materialsreserves of limestone, coal and shale. The capacity is being enhanced tol.OMTPA.
o Product- STAR CEMENT is marketed by 499 dealer network inNorth East India. .
. Plant commissioned in 2004 and producing clinker from 2311212004and cement fiom 21212005.
Capacity:
r In 2004, installed capacity-900TPD. CMCL expanded capacibr 1s
1800TPD clinker in 2009 and further to 2400 TPD.
o Limestone requi 1500 TPD to 3000 TPD.
Daily Limestoneremaining quanti
The two mines are loca
major requirement. The twci
Ha. The copy of the sale deed of said land
letter regarding no objection for utilizing
Annexure -g & 10 respectively.
mine is 2000-2500 tons andliers.
crushing plant and meet the
ed by a virgin area of 0.248
and the copy of the State Govt.
the virgin area is enclosed vide
rE:o<l
The last Mining Plan was prepared for the amalgamated leases under Rule
22 of MCR 1960 along with Progressive Mine Closure Plan under Rule 238
of MCDR (Amendment) Rule 2003 and got ii's approval by IBM vide letter
no. 3 I 4(3)120 IO/IV{CCM (CZ) l\{tr -32 dated 08.04.20 I 1 . (Ref. Annexure- I 4)
KeY Personrlls. Oeomin i)onsuilsrrrs (P) Ltd'";iL,"': ;i;::' R c t' i c r I t I 67 / e 2 I Bff
lr4ls. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
CHAPTER _ 1
PART _ I
I.O REVIEW OF MINING PLAN
1.1 Name of Mine:
Amalgamated Khub limestone mine (9.66ha.)Village-LumshnongP.O - KhlielliatI)istrict-East Jaintia HillsMeghalaya.
1.2 The last Mining Plan for Amalgamated Khub limestone mine was approved vide
letter no 314(3)/2010-MCCM(CZ)/MP-32 dtd. 08.04.2011 by IBM for the year
2010-l I to 2014-15.
Details of Minins Plan Anproval
Mining plans approved by competent authorities are as under:
Period of ML granted-Khub Limestone Mine-I from 17-I-2005 to 16-1-2025 (Twenty Years)Khub Limestone Mine-II from 02-06-2006 to 01-06-2A26 (Twenty Years)
The copies of State Govt. Meghalaya grant letter No. MG/47/2A041100 dated
20.12.2004 (for Khub Limestone Mine-I) executed on 17.01.2005 and letter No.MG/2L/2003/435 dated 14.01 iOOe (for Khub Limestone Mine-II) executed on
02.06.2006 are enclosed (Ref. Annexure-18).
KoY PersonM/s. Gecmin Consultartts (P) Ltd'
Regn. No.- RoP/cAL/167 l92lg
4
Approvi4g: -<Authorltv': :.,'
Chief;ii12.10.2004
2005-06 to 2009-10
Khub Limestone
Mine-lIMCCM(C.Zy 2006-07 to 2010-l I
Arnalgamated
Khub limestone
mine
2010-11 to 2014-152010-MCCM(CZ)/dated 8.04.201I
F
1.3
lv{/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
IWs. CMC Ltd.Mining Lessee
Date of Opening of Mine
Mining lease for Khub Limestone Mine-I (4.96 ha) has been executed on
17th January 2005 for a period of 20 years and its term will be expired on
16th January 2025. Mining lease for Khub Limestone Mine-II (4.70 ha) has
been executed on 2nd June 2006 and it's temr will be expired on 0 1.06.202G.
Mining operation was started since then with opening of limestone quarry as
indicated in surface plan (Ref. Plate-II). Date of opening of mine was
reporled to be 24.01.2005 and 24.01.20A7 for Khub Limestone Mine-I and
Khub Limestone Mine-II respectively.
The commitment outlined in the approved amalgamated mining plan
(9.66 ha) and coffesponding complia,nces to this effect as undertaken by the
Lessee during last five years of scheme period. \
1.4.1 Exploration:
a) For Khub Limestone Mine-I (4.
b) For Khub Limestone Mine-II $.70 ha).
r:.'i
1.4
FinancialYear
CommitmentBore hole No./de
1st
2010-2011CMCL-1/50CMCL-Z/60CMCL-3/50CMCL-4/60
has been drilled (Kl-2A)WFinancial
YearCommitment Compliances
Bore hole No./depth(m)
1st
2010-2011CMCL.5/60CMCL.6/60CMCL-7160CMCL.8/60
Only one bore hole has been drilled (K2-2A)in20l2-13.
5
M/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
1.4.2 Production :
Year Targeted Production(MT)
Production Achieved(MT)
Limestone Sandstone Limestone Sandstonelst
20t0-2011850000
No proposalwas given
698037.440 Nil
2nd20tt-20t2
850000 721506.380 32939.51
3rd2012-2013
2s0000 6s4699.470 Nil
4th2013-24t4
2s0000 113238.690 Nil
5tii2014-2015
(upto Mav' 14)
250000 19629.5s0 Nil
Total 24s0000 2207111.s3 32939.51
1.4.3 Dump Management:
There was no proposal for dump management in the approved MP as all the
ROM were transported to the crusher erected at cement plant site.
1.4.4 Afforestation:
KeY PersonM/s. Geomin Consultants (PlLtd';;q; No.- RQPIcAL/167/e2/B
Commitm ComnliancesPlantatisaplings
(%x-\ii-/lVsrn$t
ion of 3814have alreadycarried out
last planin safety zone
During ensuingscheme period, it isproposed to replant2510 saplings overthe safety zone areaof 1.57 hu @ 1600
inss ner hectare.
Ir,I/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
The record of plantation already carried out in the area is indicated below with
survival rate.
Qf
t'4's
#Hfi:::." ffidue to mining in these areas was
proposed to be checked by the following precautionary measures, such as:
Surface run off water was gh the quarries and waste dumping
ls and were to pass through the
ischarge point.
yards were to be O,u.n"O,*i1@ffsettl ing pond s for arrest if !{r{;'f{'f,S}compriance:
tE i {l$$I
The following precautic rf,Ssufds been taken up to check the
surface water quality.
. Guided channels/garland drains, settling ponds has been taken up
around the quarries suggested in the approved mining plan to avoid in
infiltration of surface run-off water into the quarries.
o Accordingly the surface run-off through the quarries has been guared
and disilted by guided channels/garland drain and settling ponds
Year No. of plantation Survival rate
2010-2011 5t2 790
20r1-20t2 900 84%
2012-20t3 820 80%
2013-20t4 I 582 81 0A
2At4-20rs
Total 3814
before final discharge.
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
1.4.6 Dust Management :
Commitment :
The following dust control measures were proposed in the approved mining
plan.
o Regular water sprinkling to suppress the dust on haul roads, serviceroads and mining faces by sprinklers and truck mounted watertankers.
. Grading of haul roads and service roads time to tirne to remove theaccumulated dusty rnaterial.
o Proper rnaintenance of the earth rnoving equipments & vehicles,checking of exhaust emissions and irnposing speed restrictions onthem.
. Spraying of water in and around the crushing plant, especially at thedump hopper used for feeding.
o lJsage of sharp drill bits for drilling of holes and practice of wetdrilling.
o Avoiding blasting during high winds, night time & temperatureinversion.
o Properly designed blasting by effective stemming and use of optimurn
1i
o
o
a
charge per delay with dela
Avo i d ing overl oad i ng o{ {umrylq'{ u}i$$}re tran sportation.
Development of Greqn leaft "t:qginirl$a\ea
boundary.
Periodical monitoring-rlof air,ffittty fa;itraU" steps to control thepollutants. tr,:.,,..,;,..,. ' tt: '"1..,,(.i;ui/
., , :.;1i,q;; .1:'
" -1" '
Compliance :
Due preventive and remedial measures as suggested in the approved mining
Planhave beent"-"F
KeY Personuf r. C.o,ni-n Consultants (q) !l!'i;;;=i,';::'n o P r c nr-t t 67'e2rB
B
M/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
1.4.7 (i) Blasting:Commitment:
. Careful planning, supervision and execution of each blast
:- o Use of milli-second delay detonators & cord relays and proper stemming toprevent the blow out of holes.
Compliances:
Blasting is being done taking adequate precaution as stated in the commitment.(b) Noise Management
Commitment. Proper selection of machineryo Proper and timely lttaintenance of mining & crushing plant machinery
adhering to original equipment manufacturers recommendations.o Limiting speed of haulage vehicleso Rubber lining in the chutes of the plantr Usage of sharp drill bits & delivery of compressed air at optimal pressure
during drilling.Compliances:
o Proper selection of machinery has been maintained.. Proper maintenance of mining machinery by oiling and greasing of machines at
-i regular intervals are being done to reduce generation of noise.o Limiting speed of Haulage vehicles.r Rubber lining in the chutes of the plant. Usage of sharp drill bits & delivery of compressed air at optimal pressure and
drilling.o Noise level monitoring is done in Quarterly.o Personal Protective Equipments like earplugs and earmuffs is being provided to
the rvorkers exposed to noise level.o Sufficient green belt with in the mine area is being developed and maintained to
reduce the noise level.1.4.8 : IBM's Violation and it's Com
Status & date Violation with Rule I --*r tbnipliances made bv the Lesseet. Violation under Rule- 13(l) regar{Ffexcess
production during 2012-13 vide IBM letter No.cHy/N{EG/JH/LSr/6/r(oL dtd. I e.o3-*{Gmi
'";'i1 -'','''''.',-
Compliances has been submitted to IBM by thelessee with response violation under Rule l3(l)
scrde letter no. CMCL/IOIU/Z}|4-l5l0l dtd.
NUa.zot+ (Ref. Annexure -12)2. Violation under Rule l3(2) re
of Mining activities videGHYA4EG/JH/LST/ I 6/I(OL&MEG/JH/LST/8/KOL dtd.'
i('I4 trS't- l
has been submitted to IBM by theith response violation under Rule 13(2)
no. nil dated 08.10.14. (Ref. Annexureher the order of revocation of miningfor both the lease was issued by IBM
no. GHYA{EG/JFVLST-6/KOL &JH/LST-8/KOL dated 04.03.15 in
to lessee's letter no. nil dtd. 18.02.15[Ref. Annexure - I 2(a).1
t.r.y' , ,. -,-rlM/s. Geomin Consultants (P)Ltd.Regn. No.. ROP/CALI't67 19218
9
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
PART _ II
CHAPTER _ 2
PROPOSAL UNDER SCHEMB OF MINING FOR THE NEXT FIVEYEARS:
Name and Address of the Applicant:
Cement Manufacturing Co. Ltd.Village - Lumshnong, P.O.-KhliehriatDistrict-East Jaintia Hills, Meghalaya - 793210Tel. No. 03 65 5 -27 821 5 / I 6 I 18
Fax No.: 03655-278217
2.4
2.t
Shri Devender Bansa
company (Ref. Annex
enclosed vide
2.2 Name and Address,Together with Validity di:who has Prepared the Scheme of Mining.
M/s. Geomin Consultants (P) Ltd.Mining & Geological Consultants.102, Royale ResidencyPlot No. VIP-48IRC Village, NayapalliBhubaneswar - 751015Odisha.Tel:0674 -2551080Fax : 0674 -2551687Email : [email protected]. No. RQP lCALI 167 192-8.Date of Registration : 17.08.1992.Date of last Renewal : 17.08.2010
nd Nominated Owner of the
of Directors with address is
of the Recognised Personsmployed Under Rule 42(I) (B),
. Rey personMls. Geomin Consuttants (p)Lld.Regn. No.. Rep/cAL/16 i ti,ita'
3).ffiffistof
Valid up to : 17.08.2020
10
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
Key Persons involved :
Dr. S.K. SarangiMr. H.S. SarangiMr. B.P. MishraMr. M.N. Rahangdale
The copy of RQP certificate & list of approved Key persons is enclosed(Ref. Annexure-6).
2.3 Minerals to be Mined:
Limestone and sandstone
2,4 Area and Date of Expily of Lease:'-'
M.L Area :9.66 Hectares.
Date of expiry of lease : The-,@teffiqqiry of Amalgamated lease will be
16.01 .2025 7" f-;;l$\ 1
/37'€trm\(N,*i'tl2.5 Date of Expiry of {f".$ears ffiod f}f,}pvhich the Mining Plan is
prepared, \\A\ t@ /S3\ ncrqsqa} /e:
The last mining plan waffiploved*(c0&04.2011 for a period 2010-11 to
2014-15 having validity upto 3TSfffT5. Accordingly the present scheme of
mining is being prepared under rule 12 of MCDR-1988 for the period
2A15-16 to 2019-20 as per statute.p;: t,rt.
' - r.'i ',:,
:-11,:.':i:1i;,'!l . ': ".t
/ 6fHNu.'ffid
11
3.0
3.1
It4/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
CHAPTER _ 3
RESERVE
As outlined in the approved mining ptan (Approved on 08.04.2011).
3.2 Depletion of Reserve :
(i) Limestone
During the plan period .q': tdfif*ilii ?"111.53 MT limestone (upto
May'2014) was produced irog
Additional Reserv", Er#Ci
by taking into account of
(With basis and paratndkd
I
3.3
Additional reserve has
exploration can'ied out during period. The intimation for drilling ofbore-holes (K1 -2A &. K2-2A) in form-J for both Khqb-l-imestone Mine-I &Khub Limestone Mine-II is enclosed (Ref.
3.4 Category wise Reselve Estimation :
3.4.1 Basis of Reserve Estimation
r Surface Plan of the area showing position of workings is the basis of ore-
reserves estimation (Plate No. II)o Geological Plan (Plate No.III) is updated based on the surface plan drawn on
a scale of 1:1000 with addition of two new boreholes (K1-2A & K2'2A)
drilled during 2012-13 (Ref. Annexure-7).
(Reserve in million tone)
Limestone KhubLimcstone
Mine-l
KhubLimestoneMine-II
Total Gradc
Geological Reserve 3.210 4.730 8.00 CaOoh 46.52 to 51.73
MgO% 0.37 to 1.91
Reserves blocked in7.5m & pit slopes
1.038 t.796 2.834
Mineable Reserve 2.232 2.934 5.166
72
I
uKeyderson
M/s. Geornin Consultants (P) Ltd.Regn. No.. R0p/cAL/16t lgalB
I\,I/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tvlls. CMC Ltd.Mining Lessee
On plate No.III, in Khub Limestone Mine-I, cross-section lines AA', BB',
CC' & DD' are drawn. In Khub Limestone Mine-II, cross-section lines EE',
FF', GG' & HH' are drawn.
Cross-section lines are drawn across advancing benches such that a
maximum no. of benches are intersected.
Cross-sectional areas of workings on each line are worked out.
Cross sectional area is multiplied by the length of influence to rvork out the
volumes.
A bulk density of 2.5 has been taken for tonnage calculations.
r Maximum depth upto .4.3@$ taken for Khub Limestone Mine-I and450 mRL for ,, :'1&u,ttJFSNN Mine-II based on the bore hole data.
Further the depth pas ffiffiedil@ftupto 50o/o in both Khub LimestoneMine-I and II in section DD' and EE' HH'
ith grade :3.4.2 Category wise u
The reserve has iaking into account of exploration carried
out during last plan period.
3.4.3.1 Sumrnary of Geological Reserve (Ref. Table No.
Khub Limestone Mine-I
Khub Limestone Mine-II (Ref. Tabte- 4)
Classification UNFC Code Quantity of Ore(MT)
Limestone Sandstone
Measured Mineral Resource 331 s617900 2595A6
Classification UNFC Code Quantity of Ore(MT)
Limestone Sandstone
Measured Mineral Resource 331 4266262.5 393858
13
lvl/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tvl/s. CMC Ltd.Mining Lessee
3.4.3.2 Summary of Mineable Reserve
Khub Limestone Mine-I (Ref. table-2)
3.4.3.3
Khub Limestone Mine-I (Ref. Table- 1.2 & 3)
A. Measured Mineral Resource (331)Proved Mineral Reserve (l l1)
B. Non Mineable Resource
Limestone
Limestones617900 MT3t9297tMT
Sandstone259506 MT181386 MTid
Classification UNFC Code Quantity of Ore(MT)
Limestone SandstoneProved Mineral Reserve 111 319297s 181386
Khub Limestone Mine-II (Ref. table-S)
Classification ,r,rffi
iip/ ffiQuantity of Ore
(MT)
Limestone I SandstoneProved Mineral nes#fe/ W ln 2174200 i 22t688
Summary of ore
GEO
i:28t
\fffiti
={i
s,/Q'
,I limestone & sandstone.
]RCE & RESERVE
Category 7.5m ML area Ultimate Pit Slope Total
Feasibilitv Mineral Resource (21I 449325 197s600 2424925
Sandstone
Category 7.5m ML area. Ultimate Pit Slope Total
Feasibilitv Mineral Resource (21 l) 19935 581 85 78120
Khub Limestone Mine-II (Ref. Table- 4.5 & 6)
A. Measured Mineral Resource (331)Proved Mineral Reserve (11l)
B. Non Mineable Resource
Sandstone393858 MT221688 MT
I
{/\Key Person
M/s. Geornin Consultants (P) Ltd.Regn. iio,- iii)P/ cAL/ 167 19218
Limestone4266262.5 MT2174200}dT
L4
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
IWs. CMC Ltd.Mining Lessee
Limestone
Catesorv 7.5m ML area Ultimate Pit Slope TotalFeasibility Mineral Resource (21 l ) 446650 MT l6454t25MT 2092062.5}dT
Sandstone
Category 7.5m ML area Ultimate Pit Slooe TotalFeasibility Mineral Resource (21 1) 32256i||4T 139914 MT t72t70MT
Summarv of ore reserve of Khub Limestone Mine-I & Khub Limestone Mine-II
Limestone
KhubLimestone
Mine-I
KhubLimestone
Mine-IIMeasured Mineral Resource CaOo/o -46.5 to 53.2
MgO% -1.02 to 3.91Proved Mineral Reserve (l l1 5.36 mt
KhubLimestoneMinell
Measured Mineral Resource (331) ':i1-',r,
Proved Mineral Reserve (111
Non-mineable Resource
*i-:ff 'fi]:;, lf: ::L#;J:, 1 "{trilllffiHHhlfl x,mineable resource under UNFC norm fo
Limestone
slope liave also been
the summary of non-
Category ML area 7.5m ML UltimatePit Slope
Total
Feasibility MineralResource (21 I )
Khub Limestone M ne-l 0.45mt 1.97 mt 2.42mtKhub Limestone M ne-II 0.44 mt l.65mt 2.09 mt
Total 0.89mt 3.62 mt 4.51 mt
Sandstone
Category ML area 7.5m ML UltimatePit Slone
Total
Feasibility MineralResource (21 l)
Khub Limestone Mine-I 0.02mt 0.05 mt 0.07 mtKhub Limestone Mine-II 0.03 mt 0.l4mt 0.17 mt
Total 0.05mt 0.19 mt 0.24 mt
15
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
Summary of ore reserves
Limestone
Reserves (million tones) KhubLimestoneMine-I
KhubLimestoneMine-II
Total Averagegrade
Geoloeical Resource s.6l 4.26 9.87 CaO%;o
5t.32Mgo%1.8
Resource blocked in 7.5m & Ultimate pit slope 2.42 2.09 4.51
Mineable reserves 3.19 2.17 5.36
Sandstone
Reserves (million tones) KhubLimestoneMine-I
KhubLimestoneMine-ll
Total
Geological Resourcc 0.2s 0.39 0.64
Resource blocked in 7.5m & UltimaIffi 0.07 0.17 0.24
trrtineiUte reserves /^{&X N 0.18 0.22 0.40
3.4.3.4 Grade
The analysi, fo, ,i* fKhub Limestone Mir\laboratory .
A A' A TT\TETI TIT AEQIT'TI-i
(t*.st(fli
K
N*
r4sl4lR
it
e from the Khub Limestone Mine -l &. Annexure-8) by the NABL accredited
F{)rnnuBs9/Codification -€=r/ Code Quantity(MT)
Limestone Sandstone
(A) Mineral reselveProved Mineral Reserve l1l s.36 0.40
probable Mineral Reserve 6$
&121
ififtSub Total: Reserve 1$f s.36 0.40
(B) Remaining Resource
Feasibility Mineral Resource 211 4.51 0.24
Prefeasibility Mineral Resource 221
222
Measured Mineral Resource 331
Indicated Mineral Resource 332
Inferred Mineral Resource 333
Reconnaissance Mineral Resource 334
Sub Total : Remaining Resource 4.51 0.24
Total Resource (A+B) 9.87 0.64
16Key person
M/s, Geomin Consuttanrs (p) Ltd.Regn. No.. Rep/CAL/16t tizll
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
UNFC JUSTIFICATION
a) Economic Axis (E1)
- The said mine will be a captive source for lessee's own cement plant.
- The mine is having suitable grade limestone to cater to the need of the
cement plant.- Land details are available.
b) Feasibility Axis (F1)
- M.L area is already proved with good grade lirnestone.
- Copy of Feasibility reporl is enclosed vide annexure -13.- Details of infi astructure & services are available around the M.L area.
c) Geological Axis (G1)
- Geological mapping has been done is 1 :1000 scale.
- Boreholes were drilled. Detailed as well as composite samples are
analysed.
the proved reserve ofHence
111.
The non-minable reso
criteria.
can'.{e booked under I-INFC code
er 2I1 because of following
a) Economic Axis ("r)W- It is economic, but not mineable due to slope and safety zone.
b) Feasibility Axis (F1)
- Although feasible not mineable due to eonstraints discussed under E2.
o :':::il:H:i:Jrffi-ion but not mineable due to ractors
discussed under E2 &F 1. j
'tt'-tr&/,' .t':
-/'
iKY ert6t
L7
;i,,i r
3.5
lvl/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
I\,ils. CMC Ltd.Mining Lessee
Exploration Proposal (Proposed):
In order to prove the continuity & persistence of ore deposits below
sandstone band in Khub Limestone Mine-I and Khub Limestone Mine-II the
following bore holes were proposed.
Proposed exploration-Khub Limestone Mine-I (a.96 Ha)
KeY PersonM/s. Geornin Consultants (P) Ltd'
i.gn No.' RCP/CALl167/92/B
SI. No. ltt Year Proposed Borehole
Angle of Borehole
Depth of bore hole
I 20r5-t6 CMCL/PBH-1 Vertical 50 mtr.
2 20r5-16 CMCL/PBH-2 Vertical 60 mtr.
aJ 20t5-16 CMCL/PBH-3 Vertical 50 mtr.
Proposed exploration -Khub Li
Depth of bore hole1" Year
60 mtr.20ts-r6
60 mtr.
60 mtr.
20r5-16
2015-16 CMCL/PBH-
18
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tWs. CMC Ltd.Mining Lessee
Table - I
GEOLOGICAL RESERVE (KHUB LIMESTONE MINE-I)
Limestone
CategorySection
ConsideredCross
sectionalarea(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)MeasLrred
MineralResource(33 r)
AA' 9344 55 5n924 2.5 1284800BB' 12798 50 639900 2.5 I 5997s0
CC' t4620 50 73 1000 2.5 I 827500
DD' 6s88 55 362340 2.5 905850
Total: 2247160 s617900
Sandstone
CategorySection
ConsideredCross
sectional4'' " ,'tftr\
avda<4- -t&h/.
Length of=ffiSffi") fto'"
r (m3)
Tonnagefactor
(MT /m3)
Quantity
(MT}
MeasuredMineralResource(331)
AA' 5J 31900 .8 s7420
BB' b3v3 50 686s0 8 123570
CC' 505 50 252s0 .8 45450
DD' SA. {i riq wd5 ,/...€ l 8370 .8 33066
Total :- YA,\ /,*\2 144170 259506
rJ/v0lAN
"--%
19
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
Table - 2
MINEABLE RESERVE (KHUB LIMESTONE MINE-I)
Limestone
CategorySection
ConsideredCross
sectionalarea(*t)
Lengtlr ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)
ProvedMineralReserve(11 1)
AA' 4993 55 274615 2.5 686537.5
BB' 8397 50 419850 2.5 1049625
CC' 7315 50 365750 2.5 91437s
DD' 3945 55 2t6975 2.5 542437.5
Total :- 1277190 3192975
Sandstone NCategory
SectionConsidered #fftfi
ardb:i \''r-\\*I
\r$$r"lff,ii:,i,l'".l.tl
'.:'"'rd{ntr
Tonnagefactor
(MT /m3)
Quantity
(N{T)
ProvedMineralReserve(l l1)
AA' 450'\J1 ,':u 55 .y' t-/tLq:lSO t.8 44550
BB' 98s .,1.14r5.5q, 1:'y"; : .49250 1.8 88650
CC' 322'To l6l0c 1.8 28980
DD' 194 55 10670 1.8 r9206
Total : "* 100770 181386
l#-#
Key PersonMls. Geomin Consuttarrts (plLtd.Regn. No.. R0p/CALl16t lgll}
20
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tWs. CMC Ltd.Mining Lessee
Table - 3NON-MINEABLE RESOURCE (7.5 ML boundary)
Limestone
Sandstone
Sandstone
J. :. ._.
Category SectionConsidered
Crosssectional
area(m2)
Length ofinflucnce
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)FeasibilityMineralResource(211)
AA' 823 55 45265 2.5 113162.5BB' 885 50 44250 2.5 tta625CC' tt52 50 57600 2.5 144000DD' 593 55 32615 2.s 81 537.5
Total : t79730 449375
Category ScctionConsidered
Crosssectional
area(m2)
Length ofinfluence
(m)
Volurnc
(mr)
Tonnagcfactor
(MT /m3)
Quantit5'
(MT)FeasibilityMineralResource(211)
AA' s9 55 324s 1.8 584 I
BB' 88 50 4400 1.8 7920CC' 40 s0 2000 1.8 3600DD' 26 55 1430 1.8 2574
Total:- 11075 19935
URCB (Ultimate pit slope)
Volume
FeasibilityMineralResource(2l l)
769125t12750
Category SectionConsidered
Crosssectional
area(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)FeasibilityMineralResource(21r)
AA' 7l 55 3905 1.8 7029BB' 300 , 50 I 5000 1.8 27000CC' 143 50 7150 1.8 12870Df)' 114 55 6210 1.8 I 1286
Total:- t 32325 58185
x4?Je'
lvf/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
Table - 4
GEOLOGTCAL RESERVE (KHUB LTMESTONE MrNE-rr)
Limestone
Sandstone
s-%KeY Person
M/s. Geomin Consultants (P) Ltd'Regn. No.' RQP/CAtl 167/92/B
CategorySection
ConsideredCross
sectionalarea(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)MeasuredMineralResource(33 l)
E,E' 4225 75 3 1 6875 2.5 792187.sFF' l3 169 50 658450 2.5 t646t2sGG' 67 57 50 337850 2.5 84462sHH' 5619 70 393330 2.5 983325
Total : 1706s05 4266262.5
CategorySection
ConsideredCross
sectionalarea(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)MeasuredMineralResource(33 l)
EE' 966 75 72450 t.8 130410
FF' I 34s 50 67250 1.8 121050
GG' 745 50 37250 1.8 670s0
HH' 598 70 41 860 1.8 75348
Total :- qRitt88t0 393858
ffi
22
Ir,I/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tvl/s. CMC Ltd.Mining Lessee
Table - 5
MINEABLB RESERVE (KHUB LIMESTONE MINE-II)
Limestone
Sandstone
.' .i : , /t
-r,g.f:1il'.)iiF
J
CategorySection
ConsideredCross
sectionalarea(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefacton
(MT /m3)
Quantity
(MT)ProvedMineralReserve(111)
EE' 2692 75 201900 2.5 5047s0
FF' 747 4 50 373700 2.5 9342s0
GG' 2159 50 107950 2.5 26987s
HH' 2659 70 186130 2.5 46s325
Total:- 869680 2174200
CategorySection
ConsideredCross
sectionalarea{m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)
ProvedMineralReserve(l l r)
EE' 606 75 4s450 1.8 81810
FF' 894 50 44700 1.8 80460
GG' 411 50 20s50 1.8 36990
HH' 178 70 t2460 1.8 22428
Total:- t23t6A 221688
23*t-, l. r:'.
lv{/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
Table - 6NON-MINEABLE RESOURCE (7.5 ML boundary)
Limestone
Sandstone
Limestone
Sandstone
Key personM/s. Geomin Consuttants (plLtd.Regn. No.. Rep/cAL/1 6 I lg2lB
CategorySection
ConsideredCross sectional
area(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)FeasibilityMineralResource(21 1)
EE' 500 75 37500 2.5 93750FF' 970 50 48500 2.5 121250GG' 834 50 41',l00 2.5 t04250HH' 128 70 s0960 2.5 127400
Total :- 178660 446650
CatcgorySection
ConsideredCross scctional
area(m2)
Length ofinfluence
(m)
Volumc
(mr)
Tonnagcfactor
(MT /m3)
Quantitl,
(MT)FeasibilityMineralResource(211)
EE' 80 75 6000 1.8 10800
FF' 80 50 4000 r.8 7200GG' 80 50 4000 1.8 ''t200
HH' 56 70 3920 1.8 7056Total :- 17920 32256
CategorySection
ConsideredCross .-.' ,,.,
scctional a,r€a,'(m2)l '' '
:Irfigth-bfinfliienbe
iu(fu1'
"$qlunre\ r"2'\r.
\t tttt''l
Tonnagefactor
(MT /m3)
Quantit5,
(MT)FeasibilityMineralResource(2rt)
EE' [033 ,-:75 :i1415 2.5 t93687.5FF' 4.725 _.50 / 23:6250 2.5 590625
GG' ttN64; ni'.,". 50 '', ,l8g2oo 2.5 470500HH' 22i2. :'70. 1s6240 2.5 390600
Total :- 658165 164s4r2.5
CategorySection
ConsideredCross
sectional area(m2)
Length ofinfluence
(m)
Volume
(m3)
Tonnagefactor
(MT /m3)
Quantity
(MT)FeasibilityMineralResource(2r r)
EE' 280 75 21000 1.8 37800FF' 371 50 1 8550 1.8 33390GG' 254 50 t2700 1.8 22860HH' 364 70 25480 1.8 45864
Total:- -4 77734 139914
#t
lv{,/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
CHAPTER - 4
4.0 CONCEPTUAL MINTNG PLAN:[Ref. Plate No. VIIIIThe reserve of limestone has been projected upto 430 mRL & 450 mRL in KhubLimestone Mine-I and Khub Limestone Mine-ll area respectively. Accordinglyconceptual planning for limestone has been projected as per the present availableborehole data. The gross geological reserve of this area lias been estimated at 9.87 milliontonnes under proved category by ten bore holes drilled so far in the area.
Iv{ineable reserve estimated
Production planned for Five years
Hence reserve available for conceptual mining : 3.38 million tonne
Keeping production of limestone around 5 lakhs MT per year, the life of the mine will be
around another 7 years. Hence the total life of the mine will be 12 years inclusive ofproposed five year of scheme period.
Outline of five year developmental programme:
The yearwise development of the quanies during the five years of scheme period has beenprojected upto 449 mRL & 467 mRL in Khub Limestone Mine-l & Khub LimestoneMine-ll respectively. The systematic benches will be developed in north & western part
both laterally and depth ward to reach at the desired production output. The developmentof benches will start from north-west and will advarrce in south-east direction.
The detailed yearwise developmental programme (2015-16 to 2019-20) has been
discussed in para 5.21 to 5.2.5 of mining chapter.
Exploration Proposal :
Six (6) no. of boreho roposed during 1" year
tentative location has logical plan (Plate no.
Land use Pattern
: 5.36 million tonne
: 1.98 million tonre
of scheme period. Theril).
During the life of thewill be under 7.5mhowever as follows:
MiningSafety zone (7.5m
The balance 1.57 ha.land use pattem is
M.L boundary)Total
25
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
4.5.1 Ultimate extent and size of the pit:
The conceptual quarry/ has been projected up to depth matching with the
proved limit of the ore zone. The floor RL of ultimate pit will be upto 430m
RL, in (Khub Limestone Mine-I) & 450mRL in Khub Limestone Mine-II.
The conceptual mining has been projected by extending the quaffy mostly in
all direction. The ultimate extent and size of the pit is indicated in Plate-\{II.
4.5.2 Final slope angle at the close of mine:
The final slope angle would be kept at 45o with the erection of quarry benoh
of 6m height and width. [Ref. Plate * VIII].
4.5.3 Ultimate pit limit boundaries:
The ultimate limit of limestone quarry with their coffesponding sections
have been indicated in Plate : VIII.
4.5.4 Ultimate capacity of dump:
As there is no overburden in
there shall be no waste dump.
will be generated. I{ence
4.5.5 Reclamation & Rehabilitation measures of Mined out area.
Total area to be degraded during the life of the mine is 8.09 Ha for mining.
No reclamation proposal has been envisaged during the scheme period. A
Key PersonM/s. Geomin Consultartts (PlLtd.Regn, No.- ROP/cALl1 67 lgll9
26
drWx
lv{/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
Details of location, area & types of reclamation / rehabilitation measureshave been given below:
4.5.6 Safety & Environmental Measures :
Comprehensive post plantation care is to be undertaken.
Schedule of monitoring for ambient air, noise, dust and water are to be
regulated properly.
Proper maintenance of the road surface will be done by spraying
water periodically.
Blasting will be carried out using NONEL (Non-Electric Initiation
system) to reduce fly rock, noise & ground vibration.
Proper manuring and watering at the plantation site will be supervised
to achieve 80Yo survival of planted saplings.
4.5.7 Concluding Remarks
After detail analysis ofscenario, the impacts ofdifferent controlling mefollows:
present environmention for limestone, theverse impacts are as
d,i:t t
.,..!:;:,:
Name of thequarry
Period ofreclamation &rehabilitationmeasures
Location
(Ref. Plate - VIII)Area
(hects)Type ofreclamation &rehabilitationmeasures.
AmalgamatedKhubLimestoneMine
Scheme period 7.5m all along theM.L boundary
t.57 Plantation
Beyond schemeperiod of5 years
M.L area 8.09 Bench plantation
Total 9.66
27':'
I i,
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
The lease-hold area is far away fi'om the village or any human
settlements.
There is no historical rnonurnent or ecologically or otherwise sensitive
area falls within one km. distance.
The M.L. area comprises private non-agricultural land.
Meteorological and general air quality of the area will not suffer and
there wiil be no adverse impact on the hydrography and also water
quality.
Negligible nature of air pollution can be visr-ralized for which adequate
preventive lneasures have been contemplated.
Socio-economic impact of the area rvill be significantly positive.
To encourage economic development of local people CMCL
a) Preference to local people of Jaintia Hills for all non-technical and
technical posts if suitable people are available.
b) Will not allot any contract work to any non-tribal, who does not
possess a valid trading licence.
Based on the said rnines several small industries are likely to develop
in this remote area.
KeY PersonM/s. Geomin Consultants (P) Ltd'
li;s;. N';.- RQP/ cALr 1 67 tszll
',!Q:',,irqr*-
28
5.0
5.1
N{/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
IWs. CMC Ltd.Mining Lessee
CHAPTER _ 5
MINING
BRIEF DESCRIPTION
During the last plan period (2010-2011 to 2014-15) the mining activity
within the area M.L has been carried out with respect to approved Mining
Plan. In totality the lessee has produced 22.68 lakhs MT against 24.50 lac
MT. The rnethod of mining will be fully mechanized (FM) as per approved
Mining Plan.
The machines/equipments/vehicles like Hydraulic excavator, compressor
with crawler drill, tipper, rock breakers etc. will be deployed to develop or
work in the area for limestone. It is proposed to maintain bench height &
width at 6m and 9m respectively during.the ensuring scheme period.
5.2 Yearlvise development of liQ0Is-16 to 2019-20).
ng 5 years
The yearwise development of the quarries during the five years of scheme
period has been projected upto 449 mRL & 467 mRL in Khub Limestone
Mine-I & Khub Limestone Mine-II respectively. The systematic benches
laterally and depth ward to
lopment of benches will
direction.
'li;. t 1 1 r, '1 ,i,; .'l
29_d
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
5.2.1 Development during L't year (2015-16)Ref. Plate IV(A) (Ref. Table-7)
Description Proposed quarry
Khub Limestone
Mine-I
Khub Limestone
Mine-[I
Section considered BB' & CC' FF' & GG'
Bottorn RL 479 497
Direction of advancernent NW-SE NW-SE
Height & width of bench (rn/m) 6t9 6/9
Quany slope <45' <45'
Production of ore(MT) 320625 r54470
Total production of ore (Limestone):320625 + 154470 : 475095 MT.
Generation of Sandstone :36012.6 MT5.2.2 Development during2"o year (2016-17)
Ref. Plate IV(B)
Description Proposed quarry
Khub I,i.mestone
f-,* i,*Khub Limestone
Mine-II
Section considered ryt - ;i FF' & GG'
Bottom RL diffi ls 491
Direction of advancement .\'\ )" ryo'7 NW-SE
Height & width of bench (rn/-) 'xgl=qutz 6/9
Quarry slope <45" <45u
Production of ore(MT) 2t4890 181117.5
Total production of ore (Limestone):214890 +
Generation of Sandstone :36730.8 MT
181117.5:396007.5 MT.
Irl
.UKeY Person
M/s. Geornin Consuitants (P) Ltd'
i*gn. No.' R0P/cAL/167/92/B
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
5.2.3 Development during 3'd year (2017-13)Ref. Plate IV(C)
Description Proposed quarry
Khub Limestone
Mine-I
Khub Limestone
Mine-II
Section considered BB' & CC' FF' & GG'
Bottorn RL 467 485
Direction of advancerlent NW-SE NW-SE
Height & width of bench (m/m) 619 6/9
Quarry slope <45u <45"
Production of ore(MT) t84252.5 r879s7.5
Total production of ore (Limestone): 184252.5 + 187957.5 :372210MT.
Generation of Sandstone :36628.2 MT
5.2.4 Development during 4th year (2018-19) .":..,-.:SiI;;nei-+'il\.3+),Ref. Plate IV(D) :'dr{---":(.,i..
Total production of ore (Limestone):377767.5 + 16387.5:394155 MT.
Generation of Sandstone:101061 MT
Description,JF76nQ $ffit"'t:"'
Khub Litn$tonS
,il[+\#Section considered S.9zacc'Bottom RL 455 479
Direction of advancement NW-SE NW-SE
Height & width of bench (to/*) 619 6t9
Quarry slope <45u <45u
Production of ore(MT) 377767.s 16387.s
31
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
5.2.5 Development during Sth year (Z0lg-20)
Ref. Plate IV(E)
Description Proposed quarry
Khub LimestoneMine-I
Khub LimestoneMine-II
Section considered BB' & CC' FF'& GG'
Bottom RL 449 467,473
Direction of advancement NW-SE NW-SE
Height & width of bench (m/m) 619 6t9
Quarry slope <45' <45'
Production of ore(MT) 142785 205485
Total production of ore (Limestone): 142785 + 205485 : 348270 MT.
5.3 The year wise production, waste generated and sub-grade generation ascomputed listed below (Ref. Table - 7).
Height & width of benches - 6m/9m
Pit slope (Scheme Period) - <450
Ultimate pit slope (Conceptual stage) - 450
. t(eY Personhl/s. Georrrin 6onsultants (P) Ltd'
neg;. No.- ROP/cA11167,92/B
Category lr'(2015-16)
zno(20t6-t7\
3'"(2017-18)
4.tt(2018-r9)
5t"(2019-20\
Total
Production ofore(MT)
475095A ffit't 372210 394155 348270 I 985738
Generation ofSandstone (MT)
360];&; *lfirEt 36628.2 l0l06l 210432.6
Generation ofsub-grade (m3) Nil Nil €-T\ Nil Nil
5.4 Any change in the prof machinery:.r.L fIL
n no arr * ^*r,^.i!7ioffi,$l -)H rg & development
I
as projected in the:ll L
Y ""Tryrl *l
^. r rr!,t-\.
6'<J)
ze
\\Lffi
re
32
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tWs. CMC Ltd.Mining Lessee
5.4.2 Haulage Design
Haul roads will be constructed at 1:16 to I:20 gradient. Width of roads willbe maintained at 10m to lZm.
5.4.3 Drain Design :
Peripheral/garland drains with settling tanks will be provided aroundproposed quarry for surface drainage during monsoons.
5.5 Underground Mines
Not applicable
5.6 Extent of Mechanisation
5.6.1 Drilling Operation - (Primary)
Drilling operation will be carried out with the help of high pressure
compressor XAH-210 combined with crawler drill model ROC-203. The
drill machine will receive air from the compressor through the reinforced
rubber hose of 50 mm ditjfr;lF *ithstand air pressure upto I0 - rz
kglcm2. ;icf
The drill machine will receive a minimum air pressure of t0 - 12 kgf/cm2 to
maintain the flow of drilling at the rate of 12 meters per hour. The down the
hole hammer has got the merits of transfett.tttg t!e;:erps-9ure energy direct at'''',,''. '' 'ii.''='.
After primary blasting, secondary Roc$!\euk.E#flrh e ilpFil for breaking ofoversized boulders.
:th'-*$95.6.2 Drilling Operation (Secondary)
Not applicable - Secondary blasting is totally omitted, the large boulders
will be broken by hydraulic rock breaker.
the hammer, which helps in net utllizutiqrhfrgF.s{B(g-$,, diameter of the
drlrhorewnlberesrrictedto ur,: fif
-ffi )EJ)
l(ey personM/s. Geornin Consulrants (p)Ltd.riusn. No.. Rep/cALt16 iti,ita'
33
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
5.6.3 BlastingMaximum production planned per day:(4,75,000MT/300)
1583 say 1600 MT
5.6.4 Direct Productive Equipment:
Back-hoe hydraulic (1.35m3 bucket) size.
Production capacity of back-hoe hydraulic excavator
Bucket capacity
Bucket filI factor
Density of limestone (loose)
Cycle time per pass
Job efficiency
Production per hour. Bucket capacj x Job efficiency
say 198MTDensity of limestone / Cycle time p
Output/shovel/year:198MT x 6 x I 4MTProduction planned (Maximum): 4, 7 5;*
Excavator required :4,75, 84MT:2.3 say 2
Hence two number of back-hoe hydraulic excavator of 1.35m3 capacity willbe required.
t,'.il'ir; i/,r?i1
ffi
Burden(m) 3.0Spacing(m) 4.0Depth of blast hole(m) 6.0Production per hole (m3) 3.0x4.0x6.0
72Production per hole (Tonnage) 72 x 2.5
180 Metric TonnesNo. of holes required i600/180 8.88 say t holesMeterage required to be drilled 9 x 6 54mAdditional drilling for sub-grade etc
@10% of the above60m
.93
34
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
5.6.5 Tata Hyva 18 MT Tipper for Transportation of Limestone
Cycle tirne of tipper:
Loading time : 3.0 MinutesTravelling with load @ 25 KMPH over a distance of : 10.0 Minutes3km.
Unloading : 1.5 MinutesManeuvering with curves & bends : 3.0 MinutesBack to mines @30 KMPH 6.0 MinutesSpotting at the excavator : 1.5 MinutesTotal : 25.0 Minutes
Considering l\oh additional on total cycle, Net time : 27.50Minutes.consumed per tripNo. of cycles per hour, (60/27.5) : 2.18
Transportation per tipper / hour (18.0 x 2.18) : 39.00 MTNo of tippers required (198 / 39) : 5.07
Considering 20% additional tipper on account of : 6.08
breakdown, total tipper requirement comes to : Say 6 No. oftippers
5.6.5.1 Dozer .,r*fs
It has been decided to deploy "t. *dffiM,- Model D-50 01 90 for
the purpose of leveling and other miscellaneous dozing operation during the
course of mine development and regular mining operation. The dozer will be
quite helpful in leveling the bench floors before commencement of drilling
operation. A leveled'bpnchrflqel\tl always desirable for easy maneuvering of
One no. of thnker of 10KL capacity will be used for
,'approach road and blast muck pile.
Key personM/s. Geomin Consuttants (p)Ltd.Resn. No,. Repi cAL/r6 itgzt}
dust suppression on
35
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
5.6.5.3 Explosive Van
One no. for transportation of explosives from the Explosive Magazine to themines.
5.6.5.4 Ambulance
One no. for emergency service and as a welfare measure for the miners and
their family members and the same can also be used for local surrounding
5.7
HEM MechanicMaintenance HelperHEM OperatorsDrill cum CompressorBlasting HelperOperator for Water Tanker/DiLight Vehicle DriverMagazine KeeperOffice ClerkOffice Boy
villagers for the same purpose.
Employment Potential
Existing:
Other than the above the followiworking in the mine for producl
ories of workmen and
nance & for keeping
records:
i.ii.iii.iv.V.
vi.vii.viii.ix.X.
I nos.I nos.
JKeY Person
t,l/s. Gcomin Cortsultants (P) Ltd'
R;s; No.- RoP/cAt-/tozlgzle
staff arestatutoty
Sl. No. Desisnation Oualification Nos.
1 Mine's Manger Diploma in mining 1" class
Manager's Certificate01
2. Asst. Manager(Mines)
BE (Mining), 2no class, Manager'sCertificate
01
J. Minine Engineer BE (Minine) 01
4. Geoloeist M.Sc (Geology) 0l5. Foreman Holder of Foreman certificate 02
6. Surveyor (Mines) Surveyor Certihcate fi'om DGMS. 01
7. Mines Supervisor Holder Minine mate certificate 0l8. Minins mate Minine mate certificate 02
9. MaintenanceEngineer
Diploma in Automobiie Engineering 0l
36
M/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
Proposed Workmen: (Semi Skilled)
1
2
aJ
4
5
6
For excavator
For tipper
Dozer
Water sprinkler
ROC 203 & XAH i86/210
l lt'draulic rock breaker
I no.
9 nos.
1 no.
1 no.
1 no.
1 nos.
.'==--\-
ru\F\ ffibWJ
, ,': i:li:'il\+r: ! :ii1
37
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
Table- 7
YEAR WISE PRODUCTI
Limestone
AIO q4 e'll'ide lttter N,t.w{.g.tty/.lrae.H$.
Dated.. )4 lejfralYear Section
consideredCross
sectionalarea(m2)
Length ofinfluence
(m)
Volume
(nt,)
Recoveryfactor
Tonnagefactor
Quantity
(MT)lt'
(20r s-16)BB' Kliubl 790 60 47400 0.95 2.5 112575cc' 1460 60 87600 0.9s 2.5 2080s0FF'
Khub-II 803 60 48180 0.95 2.5 tl4427.5GG 281 60 1 6860 0.9s 2.5 40042.5
Sub-Totel 200040 47509s2""
QA\6-17)BB'CC
Khub-l807 60 48420 0.95 2.5 114991.5
701 60 42060 0.95 2.5 99892.5FF'
Khub-II840 60 50400 0.95 2.5 I I 9700
GG' 431 60 2s860 0.9s | 2.s 61417.s
Sub-Total 166740 396007.s3'"
(20r7-18)BB'
Khub-I700 60 42000 0.9s 2.5 99750
CC' 593 60 35s80 0.9s 2.5 84502.sFF'
Khub-tl879 60 s2740 0.95 2.5 125257.5
GG' 440 60 26400 0.9s 2.5 62700
Sub-Total 156720 3722t04
TN
(20 r 8-19)BB' Khubl 1790 60 107400 0.95 2.5 2ssa7s
CC' 861 60 s 1660 0.9s 2.s I r22692.s
FF'Khub-II
BO 60 4800 0.95 2.5 I 1400
GG' 35 60 12100 10.9s 2.5 4987.s
Sub-Total 16s960 3941555
(2019-20)BB'
Khub-ItJ3 ffi 439B0 0.95 2.5 104452.5
CC' 269't{r,1 16140 0.95 2.5 38332.5
FF'Khub-II
l2lr-- 11\lF 13020 0.9s 2.5 t73422.5
GG' zAffi? 60 l3sa= q-0.95 2.5 32062.5
Sub-Total ."1:*q664j.: D-^\. 348270
G. Total :.'t3f61,00* \iry1 1985738
Sandstone 'lr: / A s: \:,'lr'
(2015-16)BB'
Khub-l102 60 li rc 6f 0.lg 1.8 10465.2
CC' 249 60 uo t49 r 0.9F 1.8 25547.4
Sub-Total r. ,:1. 2109S{l[rr /-6' 36012.6
2'-(2016-17) BB' Khubl 358 60 l( f.R4g0'
'i ./i?-'-.- .K7 1.8 36730.8
atuJ(2017-1 8)
BB' Khub-I357 60 *rggH 14.9s 1.8 36628.2
4tt(2018-19)
FF'Khub-II
691 60 41460 0.9s 1.8 70896.6
GG' 294 60 17640 0.95 1.8 30164.4
Sub-Total 102000 174420
G. Total \ 123060 2r0432.6
\-)r.9KS''.\)A\
n
F, *. vorm I 1g F-atrr'gf,Afll ;:r dr- F- r---
3B Key PersontI/s. Geqmin Consultants (P) Ltd.
Regn. No," R0PlcALll 67 l92lB
6.0
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tWs. CMC Ltd.Mining Lessee
CHAPTER - 6
HANDLING OF WASTES /SUB.GRADE MTNERAL:
As mentioned earlier, the entire overburden has been removed duringprevious plan period and there is also no sub-grade limestone. Thetotal ROM is used for manufacturing of the cement.
However sandstone generated durirrg the course of lime stone miningwill be directly dispatched to the plant outside the M.L area for use as
additives as and when required.
The year wise generation of sandstone in the ensuing scheme period isdetailed in mining chapter. (Ref. Para5.2.l to 5.2.4)
Both the area has alreadywaste generation as suchwaste dumping and it'senvisaged.
been worked out in totality there will be noany existence of soil except sandstone. So,
management within the M.L area is not
ra'
#b
39'. t rl
i,r i, :
ffi
IWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
Mis. CMC Ltd.Mining Lessee
CHAPTER - 7
7.0 USE OF'MINERALS
Amalgarnated Khub Limestone Mine is a captive mine for 1800TPD
capacity of Cement Plant of CMCL which has been expanded to 2400tpd.
The limestone produced in the mine is used for manufacturing of Cement
and will be exclusively for captive use.
-.nffiN*1S>:
i-.nr"9
sl<t{Qr
W
Key PersonM/s. Geo.min Cottsultatrts (P) Ltd,Reg n. No.- RQP/cA1,167 l92l}
40
M/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
CHAPTER _ 8
8.0 MINERAL BENEFICIATION :
Mineral beneficiation is not required as the total ROM (100%) will be
transporled to CMCL plant for Cement Manufacturing.
ff
4LI
TKey Person
ll/s. Geoinin Ccnsultrnts (P)Ltd.Rcgn. No.- R0Pi cALl167l92lB
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
lWs. CMC Ltd.Mining Lessee
CHAPTER _ 9
9.0 ENVIRONMENTALMANAGEMENT'PLAN9.1 Top-soil storage preservation & utilization
9.2 Land Reclamation & Rehabilitation
9.3
9.1.1 9.1.2 9.1.3Proposal as per theapproved mining plan.(Date of approval letter -3t4(3)12010-MCCM(CZ)|MP-3Z dated08.04.11)
Position at the end of 5years of mining plan.
Proposal for nextscheme period.
No specific atea was
earmarked. The top-soilhas already been removed
to outside M.L area forutilization for plantationwithin 7.5m safety zone
area.
Mining activities duringthe approved Mining Planperiod is devoid oftopsoil.
As there will be no top-
soil generation during
mining operation,
proposal for the top-soil
stacking has not been
envisaged.
9.2.r 9.2.2 9.2.3No proposal forrecIamati on/rehabi I itationwas envlsased ^ad
I) t43.
Land reclamation & rehabilitationduring next five years is not feasibleas the quarry is yet to be exhausted.
Waste dump ma t.
9.3.1 9.3.2 - ;-'--i:.-" aat.:\.-\\ 9.3.3
Proposal as per ofapproved mining plan.
Position at the/6ri{-of+years of mining.frp16r,, ;;:,.,1
QE*ut for the nextsch$h\pf mining.
No dumping proposal forwaste has been given.The overburden in thearea was alreadyremoved. The total ROMis proposed to betransported to CMCLplant for cementmanufacturing.
Not \ $fuuired as
,com$r.Sts furnished'Rar/W:..r:ri::!/r):7'.;r'
perin
42
M/s. Geomin Consultants (P) Ltd.Geological & Mining Consultants
IWs. CMC Ltd.Mining Lessee
9.4 Afforestation programme with precautions proposed for survival and
protection of plantation.
9.4.1 9.4.2 9.4.3Proposal As per ofapproved mining plan.
Position at the end of 5years of approvedmining plan.
Proposal for next 5years of scheme period.
Afforestation programme
was proposed all alongthe lease boundary withinthe 7.5ni M.L boundary
@2500 saplings per
hectare.
Plantation within the M.Lboundary (7.5m) has beencarried out. Plantation of3814 species has been
carried out rvith average
survival rate of 89%.
During ensuing scheme
period (2015-16 to 2019-
20) afforestationprogramme is proposcd
for re-plantation along
the M.L boundary (Ref.
Plate No. VII & over 1.57
hectares @ 160A sapling
per hectare.
9.5 Quality of Air.
KeY PersonM/s. Geoniintorr:;ultants (P) Ltd'"ii;;;.
N; - [oPtcrt-r t o7 tsltB
9.s.1 9.5.2 9.5.3Proposal as per theapproved mining plan
Position at the end of 5years approved rnining
-phr.
Proposal for the next 5years scheme period.
Proper maintenan""Gthe compactness of$#road surface by spraf,ngwater periodically, using
sharp cutting tools,providing dust respirators
and thick plantation wereproposed to minimize airpollution.
NfiSfag. in the area has
ffiEf carried out ryigfffipreventive ^g{Et6measures ,o tq{&rfir@$#air envi.onffi -\ffiregular mort[trd.ns !$ambient air quaYf .).
_ i;.;{
..,i,':i:i;
Besides the measures
fuqed in the approvedPlqn ncrinrlin
for theeme neriod is1rn
be,
i'17:''b1lvlrcVI)Mana6_ VID
(t.
d// stations as
{"a in the
rnmerrt Plan (Plate-
& Environment
lement Plan (Plate
43
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
tWs. CMC Ltd.Mining Lessee
9.6 Quality & make of water including surface and ground water.
As there is no water body area in the mining arca there will be no question
of water quality to get affected, so water quality remains unaffected.
9.7 Treatment of mine water and effluent/toxic substances before dischargeand Recirculation of treated water:
There was no proposal for the use for water in the beneficiation process.
There is no discharge of effluents from the working of the mine. Hence
necessity of water treatment does not arise.
9.8 Noise & ground vibrations
Proposal For The nextyears Scheme Period.
Proposal as per approvedmining plan.
Position At The End of 5years of approved MiningPlan.
Blasting and noise controlcrawler drill machines
will be provided with dustcollector to prevent dust
Periodical blasting, using(Non-Electric
lnitiation System) willreduce noise levelconsiderably & also
minimize ground vibrationand fly rock. All personnelworking on drills shall be
provided with dust masks. Itis better that the majorblasting be done only once
in a week or at mid dayuring the lunch break or at
he end of the shift when
few workers will be rn
around the workingarea. Villages are far awaY
from the working site so the
effect of dust on thisaccount will be practicallYinsignificant.
Carefully planningsupervision and exalting ofeach blast, use of milli-second delay detonators &cord relays, properstemming to prevent blowout of holes wore proposed.
Such preventive measureshave been taken up in thearea with due precautionarymeasures.
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
IWs. CMC Ltd.Mining Lessee
Monitoring Schedule with Frequency
The no. of airlwater/noise monitoring
has been indicated in Environment
:
stations both in core and buffer zone
Plan (Plate VI) and Environment
Management Plan (Plate - VII). The monitoring schedule with frequency of
Key PersonMis. Geomiri Consultants (P) Ltd.Regn. No." RePICAL/1 67 l92l9
monitoring are given below.
Environmental
Domain
Parameter Frequency
Air SPM, PM10, SO2 and NoX Quarlerly twice (continuously
for 48 hours) in 4 locations.
Water As per CPCB Guide line 2 samples from ground water
2 from surface water source
in a quarter.
Noise Level 24 hours in a quarter in 4
locations.
45
lWs. Geomin Consultants (P) Ltd.Geological & Mining Consultants
M/s. CMC Ltd.Mining Lessee
Table - 8
Plantation Schedule(along 7.5m lease boundary)
Year Area(m2)
Spacing(m)
No. ofsamplings
Type of species to beplanted
1"'year(20rs - 2016)
3140 2.5 s02
Neem, Champa, Accaciaetc.
An(]/" year(2016 - 2017\
3140 2.5 502
3'u yearQ0r7 - 2018)
3140 2.5 502
4'" year(2018 - 2019)
3140 2.5 502
5"'year.(2019 -2020)
3r40 2.5 502
Total:- 1s700 2st0
46
PROCRHSSI\PC ffiIilH GtE$URC PLATI
ln Respect Of
Amalgamated Khub Linrrestone M:neOver an Area of 9.66 Hectares
ln East Jaintia Hills District, Meghalaya.
t Khub-t (4.e0 Ha) & Khub-ll (4.70Ha) I
(Submitted under Rule 238(2)of MCDR, 1988)
ffifor & on behalf of
ffi/s Gemes?€ WmxsssSae&xxrExxg &ompeny L*d,Mining Lessee ,,j
Prepared by:
GTOMIN CSN$ULTANTS PVT. LTD,An ISO 9001:2008 Certified Company
102, RoyalResidency, Plot No. VlP48, IRC Village, Nayapalli, thubaneswar-7s1015, OdishaTel. : 0674-2551080, Fax : 0674-2551687, E-mail : [email protected]
CONTENTS
1
J
07
1
2
aJ
SL. No. NOMENCLATURE
6
7
8
9
10
Introduction.
Mine Description.
Review of Implementation of MiningPlan/Scheme of Mining Including 5 yearsProgressive Closure Plan Up To The FinalClosure Plan of The Mine.
Closure Plan
Economic Repercussions Of Ciosure Of MineAnd Man Powqr Retrenchments.
Time Scheduling For Abandonment.
Abandonment Cost.
Financial Assurance.
Certificate & Undertaking
Plans & Sections.
PAGE
08
10
t2
15
16
I7
l7
#%
I
A
Y;;ffiii,"-t;lul,:ll;y
1.0 INTRODUCTION:
* Name & Address of the Applicant.
Sri Devendra Bansal, Authorised Signatory, on behalf ofManufacturing Co. Ltd.
* Location, extent of the lease area, type of landnon-forest)
Village - LumshnongP.O. - LumshnongDistrict - East Jaintia Hills
Cement
(forest I
StatePINArea
- Meghalaya- 793 210- 9.66 hectares
Type of land- Non-forest
'r Present Land use pattern
ML Area comprises Grazing, barren and fallow land, where mineral
deposits exist. The area is surrounded by thick bushes. A perennial nala
flows about 400 mtrs. south of the southern lease boundary. The area is
devoid of any natural drainage course or nala.
tr Method of Mining
As mentioned earlier OB consist of soil & sandstone , the ent(Le OB has
been mined out in the M.L. area during last approv.g"d,$fi&Si
7.5 mtrs.
Mechanized method of ope
mine working i.e. height & width of benches,
blasting pattern, loading of blasted material, transporta)
OB etc. remain the same as discussed in Chapter IV.
* Mineral Processing
Mineral processing is not
manufacturing of cement.
required as 100% ROM is used for
I
IJ^ KefiersonM/s. Geomin Consuttants (P) Ltd.Regn. No.- R0ptcAL/167 lgllB
."s6T8li
1.1 REASONS FOR CLOSURE:
It is a new venture, the mineral is for consumption by the company's of
own cement plant located at 3.0 km. distance from the lease area. There is
no directive from any authority or any statutory organization or court. As
per statutory nonns the applicant has engaged North-Eastem Hills
University, Shillong for Rapid EIA and EMP studies.
Statutory Obligations :
The legal obligations, if any which the lessee is bound to implement like
special conditions imposed while execution of the lease deed, approval of
rnining plan, directives issued by Indian Bureau of Mines, condition
imposed by the Ministry of Environment &Forest, State or Central
Pollution Control Board or by any other organization describing the nature
of conditions and compliance position will be taken care of by the lessee.
If any objection is raised by the authorities named qbe1ffiRtlcant will, r-''
t.2
1.3
approach the concerned authoritv
ffi*ft?efrm' ahClosure Plan Pr
IePara'fi'n -#.fff-g,ffi')nsTr-- \\$.;H%
/,:i),'tName & Address of the Applicant.
'\t..:tth;; is;)'t(
IWs Cement Manufacturing Company Ltd. (CMCL)Village-Lumshnong,P.O.- LumshnongDist-East Jaintia HillsMeghalaya-793 210Phone No.-0365 5-27 821 4- 1 8
Fax-0365 5-278217E-Mail ID : [email protected]
Name & Address of the RQP Preparing Progressive MineClosure Plan.
Mls Geomin Consultants (P) Ltd.267 ,Kharavela Nagar,Bhubaneswar - 751 001Phone: 0674-2392080Fax: 067 4-2390687Regd. No. RQP I C ALI 167 192-B-
First date of grant: 17.08.1992Date of Last Renewal: 17.08.2010Valid up to: 17.08.2020
Name of the Executing Agency
Closure plan will be implemented by the Lessee M/s Cement
Manufacturing Company Ltd.
Copy of the Resolution of the Board of Directors.
The copy of resolution & certificate and undertaking are enclosed
with the document.
2.0 MINB DESCRIPTION ,,,,i?R
2.1
ropography of the M.L area'and its ,"*"""oiligf*ffi4;/o
KeY Personrr11l.. Cro,.,ii1l';nsultarrts
(P) Ltd'-[],
nT,' ;;;.'' rio i' ; c "r
r' t 1 67 / e 2l B
D
mountainous. Maximum and minimum contours passing:thi$&ffi area
are 546 and 520 metres above MSL respectively with a relief of 26m. The
area is surrounded by thick bushes. Norlhern part of the area is at a higher
elevation with respect to southern and south western part. A perennial nala
flows about 400 mts. south of the southern lease boundary. The area is
devoid of any natural drainage course or nala.
The temperature of the area as recorded by CMCL is 40.80 C maximum
during summer and minimum 6.20 C as observed during winter months.
Rainfall as recorded by CMCL at project site is 1046.80 mm maximum
during June 2003 and 1 mm minimum during April z}Lr. The company
has constructed infrastructural facilities near the mines site and also
constructed haul roads from NH-44 to mines site maintaining gradient at 1
in 18 to 1 in 20.
Regional Geology
The State of Meghalaya comprising eleven districts covers an area of22,429 sq km. Bordered to its North and East by the State of Assam and
South and West by Bangladesh. The state presents a picturesque
landscape of plateau, ravines, rivulets, lakes and water falls and
magnificent gorges even exceeding 60 mdepth in Khasi Hills. Shillong the
state capital is located at an elevation of 1800 m in thg_, I part ofKhasi Hills. The rock formations of the area fall ,ne,aiL#RFN*, "rEocene age.
The Regional Stratigraphic 65sion is as follo ',--l \r91.,\
-N.'")
Q,;it?)y, ,l ;". ti
Y"Y/*:iiAse Group/Series Stage Rockntiffi e$r;,..i\ E!}r'Oligocene Barail Series Sandstone-&Sfiaie.Upper Eocene Garo Group Kopili Formation Grey shale with alternate
layers of sand stone & siltstone.
Lower to MiddleEocene
Jaintia Group Sylhet Limestone Prang LimestoneNarpuh SandstoneUmlatdoh LimestoneLakadong SandstoneLakadong Limestone.
Palaeocene Therria Sandstone sandstone
tl
Limestones of Lakadong, Umlatdoh and Prang horizons are distinctly &sequentially separated by two bands of Sandstone known as Lakadong and
Narpuh sandstones.
Local Geology-
In local geology, the thickness of various litho units encountered in the
bore holes are taken care of. (Ref. Plate-III).
Rcserves
GBOLOGICAL ORE RESOURCE & RBSERVE
Khublirqestone Mine-I (Ref. Table- 1.2 & 3)
2.2
A. Measured Mineral Resource (331)Proved Mineral Reserve (l l1)
B. Non Mineable Resource
Limestone
Limestone5617900 MT319297s MT
Sandstone259s06 MT18r386 MT
Category 7.5m ML area Ultimate Pit Slope Total
Feasibility Mineral Resource (2 1 l ) 449325 1975600 2424925
Sandstone
ub Limestone Mine-II
A. Measured Mineral Resource (331)Proved Mineral Reserve (l I l)
B. Non Mineable Resource
Limestone
t a'''Limestone
4266262.s MT2174200}/4T
Categorv 7.5m ML area Ultimate Pit Slope Total
Feasibility Mineral Resource (21 l ) l993f,c- 58185 ---:::.:=::: 78120..', _.11, tt.
'.' 4'- s-
Category 7.5m ML area Ultimate Pit Slope Total
Feasibilitv Mineral Resource (2 1 l) 446650 MT t64s412.5 MT 2092062.5 MT
Sandstone
Category 7.5m ML area Ultimate Pit Slope Total
Feasibility Mineral Resource (21 1) 32256 MT 139914 MT l72l70MT
Key Personld/s. Geomin Corrsultants (P) Ltd.Regrr. Nd.. RePlcALlr 6 7 l92lB
Sumtnarv of ore reserve of Khub Limestone Mine-I & Khub Limestone Mine-II
LimestoneCategory Khub Limestone
Mine-IKhub Limestone
Mine-IITotal
Measured Mineral Resource (331) 5.61 mt 4.26 mt 9.87 mtProved Mineral Reserve (11 l) 3.19 mt 2.17 mt 5.36 mt
Sandstone
Category Khub LimestoneMinel
Khub LimestoneMine-II
Total
Measured Mineral Resource (331) 0.25 mt 0.39 mt 0.64 mtProved Mineral Reserve (l I l) 0.18 mt 0.22 mt 0.40 mt
Non-mineable ResourceThe ore reserves blocked due to 7.5ML boundary and ultimate pitestimated. The tabular statement is indicated in table no. 3 & 6. Thusmineable resource under UNFC norm for the ML area is given below:
Limestone
Sandstone
slopc have also beenthe sumrnary of non-
Feasibility Mineral Resource (21 1)
Mine-II
Ultimate Pit
Feasibility Mineral Resource (21 I )
Khub LimestoneMine-IKhub LimestoneMine-II
0.l4mt
Reserves (million tones)
Resource blocked in 7.5m & Ultimate
Reserves (million tones) Khub LimestoneMine-I
Khub LimestoneMineJI
Total
Geolosical Resource 0.2s 0.39 o.64
Resource blocked in 7.5m & Ultimate pit slope 0.07 0.17 0.24
Mineable reserves 0.18 0.22 0.40
2.3 Mining Method
Ref. Chapter-5 of Scheme of Mining.
Mineral Beneficiation
Not applicable
REVIBW OF IMPLEMENTATION OF MINING PLAN/SCHEMEOF MINING INCLUDING FIVE YEARS PROGRESSIVECLOSURE PLAN UP TO THB FINAL CLOSURE OF THE MINE.
e Ultimate bench height and width will be maintained at 6i9m with450 pit slope.
c Haul road within the lease area will be maintained at 1 in 16 to 1 in20 gradient for easy movement of the vehicle.
Plantation will be done all along the lease boundary within barrierzofie.
il.,=,,:"ilffi;:i#,""Land reclamation at this stage can not be exactly visualized.
It is a hilly area, southern portion is sloping. All benches will be
developed along the slope (North-West to South-East).
During the planned two years only afforestation and de-siltation of
2.4
3.0
runoff water through settling tanks will b9*
Nothing except dust contamination 'r{:*?fr
the dust contamination periodicalalong the haul road, mineral dumsaplings for growth.
During the planned two years therefully closing of mines. Further, the
limestone has to be'explored.
. To checkdone allover the
partly ore and
l{cy FersonM/s. Geomin Consultants (p)Ltd.Regn. No.. RCp/CAL/1 6t lgZlA
+
4.0. CLOSURE PLAN
4.1 Mined out Land
Land restoration / reclamation / rehabilitation can not be visualized at this
stage of mining. As the ML area is hilly terrain, land restoration /reclamation / rehabilitation may not be very useful for local population
except the land could be used for afforestation to preserve the ecology &environmental parameters of the area. It is proposed to develop a
systematic green belt over the mined out land/benches by laying a layer
1.5m thick of top soil fiom out source. Overburden of the mine is being
utilized for making haul road & as additives for cement plant thus OB
dump will not be there in the ML area & hence no restoration of land is
required.
4.2 Water Quality Management
There is no water body in this proposed mining area and all run off during
monsoon period will gravitate to the down slope (southern direction)
where the same will be arrested in the water settling tanks as shown in the
Environment Management Plan - plate no. VII. After one stage settling Itreatment the fresh water will be over flown to the existing natural
drainage out side the M.L area as shown in Environment Plan - Plate
no.-VI. Periodical water sarnpling and its analysis will be done at CMCL
laboratory and accordingly its quality management will be undertaken. Itmay be said that limestone doesn't contain any toxic component.
4.3 Air Quality Management
s%
1'' .,;f i.'' -:.'Existing air quality is free frog,,ailpottuti,{be adopted by mechanized
control the dust pollutionroad, haul road, mineral dworking sector will also'
mining operation willby dust is likely. To
the mine approach
tation all along the
of dust and fumes
produced by movement of hea
*
4.4
4.5
4.9
Waste Management
Including limestone all waste and overburden will be dispatched to the
cement plant. The quality of limestone being of high grade will require
other additive materials for dilution.
Topsoil Management
Top soil is already removed.
Tailing dam Management
Not applicable
Infrastructure
From mine area to plant via NH-44 an all weather road is constructed.
Office, store, miners qtrs. are also provided outside of ML area. All other
required infrastructural facilities such as rest shelter for labour canteen,
lavoraries & first aid station etc are provided by management as per
statute. No treatment or beneficiation plant is required as the ROM and
overburden/waste are dispatched to the cement plant. For drinking water
one deep tube well is provided at the mine site near the establishment.
4.6
4.7
4.8 Disposal of Mining Machinery
At present not applicable
Safety & Security
at accessng
ain or less thanpoints & by blowing sirens etc. Overatl,pi\slot'e'id;:
450 for the safety and stability of ttt.'tfiiN'Fo$.i
ffiIt is a mechanized mines, the entire working area will be fenced by barbed
wire with notice board stating that the area is 'lr"ep-t(i:a is,']restricted" and entries,.'[ " -' :.-'+-
prohibited to general people. All preca,uttqp",4l:i the safety of961. Specialmen & material & the mine as per proyisio'l&
precaution is taken during rr.""y urf*ilJjl$
of use ofexcavator / shovel drilling rig &dumper iitr{.@U neries no person
machineries. Slope of the bench is maintained at par with ground
I
JKey Person
fil/s, Geoinin Consultanrs (Pl Ltd.Regn. No.- Rep/cALl16T lgzl}
condition.
4.10 Disaster Management and Risk Assessment
It is a hard rock area) no serious disaster is foreseen except sink hole. The
sink hole areas are demarcated and guarded by barbed wire. For avoiding
any disaster / risk the space and height of the disaster management and
risk assesslnent cell is maintained by the management to rise to the
occasion in case of any emergency. Risk assessment is got carried by the
management by outsourcing to expert agencies & their recommendations
are implemented.
4.11 Care and Maintenance during Temporary Discontinuance:
There is no temporary discontinuance of workings except a brief period of
rainy season. For care & maintenance, the applicant has established
captive workshop at the cement Rlant.g$e during temporary
discontinuance. ,ffi"tqKkOEffiCI**o*
5.0 ECONOMIC REPERCUSSIONS OF CLOSURE OF MINB ANDMANPOWER RETRENCHMENTS.
At present retrenchment of manpower is not foreseen. Economic condition
by this new venture will increase the present condition by way of
employment, development of other ancillary units, shops, medical aid
centre etc. If any unforeseen condition arises for retrenchment of any
regulations framed by the Government of Indid,t '";t"l+'. \
,, '1'nd'--t'l' t{Fo'
Meghalaya. It is a fact that to run the cement,'flAnt atd$gffi30
retrenchment of mining personnel does not ariiq...i}t#fi*.$
.i l:i, 1i
tof
l0
6.0 TIME SCHEDULING FOR ABANDONMENT
l't year Proposal for Item no. 6 & 7 of PMCP (2015-16)
ltems Details Areafta.)
Quantity Expenditure(Rs.'l
Remarks
Pronosed Proposed ProposedA) Reclamation &Rehabilitation ofMined out area.
i) Backfilline
There is no possibility of abandonment of quarries or partthereofduring ensuing 5 years.
ii) Afforestation on thebackfilled area.
iii) Others (pleasespec ify) eg. Afforestationon exhausted benches.iv) Pisciculturev) Converting into rvaterreservoirvi) Picnic Spot
B) Stabilization &rehabilitation ofDumps (WithLease)
i) Terracins / Pitchinsii) Construction ofParapet Walls / Retainingwall at toe of dumpsiii) Construction ofCheck dams along slopeof valley etciv). Construction ofsettling ponds,Garland
drain etc.)
0.03 30,000
v) desilting of settlingponds, channels.
20,000
vi) Afforestation ondumpvii) Others( diversion ofnala)
C) Rehabilitation ofBarren area withinlease
i) Afforestation (Greenbelt )
0.3 s02 50,000 (Ref. Plate -vrr).
ii) Others (Please speciff
D) Environmentalmonitoring (Corezone & Buffer zoneseparately)
i) Ambient air quality 100000
ii) Water quality 30000
iii) Noise level survey ;-."' ,c,.\ ;ffisiv) Ground vibration ,': / s-^xN,v) Others (Please specify r(F 'l 'r'
f \"
'"I iffi Y4\
sn4s, ;.!r il;l'i1.'ll
).+t);;1,\',. ii,{}J'. l\ tt6r,:r' :t'/',i
Ifr/a/Ft,rt':/, ,i','---- --1:.$,7
':,., r ii,ii'..i.1 t:J:4"
1l
. ''- '',. .."-.:- :,':.-
Key PersonM/s. Geornin Consultants (P) Ltd.Regn. No.- RQP/cAL/167 19218
2nd year Proposal for ltem no. 6 & 7 of PMCP (2016-17)
Items Details Area(ha.)
Quantity Expenditure(Rs.)
Remarks
Proposed Proposed ProposedA) Reclamation &Rehabilitation ofMined out area.
i) Backfillins
There is no possibility of abandonment of quarries or partthereofduring ensuing 5 years.
ii) Afforestation on thebackfilled area.
iii) Others (pleasespecifu ) e g. Afforestationon exhausted benches.iv) Pisciculturev) Convertittg into waterreservoirvi) Picnic Spot
B) Stabilization &rehabilitation ofDumps (WithLease)
i) Tenacing / Pitchineii) Construction ofParapet Walls / Retainingrvall at toe of durnpsiii) Construction ofCheck dams along slopeof valley etciv). Construction ofsettling ponds,Garland
drain etc.)
Maintenance 20,000
v) desilting of settlingponds, channels.
Maintenance 25,000
vi) Afforestation ondumpvii) Others( diversion ofnala)
C) Rehabilitation ofBarren area rvithinlease
i) Afforestation (Creenbelt )
0.3 502 50,000 (Ref. Plate -VII).
ii) Others (Please specifoD) Environmentalmonitoring (Corezone & Buffer zoneseparately)
i) Ambient air cualitv 100000ii) Water quality 30000iii) Noise level survey 20000iv) Ground vibrationv) Others (Please specifV
t2
3'd year Proposal for ltem no. 6 & 7 of PMCP (2017-18)
Items Details Areafta.)
Quantity Expenditure(Rs.)
Remarks
Proposed Pronosed ProrrosedA) Reclamation &Rehabilitation ofMined out area.
i) Backfilline
There is no possibility of abandonment of quarries or partthereofduring ensuing 5 years.
ii) Afforestation on thebackfilled area.
iii) Others (pleasespecify) eg. Afforestationon exhausted benches.iv) Pisciculturev) Converting into waterreservoirvi) Picnic Snot
B) Stabilization &rehabilitation ofDurnps (WithLease)
i) Terracins / Pitchineii) Construction ofParapet Walls / Retainingrvall at toe ofdunrnsiii) Construction ofCheck dams along slopeof vallev etc
iv). Construction ofsettling ponds,Garland
drain etc.)
Maintenance 20,000
v) desilting of settlingponds. channels.
Maintenance 25,000
vi) Afforestation ondunro ----ft5,/,", j e11j4j -\ - .\vii) Others( diversion ofnala) / --l-/ -: . |'.\ :.\
C) Rehabilitation ofBarren area rvithinlease
i) Afforestation (Greenbelt )
0.3 t'I
'502 ,,,, .',\,:./'Jkli'g',F ;r\l
s'01)00\o!,\
(Ref. Plate -VII).
ii) Others (Please specifo ,.._ Y
D) Environmentalmonitoring (Corezone & Buffer zoneseparately)
i) Ambient air oualitv t00sooii) Water oualitv \ rj,.-l r-;r ,40000iii) Noise level survey l}0000iv) Ground vibration *. .'" 1.:.1 f.U. /2__
v) Others (Please soecifo
$l3
t(ey PersonM/s, Geonrin Consultants (PlLtd'Regn. llo.- RQ P/CALl1 67 I 9218
4th year Proposal for Item no. 6 & 7 ofPMCP (2013-19)
Items Details Area(ha.)
Quantity Expenditure(Rs.)
Remarks
ilil
Proposed Proposed PronosedA) Reclamation &Rehabilitation ofMined out area.
i) Backfilline
There is no possibility of abandonment of quarries or part
thereofduring ensuing 5 years.
ii) Afforestation on thebackfilled area.iii) Others (pleasespecify) eg. Afforestationon exhausted benches.iv) Pisciculturev) Converting into walerreservoirvi) Picnic Spot
B) Stabilization &rehabilitation ofDumps (WithLease)
i) Terracins / Pitchineii) Construction ofParapet Walls / Retainingwall at toe of dumpsiii) Construction ofCheck dams along slopeof valley etciv). Construction ofsettling ponds,Garland
drain etc.)
Maintenance 20,000
v) desilting of settlingoonds. channels.
Maintenance 25,000
vi) Afforestation ondumovii) Others( diversion ofnala)
FNC) Rehabilitation ofBarren area withinlease
i) Afforestation (Greenbelt )
0.3 502 "(Ref. Plet'e$rvfu \;ll
ii) Others (Please specify
D) Environmentalmonitoring (Corezone & Buffer zoneseparately)
i) Ambient air quality 100d00 i
ii) Water qualitv 300d0 i:j. iliii) Noise level survev 2809 I"-.+ / .'iv) Ground vibration --\" /;-\' .,/.irv) Others (Please specifv ,a.^v:/./\ ^:;jl-.:!-.'qi'
Ft4
Items Details Area(ha.)
Quantity Expenditure(Rs.)
Remarks
Proposed Proposed ProposedA) Reclamation &Rehabilitation ofMined out area.
i) Backfillins
There is no possibility of abandonment of quarries or partthereofduring ensuing 5 years.
ii) Afforestation on thebackfilled area.iii) Others (please
specify) eg. Afforestationon exhausted benches.iv) Pisciculturev) Converting into waterreservoirvi) Picnic Spot
B) Stabilization &rehabilitation ofDumps (WithLease)
i) Terracine / Pitchinsii) Construction ofParapet Walls / Retainingwall at toe of dumpsiii) Construction ofCheck dams along slopeof vallev etciv). Construction ofsettling ponds,Garland
drain etc.)
Maintenance 20,000
v) desilting of settlingnonds^ channels. iffic"": 25,000
vi) Afforestation ondump
€5"€d I{P
vii) Others( diversion ofnala)
C) Rehabilitation ofBarren area withinlease
i) Afforestation (Greenbelt )
0.3 s02 50,00p-., =;;,. ::. li
ti t;a. ':(Ref. Plate -VID.
ii) Others (Please specifyD) Environmentalmonitoring (Corezone & Buffer zoneseparately)
) Ambient air quality 100000 -l:
r
ii) Water qualitv 30000r:
iii) Noise level survev 20000',v) Ground vibration
v) Others (Please specifu l+ i.-l
5th ear Proposal for ltem no. 6 & 7 of PMCP Q0lg-20\
7.0 ABANDONMENT COST ', l,o, ,r,-;. ' '1
:';)) '
Except legal compensation nothing can be foreseen. The applicant has
applied for another area adjacent to the present lease area and so mining
will continue. As because the area is hilly reclamation or refilling is not be
possible, only plantation over the ultimate bench space with 1.5m soil
t5
KeY PersonM/s. Geomin Consultants (P)Ltd'
;;s;. No.' RaP/cAL/1 67lezlB
cover can be possible.
i fra.qa *l rtt L, ti.- No.
Itw-{q ffr | 4,q.9 /H,lttt { +x I n s-
8.0 FINANCIAL ASSURANCE
The mine is proposed to be worked as
area calculated for financial assurance
assurance is 8.09ha x Rs.25,000/- :Rs.25, 000 / -per hectare.
ftalalDuted.
fully-mechanised (FM).
is 8.09ha. Therefore,
Rs.2,02,250/- at the
The net
financial
rate of
(Area in hectares)
sl.No.
a
Head Area puton use atstart ofplan
c
Additionalrequirementduring planperiod
d
Total
e
c:(c+d)
Areaconsidered as
fullyreclaimed &rehabilitated
f
Net areaconsideredforcalculation
GG:(e-fl
I Area to be excavated 8.09 Nil 8.09 N I 8.092. Storase for topsoil N Nild N N I N
Overburden/ dump Nil ffi rN N N4. Mineral storage Nit N N I N5. Infrastructure
(Workshop,administrative buildin s)
Nil rrWKtl Nit Nit Nit
6. Roads N N N N I Nil7. Railways N N N N I Nit8. Green belt N N N N Nit9. Tailing pond N N N Nil Nilr0. Effl uent treatment plant N N N N Nil11 Mineral senaration nlant N N Ntit .,- :-. Nit Nil12. Township area N N lrtr t -_-": Nr, Nilt3. Others to specifv N N ,'Nil r}' Nitir\\ Nil
Total 8.09 Nit 8.09*":"11 i\r 8.09
/J .dril>
,e,*,:
*f 'lreP*/a B P6r,noAlll
,r , .:, r l>u, vgu *r lt,rr re'l , !r.i,,tgr6
9.0 CERTIFICATE & UNDERTAKING:
A certificate duly signed by the Lessee
plan and to approach the concemed
Similarly, an undertaking is attached
closure plan in a time bound manner.
is attached to consider the closure
authorities wherever necessary.
to implement progressive mine
10. PLANS, SECTIONS ETC.
The plan and section subrnitted along with the scheme of mining may
please be referred [Ref. Plate - I to IX].
li1/s, Geomin Ccnsuliants (P) Ltd.
Regn. No.- ROP/CALi 1 67 l92lB
t7
CEMENT MANUFACTURING COMPANY LTD.
EARACT IIROM THE MINUTES OF THE MEETING OF THE BOARD OFDIRECTORSI OF CEMENT MANUFACTURING COMPANY LIMITED DULYCONVEYED. HELD AI\D CONSTITUTED ON THURSDAY. THE 16TH DAY OF(rcTOBER 2OI{ AT 6. LYONS RAI\GE. KOLKATA - 7OO OOI
"RESOLVED THAT all the measun$ proposed by IWs GEOMIN Consultents (P)Ltd., Bhubanerwarr Odlrha, in this Progressive Mine Clorure Plan under Rule 238(2)of MCDR, 1988 in respcct of Amalgamated Khub Limertone Mine over an area of9.65 hectercs in the district: Eect Jainda Hills Meghalaya will be implemented in atime bound manngr."
"FURTIIER RESOLVED THAT this PMCP also assures the amount of finance viderule 23F(2) of Mineral Conservation and Development (Amendment) Rules, 2003."
Ccrdfiedtruc cory
FoT CEMENT MANUFACTURING COMPANY LIMITED
?*sq4@ankaj KeiriwrDDlrectorDIN: fi)383635
$IIRCE]ilEllTWt 0ltll
D{JOlior:lll.Ocqdi.PrmFnl{nDcri-ll00!tPt 0ll-lru3tll llll2l,Cu,t0ll-fl0t!!il. c-ml:[email protected]}rf.d.Ofnc. f yVod.r: turn$nor1,tatllrl lf,b DtriclHcthd"&79!110, ?h:016t!1ttll5, 16, lt, hr:0t61$lTltlt lrobj09l30Dl6l6 cmd:[email protected]
AN tSO t00t, tso ra00l t oHsAS ll00l cErllFtED coHPANyC!11 llo. U26942ilL2OO|ILC0OGG63
CEMENT MANUFACTURING COMPANY LTD.
CERTIFICATE & TJNDERTAKING
This is to certi$ that all thc statutory rules, rcgulations, ordcn made by the Cenral or State
Govcrnmcnts, Statutory organizations, court etc.have been taken into consideration in this
Prcgncsivc Minc Clorure Plrn prepared by the RQP, lt[/r Gcomin Consultrn6 (P) Ltd.,
Bhubarrcswar, Odisha undet Rule 23B (2) of MCDR, 1988 in respect of Amalgamated Khub
Limestone Mine over an area of 9.56 hectares in Eest Jrinth Hillc district, Meghrleye and
will be implernented in a timc bound manner.
I do hereby undertake that all the measures proposed in this Prcgresrive Minc Closure Plan
will be implemented in a time bound manner.
Lumshnongl0.l1.2014
Place :
Datc :
SigneturcNameDesignation
f the Lessce: Shri Devender Bansal: Nominated Mines Owner
FMAB'\\GEMEilT
Corp*rtc O{ncc : gt1ram Tonr1 3, Arporu Rod, lst Fbor, Unit No. 98, Kolk te-700 027, Ph.: +91-33-2.t t8 1l69l470n14l$93, Fix : 031-2{18 ,1168, e-mail : [email protected]. Ofic. & Wod6: Lunrsturong, P O.: Khdiehrbt, Dstt.: Jrintia Hills, MeShaLfr, Ph.:03655-278215116/18, Fu :03655-278217, c-mil : [email protected]
aN tsO 0tnt, lsO t4001 & oHsAll 18001 cEBTtftED coilpaily
A'",n p.Xqre - -j.-
.t. Ftrtrrr l. R. -'-- r- -\" . -" h ,// .'|
.i- flrdrJlal .,r, o",,", .,r, '"t'{3!y/
'i'
.,. cEJt/,7Jifif'4 IF','?Ii"rN,.^c*,9#1"'ry,f fro N
ttaa... C8.177'I.I:[(Arc OF INJCORPORATION "',1, cotrpoR^t'E. IDEhtrI'ty Nuf,lu[n ( cll.r ) .:.
.1. \rr_tJ?.627?l4:lLo-tt!.-c!-0-C6-C9-',t;1" it'-3e9f:4p3- . ,, , .1.e'ttI l.{o l-3 - 06663 of 2O0 l-2O02- 'i'
tat t ta'
nl' i'l {ofnr wlllulu tnfor ( ft; sttl , , .lnl.a+ ..tl
ata
::. ;6r,i:i) ;r1fi1[-1rsr1 1(]s6 (19s6 -lr;I i.) ,)i r1[ip1 {:;1,1[i1n rl) ,i{ i: :i)r. ;6r,r,rJ .::ta.l..rliiilfirntr .1.a''i' I lrr:r cl>y vxtity l| 1;1t- CLrrlliNl!-]lt^l9l!c-t-uj'. rye -c!t!l\!-- '1'
a+t t'. LIMI'TED t
';' .1.t3 Ittt
aa
:l^ is tlris day incorporaled undcr tlre Cornpanics Act, 1956 (t.lo. 1 of i 956) 'i'?:' and tlrat tlro Company is tirnited..;. i.
f. t'ft trtttte.t( i) srtq tu. rnl iilqt tt.lt ^,.t -a-
a':' Given urtclcrrny hancJ3l Shl-Ihnq * ll-ris o2nct(Second) 'i'ata ?'0'
^ '^latl ?
j: day of lqovember -Tlvo tlrous and,. one :,..
-
.:il. ffi7,,/.'!, .1.
;: -: ,: .i,r tl?,ttz
ar of CortI
I
: Asr':irr. licgllraliya. MattiJrut. f rilur6. Sh,{FUr{,5 -i
-r nntn:l(tr;rl t'l;r,Ir:..1r r. l,itrrti;rytrlif,U,iilSro'it\a .:..l*.'. .', r'i i'o .', ,'. .'. .'. ." .f. .f+ .f. .f. .! .1. .1. .].,;rlirli. .l*i:*t$b.;'\$)r\. .1.
,: ' I. .. J
, l,:'jl I
'r "l
t5't.tr I\
I
U?5 9L2}{L;cO 1 PLCGi ir'r 6 I
1l - 06661 or :lcc1-2$02 ffiTFdrzE,
O
FttESIi Ctllt i IFICATFIccN.iEQuEI\'[' ON CHANGh, 0F NAr\t['
ts hc Qflioa of tlrc licgistc,t <.'I Cootl:arti99, As:.altt, Meglralayr, 1..'larri[::r:, .l:ip,rrn.
]lagtln,el,Aruna*lrel Perdcsh lc lv{izotni:i $ltiltotg.
[Undcr thc Corttpgrici.{ct. 1956 (l of I 9l J)l
Llr'Tlll.lt!\I'rERoF'_-_gj.tpjme_iiAI_gJlgIURIliq_cc+ltgjy ilil:l!.fl_
I ha* cc r-: ir +'t- - -
g E HDI!-TS-i-{41tu--{tq T! ?. I }i C g-(i.jf .i. ! : I
Urnitcd rvhicbrves origrralli inccrocnicC on_9?pdl_6.SgnEL_dfy"f_lj$_€g3:L.-2C01
ucd€r$c .Cclr?an1;3--Acar..dunderthene'nc Cincnb! l'hlluIletrgilg_1::gfgf.- _
,*.6"Li,',c ao;dll;i:iil.'1-T.,:j3.ffi;*;,:.,..:: :n*e'.ffjdgrj&tb\tRfu\ h=rEtez:r La5;{i?$ &tt()r}1i+.$cli;*cqr *&rrre<::c{tr k r::r!.nrit=€l-:Ol.--ri*,y:cricf:rgt, th't n Of f"tn: vtrltXxsFttffi.. ..-
l-:,!er n*o s1.6"{11_--Cir5l-3l-iiqc-b:u)Jr-?J hgjJ__-- cared_!i.1_jiJ_'-..r__lL\01-
tlicncrncofthcs:idcor,,:nnyist!sClyclrsngccita Ct,],.fnt{T lliJiil lii';r-r.ili,r-i-L{i.11'::.1j!--^--
L;qntc,C lC ihjs i!'rlif i.1ic ir i:.s,;cd rrrs:Lli to scajc;: 2-1 (l) of rJ:c aajd Acr
(ii',,e-'r ur:ds m1'hrrtj r:. __ _ __ inj.,tig,X {__ _ tJris day ci --1C i-' :_ ir,l-,.,i:i.9._o-I t ..
'iirr.t 6,v...:'; :,ir:: 1:: ::r r .
!i':: r,.s l a ..t:: ?! '-: /'ii'
Ccr tif i;ii tiifoi L.,
$- t%.,.-r.... ..,.i.1
i )i'l ^
lic true t)uplr
-r.i
iI,t")
6 irl Cre
,f,1iri'Itl 0l
1**rr#.al
l---', ltlt
[..ffi
CENTENT MANUFACTURING CO. LTD.Lumshnong, P.O. Khliehriat, Dist. : Jaintia Hills, Mcghalaya
pETATLS Of DTRECTORS
Namo Father / Husband Nime I{esidcntial Addre.ss E-MailAdclress 'l clenhonc No. PAN
6
7
8
4
5
J
9
IO
ly,,-luriro ptr-qrete Lt.Ram, Dass Bhajanka 15, Belvedere Road, Kolkata.2T sajj anriDcentu rvo lv,cQlo 03312? | q{j? I
0t t-2703382t
ACAPB0486I:
49rlPCi1.l-o_a
*AD-DPA5363J
ACGPAO365A
.AGOPB_l886ti
AcAt,l]4176A
AEJPK9055K l
I
i
I
IIIII']
ABDPBS6 I oK I
ADIiPR42S0ll ii!ACXPJ3 173(' lr
iYtLBeig$:19_!'-l1rsr.,3 G,S. Chamuia Andhra Pradesh [email protected]
lr, u*us${?r sh.l;;;,,,,, ;;;;;, 6 Lyons Range,
lKotkutu s4qj-a.v@cen tgryo I v. com 033-22t04323
lltlr. Rrij Bhushan Aganvait-Mr. Saian Kumar Bansal
aqil, Mahabir Prlsad Aganval
l,t;;'*;;,r;il;fx.otkoto b bu sh /glshydnr g ro u p. com 033-22r t6346
Sh Snrlhrrrem Rnriqnl A, N.S. Road, Stlr Floor, Kolkata
Mnkum Road,'l'insukia, Assant
-::lpkb(r?pl-vnrnil.com
I
ry*eilg+sf Al rr rr:,+ r+q,lti I
I
Rir:d-b.1$iq!-L.@crtl*-q I
sbroo n p-l ni2cr rrc l. co. i,[email protected]. I
" 93]-:?J-io.9l?1
0t745,24284t
0l t-2.70338'2t
. .. .':' ."
03.3-2448169
079) 26'14899.t
2(r740928
Mr. Prcm Kunrar Bhqjanka M.P. Bhajanka
Ml fgkaj [".jrir"y*l Sb. Prtr Prakash Kejriwalilt;;;;;;, ""'"' '"i*"
o."0, I
l+qg|_.-*-oS1,"Y-qr-uo.! I
Mrs. Clara Suja
ih. Dramadutta Roongta
Lumshnong, Khl iehriat,Jaintia
Eilb.VlsHgv? . .
]5, B9lved91e lioad, Kolkat?: -21
Gurukunj' B/5. Satellite Conrplcx
Bunglorvs, Near Satcllite Torvcr,
Prenrchandnagar Road, Satcllitc,
Ahrncrjabatl - 380 015, lndi,t
Miss PayalBha.junkal:;i I
r\9'" --'l'.t'\.q
d*.Hl
nqNI
i"r. rnr., Kishan Bramaclutta -.r)$I1 Mr. MangiLalJain .atc P.C. Jain 7-8, Glrcha Road, Kolkata- l9 I
r$
A"r',rte utf;Q - 3. : -,:r
CEMITNTS h4ANtJI;ACl-UruNG Co. LT'D.l{rqrsit'tr:tt Oll'rcc Luntrlruor.p. ['() Frlrrlrchrr:rt. I)rrt J:rtrrtra llrlls. \'lnghnlnsn
Date: - 18.06.04
Board o.f .D_irectors Resohttiort
'l'lrc board of Directors of Ccnrcnts lr4anulacturirrq Co. Ltd, irr thc mccting
lreld on clatccl l Ttr' Jurre 2004 'at Delhi, hcrebl' rcsolvecl to designate Shri
I)cvclrlcr lBnrrsnl as Nominatcd Owrtcr ol thc contpan)"s linlestonc ntincs
locatc6 nt l-unrshnong Villagc. P.O. Khlichriat, Distt. Jaintia I{ills,Meghalaya.
It is lirrtftcr rcsolvcc]. thal. .Shri Dn'cnrler I]ansa!-is auihoriz-cd 1o pr-rt lris
Signatrlrc zirtd sclrl in all c<ln.cct:tccl pai)crs itt conncction x'itlr titc ltlittcs ol- tirc
C)otnplnv.
(Slrri
'l'hc Signature of Shri Dcvcndcr Bansal is attcstcd I
$ (Signatur
nx.r-!)
I)qlcndcr []anstl)
ffirro{q qqd
l )r'llrr t )lllr-'c - l!il. l r, 1t:tll l'll:"r'i"rt;t. l'icrr l ).'ll'r- l l{i(}1 {
A*r'exL{Te_E.eq}
SPECIAI.. POI4FR OF ATTORNEYOOAA
i-,'.nor.+ al L men try. lii-rr:'9-=.!:' i:rrF;"entt. 't!-t*t Ln llt..it'€:.i.:!:-iigr:'f tfi* i:*arcr crf cl i i*r't:tcrr"s riin*i;i irc--.i ,:rf I'i,/i.. iliit-.*i-ri:;f'l;errrll;i.:"',:r..rri-nt flr;1 "i..+;,J. lil:.1.r:i a'f; l'itii.,:at;: r:l-t.11,i,,;t;:i+f',:-:t::1i:J.r:i.,f'lt'., iti"v*nclpi Fl*n:.eJ Fr:n of iiliri i'{*nrtm;,ri: l:t';,*.;t'r Ii./cr iir:.rnan.Et:-a.et, l-iai:-r tits:r:ar, .8lri.t,i:;r;t ii'-lar'yan.a) i :-, 11 l; ;' ii1 i: -v
+'-rthri'i:ri::ci 'l.n FtrFrFeR.r- i:,ofct!-'--: s.niJ fiiiir"r-; ii.n appl!ra+:j'-i'if oi- p;-.c+1:ect:.nr.1 L i;r:ne: e t^,ii ii-r 'Lhe apilrcipri ai;r-' ai,tir.:ir-i. hy''
f-'n i,eha J f nf ttrs r-,ririren'y f nn i tE.' ri Fr!:€tr .' p i *nt 4i:Luttn=,irnong. .fainti;; l-liLil; li';,tt:r i"tegl-r+i;'r;.ra., i'le j.s ft.li'tii*r'Fttthciri rr.ct tn +5rpr.1 ;r f mi-' fiirririg LeBsFr fc,r rapti'vrtcn.:r.-rrnptj.c'n cii-' treh.aif cif ihe -'L1flip::r'lyz" i"le is al':c:ar.tthni'i;.:.ei{ tct .::;lqn' rrn ai. I a' rI i.ratiern'r cicrci'tnten'il= at'iiJ
n.ther rp l.;;tr;rl ilapei-5 ani: f,,r-' tai:e al 1 s'tich step= F.is r'az-v
097 258
he cnrir.; cier'*d
I l,lattc-,r'n*y
Fs.sar', .in ttris neqarcl "
f i+i-irRrnr=, lr.tgi fiAVei-he ft-;l
si!ned thE it r--rtr, f,l r i:: ffi'r'e!=enre nf
WIThlfiicf-l:r'
1.reWL Se:eADlr2Q'*4101)-F'zle{, tt^.ir
%U 3 ,J. D< lr/-'Fc
Fnr fierirent l"!arrt.tf
( Di rec tctr
IYescF{,8. MEEIn,AAscg NC? 8)elhlRsE! Bgo, B85l
AtrTESTET'
DELHI
-V*r?.["ffi's v-
$€ IDtsSSF?nnn
A.vrtrel'rr L* 4
€rrqa-q futil-.r{mcburrex InPARTMENT
DEVENDER KUMAR BANS.AL
HANUMA\ PARSHAD l
r08fi21978Ferfi anen". Accourti ll[$ber
AGSPB4527D
ffi""ddb
'1Tr€.,:tRGl.GOvc.,Or,mon
liiad* ..:h .,sFi tt :p,uat t1f*ti 72i I tllfai',rrjn ii:'rriqr Ea:i{'. fi q{ sl.{i1: ''r' ".:.t;?:'4'it,r, ?r$i:i 1.i1{, qiIII l}<t +-irig.r;t' 11 u:'1, .-t';ta'.{ii{, t,a{.. too clii
f tnr:s e] -{t{rr:it..............,
<{,.,,......,.,...,...,.-...
I
i;"'t mr
illry* p-*p;ffi' ri{-{r q{r -xt'flr r+ i1I!1,.,1,,.r,:..;............-...............3it::Lf ,f;1r.....".. .a-.ih;,i ,,..-'"--. ..............
c;l i
!iII
rti' il !\
Itii4...... 1 \,
q{"i-*.< E-; eq(ti' wi f,{i{qut
CEMENT MANUFACTURING COMPANY LTD.
Date:01-12-2010
TO WHOM IT MAY CONCEBN
This is to certify tlrat Shri Devender Bansal son of Shri Flanurrran Prasad
is the Resident Director of VI/s Cernent Mairuiacturing Company l-tt1. FIe
is preserrLly residing at the colony of N4/ s Cenrent ivlanufercturirrg
Company Ltcl. locatecl at Lurnslurolrg village, P.O. & P.S. Khliehriat,
]aintia Hills District, Meghalaya - 793 200.
ufacturirrg Co. Ltd.
Dy. Geng
Regd. Ofiice &Works: Lumshnong PO. Khrliehr'irt, Di:tt. Jaintia Hills, Heghrlaya, Ph:03655-27821 5/ l6/t 8, Fax 016S5-278217. e-nu,it: [email protected]
AN IIiO OOOI COIIPANY
For M/s Ce
(HR),
,l
-' '1
Arnayrnl';t-- G
CERTIFICA,TE OF RECOGNITION AS J
QUA,LIFIED PERSON TO PREPARE MINING PLANS(Under Rule 22 (c) of Mineral Concession Rules 1960)
&q t @*o";, ?.,.^*h,,**..6ril a*. .. fiauiny
registerel off;r, at .?4a-.#/^,r-*eft ...,fr.4rry'.azzaaaa=z:rtoat, anl
lravtng giuen safisfactury euilencti tf tLrt lualilications onl eryerienc, ,filtetr {try yrrtont rs ltrrn[ty grantel rccarsnitiott ,rnlr, %.rh ,, 0 ol tk,
Jl{.truro{ P'oncession fr.r[rt tg60 as a 9"ohf;tl ?nrro,, ta freFare
il[trtng ?lon',
{lrt re1istration ,rr*lr, rs
th;t recof
rV.,lA hW(furH,r 8rH\I|P*,4:ry,Indian Bureau of Mines
rt\{rF oT-7 AT[.. Tgg' .l"ilil'
t{}wql 1rO tO-'---d-
Ld/EP'l[#a t1';a lclff,
_..-2;^r I ^.-rrr '1t." d rll11
rE*r r[)
Calc.u.lta.
;ffi X,"J:l:yrtgifuooo
trr{l6r mn1ffiAWDOLOr-ffif Ir---.--
,rcflfi{rnRc n e urcd
fi:ri.n t1 -upto
REGIoNAL co.NTRoLLERoT MIHEs
"rn*q trrt afrlINOIN BUREAU OF MINESXa*r*/eHuBANESwAR
3Mrlt 9l/a/7g .
ffOg.C: ' "-''.'.r,,il+;r +t'#ffi$4,$ud,rr",, .r:!qiJ "l A..l,nJT
\' ,tt.
$,*i",*!.F.h
ffi'^,",yxffi'"."drn:,-f"nl"
soof,lCrlcutta
g-2oz}....a4i
',,*k,' l-i , -"!'*b"io
," ,".r ]
BY REGD POST with AD
GOVERNMENT OF INDIAMINISTRY OF'MINES
INDIAN BUREAU OF MINESOFFICE OF TIIE REGIONAL CONTROLLER OF MINES
No. RQP/ BBS/ 7 (Ry e8/ B Mahani Complex, znd Floor3 0 8, District Centre, Chandrasekharpur
Bhubaneswar - 751 016Date: 16.04.2412
,/ro ,/{ Ws Geomin Consultants (Pvt.) Ltd.267,Kharavela NagarBhubaneswar - 751 001
Sub: Inclusion of Key persons in Recognition Certificate of M/s GeominConsuitants (Pvt.) Ltd., Registration No. RQP/ C1^LI 1671 9Zl B valid up toL7.08.2020.
Ref: Your letters (i) GM (G)/ IBI{/ RQP/685i I 1 dated 14.12.20t1 .
Sir,
With reference to above letter, it is informed that the names of Key persons inthe RQP certificate No. RQP/ CALI 1671 921 B of your organization have been
revised by deleting the names of Shri Pradeept Mohapatra and inserting the narne ofShri Binod Chandra Patnaik in his place as new key person, as requested. Therevised Key persons are as follows:
i. Dr. S.K. Sarangi
i' ill il*itt"il1*J;:T:- tW5. Shri Bhagabati Prasad Mislup
( T KRATH)et*q gt-{ ffi / Regional controller of Mines
Copy for kind information to the Controller of Mines (Cz),Indian Bureau of Mines,Nagpur.
( r K RATH)tt*q -€T{ ffidfi' / Regional controller of Mines
ffi{sffi)
wo'ft qtd
Litho,chemical loe of Borehole No. K2-2A / nnnnxuw-7
! ,.:.- r
lncllnatlon of llolc: VertlcalArea: Khub llmestonc Mlne - ll ( .70 HaJR[ of Borehole collar: 494.3G2m.
Run (m) . :Coraof thc Eorehol.: 48.50 rn.
,..rl;1,l",t,i.1..':i,:;..:' ,.1,.jrt,i.rt
slmpie,r:Noi; r;:
.iilir:'I"i:); .
i*B.-'ii"::i:jjiian.iiliTrrx.tllfrom ,..,To.'i
Lenqth !,41 ,irSlO2.i Al2o3, ,,,fuu'? i].,$.ii l-il0.o0 0.50 0.s0 0.35 70.00 L'mestone: 6rey, hard & compact, medium grained
7 7.32 0.80 0.74 53.07 0.81 0.12 0,03 o.o2 42.780.50 1,00 0.50 0.35 70.00 limgstone: prev.hard & aomnr.f mpdirrm or:inar{1.00 2.OO 1.00 0.55 55.002.00 3.50 1.50 1.50 100.00
6tcy, ld(u a Latnpaca, meotum Efalngo 2 1.06 0.88 0.66 53.15 0.87 0.11 0.03 , 0.02 42.58
3.50 5.00 1.50 1.50 100.006,r y, ildru d Lompact, meotum Rralngo 3 7.73 o.84 0.73 52.66 I.23 0,11 0.03 o-o2 42.78
5.00 6.50 1.50 1.30 86,675r yt |dru e, tompact, meotum sralngo A 6.78 7.46 2.58 48.73 7.48 0.72 o.o4 0.02 37.39
5 7.73 1.78 2.9I 47.47 7.04 0.13 o.06 0.02 35.016.50 8.00 1.50 1.40 93.338.00 9.50 1.50 1.50 100.00
6ruy, |dru & qompaEl, ilne to meotum lralnecl 6 8.36 t.49 7.97 47,75 1.05 0.13 0.04 0.02 36.86
9.50 11.00 1.50t.20 80.00
7 7.92 0.89 I r9 57.94 0.83 0. 2 o.04 0.02 39.798 9.90 0,87 2.17 47.53 o.7r 0.10 0.03 o.o2 34.84o.20 73.33
77.00 12.50 1.50 1.35 90.00, LUrilpdLr, rlteQlum Rralngg 9 84.7 0.29 7.77 5.73 o.74 0.01 0.05 0.01 6.60
72.50 14.00 1.50 1.30 86.6710 75.92 1.77 2.85 14.95 0.15 o.03 0,15 0,01 2.55
t4.00 15.S0 1.50 1.50 100.00I'tnr trey, compacl, me0tum Erainec, 11 79.66 2.90 10.56 o.72 0.03 o.74 0.o1 3.06
15.50
77.OO
18^50
77.00
18.50
,0^o0
1.501.00
0.45
66.67tr 72 83,78 3.44 2.59 3,33 0.09 o.o2 0.16 0.01 4,86
re;#]y, compacl, line to medium grained t3 76.24 4.20 4.69 6.33 0.26 0.o4 0.18 0.01 6.3730.00 tim*n!*&rey, fine grained, hard & compact 74 o.77 0.55 o.94 53.54 0.61 0.11 0.02 0.02 42.131.50 1.35 90.00 Lim ght grey, fracture, fine srained 15 0.38 o,48 0.53 54.27 0.51 0.09 0.02 0.02 43.111.50 1.35 90.00 Limel gt grey, fracture, fine grained 16 0.45
0.53
0.53 0.69 53.99 0.60 0.11 o.o2 o.o2 42.5420.00 96.67 !,-ryle&1tiffifit gr€1,, fractrre, fine s;ine; T721.50 23,00 1.50 /.45
0.60 0.60 53.8s 0.69 0.10 o.o2 0.02 42.5296.6/ timef6 g:lttpht prev. fracturp- fina orainc/ 18 0.45
0.91
0.61 0.41 54.15 0.57 0.10 o.o2 0.02 42.4000 24.50 50 1.50 100.0024.50 I 26.00 L.42 94.67
19 0.69 o.4 5 69 0.70 0.10 o,o3 o.o2 42.99
26.00 27.50 I 1.s0_ .__-___!rrne5rone; grey, meotum gralnect, hard & comDact 20 0.99 95 o.42 53.40 0.77 o.11 0.03 0.02 43.05
z-,t:r-iii t 3 ."Rtto n e : grey, m e o i um lra ineaJira? .orpa.i 27 o.9227.50 29,00 1.50
7.50
1.50 I 100.000.95 I 0.55 52.93 L4 t 0.03 o.o2 43.25
29.00 30.50 1.50 100.00gIL8Il{Crgy to grey, medium grained, hard & comoact 22 1.95 7.64 0.99 I 49.54 2.98 0.73 0.05 o.02 42.34
L'me] gey, medium gralned, hard & compact. 23 0.64 0.64 7.74 53.33 0.80 0.72 o.02 0.o2 42,7430.50 '32.00 1.50 1.50 100.00,, timr gley, fine grained, hard & compact 24 0.70 0,74 0.5j0.72
s3.46 0.90 o.72 | o.02 o.o2 43,481,50 1.50 100.0( A f,'j,l )rl, rcy, fine grained, hard & compact 23 0.89 0.7233.50 35.00 1.50 7.45 96.67
0.12 I 0.03 0.02 43.39,l lRi ey, fine grained, hard & cdmpact 26 0.89 0.78 0.7s 53.15 o.94 0.14 0.03 0.0235.00 36.50 1.50 1.50 100.0c tl#"-qt6$es, ey,fine grained, hard & compact 27 o.78 0.78 o.76 s3.29 I 0.88 o.72 0.02 o.o2 43.5035,50 38.00 1.50 1.45 96.67 l_imE rey, fine grained, hard & comoact 28 2.33 a oA L.79 48.27 I 3.68 0.13 0.o6 o.o2 41,.6338.00 39.50 1,50 1.50 100,00 \N2,,\ w !: grey, flne grained, hard & comoact 29 0.95 0.89 0.7s 53.02 o.98 0.72 0.03 o.o2 .43.7839,50 41.00 1.50 1.50 100.00 \sAanF* \ffffine: grey, fine srainJd, hatd & compact 30 0.86 0.79 0.77 52.97 1.10 o.77 o.03 0.o2 42.7841.00 42.50 50 t.5g I00.oo -\;::ittrtfestone: Erev. fine crainod. h:rd & 31 0.69 0.59 0.68 53.59 o.76 0.12 0.o2 o.02 43.3342.50
44.00
45.50
47.00
44.00
45.50
47.00
48.50
1.50
1.50
1.s9
1.50
100.00 Limestollei grey, fine grained, hard & compact 32 0.64 0.72 0.58 53.61 0.80 0.11 0.G? ,02 43.75100.00 Limestone: gley,fine grained, hard & compact 33 7.O2 1.03 0.83 s2.67 L.74 0.13 0.03 0,02 42.67
1.50 I.20 80.00 Limestone: grcy, fine grained, hard & compact 34 1.06 ntq 0.90 s2.90 0.95 0.11 0.03 0.02 42.171.50 7.50 100.00 Limestone: grey, fine grained, hard & compact 35 0.81 0.73 1.03 s2.40 7.52 0.11 o.o2 0.o2 42.36
Borehole closed at 48.50 m.
Paqe 1 of 1
Litho-chemical loq of Borehole No. K1 - 2A
't r' ,,-,, r
:.. !.
'^i'lnclination of Hole: Vertidl ,
Depth of the Borehote: 54.50?ir .. ,
i r:!
Area: Khub Llmestone Mlne-l (4.96 Ha.)
RL of Borehole collar: 485.617 m.
.i 'i Core.r ,
Recovgry
r'.:::l%l
j j..r'; :: .. . -;;;'j .,r;,jili ' .tr:.,,:
li*rotogffitt,lr,''',,': ,i'. ;ljflli :.i.,:,., ", , Al20r F,gi9-i it,!f#
ilaa,l
?li; rilol:l
0.00 1.50 1.50 0.44 26.67 Limestone; grey, fine grained, fractured, siticeous, 1 27.96 2.34 3.72 35.08 1.24 0.11 0.05 0.03 26.34
1.50 3.00 1.50 0.60 40.00 Limestone: light grey, fine grained, fractured, siticeous. 2 11.26 1.10 1.84 46.70 0.82 0.11 0.03 0.02 35:61
3.00 4.50 1.50 0.65 43.33 Limestone: grey, fine to medium gralned, sillceous. 3 10.26 0.92 1.75 47.48 0.76 0.11 0.03 0.02 36.27
4.50 6.00 1.500.70
56.67Limestone: light grey, fine grained, fractured, siliceous. 4 1 3.51 0.99 2.25 45.49 0.63 0.08 o.a 0.03 32.91
0.15 Sandstone: ca(carous, grey, medium to coarse grafned. 5 61.10 4.22 0.98 15.14 0.02 0.00 0.05 0.01 27.30
6.00 7.50 1.50 0.48 32.00 Sandstone: [ight grey, medium grained, fractured. 6 91.19 0.48 1.64 1.12 -0.09 -0.01 0.06 0.01 -3.66
7.50 9.00 1.50 0.18 12.00 Sandstone: [ight grey, medium grained, fractured. 7 78.39 0.49 I .53 11.79 -0.07 -0.01 0.07 0.01 5.81
9.00 10.50 1.50 0.30 20.00 Sandstone: light grey, medium grained, friabte. 8 92.07 0.28 1.83 2.33 -0.10 -0.03 0.05 0:01 1.49
10.50 12.00 1.50 0.10 6.67 Sandstone: [iqht grey, medium grained, frlabte. 9 94.53 0.41 2.16 0.50 -0.10 -0.01 0.05 0.01 0.55
12.00 13.50 1 .500.33 22.00 Carbonaceous 5andstone: blackish, medium grained. 10 79.04 0.57 2.84 7.96 0.01 0.01 0.07 0.0 8.08
0.57 38.00 C a rb o n aceo u s S a n d s to n e : b ta c ki l3tellm g rai n ed. 11 67.21 6.66 5.98 1.54 0.39 0.07 0.33 0.01 5.7
1 3.50 15.0q 1.50 1.20 80.00 Ca rbonaceous S a n ds tone ; b (ackishlleL gr aine d, 12 82.78 2.26 3.88 1.80 0.08 0.01 0.11 0.01 7.31
15.00 16.50 1.50 1.50 100.00 Limestone: grey, fine to medium graintfftdZl Compact 13 1 .08 0.66 0.87 53.37 o.67 o.12 0.03 0.02 12.87
16.50 18.00 1 .50 1 .50 100.00 Limestone: tight grey, fine to medium grail*! ila Compact 14 0.55 0.58 0.49 54.04 0.59 0.10 0.02 0.02 13.77
18.00 19.50 1.50 1 .50 100.00 Limestone: tight grey, fine to medium grainfra'ld &, Compact 15 0.75 0.67 0.47 53.80 0.66 0.11 0.02 0.02 43.65
I 9.50 20.00 0.50 0.50 100.00 Limestone: light grey, fine to medium grainedpllrd & Compact 16 0.68 0.68 0.58 53.76 0.67 0.11 o.02 0.o2 43.51
20.00 21.50 1.50 1.50 100.00 Limestone: tight grey, fine to medium gralned, hard & Compact 17 0.53 0.66 0.38 53.9E 0.67 0.10 0.02 0.02 43.88
21.50 23.00 1.50 1 .50 100.00 Limestone: light grey, fine to medium grained, hard & Compact 18 0.71 0.82 0.44 53.60 0-79 0.12 0.03 0.02 43.86
23.00 24.50 1.50 1.50 100.00 ljne*e!& tight grey, fine to medium grained, hard & Compact 19 1.03 1.05 0.51 53.09 0.93 0.10 0.03 0.02 ,{1.58
74.50 26.00 1.50 1.50 100.0v itlJttltOfieq$qt grey, fine to medium grained, hard & Compact 20 0.62 0.71 0.61 53.57 0.84 0.10 0.02 0.02 42.52
26.40 27.50 1.50 1.50 10v, z-Limestone)'$iD.h.uy, fine to medium grained, hard & Compact z1 0.57 0.62 0.54 53.78 0.75 0.11 0.02 0.02 43.59
27.50 29.00 1.50 1.50 fip a Liqrestone;tighll y, fine to medium grained, hard & Compact 22 0.48 0.57 0.41 54.12 0.60 0.10 0.02 0.02 43.85
29.00 30.50 1.50 1.50 100t gtr fine to medium grained, hard & Compact 23 0.89 0.71 0.61 53.57 0,70 0.12 0.03 0.02 42.68
30.50 32.00 1.50 1.40 qmn lfirffi&iffihdd fine to medium grained, hard & Compact 24 4.86 1.25 1.82 50.29 0.75 0.1'l 0.u 0.02 39.41
32.00 33.50 1.50 1.40 9\93^\ *Limestone :'ti gf fine to medium grained, hard & Compact 25 1.48 0.93 1.00 52.74 0.83 0.11 0.c3 0.02 42.41
33.50 35.00 1.50 1.45 96.'dsfa^\m eslong2+(edg{/ey, fine to medium grained, hard & Compact 26 2.25 1.04 0.89 52.35 0.79 0.12 0.4 0.02 41.85
35.00 36.50 1.50 1.50 too.oNJfr'nm"*effi'grey, fine to medium grained, hard & Compact 27 2.60 ?.25 1.14 49.92 1.98 0.12 0.06 0.oz 40.78
36.50 38.00 1.50 1.50 100.00 ffi, fine to medium grainea, hard & compact 28 0.68 0.72 0.82 52.98 1.19 0.12 0.02 0.02 42.99
38.00 39.50 1.50 't.50 100.00 Limestone: tight grey, fine to medium grained, hard & Compact 29 0.64 0.69 0.72 53.58 0.77 0.09 0.02 0.02 41.29
Page 1 of 2
Area: Khub Limestona Mlne-l(a.96 Ha.)
rq of Borehole No. K1 - 2Ai-itho-chemical lc
', .t:' i.:.-:.,
t-...':lnclination of Hole: Vertical I
RL of Borehole collar: 485.6't7 m. Depth of the Borehole: 54.50 m,
,ll'i::)i. !;:
,
" l::jl l: 'lrliiiilt
i'1.'., l; i;.j;,,'sll rit'.,-'i!.1-, il,,-;ii
,,t'1:,;t':;;+i :,f'ijffi 'tff!,ti . i ld!"0;i r^l.'i.i'
39.50 41.00 1.50 1.50 100.00 Limestone: light grey, fine to medium grained, hard & Compact 30 3.05 1.30 0.87 51.86 0.70 0.11 0.04 0.02 40.02
41.00 42.50 1.50 1.40 93.33 Limestone: tight grey, fine to medium grained, hard & Compact 31 1.47 0.99 0.79 52.73 0.90 0.12 0.03 0.02 41.14
42.50 44.00 1.50 1.45 96.67 Limestone: tight grey, fine to medium grained, hard & Compact 32 0.84 0.76 4.73 53.34 0.83 0.11 0.03 0.0? 41.53
44.00 45.00 1.00 0.90 90.00 Limestone: grey, fine to medium grained, hard & Compact 33 0.95 0.78 0.66 53.09 1.02 0.11 0.03 0.02 42.58
45.00 47.00 2.00 1-10 55.00 Limestone: grey, fine to medium grained, hard & Compact 34 1.02 0.75 0.88 53.26 o.74 0.11 0.03 0.02 40.89
47.00 48.50 1.50 1.40 93.33 Limestone: grey, fine to medium grained, hard & Compact 35 2.99 1.26 o.96 51.59 0.94 0.13 0.04 0.02 41.60
48.50 50.00 1.50 1 .50 100.00 Limestone: grey, fine to medium grained, hard & Compact 36 1.31 0.88 0.78 52.93 0.88 0.12 0.03 0.02 43.05
50.00 51.50 1.50 1.50 100.00 Limestone: grey, fine to medium grained, hard & Compact 37 0.95 0.72 0.75 53.20 0.91 0.12 0.03 0.02 42.82
51.50 53.00 1.50 1.50 100.00 Limestone: grey, fine to medium grained, hard & Compact 38 0.93 0.76 0.71 53.23 0.90 0.12 0.03 0.02 43.07
53.00 54.50 1 .50 1.50 100.00 Limestone: grey, fine to medium grained, hard & Compact 39 0.91 0.74 0.71 53.29 0.86 0.12 0.03 0.02 42.67
Borehole closed at 54.50 m.
$
Page 2 of 2
-/@
==--=-==== 55===-E-=:A N ALyT:ICAL LABS LIFTITED
E.41- Okhle lndl. Area, Ph'll.'llew Delhi'110020 (lNDlAlPh: - $1 :11-40522000. 41$11000Fai ; .91'11-ao!03150, [email protected] ti/ww'speclro'i n
+fa11r.S1t.*t.\^f " 8TEST REPORT
lasuedTo i CEI'|EI{I I'IANUFACIURING CO'[ro,!Ul'rtSilN0l'{6 ViLIACEEAST JAINTU\ 1{LLS OISI.
I."EGHAL{YA.?932,I0
Phone,far 096121683+4Find At1n. : ltRiSUREtlOiR KU'IAR JF]N
Rcprt tlo; 130829C541{3tS?SC160 Oate; 0-r"Sep'20i5
Samp,{e0escrlption: DOR 29-iug-2013
KH.lrss.1
Ycur Ref. lio. : SAt-UCLtGu?70BIl314 0Ti27.08.?013
/1) .Vo * 130.52901(;0
Chtnic:al 'fcsts;
/:rri4E.\?il:
Sl/ic:n 1n.s SIO:J
Aluwinte (as rtl:O-: )
lron tt:tit{e ( as ]:tc:42,1
Ciriclrirrr o.rida (a;r Cu()i
;\du.q rrrs rc fa.s,ti{.g-(}J
/..rrrrs rrlr l.glt ition
-iirrltrrr:lrJ- ,l!; j :fil .' I lt,li irilrYiti:uirfrr
COn C'i:.';\iI&J i"/O.l'S r?'{a}
t.t4
0.53
il^952
iJ.5
.lfit{\t\pAocs,rAo090
, l*,..' tt.' lfiif'lfir"
lrrF-ilst'
re& D t,DA" t4oEF, DGCA apgrrov'er:'
r-qo - *rr$1. 20']8' rs#ifi;i '''?604
a-oiGl.F;-I-i:iun? certirrcri r"sbcrafcrv00 dE2 ilSrrbiect tc-ferrns & Conditions Overlsaf
E.41, Okhla,lndl, Area, Ph-ll,'New Dslhi;l:t 0020 (lNDlA)Ftt: - 91-11-40522000, 4161100OFax : 91-11-40503150. 405031 51care@speclto;in www.spectro,in
TEST REPORT
ID No - 1308290161
Clretnic-{tl Tests:
L7./i,,1/EN71S
Silicn (rr-s" S'iO:J
Altnrina ku At:O: i
/l'rttr r"r.r'rtdc i cl,s Ft?::'C),,j
(]ultitttrt oxido 1u* Cot)) -
CO N C tti:s'fi4 7' I O i* S i td i
Q.7B
/l.,jj
ffiefl, w\r
#'q*.**r',RAooo,rAsoec$i-;
;; 5** Au
lrsucd To.: CEMEI{T *IAIIUFACTURING COLT0.LUI.{SH}iOSIG VIT]AGEEAST JAINTIA HILLS OISI"
HEcitArAYAt93210
13CS2!0dJi30a?9010i rsau 05-$ep.?01;3
fOR 2-q.dur'2013
I.IR.9URETIDTR XU I,{AR JAIit YaurReLNr.: SALLlCl,lCll2?08,r13,110I;-2?.08.2013
n,.jj',n$qb
,'lCrrjjr'rcrsirr (a s it'lg})
l(.7.t.T (rfi lgttilion
ir, ri.x,rr:'t.rr ,t5 I lio Ll{l"Sigi:rr1;lnrrr,r
- #ftfr n^F e r\ rin& niifttrF flf:nA annrnuer{.
:t:..'iLtl1l: .:1::a::.:
LWICAT LABS LIIVIITED
E-41, Ohhla lndl. Area. Ph.ll,New Delhi-l1 0020 (|NDI.A)Phi - 9'1.1140522000, 41611O00Fax : 91-11'40503150, 405031 51care@spectro-in utwlv.spectro,itl
TEST REPORT
ID j\to- //30$2t)0162
Llsfrticdfies!&
/jI.Ei./6A'I,S {:ON(lft:}i7t,'l TIO;\5 r9A
.S'i/jr:a /cr.s SiO.'J - 0'.$4
-,litrrttittct (as A!1O; ) - A.5l
lrott uxitle ( cts f",-,rnl,,o,
g#;-C)ulcirm oxido (t
i\y'crgries fcr rct s l.{rg,O)
lcrs.r rlrr Ignirbn
l.lI9
4 _1.2
q ffi ffi,,i..#,*,$;*,
tu4lUtbxrorlr Elr'oo,rA.s ggl
lssuedTo : CEMTNTMAIIUFACTUR|HG CO[TD.LU|.TSHNCNGVtLt tGEEAsr JAIHTIA riLr-s orsr-
M:.GHA!IYA:7932t0
PhonetFar: 096121083C{tiindAflil.: L!R.SUREl.lDERKUhli.RJilt'l
Repc<t L'0.: :AC'529C541110923{142 Date: 03-Sep?0 t iSemple Descripiico : DOR 23.Ary-?'I3KH-il€S.l
YourRel. No : SALUChICL?;09,{-l.t4 DT:-2i 8E,2313
v- --:-
-
--€i:--- --:- 6r^ rin.. .{ n nn.a t\lartrtr !-]fqCA arrnroved,
.WICAL IABS LIMITED
Ph:: - 91-1140522000, 41611000Fax : 91-11-405031 50, 405031 51care@speclro,in r./r,nr.6pectro.[n@
TEST REPORT
E*41, Okhla lndl, Area, Ph.ll,New Delhi-l t0920 (lNDlA|
lsrued To : CEMENT ITANUFACTUR${G CO LTD.Lul,tsFtlol.tG vlLt 4cEE,qST JAII,ITIA HILLS O6T.
HEGHiLAYA.?S3210
PhondFax: 0l+i,l2t60304Kind Atl,'i. ; lvlR.SURElltER KUt,tAR JAIH
13{8290s4n308290r63Samge Oescriplion :
KH-ll,'$S.2
You;'Ref.f{c. I SALUC|,tGlnifiAil3.llDT:ti.0r1.2013
COA{CC j\r77iil 7 10r\i5' a ;4.'f I
3,75
2.r]
t.7h
Drite;
0030$5ei{g1J
2$-Aug-2013
ID No - I-108290163
C!rctficil Tes,t$i
/jLEnl{ll7;s
Sific:tr hs SiO:)
Altrnrirtu t'os dl:Qt, i
. [n.tn r).rrd/cf ( t't.s l"'c:().,)
(.blr:irlrr exitl.o fus Cn)i
.'t{cr.gnesra fus il{g2t
l-,o:;x tttt lgtri t i ori
..'!ririrJc.)i. /.(, i idil .1 RIJSjli.irrrlrrt,l'iiir
ft
*Yrnro ourl\RAooo,,A'oso
fu,*i'#*n.,",f;**,Authorised
* .. tg f;l- ,#.r A na\ A tt"tl-tl:(: nrtrt.rl1, ,tnr-rtfiIlr'r{4
ffiffi\;M/,1/D3,Q
3
!
A"nnneiture- * g
Sf Ep.S xo s's "( ecc6.
SALE DEED.
SALE DEED MADE on the 22od August, 2005 by Smr Sukh pdang WoSh. Change Rymbai R/o Vill. Lumshnong, P.S. Ktrliehf[.Iills, Meghalaya, hereinafter to as Vendor which expressito the context shall mean and concluding the said Vsuccessoni, executors, administrators and assigns of the ;t !)ttu tE
?=>
c-,AND ,# \\"eqQrn',
\t s\?o)
I1.02.2001 under the Companies Act, 1956, and having it's registered ofEceat Lurnshnong Meghalay4 hereinafter referred to as the purchaser, whichexpression unless rcpugnant to the contelit shall mean and include the saidpr.uchaser, successor, executors, administrators and assigns of the OTHER
$gF-JI-i
cements Manufacruring "".ffiW **o*WRegistrar of Companies, Shillonflvide Regishation No.13- 06663 dated
PART wfinessz follows: -
t{r
r.d
"a-J"'{
'l'l;;i'ttqu\'": ^ '' tt' ''..., i''::.,': , .,--..^i,\
*2--- *'o*?*nn14fi-Sr, j... ...,...J. \.\\
WHERE Aq'.ft; aUonrc named SbnOor is the absolute owner of the landhaving a t{tali area o{,4800, ${ vt r, Situated at Khub are4 villageLumshnong iiP.q. Kblieluiat/_i.pistt. Jaintia Hills, Meghatayq morespecifically dbi.erl,pe{'in the,$h.f,6ule below and same beine cerrified by theoffice of the JISntia, Hills ;$r{onomous District council, Jowai vide LandHolding certificate-No.- f7 of 2005 and the said land is free from all
/-:dito. jaintia Hills, Meghalayq morespecificatly dUC m
encumbrances what so ever AND WHERE AS the above named vendor hasagreed to sell the total land measuring 4800 Sq. Mrs. (along withLimestond atty other minerals or anything what so ever which may be foundembedded therc in) us specifically described in the schedule below alongwith approved map of the said land as issued from the office of the JaintiaHills Autonornous District Council, Jowai, to the above named lvl/s CementManufactuing Co. Ltd., for a total coruideration amount of Rs- 96,000/-(Rupees Ninty Six thousand only).out of which Rs.450001 (Rupees ForryFive thousand only) has faid as advance money. The Balance amount i.e.Rs. 5t000/- (Rupees Fifty One thousand only) has paid today to the vendorvifle cheque no.0144ll dated 22.08.2005 and the receipt of wtrich hasalready been acknowledged by the Vendor.
I
10O0Rs.
Et'-ni{
--3-
NOIV-IES p EEg W rTlilgs SET .H ANQ,TOLT{OWSI
Ttrst i-o consideration of a total sum of Rs. 96,0004 (Rupees Niotyonly) paid Uy thc purchascr and thc reccipt *trercof (the cntire saleb.iog admitted and acknowledged by the Vendor do hereby and@nvey, trarsfer to tbe purcbaser by way of sale ALL TI{E ESTAintercst claim and demand what so ever of the vendor into or upon the samepart thcreof referrcd to abot'e and spccifically described in thc schedule bclowHOLD tlre sane as an absolute ownerA}ID a PERIvIANENT RIGff AI{D RECORDSOF RIGHT to use AI'{D THE Veodor do hereby covenant with tbe pucbaser tbat notwithstanding any acq deed or tttiogt hereto beforc done or executcd AND LAWFULLYposs€ss the said land free from aay encumbraoce, attachments or defect in tbe tittcwhatsoever and Vendor has fuIl Power and absolute arrthority to sell the said land in themanncr aforesaid AND the purchasei shall thereafter pcaceably and quietly bold, possessand enjoy the land in KHAS POSSESSION with all the riglrts rcluing to sale' mortgagglcasc and mining of limestone or any other mi"eralS, &y otber use wlntsocver withoutany intcmrptton by Vcndor or person or petsoru claiming through him WHATSOEVERAl.lD FI.JRTI{ER MORE THAT THE Vendor shall at all time thereafter indemnifu andkecp indemnffied the purchascr against losscg damagcs, costs, charyes and expenses ifany suffered by reason of 'any dcfect in the title of the Vendor or any breach of coverantshercaft€r contained and tbe Vendor do bereby coveoants witb purcbaser tbat if rcquired.
500
vcd
LJ')
=4The Vendor shall appeBr in person in all government/ Semi-govemment/financial InstitutionV Durbar/ t ocat body in connection with sale of thisland and the Vendor do hereby agrees to suitably amend the Terms and
Conditions of the Sale Dged if so required to be done so on behest ofFinancial InstitutionV Government Dcpartnents.
expendiurre towards
.-4-*,,dltlt*ftl4''
.\rSlp"ia ladd shlt!9Tl$*pressions "VENDOR
\\a'\',
ra*tM#i"ir respecrive successors'
HENCE FORTFI all the landby the purchaser PROVIDED t WAA].{D TI{E
for
PURCHASER" herein before used s*
legal representatives and assignees.
IN WTTNESS WHEREOF Vendor has here unto set and subscribed his hand
and seal on the dan month and year first witten above.
\
IUU KS.
G[tPF'.'| - G
scspw-E
LA].{D SIIUATED AT Khub area village Lrnnshnong, P.S. KbliehdaL Disfl. Jaiutia
Hills, Jowai,-Megbalaya butted and bormded onthe
NORTH
EAST
SOI]TH
WEST
The Lsod of Dap Suja (CMCL) , Lumshnong
The l"aod of Iaid Bareh ( CMCL) , Lunshnong
Theland of Smt. Sukh Pdang Lumshnong
The tand of Smt. Sianti Papiah (CMCL) , Lumshnong
Within the abovebormdaries land measuring 4,800 Sq.
wf,rNFssES:
i*1 ;rr1th+lqfll€t
Elah llrrpuh
3)
wL1(J
J.)
-\
l?-ri::
g''/
@\SF?FP'
f.i
18 /o-o{ ,riitc{ok}zll d i f.t?'(
r.J)I./
t..f*r .
F *"*.r" ":"r'
oFFte E:OF TItEJAtNilA HrLrS AUTONQMOUS qSrircT e Obrtcit*,,i i, , :IIl.I C:r.
No. .....1-./.-...... oF zt.(.,i..-.
eaua ..... ilK.t/.c:L'... . . .
LAND HOLDINGCERTIFI
ber-t i fi ed th at accordi ng to custorlrary d ght of I and hcldi
bclongs to SJxi/S mt.'....1
Fresently residing
Northtrast
South
West
i.r *d+...' r...r..'..;...i.+.<9....*i-r;rrr.j+.-.. i..i..... '...1'....-.. "...
a.rj.d: !-ilirr...rj;i ai.. i:.r- i-.r. r r. rt 6 l.t:,.r.;.'. r r r: - . r *.:- .1
/}"rtn'rsii -;*
MEMONo.JHADOREV/IJ|0('qp;r
gt
scHED(rL? o, LAND havr a'*'.'6 "
,(
land is liable to assessment of ievenue as and the Dif)istrict, may by law enact.
Sigluturc of ls$ging Aurhorit).r
Otfice Seal and Dcsignation -
W,:{,,,.,piflsn*",:,,
flat"f w
Jaintia Hills A
s\^E-rc.bt \.L\P oF 'rKE txtt}6(l..Na€ GtSDest
Otr S\rsr, Sur< lPD t\D*l, G o F
Lu stsHh,.\o F{G (v tr-u1 AT' KHuP \
Lusrcs btb-Lotvct . E L \\,(\ . Nn Il,Pu n .
tqo "r To S c-\uEA-m-e ,l'. -
tr+ Bo o . o a Sqr-trs. (tf r= 11o Utt tDrc-F\-Tro h( .
a
--_!/ st De. DKxtrrr, r- * n
!tr'1
f-t,,,t,/4yf
t_
/v:A
r,
A]FrF(nrre5 Blf .'-
)frla Hiltt ttt,si-'t.W h*,.ltal
Mex:uReDrDRxlrrrxr
:lo -
"l!:lp:::::9:Hrntfi';s.16:q5g llV,
''; i;tJlS IUOJI
1..roJ'il06tiu1,u,i OlqlSStuJPV Eo"yJ L*-5z*1
fl"\=.,*oS
\,*'-*r*r7g
:\
q?-e:\t
I
:l'I
\ .e8"ropttcA d@8
'3f,ffi'a'1"
*r ;"r 1g,'ri\1!?,l'di;';I#xE
.r-F-H-.**-'gL pt3
,f,hffx'v7*
A*rnrEXuRE-j'OGOVERNMENI" Ot.' MtrGHALAY A
MINING AND 6EOI{)GY DLPAR'IMbN1><.>o<
No.MG.9812008/23,
From : Shri C.lCl$*rakUnder Secretary to fhe Govl. of Meghalaya,ti{gfu€ & Geology Deparunent,/
To : /Th. Dir""tor,Cement Manufaohring Company Ltd.,Lumshnong P.O. Khliehriat,Jaintia Hills District-
Subjecl:: Decision ol- the Govemmsnt for permitting amalgamation o1'2 (two) Mining leases ol.er anArea of 4.96 hectares and 4.70 hectarcs respcctively at Lumshnong Jaintia Hills District iflrespect of IvI/S Cemsnt Manulacturing Company Ltd.
Sfu,
I am directed to conve), thc deoision of the Govemmcnt for permitti-trg arnalgarnation of2(tu'o) mining ieases on limsstone over ar ar"ea of 4.96 hcclares and 4.70 hechres respectiveiy atLunshnong Jaintia l{ills District which havc been granlecl to }v{,/S Cement h4anutacturing Company I.tdvi<le letter No.MG.47l2004/100 d1,20.12.2004 and vide letler No.MG.U/2AA3/438 dr.14.1.2006, inac.cordance rvith the provision of the \,lines and lr,Iinerals (Development and Rcgrrlation) Act, 195?subject to the tbllowing conditions i
(-t) Submission of ficsh Mining Flan for the amalgamated leases duly approvcd bythe competent audroriry;
(i0 Subrnissiicn sf Environmcfital cloarance;
Gi$ Any other matcriayparticulars as may be required.
This has the approval of the competent authority.
Memo IIo.MG.93/20081 23-A,Copy to i
Yours taitMully,
,1(,'.'{"o(.rurut"x I
Under Secretary ro *re Gavt. of MeghalayqMining and Geologr Dspertment
Daled Shillong the 1" April 2009.
I Thc Directsr of Minsral with reiersnce to lstler
By 0rder Etc.,rlI
to the Go'vL of Meghalavaand Geologr Departnent.
Dated, Shillong rhe l* Aprit 2009.
.."- IiF i: * ?E I E'r 1a
GOVERNMENT OF MEG}iALAYAMINING AND CEOLOGY DP}ARTMENT.**
NO.MG.9312008/38 ated Shiliong, the lOs Decamber,2010.
Fronr I $hri.C.K,\'1srak,Undcr Secrctary to the Govt, ofMcghalayaMining and Geolcgy Departrnent,
TO-/Ahe Director,\'/
Cemgnt lrlarlufachuingsonrpany Limired,I-umsturorrg, P.O. Khliehriel,.l airrtir I-1ii1s D istri ct.
r Decislon of rhe Governnrent fot permirting amalgarnationof
-2 (two) Mining leasc:i ov$r an ares of 4.96 hectares aad
4.70 hectares respectively &t Lumshnong, Jaintia Hllls
#T:::::::::;::::,,,Sub
Ref
$ir,
dl#'i24.08"2010, I ultd state
area of 0.24 hectargs
and 4.70 hectarcs respecti
ald in position.of the C
dumping overburdbn.
Memo No.MG.93n0088g-ACopy to:-
No.CI..{CUAh'1C&0 l, 0-1 \ i dated
objcction for utilizing the virgin
over an area of 4.90 hectares
ills Dishict rvhich rvas acquired b,y
rosd or tbr utilizing the area ior
This has the approval of the Competent Authotiry.
Yours faithfully,
Under Secreta$. to the Govt. of Meghalaya.Mining and Gcology Depanment
Dated thillong, the lOs December,2010.
The Director of Mineral Resources, Meghalaya, Shitlong with reference. toletter No.DMR/hdlWsg 1 104/3 I 7 8. dued 1 0. t 1,20 I 0"
By Order Ere.,
+tlNExuRE - Lt
CEMENT MANUFACTURING COMPANY LTD.
SUBMISSION OF GEO.REFERENCED CADASTRAT MAP FOR THE COMPLIANCE
oF IBM CTRCUIAR NO. 2/2010
UNP.EBTAKIN.G BY THE APPLICANT
I, Shri Devender Bansal, Nominated Mines Owner on behalf of M/s Cement
Manufacturing Company Ltd. at Lumshnong village, P.o. - Lumshnon& P.s.
Khliehriat, District East faintia Hills, Meghalaya - 7932L0, hereby undertake that,
I shall approach for the Geo-referenced Cadastral Map of Khub Limestone Mlne
over an area of 9.66 hectares to the concerned State Government Authorities for
Mining Plan and Progressive Mine Closure Plan of 9.66 hectares to(amalgamated
area) fulfill the requirement as per IBM circular No. Z/20L0, dated 06104120L0.
I, Shri Devender Bansal on behalf of M/s Cement Manufacturing Company Ltd. at
Lumshnong village, P.O-Lumshong & PS - Khliehriat, District East faintia Hills,
Meghalaya-793?t0 is giving an undertaking that I shall deposit the certified copy
oftheGeo-referencedCadastralMapbefore31.03.2016./.m
ffi(J*"fft ).il)5i/l:ii
Place: Lumshnong affi; oevqffi.ffi$,li'Date: 29.L0.20I4 169$+fominated Mines Owner
Regd' otrce & works: Lumshnong, P O: Klralchnat. Drsn :Jarnria Hills, Meghalaya, Ph.;03655-278215/l6llg, Fax, blesi,zzgztz. e-mail : [email protected]
AH NE-xuKe - lZ
ll-{f, rrr6n / covenruuENT oF tNDtA
rnrt dx-f,q / urrursrnv oF MTNES
qn-fi-q qn qiT / TNDTAN BUREAU oF MTNES
eiftq src fd{iTo 6-r odrc{-q/orrrcE or rHE REG|oNAL coNTRoLLER oF MINES
qftfr - 13, Rt{d{ - v, d-ee d-qt Rre, dT-d-6rdT -700 0e1
C.P. -13; Sector -V, Salt Lake City; Kolkata-7O0 091Phone: (033) 2367 39BG / 3618; Fax: (033) 2367 3617
E-mail : [email protected]
i;-:-E+: -,^ :. |"jf?'i$i'
i;r!c/;r '
?!," -.a,:,t: n ,
NO.GHY/MEG/J H/Lst-6/KOL
ToShri Devender Bansa! ( lrlamineted Owner)Cement Manufacturing Co. Ltd.LUhTSHONG, POST- KHLIEHRIATDistt.- JAYANTIA HILLSMEGHALAYA- 793200
Dated - 2610512014
production of 6,54,699.45 tonness there is an excess production cf
Sub: Order of suspension of mining operations under Rule 13(2) of Mineral Conservation & Development Rules, 1988 inrespect of your Khub-l Limestone mine, over an area of 4.96 ha, in East Jayantia Hills district of MeghalayaState.
Sir,
Please refer to the inspection of your above mine carried out by Shri M.G.Bhattacharyya, Junior Mining Geologistlndian Bureau of Mines, Kolkata on 05/03/2014 accompanied by Shri P.Jagdish Babu (Agent) & Sikandar Prasad(MinesManager) of your mine.
02 The following provision of Mineral Conservation & Development Rules, 1988 were found violated in your abovemine during the above inspection dated 05/03/2014.
Rule 13(1):- The Combined Mining plan of the above Khub-l & Khub-ll mines/ leases was approved vide letterno.314(3)/2010-MCCM(CZ)/ MP-32 dated 8/4/2011 with a proposal for production, exploration, developments etc witheffect from 2010-11 to 2015-16. The following deviations from the above approved Mining plan were observed during theabove inspection.
ln the approved Mining Plan, there is a proposal of total production of 2,50,000 tonnes of Limestone during 2012-13 for the above two Mines.
Hovvever, it is seen during inspection, that during(1,78,858.45 tonnes in Khub-l & 4,75,841 tonnes in Khub:ll)4,04, 699.45 tonnes against the targeted production of the
03. The above violation under Rule 13(1) of MCDR, 1988 h violation cum show causenotice vide this office registered fuD letter of even no.
04. Your reply vide your letter no. CMCUKLM/2O14-15/01show cause notice has been reviewed in this office and
this office above violation cumof the above violation has
not been accepted since the modification of approvedLimestone mine at Lumshnong Village, East Jaintia
hects. of amalgamated Khub1/iuOmitted by you vide letter no.
IBM/CMCL/9.66 Ha./201 3-1 4 dated 20l2l2AM to regularize thb'\a'bbvgilq[er\office vide lefter no. IBM/GHY/MEG/EJNH/LSTIMP-72 dated 15/5/201&- =::'>
ion has not been apProved bY this
05. Therefore, by virtue of the poweb conferred upon me under Rule 13(2) of MCDR, 1988, I hereby ordersuspension of all mining operations in the aforesaid lease area over an extent of 4.96 ha, in East Jayantia Hills
t
-2-
NO. cHYrMEGlJHlLst-6lKOL dated 26tst201 4
06. No mining operation should be carried out in the above mine except the operations as may be necessary to restorethe conditions in the mine as envisaged in the approved mining plan.
07. This order shall remain in force until revoked in writing. After compliance of the provision of Rule 13(1), of MCDR,1988, you may apply to this office for revocation of this order.
An immediate acknowledgement of this order is requested.
Yours faithfully
.\**9Lo,-._ \, /-lb\)\
F. q. qtilt,.ti$i rr 'B Panigrahi)
ei*q lgtq frli7-6 / Regional controller of Mines
Copy forwarded for information and necessary action to:
1. The District Commissioner, East Jayantia Hills district, Khliehriat , Meghalaya- 793200
2. The Dii'ector, Directorate of Mineral Resources, Govt. of Meghalaya, Risha Colony, Shillong-793003,Meghalaya.He is requested to intimate the concerned DMO for non-issue of Limestone transit permission till the
revccation of suspension order.
3. The Dy. Director, , Directorate Generat of Mines Safety, Guwahati Region, House No. 16, Bylane -10, Ganesh
Mandir Path, Guwahati -781020,ASSAM.\\\
ft. A. qrFm€/A. B. Panisrahi)
d*q l9rq RdTfi /RegionalControllerof Mines
#EN,
..4",i"f',! .l Y,l-4t- i\1xlq4i?.4;/"::,ffi6//
i !:t!5.-,
etffq
qr{f, TI-T?5T{ / COVENNUENT OF INDIA
lcTq qTftrq / urNrsrnv oF MINESqrrftq qrq qtr / INDIAN BUREAU oF MTNES
gTq fr{iT-dn o-t or4rcq/oFFlcE oF THE REGIoNAL coNTRoLLER oF MTNES
fift - 13, t{-r - v, rfrte A-fi ftr$, dT-dfiT-dT -700 0e1
C.P. -13; Sector -V, Salt Lake City; Kolkata-700 091Phone: (033) 2367 39BO / 3618; Fax: (033) 2367 3617
E-mail : [email protected]
NO.GHYiMEG/JH/LSI-8/KOL
To.Shri Devender Bansal ( Nominated Owner)
"-" Cement Manufacturing Co. Ltd.LUMSHONG, POST- KHLIEHRIATDistt.- JAYANTIA HILLSMEGHALAYA. 793200
04. Your reply vide your letier no. CMCUKLM/2O14-15/01show cause notice has been reviewed in this office and yournot been accepted since the modification of approved miniLimestone nrine at Lumshnong Village, East JaintiaIBM/CMCU9.66 Ha./2013-14 dated 201212014 to regularizeoffice vide letter no. IBM/GHY/MEG/EJNH/LST/MP-72 dated 1
05. Therefore, by virtue of the powels conferred upon mesuspension of all mining operations in the aforesaid lease area
Sub: Order of suspension of mining operations under Rule 13(2) of Mineral Conservation & Development Rules, 1988 inrespect of your Khub-ll Limestone mine, over an area of 4.70 ha, in East Jayantia Hills district of lvleghalayaState.
Sir,
Please refer to the inspection of your above mine carried out by Shri M.G.Bhattacharyya, Junior Mining Geologistlndian Bureau of Mines, Kolkata on 05/03/2014 accompanied by Shri P.Jagdish Babu (Agent) & Sikandar Prasad(MinesManager) of your mine.
02 The following provision of Mineral Conservation & Development Rules, 1988 were found violated in your abovemine during the above inspection dated 05/03/2014.
Rule 13(1):- The Combined Mining plan of the above Khub-l & Khub-ll mines/ leases was approved vide letterno.314(3)12010-MCCM(CZ\| MP-32 daled 81412011 with a proposal for production, exploration, developments etc witheffect from 2010-11 to 2015-16. The following deviations from the above approved Mining plan were observed during theabove inspection.
ln the approved Mining Plan, there is a proposal of total production of 2,50,000 tonnes of Limestone during 2012-13 for the above two Mines.
However, it is seen during inspection, that during the year 2012-13 a total production of 6,54,699.45 tonnes(1,78,858.45 tonnes in Khub-l & 4,75,841 tonnes in Khub-ll) have been achieved. Thus there is an excess production of4,04, 699.45 tonnes against the targeted production of the above approved mining plan.
03. The above violation under Rule 13(1) of MCDR,1988 was violation cum show causenotice vide this office registered A/D letter of even no. dated 1
Dated - 2610512014
office above violation cunof the above violation har
of amalgamated Khutby you vide letter no
not been approved by thir
':pf mCOn, 1988, I herebY orde
ot 4.7O ha, in East Jayantia Hill
,ffir":d
district, Meghalaya State under the provision of Rule 13(2| of MCDR, 1
-2-
NO. GHYTMEGilHIsI{/KOL dated Z,,tStZOlA
06. No mining operation should be carried out in the above mine except the operations as may be necessary to restorethe conditions in the mine as envisaged in the approved mining plan.
07. This order shall remain in force until revoked in writing. After compliance of the provision of Rule 13(1), of MCDR,1988, you may apply to this office for revocation of this order.
An immediate acknowledgement of this order is requested.
Yours faithfully
, \\nntu"Lv1t$/,-at! ri]i\{
8. q. qrftirntl'A d'lo,nisr.ai,i)
e)-jlq grq {iziTfi / Regional Controllerof lvlines
Copy forwarded for information and necessary action to:
] The District Commissioner, East Jayantia Hills district, Khliehriat , Meghalaya- 793200
2. The Director, Directorate of Mineral Resources, Govt. of Meghalaya, Risha Colony, Shillong-793003,Meghalaya.He is requested to intimate the concerned DMO for non-issue of Limestone transit permission till therevocation of suspension order.
3. The Dy. Director, , Directorate General of Mines Safety, Guwahati Region, House No. 16, Bylane -10, GaneslMandir Path, Guwahati -781 020,ASSAM.
\\\
(q. *. crFrqlfr/A. B, Panisrah
e)-fm r9l{ ft"{iTfr /RegionalControllerof Mine
Ref.
Sub.
CEMENT MANUFACTURiNG COMPANY LTD.
Dated: 08-10-2014
To,
The Regional Controller of Mines,lndian Bureau of Mines,
Office of the Regional Controller of Mines,
CP - 13, Sector - V, Salt Lake City, Kolkata- 700 091
You r letter No. GHY/MEG/JH/Lst-6/KoL, dated 26 | os | 2ol4 (Annexure-l) &your letter No. GHY/MEG/JH/tst-8/KoL, dated zG I as I zot4 (Annexure-ll)
Request for revocation of Orders of suspension of mining operations under Rule 13(2) of the
MCD Rules, 1988 in respect of Khub-l & Khub-ll Limestone mines, over an area of 4.96 & 4.70
hectares respectively, in East Jaintia Hills district of Meghalaya.
Sir.
With reference to the subject cited above, we would like to submit the following for your kind consideration
please.
1. you are kindly aware that Khub-l (4.96 Ha.) and Khub-ll (4.70 Ha.) mining leases form parts of the
amalgamated ML of 9.66 hectares for which MP & PMCP has been approved by IBM vide letter No.
314(3)/2010-MCCM(CZ)/MP-321327, dated 08.04.2011, which is currently valid.
Z- We have submitted our explanation vide letter No. CMCL/KL[v4/2OI4-15|AL, dated 23.04.2014
(Annexure- lll) for excess production in 2012-13, i.e. due to delay in grant of Environmental Clearance
for 70 hectares mining lease of the company, for which also MP & PMCP has been approved by lBM.
Though we have completed all the requirements/compliances at our end, the delay in grant of
environmental clearance for 70 hectares was unanticipated and beyond our comprehension.
annual actual production and projected production figures in the
9.66 hectares amalgamated ML are as under :
:1.2.
YEARSduction in lakh
tonnes
(As on May,2014)
As per approved MP in lakh
tonnes8.5
7.21 i -or
: O.J
65M
(;')f)
6.98
i)ry-.cercran
Regd. Ofiice & \,vorks : Lumshnong, p O.: Khaliehriat, Distt.: laintia Hills, Meghalaya. Ph.: 03655-278215i l6i 18, Fax : 03555'27821 7' e'mil : lumshnonS(dcmcl co'rn
:tN lti0 l)0O1, tSO l'lOOl & {lIlSAS rSOOr 0lil!]lt{lilt OOilt}ANY
3. For your kind ready reference the_
approve' ancj vaiicj ,,rffi
CEMENT MANUFACTURING COMPANY LTD.
It may kindly be seen frorn the above table that:a) the actual production levels during the periods 2010-11 and 2011-12 and 2013-14 are well below
the projected producticrn f igures in the approved Mp.
b) We agree that the production during the Year 2012-13 was higher than the projected figure in theMP and the entire lirnestone produced is used in it's own cement of company for which the ML isa captive source.
c) the cumulative actual production for the first three years of the five year plan period ie from 2010-
11 to 2012-13 is 20.73 lakh tonnes as against projected figure of 19.50 lakh tonnes in the MP &PMCP. Thus the excess production during the period is only 5.gg%.
d) the cumulative actual production for the firlt four. years of the five year plan pe riod ie from 2010-
1i to 2013-14 is 21.96 lakh tonnes against projected figure of 22.00 lakh tonnes during the periocl
in the approved t'/P &PMCP. Thus the actual production during the period is less by 0.04 lakh
tonnes compared to the projected figure in tlre Mp.
e) lt may be observed tlrat corrective measures are taken up in the subsequent years i.e. 2013-14
and 2014-15 to keep the production levels within the approved limits.
5. The mines are the captive source of limestone for the company's cement plant.
6. We would like to bring to your kind attention the letter No D.O No. 16l185/2010-M.Vl(Pt-l) dated 05
September, 2012, from the Secretary , Government of lndia, Ministry of Mines addressed to the Chief
Secretary, Govt. of Odisha, referring to the total production for five year periods & tentative annualproduction targets in the MP or MS and the imperative need for flexibility on the annual productiontarBets vis-)-vis the five year periods. Copy of the letter enclosed for ready reference (Annexure- lV).
The relevant part of the letter (4"'to 13'h line of para 2) is reproduced below for ready reference.
"Considering the fact that sale of materials is detbrmined by market demand, the total production
target provided for in the MP or MS for five year periods should be taken as criteria for determining
the performance of the lessee, r n the annual prodtrction targets within the said five year
periods, for the reason tha is imperative on the basis of demand conditions for any
mineral. Any violation of the ing excess productions vis-i-vis the total target over thesaid five year periods, p the approved MP or MS , when noticed by the state govt. shouldbe immediately brought to the notice of the IBM to initiate suitable action."
7. ln compliance with your orders cited above we have suspende{,Ha.) & Khub-ll (4.7O Ha.) with effect from June, 20L4. sfh,u-,ros6
11igliq ,nira
AN IS(l tl00l, IS(t IdOOI r1(lns,tS ISOOl Cliltl'lllllill C{}lll'ttNY
,.nLIJa
CEMENT MANUFACTURING COMPANY LTD.
The production in the cement plant, for which the amalgamated ML of 9.66 hectares is the captive
source of limestone, is stopped for want of limestone. The cement plant and the mines provide
employment to 7t4 direct employees and indirectly to around 20O0 workers. This situation ofstoppage of plant and mines is creating unrest in the employees and financial loss to the company
and loss of revenue to the Government.
ln view of the above facts, we would request you to kindly consider the above cited cases ofsuspension of mining operations, sympathetically for revocation of the orders, so that mining
operations can be resumed in conformation to the five year plan period of the approved MP & PMCP.
We assure you that we will abide the Rules & conditions stipulated by you for revocation of theorders.
Soliciting syrnpathetic and favorable consideration of our request for revocation of the tr.vo orders
Tha nking you,
Yours truly,For Cement Manufacturing Co. Ltd.
"F)*-- -
Devendsr Bansal(Nomin{ted Owner)
Enclosed: as above
Copt to:1. The Controller of Mines (C), IBM Nagpur2. The Chief Controller of Mines, IBM Nagpur3. The Controller General, IBM Nagpur
8.
9.
10
]For kind information and favorable action
ffi-
f.ta O{nce & Wo+*s : Lumshnong, P O.: Khaliehriat, Distt.: laintia Hills, Meghalap, Ph.: 03655-278215/16/t8, Fax : 01555-278217, e-mail : lumshnong@cmcl'co.in
aN IS() eoot, lsO l4ool & of,sAs r8ool csllTlFtlll) colltlaNY
REGISTERED A/D
VIOLATION{'M. SHOWCAUSE NOTICEGOVERNMENT OF INDIA
MINISTRY OF MINES
INDIAN BUREAU OF MINESOFFICE OF THE REGIONAL CONTROLLER OF MINES
Block CP, Plot no -13
Salt lake, Seclor-tV, KolkataPin 700 091
Telephone : (033) 23673986, 23673618
Fax : (033) 23673617
llc. G?ry/l*e gi.lh/Lst-6i l{OLTo
I Shri Devender Bansalt'lominated OwnerCement Manufacturing Co.Ltd.Lumshong, Post:- Khliehriat.Dist:- Jaintia Hills.Meghalaya-793200Sub: Violation of provisions of MCDR" 1988 in respecl of your Khub. | & Khub- ll limestone Mine, over anarea of 4.96 hects. & 4.70 hects. in Jaintia hills districl, Meghalaya.Sir,
The following provisions of Mineral Conservation and Development of Rules, 1988 was foundviolated in the above mines during the inspection of your above mines on 5/3/2014 by the undersigned.
Rule 13(1)i The combined Mining plan of the above Khub- I & Khub- ll mines/leases was approved videlefter no.314(3y2010-McCM(CZy MP-32 dated 8,4/2011 with a proposal lor production, exploration,developmenls etc with effect from 2010-11 to 2015-16. The following deviations from the above approvedMining plan were observed during the above inspection.
ln the approved Mining plan, there is a proposal of total production of 2,50,000 Tones of limestonedudng 2012-13 for the above two mines.
However, it is seen during inspection, that during the year 2012-13 a total production of 6, 54, 699.45
tonnes (1,78,858.45 tonnes in Khub-l & 4,75,841 tonnes in Khub'll) have been achieved. Thus there is an
excess production of 4,04,699.45 tonnes against the targeted production of the above approved mining plan.
02. lt is brought to your notice that the above violation constitutes an offence punishable under rule 58 ofMCDR,1988.03. You are therefore, direcied to show cause within a period of 30 (thirty) days from the date of issue ofthis letter, as to why you should not be prosecuted lor the above offence and I or why the mining operationin the mine shall not be suspended under Rule 1988 lor non-compliance ol Rule 13(1) olM.C.D.R.l988.04 Pleasenotethatnofurthernotide regard.
Yours faithfully
Dated 19/3i201ti
ffi;ffaH:r#t'/v;,/;:r
-,/$",i"
.2.
No. GhyIMeg/JhfL{-6rKOL Dated 19t312014
Gopy for kind information to the Direc-tor, Direclorate ol Mineral Resources, Govt d Meghalaya, Risa
Colony, Shlllong-793003. //
(M. G. BhattacharYYa)
Junior Mining Geologlst
;$- !
i:t:ii:it i I,lAiiii ji::iit. ii i1il l.:i9' f,icqisi':, r,r:
, i,i:i,ii:;1|:itl i
iiilii
iir
i':;l:,i:: ,l l ,1
lcJunior M ining Geologist,O{frce of the F{egional Controller of Mines,
irrdiau Blireau o{ l'"4ines,
S;ilt L"ake, Seclor-V, Kolkata- 700 091
i-) .ir. ;"1,1.::, ,'N ] 1,
Krnd Aitn
Ref
)1.1'.1
Shri M.G Bhattacharyya
Your letter No. Chy/Meg/JhlLsi-6/KOL, dated L9/O3/2OL4.
tiii:lation of provisrons ci ll(t)ti, 1988 rn r€spect of Klrtrb-l & l(trLrb ii[.inrestone lvline, over ari area o{ 4.96 &.4.7o hectares in [:ast Jaintia11ills distri< t, Meghalaya
Sir,
\{e acknowledge the receipt:9iC3/20I4, on tlre above referred su
ab.-,ve titecj letter is as uilcler.
No. Ghy/Meg/JHlLsi-6/KOi-. dated.042014. The point wise compliance to the
Rule 13(1):- The anralgamated Mining lease over 9.66 hectares. (which includes tire 4.96 &a 7C hectares area) rs a captive source for Linrestorre for the 2400 TPD Cen-renr plant ofCerrierrt Manufacturing Co. Ltd. {CMCI-) The Minrng Plan v',rth PMCP has been apprc',,ed {orthe amalgainated Mrning Leases of Khub I {4.96 t1a ) and Khub U (4.70 Ha.) orr 08.04 2011.
The yearlv production figures ir-r the approved f.linirro Plag4cryqpsed lookirrg rntc the
overall lorrq-ternr planrrinq envisagecl for CMCI Plarft.ffi6$rqfi/ttt$Vcls in plan periodivere reduccci frorn 8.5 lakh torls pe r anrrurr" rn tlrc {ryffi{yq+fAlp NtaX\tons per annumfrorn the third y,ear"cnwards (2012-i3). ll* / "&$fl \i\
;?:;:Jil:: ff T::Y,T.T;;';:',111,'J i,fi '' "': tak"'&' *.$l' rrva rds was
proposeo To r)e rarsecr Tront /u Ha. tKnuD-ilrJ. rl\1r\ qi:c-.i cia ,/.F-,(,
However, due to the detay in Environmentat J;;*\**6-#1c"nt."t) we are
unable to start working in 70 Ha, despite of having "pp'F;i;ii*ffin9
el"n & PMCP byIndian Bureau of Mines.
Regd. Ofiicc & Wcrks : i.uin;!r:o,rt, 8 O. Khalichnrt, Uirn
1:{ isil iltir)i. lSt}
t^€lrs }.-,€g *{tr-.4 r.{ r.'i r;,
]arntir,! tlltltl .r'::ll1i.'r ;l'':ri' i
C[ tvt Hi\T MAI'I U I:ACT lJ RI i{ G COli PAi'.iY t TD.
The production was enhanced frorn Khub-i and Khub-II (4.96 & 4.70 hectares) in tlrethird year 201"2-r3 nrainly due to the above reason as there was no alternative sourceof lirnestone to run our captive ptant (CMCL).
Ir i,,erv of the ai:cive. t<; rneei il_re ieciurlcr_rreiit of plant the rnanaqetnent of C-f.lCL lrascacrded l.c rnc\dify the applr:vecl nrirririg plan fr:r the nexi two vears of iriarr perioci {2C13-146 20i,i i5 v-rith 1;ro1er-tion o{ ):.9a lakh t'll ancj,c.80 lakh MT respectivelv Accordingly, themodification of approved Mining Plan iras heen subrnitted unijer Rule l0 of llCDR,1988 at 5ub-Regiorral Oflrce, ltslil Ciuwairatr on 20'r'Fe'oruary,2OL4 {or the approval. (Copyenclosed as Annexure-I)
Hence, ri,'ei'assur-rl ihat the deviations frorn the apprcved lr4ininq plan wili not take place infuttrt e:
Iir;pc, ll're cr:tlltliai'rce rei;orl in:i1I rrri:ct tite reciltrrtlrlcl-rt:,,
l-irankino You,
Yr.;urs iarthfully,Fcr" (srngnl Manufacturing Co: Ltd.
\lf:t-'.t
{DeventlNominat
\i
er Bansal)t,d Mine Or.vner
Encloseci. As stated above
Reiid Ofli.e & Works : l.i;m:iimn! P C. K!raii:i'rr,'i
,tI l$ll ${x} I ,
s%
.L.Jf'*'-*d-+x*' .- ji#*4 ( r \,,i i.r I
O:,,[ l]r.,:i: '
ls(l l.t(l0t A Olls;t$i lll(t(li {;titt'l'll'Iill} {l{}}ti}ih-}'
t<t* 2 Ct1 2
No. pHYIMEG/JH/LST-6/KOL,/
\r/t Shri Devender Bansal (Nominated owner)
ing lease are as under:
2.
2
4.
t-.>'.{i llitli i\l r,''v}'iYog have complied wjlh this office order for suspension of mining ofiiiaiions'in KHUB-I(4.96 Hect.) & KHUB-ll (4.70 Hect.) with effect from June, 2014:The mines are the captive source of Limestone for: the company's cement plant.You have assured that you would abide by the Rules A coniitio'ns stipulatel UV in.department.
A*nexuKE- tz(4)
Reoistered A/D.$If{f, rg-qsTt / eovERr'ttrlENToF tNDtA
icn dTIilq / MNlsrRy oF MtNEsrnrftq srq aqtr I NDTAN BUREAU oF MINES
eifiq sH futT6 o'r orfiaq / oFFtcE oF THE REGIoNAL coNTRoLLER oF MtNEsqft. fr. - 13, *€r&V/cp-13,Sectorv
d-de *6 Rr&, ota-or* * 700 oe1/sALTt-AKEctw,KoLKATA-g1Phone: (033) 2367 39861 3618; Fax (033) 2367 3612.
E-mail: [email protected]. net.inDated: 0410312015
M/s Cement Manufacturing Co. Ltd.Lumshnong, POST- KHLIEHRIATDisft.- JAYANTIA HILLSMEGHALAYA -793200
Sub: Revocation of order of suspension of mining operations under Rule 13(2) of MineralConservation and Development Rules, 1988 in respect of your KHUB-I Limestone mine
of M/s Cement Manufacturing Co. Ltd. over an area of 4.96 ha. in East JSyantia Hills District ofMeghalaya State.
:*' 8,1[i,..ffi:Ji,T'^ilr:H?"r"i$,3'eq 26rc5t2a14 ffi-Sir,
'No, NlL, dated 1810212415 ,lgry
Please refer to lhe order of suspension of mining operation issued to you vide this office letterNo. GHY/MEG/JH/LSr-6/KOL dated 2610s12014 in respect of your above minl.
Vide your letter No: NIL dated 1810212015, addressed to the Regional Controller of Mines,lndian Bureau of Mines, Kolkata, you have requested to revoke the ord6r of suspension of miningoperations wherein you have stated folloving:
The annual actual production & projec{ed production figures in the approved and valid!t{!ning Plan (MP) and Progressive Mine Closure Plan for g.'oo Hect. amatgamated
1.
2010-1 1
201't-122012-132013-142014-15
No. GHYTMEG/JH/LST-GIKOL dated 4131201 5
ln this regard IBM has observed following:-
"(a) There are instances like exceeding the annual limit of production by more than 20olo or miningbeyond the approved limit etc. where violations observed by the lnspecting officer can not be rec{ifiedor complied either by submitting modified mining plan or Scheme of Mining . ln such cases wherevermining operations have been suspended under rule 13(2) of MCDR'88 for gross deviations from theproposals contained in the approved mining Plan or Scheme of Mining, the mine can not be allowedto remain in suspended animation for ever. Therefore, it is suggested that in such circumstanceswhere violation can nct be complied with, the same should be followed up further to bring it to logicalend by launching prorecution in the court of Law. Once the violation of provisions of MCDR' BB hasbeen brought to logical end, the RCOM should revoke the suspension of mining operation under rule13(2) of MCDR' BB.
(b) Since decision of suspension was taken at RCOM level and powers are already delegated toRCOM's for revocation of suspension vide CCOM office letter NO.- K-11014/SG/89-CCOM dated1611212}fi, it is desired that decision of revocation can be taken at RCOM or COM level."
ln this regard prosecution case has been launched by this office in the court of Law on19lA2l2A15 vide no. Ct567/15 for the aforesaid violation.
Based on examination of the above facts, I am reasonably satisfied with the compliance ofRule 13(1) of MCDR, 1988 and by virtue of power confened upon me under rule 13(2) of MCDR'1988l, hereby revoke the order of suspension of mining operations in respect of KHUB-I Limestone mineof Mls Cement Manufacturing Co. Ltd, over an area of 4.96 ha. in East Jayantia Hills District ofMeghalaya State.
An immediate acknowhdgement of this order is requested.
Ypyrs faithfully
,h##i'-Regional Controller of Mines
Copy foruarded for information and necessary action to:
1. The District Commissioner, East Jayantia Hills district, Khliehriat, Meghalaya- 793200.2. The Director, Direclorate of Mineral Resources, Govt. of Meghalaya, Risha Colony,
Shillong- 793003, Meghalaya..3. The Dy. Director, Directorate General of Mines Safety, Guwahati Region, House No. 16,
Bylane -10, Ganesh Mandir Path, Guwahati-781020, ASSAM.
(M. BTSWAS ) .-
Regional Controller of Mines
Reqistered ArDqrfit srSFT{ / covenNuerqT oF rNDrA
icn daffiq I MNtsrRYoF MtNEsqmfiq qTq altr I rHurnr BUREAU oF MrNEs
A-*q rgrq ftrbro qrr 6Tdrffi / oFFrcE oF THE REGToNAL coNTRoLLER oF MtNEs
$. ft. - re, *€t&V/CP-'t3,Sec1orV
S-€ d6 RrS, o-ld-olf,T - 200 0e1/sALTLAKEcTTv,KoLKATA-g1
Phone: (033) 2367 3986/ 3618; Fax (033) 2367 3617.E-mail: [email protected]. net.in
No. GHYIMEG/JH/LET'8/KOL,/
Tl\,/ ShriDevender Bansal (Nominated owner)
Dated:04/03n015
M/s Cement Manufacturing Co. Ltd.Lumshnong, POST- KHLIEHRIAT
. Distt.- JAYANTIA HILLSMEGHALAYA - 793200
Sub: Revocation of order of suspension of mining operations under Rule 13(2) of MineralConservation and Development Rules, 1988 in respeci of your KHUB-ll Limestone mine
of M/s Cement Manufacturing Co. Ltd. over an area of 4.70 ha. in East Jayantia Hills District ofMeghalaya State. \Rer :
[Il,T[:,"g,f i,T'-:'.:::?"X"i 3'eifffl*t2014 "d,ffiSir, '--'i5
':'Td'.s#Please refer to the order of suspension of mining opei'ation issued to you vide this office letter
No. GHY/MEG/JH/LST-8/KOL dated 26/05/2014 in respecl of your above mine.Vide your letter No. NIL dated 1810212015, addressed to the Regional Gontrotter of Mines,
lndian Bureau of Mires, Kolkata, you have requested to revoke the order of suspension of miningoperations wherein you have stated following:
1. The annual ac*ual production & projected produclion figures in the approved and validMining Plan (MP) and Progressive Mine Closure Plan for g.66 Hect. amalgamated
ino lease are
You have complied with this office order for suspe$,rd(4.96 Hect.) & KHUB-ll(4.70'Hect.) with efiectThe mines are the captive source of Limestone for tt\iiYou have assured that you would abide by the Rules &.
2.
3.4"
AS PERAPPROVED MP
0.19 {As on Mav'14
department.
No. GHY/|rIEGIJH/LST{'KOL dated 4t3t201 5
ln this regard IBM has obsewed'following:-
'(a) There are instances like exceeding the annual limit of production by more than 20olo or miningbeyond the approved limit etc. where violations observed by the lnspecting officer can not be rectifiedor complied either by submitting modified mining plan or Scheme of Mining . ln such cases wherevermining operations have been suspended under rule 13(2) o{ MCDR'88 for gross deviations from theproposals contained in the approved mining Plan or Scheme of Mining, the mine can not be allowedto remain in suspended animation for ever. Therefore, it is suggested that in such circumstanceswhere violation can nst be complied with, the same should be followed up further to bring it to logicalend by launching prosecution in the court of Law. Once the violation of provisions of MCDR'BB hasbeen brought to logical end, the RCOM should revoke the suspension of mining operation under rule13(2) of MCDR'88.
(b) Since decision of suspension was taken at RCOM level and powers are already delegated toRCOM's for revocatim of suspension vide CCOM office letter NO.- K-11014/SG/89-CCOM dated16l12n}13, it is desired that decision of revocation can be taken at RCOM or COM level."
ln this regard prosecution case has been launched by this office in the court of Law on19n2n015 vide no. C/566/15 for the aforesaid violation.
Based on examination of the above facts, I am reasonably satisfied with the compliance ofRule 13(1) of MCDR, 1988 and by virtue of power confened upon me under rule 13(2) of MCDR'1988l, hereby revoke the order of suspension of mining operations in respect of KHUB-ll Limestonemine of M/s Cement Manufacturing Co. Ltd. over an area of 4.70 ha. in East Jayantia Hills District ofMeghalaya State.
An immediate acknowbdgement of this order is requested.
Ybrrs faithfuily
Wr{i?sF[s;
Regional Controller of MinesCopy forwarded for
1. The District2, The Director, Directorate
district, Khliehriat, Meghalaya- 793200.i, Govt. of Meghalaya, Risha Colony,
Shillong- 793003, Meghalayal3. The Dy. Director, Directorate General of Mines Safety, Guwahati Region, House No. 16,
Bylane -10, Ganesh Mandir Path, Guwahati-781020, ASSAM.
\\
(M. BTSWAS )Regional Controller of Mlnes,,4k
2
CEMENT MANUFACTURING COMPANY LTD.
Dated: l8.A2,20lETo,
The Regional Controller of Mines,lndian Bureau of Mines,Office of the Regional Controller of Mines,CP-13, Sector- V, Salt Lake City, Kolkata -700 091.
Ref.
5ub.
1. Your letter No. GHY/MEG/JH/LsI-6/KOL dated 26l05/20t4(lnnexure-ll &2. Your letter No. GHY/MEGIH/I-sI-8/KOL dated 26105/zor+ (Annexure-ll)
Request for revocation of Orders of suspension of mining operations under Rule 13{2} ofthe MCD Rules, 1988 in respect of Khub-l & Khub-ll Umestone mines, over an area of 4.96& 4.70 hectares respectively, in East Jaintia Hills district of Meghalaya.
Sir,
With reference to the subject cited above, we would like to submit the following for your kind considerationplease.
1. you are kindly aware that Khub-l (4.96 Ha.) and Khub-ll (a.70 Ha.) mining teases form parts of theamalgarnated ML of 9.66 hectares for which MP & PMCP has been approved by IBM vide letter No.
314(3)/2010-MCCM (CZllMP-321327, dated 08.04.2011, which is currently valid.
2. We have submitted our explanation vide letter No. CMCL/KLM|2OL4-L5/01, dated 23.O4.20L4(Annexure-lllf for excess production in 2012-13, i.e. due to delay in grant of EnvironmentalClearance for 70 hectares mining lease of the company, for which also MP & PMCP has beenapproved by lBM. Though we have completed all the requirements/compliances at our end, thedelay in grant of environmental clearance for 70 hectares was unanticipated and beyond ourcomprehension.
3. For your kind ready reference the and projected production figures inthe approved and valid MP & PMCP for ML are as under:
4. lt may kindly be seen from the above table that:a) The actual production levels during the periods 2010-1
below the projected production figures in the approved M
- Regd. Offi(c b vbrkr : tlcrrirnong. P O.: Khrlichdrt, D*t: frintir Hilb. t'le6luhye Ph.: 03655-278215/16/18, fs : 01655-2zgZ tl. +m.it r fumrhnong@<rncl.co.in
aN I${} 9OOl, I$0 t,t00l s llilsAs l$o0l cEn'llrtnD coltPAl\"r
201S.11
2014) 0.1e
2011{$Zrdhfl 2o1
v,.e'is -'iqi
CEMENT MANUFACTURING COMPANY LTD.
We agree that the production during the year 2012-13 was higher than the projected figure inthe MP and the entire limestone produced is used in it's own cement of company for which theML is a captive source.
The cumulative actual production for the first three years of the five year plan period i.e. from2010-11 to 2012-13 is 20.73 lakh tones as against projected figure of 19.50 lakh tones in the MP& PMCP. Thus the excess production during the period is only 5.gg%.
The cumulative actual production for the first four years of the five year plan period i.e. from2010-11 to 2013-14 is 21.96 lakh tones against projected figure of 22.00 lakh tones during theperiod in approved MP & PMCP. Thus the actual production during the period is less by 0.04 lakhtones compared to the projected figure in the MP.
e) lt may be observed that corrective measures are taken up in the subsequent years i.e. 2013-14and 2014-15 to keep the production levels within the approved limits.
The mines are the captive source of limestone for the company's cement plant.
ln compliance with your orders cited above we have suspended the mining operations in Khub-l (4.96Ha.) & Khub-ll (4.70 Ha.) with effect from June, 2014.
The production in the cement plant, for which the amalgamated ML of 9.66 hectares is the captivesource of limestone, is stopped for want of limestone. The cement plant and the mines provideemployment to 7L4 direct employees and indirectly to around 2000 workers. This situation ofstoppage of plant and mines is creating unrest in the employees and financial toss to the companyand loss of revenue to the Government.
8. ln view of the above facts, we would request you to kindly consider the above cited cases ofsuspension of mining operations, sympathetically for revocation of the orders, so that miningoperations can be resumed in conformation to the five year plan period of the approved MP &PMCP.
9. We assure you that we will abide the Rules & conditions stipulated by you for revocation of theorders.
Soliciting sympathetic and favorable consideration of our request for revocation of the two orders.
Thanking you,
Yours truly,For Cement Manufacturing Co. Ltd
b)
c)
d)
7.
Deven!er Bansal
{Nomiriated Ownerf
Enclosed: as above
Rcgd. Officc & Wortr: llrmrtmn3. ? O.: KhCidii.q qi*L:Jairtle Flilb.l{qhdap, Ph.:03655-1782lVlUl8. trx:0!655-278117, c-mil : lum:[email protected]
aN t$o 00oI, $o 14001 * olls^s l0oor {nnTtlflltD ()Oilt AIry
Annexure - 13
FEASIBILITY REPORT OF AMALGAMATEI)KHUB LIMESTONE MINE OVER 9.66 fla.
In East Jaintia hills District, Meghalaya
[Khub-I (a.96Ha.) & Khub-II (4.70 Ha)l
wi@emolrEg
CBMENT MANUFACTURING COMPALUMSHNONG VILLAGE, JAINTIA HILLS DISTRICT
;i,l'1)
iird
MEGHALAYA
CONTENTS
SL.NO.PARTICULARS PAGE NOS
1.0 lntroduction 01
2.0 Topography and General Geology 02
3.0 Exploration 03
4.0 Reserve Assessment 04
5.0 Production Schedule 05
6.0 Mining Method 06
7.0 Beneficiation 07
8.0 Marketing 07
9.0 Infrastructure 08
10.0 Employment 08
1 1.0 Environmental Requirement 09
t2.0 EconomicEvaluation 09
1.0 Introduction:Reserves in a mining lease need to have higher level of confidence in terms of itsgeology, and its feasibility. In terms of geological aspects deposit characters,structural layout and quality both in lateral and depth continuity established through asystematic. In respect of feasibility the deposit should meet the economic viability andultimately the final product should have the market acceptability.
Cement Manufacturing company Limited is a public limited company registeredunder company act.l956. The company is managed by Mr. SajjanBhajanka, Mr. PremKumar Bajanka, Mr. sajan Kumar Bansal, Mr. sanjay Agrawal, Mr. BrijBhusanAgrawal. Mr. RajendraChamaria. The promoters are well known businessman havingexperience in various industries.
Cement Manufacturing Company Limited (CMCL) is the largest cementmanufacturer in Noth-East India. Our plant is spread across 40 acres of land in theidyllic town of Lumshnong, a strategic location at Meghalaya that ensure availabilityof high grade limestone. Our brand "Star Cement" has established itself as the mostaccredited brand of the region on ground of both quality and fair pricing.
Regd. Office & Works
Lumshnong,
P.O. Khliehriat, Dist. Jaintia Hills,Ph: 03655- 278215 I 16 I l8,Fax:E-mail : lumshon [email protected]. co. in
Sales & Marketing Office
Mayur Garden, 2nd Floor, Opp.
G.S. Road, Guawahati- 781005,
Ph: 0361-2462215 I 216 l513,Fax:E-mail :[email protected]. in
Delhi Office
281 Deepali, Pitampura,
New Delhi - 110034
Ph: 01 l- 27033821 122127, Fax: 01 | -27033824E-mail:[email protected]
/ t*i
*c,\
\rl
Corporate Oflice
Satyam Tower, 3, Alipore Road, 1'tfloor, Unit No .98Kolkata -700027
Ph- 033- 24484169 t4t70 t2448 t4693
Product:CMCL's product range includes Ordinary Portland Cement (OPC 43- grade)
and OPC 53- grade and Portland Pozzolana Cement (PPC) in line with evolvingcustomer needs.
Plant: CMCL's integrated cement plant at Lumshong (Meghalaya) is proximate tokey raw material reserves of Limestone, coal and shale.
Pride:CMCL rvas recognized by the Meghalaya state government for its pioneeringcement plant in the backward area of Lumshnong in 2005. The company is ISO9001 :2000, 14001 : 2004 and 18001 : 2007 certified.
Penetration: CMCL's brand "star cement "is one of the largest in the Northeasternregion. Its output is marketed through a 400 dealer network resulting in the largestmarket share in Northeastlndia. The company's institutional customers comprise L&T, National Hydro Power Corporation, Public Works Department, Indian Railwaysand Ministry of Defense.
The plant is located at village Lumshong, situated on National Highway 44 and 135
kms away from Shillong torn'ards Silcher in East Jaintia Hills, Meghalaya.a
The plant was commissioned in Dec. 2004 and has been producing clinker from 23rd
Dec. 2004 and cement from 2nd Feb ,2005. This is the largest cement plant in North-East India.
Presently CMCL is marketing super Quality cement of 3 ryfltl. Ordinary Portland Cement 43 grade
2. Ordinary Portland Cement 53 grade
3. Portland PozzolanaCement Part 1 Fly ash based.
Topography and General Geology:Topography:
Topography of the M. L. Area and itsMaximum and Minimum contours passing
respectively with a relief of 26m. The area is
part of the area is at a higher elevation with
€f+g$pgifl.rir lease boundarypart. A perennial nala flows about 400 mtrs. SoutTi.({gheiso4thern lease boundary.
These sinkholes occur in the area, the area is devoid "i";tfar;ral drainage course of
unov-E
2.0
the
nala.
The temperature of the nala was recorded by CMCL is 40.8"C maximum duringsunmer and minimum 6.2o C as observed during winter months. Rainfall as recordedby CMCL at site is 1046.80mm during June 2003 and 1.9 mm minimum duringJanuary 2004. The company has constructed infrastructure facilities near the minessite and also constructed haul roads from NH -44 to mines site maintaining gradient at1in18tolin20.
Regional Geology
The state of Meghalaya comprising eleven districts covers an area of approximately23,000 sq.km. Bordered to its North and East by the State of Assam and south andWest by Bangladesh. The state presents a picturesque landscape of Plateau, ravines,rivulets, lakes and water falls and magnificent gorges even exceeding 60m depth inKhasi Hills. Shillong the state capital is located at an elevation of 1800m in the centralpart of Khasi Hills. Thee rock fotmations of tl're area fall under Jaintia series ofEocene age.
The Regional Stratigraphic is as follows:
Limestone of Lakadong, Umlatdoh and Prang horizons are distinctly & sequentially
Local Geology:The present area India Toposheet No -83 C /!V and located near village xrm minimum elevation
of the area varies from 630 m to 498 i . The litho units of the
area belong to Jaintia series of Eocer{b:age. The lirn€stony' belongs to Sylhet ofJaintia series of Middle Eocene age. ttl t
.' :,. '; :' ' ":'i u/'.3.-,
In local geology, the thickness of various litho iinits .i,intered in the bore holes and
on surface and sub-surface data generated during the exploration the following rock
formation. Three bands of limestone occur in the area which are known as Prang,
Umlatdoh and Lakadong limestone bands. These are separated by Narpuh sandstone
and Lakadong sandstone. The topmost limestone bands i.e. Prang limestone occurs.
Age Group /Series Stage Beds
Oligocene Barail Series Sand Stone & Shale
Upper Eocene Garo Group Kopili Formation Grey Shale with altemate layersof sandstone & Siltstone
LowerMiddle
toEocene
Jaintia Hills Sylhet Limestone Prang LimestoneNarpuh SandstoneUmlatdoh LiLakadonLakado
Palaeocene Theria Sandstone_r.
sandstone
Overburden ( Sandstone withunconsolidated soil and
Limestone boulders)
Narpuh 1.00 to 09.50 m
Grey coloured limestone Umlatdoh 22.45 to 45.00 m
Sandstone Lakadong Not fully explored
Limestone Lakadong Not fully explored
Based on surface and subsurface data generated during exploration work the following rockformations.
The Lease boundary pillars are connected with GTS station lkm away. Also ML areais connected by permanent reference points with 3 ground control points.
3.0 Exploration:
Eight vertical boreholes were drilled earlier for a cumulative meterage of 340.40malong two section lines in N - S direction. All the eight boreholes were closed inLakadong Sandstone. Further two bore holes were drilled Kr2 A (Khub-I) and Kz-2A (Khub-II) for a cumulative meterage of l02m during 2012-13. (Ref. Annexure-7) ofscheme of mining) .
4.A RESERVE ASSESSMENT:\
Ref. Para 3.4.3.1 of Scheme of MiningSummary of Ore Reserves
Limestone
/',f:r- --:.* j:>
Reserves (million tones) Khub-I Khub-II Total GradeGeoloeical Resource 5.61 4.26 9.87
CaOoh-46.5 to 53.6MgO%- 1 .02 to 3.91
Resource blocked in 7.5m & Ultimatepit slope
2.42 2.09 4.5t
Mineable reserves 3.19 2.lil:'=,: :536
Sandstone:,-;t:... ,.,\
Reserves (million tones) * Khu rI;" rhfidin TotalGeoloeical Resource a;t 0.7 o.35; 4.64
5::".r*. blocked in 7.5m & Ultimate pit
\ Q.a*;;:'Frad.ilt--{ KtYl
0.24
Mineable reserves 'sJef_9 4.zz 0.40
4
5.0 PRODUCTION SCHEDULE:Mine capacity:
The mine capacity is 1600 MT of limestone per day.Total Handling of ROM ore & OB / Waste: Sand StoneLimestone from the mine will be utilized in the captive cement plant of the company.Sandstone will be utilized as blending material in raw mix.
Rate of Production:
Dilution recovery, grade control /blending:
The limestone found in the Miningminor quantity of ROM ore whichwill be controlled by blending with
MINING METHOD:
Lease area is o
may someti
higher grade
Bench dimension, slope angle, stripping ratio:
& homogenous. The
ing with lower grade
6.0
Year Limestone (MT) Sandstone (MT)
l't year(201s -16)
475095 36012.6
andz yeat(2016 - t7)
396007.s 36730.8
ardJ year(2017 - l8)
372210 36628.2
4tL year(2018 - 1e)
394155 101061
5th year(2019 -20)
348270
Total 1985738 210432.6
I Working ,p1$ffiffi{pd open Cast
il Height of each bench i'47-;)vNilI Width of working benches ,;/ ,\4IV Slope angle
L.ta:),'"| $f$.din *o'
lir,(a:trl^^-^! I mine[l staged1,
V Haul Road Gradient and width of Road t id-r{rbT'in2oVI Raising of Limestone p'er day
VII Raising of sandstone per day 333 MT
VIII Stripping ratio 1:6
x No. of working days 300
X No. of working shift I
Drilling Mining& Transportation equipments / machinery:
Drilling operation will be carried out with the help of high pressure compressor XAH-210 with crawler drill model ROC - 203.
It is proposed to do single Row blasting of 8-10 holes of 115 mm dia with 6.0 m depth& spacing x burden (4m x 3m) .The holes proposed for drilling will be angles holes tomatch the requirement. Blasting will be done with Higher Explosives using Raydet orExcel to initiate the blast. This reduces vibration, noise, throw and air blast.
All mined out material (limestone) will be transported by 18 TATA HYVA .Truckthrough haul road to crushing plant. Distance of mine to the crushing plant is 3.50 km.
Requirement of Equipment:
grade & homogeneo --=-----t-
8.0 MARKETING:
Type of commodity with use
The ROM ore will be utilized as captive source for the plant.
SI. No. Equipmcnt Quantity
Compressor XAH -210 with Crawler Drill Model ROC - 203 0lset
2 18 MT TATA HYVA Truck 06 Nos
aJ Dozer ( BEML D -50 ) 0l No
4 Hydraulic Excavator, Model Volvo 290LC 1.35M3 bucket
capacity and PC-200, Excavator, Make L &T Komastu.
".l;;]l
02 Nos
01 No.
5 Water Tanker 10 kl capacity .mk g 01 No
6 Explosive van 01 No
7 Secondary Rock breaker 0l No
8 LMV / maintenance vehicle 01 No
N
7.0 BENEFICTION:
Crushing / manual dressing, sorting sizing & was
Beneficiation is not required.as the limestone availa
il'.il,-ilcl
$e flt+!;16aMinins
*u)tLl:>s\'t
area is ofcement & us. ut:,ll;lin g$9
9.0 INFRASTURTURE:
9.1 Road:
The area is situated on the western side of National Highrvay No .44 from Shillong toSilcher and near to 126 km. Stone and located south -west of Lumslurong village.Distance of mine from the crushing plant is 3.50 km.
9.2 Power Source:The power is supplied by Meghalaya State Electricity Board (MSEB) & DieselOperating Generator for Office lighting and street and hauls road lighting.
9.3 Labour Supply and Skill:
It is not applicable as the mine is fully mechanizedmine.
10.0 Employment:
Managerial & Supervisory
I Manager (Mines) I
2 Geologist
J Asst.Manager 2
4 Mining Engineer
5 Mines Surveyor
6 Mines Foreman -Gr 2
7 Mining Mate ffi 2
8 Mines Blaster f'1. : ri.dl lt I
9 Manager Maintance I
10 Engineer Maintance I
Others
I Operators & Mechanic 40
2 Semi - Skilled & l0
J Clerical Staff /*Y cyl:'s \D\r 2
4 Peons & Tea Boy *-l
'S:i=; ,ilrl , . ll
*I
5 Plantation Gang te\ €,r$$ i€ 2
'"::iI\iv')'7-----
11.0 ENVIRONMENTAL REQUTRMENTS:EIA & EMP, Mine closure plan reclamation plan, sustainable developmentstrategy etc.
We do not see any adverse effect on the environment in the ML areas which is underoperation .There will be no adverse effect on the environment, as regularenvironmental monitoring is being done and the report of the same is being regularlysent to IBM & State Pollution Control Board.. The copy of environmental monitoringreport for April-May-2014 is enclosed vide Annexure-l7.
OTHERS :
Tribal Issues:
There is no tribal issue in the area.
National Park, monuments etc. :
There is no National Park, monuments etc. within
12.0 ECONOMICEVALUATION :
Estimated Capital Cost:
l0 km. radius of the Mining Lease area.
Sl. No. Name of the Equipment fffi rfrK Amount in Lacs (Rs.)I Hydraulic Excavators with 1.35 m'back hoe bucket a2 1402 Rock Breaker arrangemenl 0t l23 l8 MT TATA HYVA Truck 06 1324 Crawler mounted Crawler drill with compressor 0l 305 Water tanker truck mounted
0l 20
6 Dozer (BEML D-50) 0t 40
Total t2 374
Break-up for Production & T/
. r )i.\\z')
Sl. No. Description /A#/ d#ile&ns.\W iflT)I Drilling Cost *"/ 6.e2\ *2. Blasting Cost H t F?t#!r;.\ 15.94 E3. Braking Cost i\ i*--* r.sL,a'l!4. Dozing Cost 4'\-- ;45i/r5. LoadingCost \(.ari[tr tSiW46. Transportation Cost ----*? 35-52
Tbtal 74.00
* Break-up for Royalty and other taxes:
Sl. No. Description Cost (R. Per MT)
I Royalty (to State Govt.) 80.00
2. Mineral Cess (to State Govt.) 20.00
J. Welfare Cess (to Central Govt.) 1.00
Total 101.00
* As per New Gazette of India No. 3454 GU20I4 & Notification No. GSR630(E), dated 01.09.2014
estone:
The availability of financing & Profit to indicate that the mine is technically andeconomically viable under foreseeable operating scenarioFinancing is done by the Management of the company. Mine is the captive mine which issupplying Lime stone to its Cement plant and is about 2.5 km from the lease. The finishedproduct is cement. The Mining Lease is viable and is made to value added product besides thejob opportunities & development of the area.
?krr*****trtr*:k
Sl. No. Description Cost (Rs. Per MT)1 Production & Transporlation 74.002. Royalty & other taxes 101.00
Total 175.00
GOVERNMENT OF INDIAMINISTRY OF MINES
INDIAN BUREAU OF MINESMCCM CENTRAL ZONE
Regd. AD
AxNcr(u€- lt{
No. 3 1 4 (3 )/20 1 0-MCCM(CZ) lMP -32 '). ") -l,/_.( Nagpur, ttr" 8,April, 2011.
To,M/s Cements Manufacturing Company Ltd.,Lumshnong, P.O. Khliehriat,District Jaintia Hills.Meghalaya - 193200.
Sub : Approval of Mining Plan alongwith Proglessive Mine Closure Plan in respect ofKhub Limestone Deposit-I (4.96 lia) & II (4.70 ha) over an area of 9.66 ha(Under Analgarttittion) of li4/s Cemcnts Manufacturing Corrrpany Ltd. in District.Ii'.itttia IIills t>f h4cghaltil'a Siirle srrlinittecl for'grzlrlt of r.nining lease tinder liule22 oi ldClt, 1950.
I{eference:- l.Your RQP's letter No. ALPL/2010-LI/679 dated 06/01120112.This office letter of even nurnber dated lOlOZl20ll3.Your RQP's letter No. CMCL / KHUB (Amalgambted Mining Plan)/10-
@.ffi_Sir,Inexerciseofthepowersconfenedo,mffiSection(2)olScction
5 of Mines & Minerals (Development & Regulation) Act, 1957 read with Government ofIndia Order No. S.O.44-5(E) dated 26.4.1987, I hereby approye the above'said miningplan. This approval is subject to the follorving conditions :-
'Ihis Miriing Plan is approved rvithout prcjudice to any other laws applicalrle to the
mine/area from time to tiine rvhether rnade by the Centrirl Government, Statc
Government or anv other authority.It is clarifieci tl"rat this approval of Minine Pian does not, in any rvay, imply the
apprclval of the Covernment in tclms o1 any other provisions of the Mint-:s 8{.
Minerals (Developnrent & Regulation) Act, 19-57 or the ldineral Conccssion f{ules,
1960 and any other laws including the Forest (Conservettion) Act, 1980,
Environnent (Protection) Act, 1986 and the rules made there under.iii) lt is clarified that this approval of the Mining
Forest (Conservation) Act 1980, Irorest
It
i)
ii)
f#il:''#utes,orderSandguidelin*meleasearea[romIt is further clarified that the .pp.ouuf# ifii"i.l$H$u-i. rffict to the provisions
of the Mines Act 1952- and Rules :it.f"Srtu.qie!9j.^maOe ]theleunder incluctingiv)
v)
submission of notice of opening, aptq-iitmentl'of iibnug"f -attA other statutory
officials. ,,. 'i.,The execution of Mining Plan shall be iubjected to vacitibns pf prohibitory orders
/ notices, if any.
6lh Floor,'D" Block, lndira Bhawan, Civil Lines, Nagpur - 44O1O2
trmail 'com ez@ihm mah nir: in' trav' (O712\ ?5656Oi Telenhnnc ' (0712\ 25656n3
vi) The Mining Plan is approved without prejudice to any other order or directionfrom the court of competent jurisdiction.
vii) The approval of mining operations and associated activities is restricted to themining lease area only. The mining lease area is as shown on the statutory plansunder Rule 28 of Mineral Conservation and Development Rules 1988, hy thelessee/RQP/applicant and Indian Bureau of Mines has not undertaken verificationof the mining lease boundary on the ground.
viii) If anything is found to be concealed as required by the Mines Act in the content ofthe mining plan and thc proposals for rectification has not been made, the approvalshall be deemed to have been rvithdrawn with imrnediare effect.
ix) At any stage. if it is observed that the information turnished in the document areincorrect or misleading or \\'rong, the approval of the document shall be revoked.rvith immediate eflect.
x) The approval of mining Plan is subjcct to the compliance of CCOM's Circular No.212010 rcgerrclirrg Geo-referenccd caclastral rnap rvithin 6 months fronr tlic datc cfaplrt'oval failing u'lticli tlic appror,iil of the clocumclrt shr.ll be tJcemeC t,l hiivc becnrvithdrarvn u,ith immediete effect.
xi) Yearly rcport as required undel rule 238 (2) of |ICDR, l98B setting forth thcextent of plotection and rehabilitation rvorks camied out as envisaged in theapproved progressive mine closure plan and if there is any deviations, reasons
thereof shall be submitted before 1" July of every year.xii) Your attention is invited to the Supreme Court interim order in W.P.(C) No.202
dated 12-12-96 for compliance. The approval of Mining Plan is, therefore, issuedwithout prejudice to and is subject to the said directions of the Supreme Court.
xiii) A copy of Environment Impact Assessment-Environment Management Plan (EIA-EMP) as approved by MOEF (Ministry of Environment & Forest) shall be
submitted to IBM irnmediately after approval Lry MOEF.xiv) The Environmental Monitoring Cell establi by the company shall continue
monitoring ambient air quality, d lvater quality, soil sample analysis
and noise level measurenrents at established for the purpose bothin the core zonc and buffer iiement of Environment Guidelinesand keeping in vieu, IBM's circular No. 3/92 & 2193 season r.vise every year byengaging the senices of an Environmental L.aboratory erpproved by lv{OEFiCPCts.The data so generatcd shail be maintained in a bouncl paged register kept for the
purpcsje iind thc sarne shall bc made available to tlie inspecting officcr, olt dcmand.
xv) This approval is restricted in respect of proposal given in the document for the
period 2010-l I to 2014-15 with validity upto 3ll03l2}l5.xvi) The financial assurance submittcd by you for only for Khub-l deposit
(Area- 4.96 ha area) and Rs.2.0lakh onl (Area- 4.70 ha area)
be submitted on orapplicable upto 31.03.2015 and next fibefore 31.03.2015.
xvii) The next Scheme of mining will be d
Encl. : Two copies of approved mining plan V',it1
)14.; \Yn6rs [r
\Controller of Mines (CZ)
Copy for information to :
1. The Director of Mineral Resources, Government ofShillong-?93@ 1, Meghalaya.
Meghalaya, Risa Colony,
2.
J,
The Director of Mine$, Directorate General of Mines S.afety, Sitarampur, Region(II), West Bengal along with a copy of approved Mining plan.
Shri P.K. Jha, RQP, 59, Baji prabhu Nagar, Ram Nagar, Nagpur.
I{
(Ranjan Sahai).Controller of Mines (CZ)
qffim\'$ -n-.,*w\{lF75..4}
A\ r'rlT.iq ii,;i r,
CEMENT MANUFACTURING CO.LTD.Regislered Offict & Wuks: Lumshnong. !.O' $lt:F-:.t. Dist- East Iaintia llills. Meghalaya' Pin 793200'
- TeL No. : 03655-2Z8AS/rQ/V/rb, Fax. No.03655-278217. E mail: [email protected],
A nr hlExuF,E - lg
Sub.: Application for Environmental Clearance of "Khub Limestone Mlnes" of M/sCement Manufacturing Co. Ltd. at ViIIage Lumshnong, East Jaintia HillsDistrict, Meghalaya (9.66 Ha)
Dear Sir,
V/e had su'nn-iitted the Environruental Clearance application of the pi'oposed project"l([ub Lirrrestone lvliles of I4/s Cerneul lr{anulacturirig Co. Ltd. located at village
Lumshnongl, Tehsi[ - Kheliehriat, East Jaintia llills Districr, l'4eghalaya(9.6(; llaJ" undercategory B of schedule 1(aJ in SEIAA, Meghalaya. TOR was issued to us vicle letter no,
SEIAA/PR-2 0 / ZALZ / 6, Dated 24 / A4 / 2013.
After getting TOR from the Committee the public hearing was conducted on 126 June
2014 for the ProPosed Proiect.1,.
Hence, we are submitting herewith the EIA Report alongwith all relevant documents.
Following documents are enclosed herewith:L. Questionnaire2. Form I3. TOR letter4. Copy of Public Hearing Minutes5. Compliances of Public Hearing Minutes6. Executive Summary of EIA Report in English7. EIA Reporiwith PlansB. Copy Approved Mining Plan9. Soft Copy of above docunrents-One CD
We hope thar you will find the above enclosures in ,iii"'ll'ajEhVi*irrn,"ntal Clearance be
given at the earliest.
Thanking you,Yours faithfully
Ref.No. CMCL/SEIA L | 2oL4 / 122
ToThe ChairmanState Enviro nment Impact Assessment AuthorityMeghalaya,Arden, Lumpyngnad,Shillong,793AL4
Date:29 lLAlzO1*
*i:)
For M/s cement Kii$4:l'.t"ring
companv Limited'
y*J5*r,-"","1I
4.f.€. 1
Lt.r#
Delhi: 281, Deepali,[email protected]
w
c{ 6+2- REGISTERED PisrCEMENT MANUFACTURING COMPANY LTD.
Ref: CMCL/K-V2012-13
To,The Controller GeneralIndian Bureau of Mines2nd Floor, Indira Bhavan,Civil Lines, Nagpur - 440 102
#e
flc,Dated: 20-07-2012
FN H E.Ku Ra-t6
I
Sub: Intimation for drilling of borehole in Khub Limestone Mine-l of M/s Cement ManufacturingCompany Ltd., Meghalaya.
Dear Sir,
With reference to the subject cited above, I am hereby submitting the intimation in Form-J as per Rulc-47 of MCDR, 1988 for thg drilling of borehole in Khub Limestone Mine-l of M/s CementManufacturing Company Limited, Lumshnong village, Jaintia Hills District, Meghalaya.
In thc said I'41- area, rnining is going on in the Unlatdoh Limestone Band. It \\'irs ttccessar), to sink tlrcbcrclrolc so as to ascertain the <1ualit1, artd quaritity, of uncieriy'ing L,al<trdong Slr,Csione r-nC l-al:.aCcngLinrcstone bend lor future usc.
I do hcpe you rvill find the Form in order.
Thanking you.
Yours faithfully,For, Cement Manufacturing Co. Ltd.Rnrq(P. Jagdish Babu)Agent,Khub Limestone Mines
Enclosed: Form-J
Cc:1. The Controllcr of Mines (CZ)
Indian Bureau of Mines6th Floor, Block'D',Indira Bhavan, Civil Lines,Nagpur - 440 102
The Regional Controller of MinesIndian Bureau of MinesCP-13, Sector-V, Salt Lake City,Kolkata - 700 091
The Director,Directorate of Mineral Resources,Risa Colony, Shillong- 793003
2.
3.
To
FORM-J(Notice ofsinking shafts and boreholes)
(See rule 47)MINE CODE: 38 MEG 03003
IMPORTANT:Notice in this form shall be sent to the concemed authorities within fifteen days after the commencemcnt of sinkingshafu/boreholes.
The Controller G eneral,Indian Bureau of Mines,Indira Bhavan, Civil Lines, Nagpur-440 102.
The Controller of Mines (CZ),Indian Bureau of Mines,lndira Btravan, Civil Lines, Central Zone, Nagpur - 440 102
The Regional Controller of Mines,lndian Bureau of Mines,Plot No: 13, Block-cP, sector- v, salt Lake City, Kolkata - 700091
The Director,Directorate of Mineral Resources, Risa Colony, Shillong.
Signature:
L
*2.
'*3.
.1.
Place: LumshnongDate:20-0'l-2012 Name in fLll: P. Jagdish Babu
Designation:ervner/Agen
t.
L
J'Ianre of prospeGi/mine and nrineralrvoikc d/nr<rsire cted-Narne anC address of tic+asee/Lessee
Kh'.rb Limestonc lvline-lLinrestonc & Sandstone
Lunrshnong villagc, t'.hliehriat sub-division,Jaintia IJills District. Meehalava -793 200
3. Location(i) Toposheet Nunrber 83 CAIJ (restricted)
(iil Villase Lumshnong(iii) Taluka Khlietuiat(iv) District Jaintia Hills(v) State Meghalaya
4. Number of shafts/boreholes intended to be sunk
or extended (Attach a plan on a scale not less than
I centimetre = 40 metres indicating the precise
location of the shaft/borehole).
il:":iH:Tili14@-h!*fu@
5. Purpose for which each ofthe sha&s/boreholes is
intended to be sunk or extended.
To ascertain the quality and quantity of underlyingLakadons Sandstone and Lakadone Limestone band.
6. Type of shaft(s)/contemplated and itsltheirdimcnsion(s).
NA
L Tvoe ofdrill used and size ofcore to be obtained. Hvdraulic core drilline machineiNXsize core
6. Intended depth upto whicb shaft/boreholes is tobe extended.
50 mtr.
9. Il the shaft/borehole commences flomunderground the depth of the level at \vhich the
shaft.,borehole is sunk.
NA ffi-/T#,
ti: /10. N"me
"n.i qdiiGi6; of ihe geologist or mining
ensineer in charge ofthe operation. Lffi lgSh. Hijam na$S{nett
n Date of commencement ofsinkinddrillins operation.
proposed shaft r"Jury,2ot2 \a\ #ffT"A /.&-/
rcryorial jurisdiction thet This should be sent to the controller orMnes and Keglonat uonlrollor oI Mmes ul wnoss tErrlturr4rJur)urvrruu rue
arealmine falls as notifieJ from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the
,l
CEMENT MANUFACTURING CO. LTD.WLIAGE LUMSHNANG, P,O. KHLIEHRIATJAINTIA HILLT DISTRICT, MEGHAIAYA
KIIUB'LIMESTONE M1NE - I (4.96 hectarcs)
50ffn 25 0 s0 tN Ntft.
SLTII'IEY OF INDIA BENCII MARKLCCATED AT LUMSHNONG VILI..AGE
iAl: 25'10'33.185"L?i'tG: 922232.492'
RL-547.199M
A*r-ev*te -\
CEb4ENT MANUFACTURING CO. LTD.LIIMSHNO}qG, JAINT,IA HILLS DIST., MEGHALAYA
PI.AN SHOV/ING I.OCATION OF BOREI{OLE AT KHI'B LIMESTONE MINE'I
APPRO\IEDBY
t") (t\-w6hl
P. JACDTSIT BABUuy
& PREPARETJ RY
RESI$TERED POST
CEMENT.MANU FACTURING COMPANY LTD.
Ref, CMCL"/K_[V20L2_13 Dated: 24-A7-2012
To,The Controller GeneralIndian Bureau of Mines2nd Floor, lndira Bhavan,Civil Lines, Nagpur - 440 102
Sub: Intimation for drilling of borehole in Khub Limestone Mine-ll of M/s Cement ManufacturingCompany Ltd., Meghalaya.
Dear Sir,
With reference to the subject cited above, I am hereby submitting the intimation in Fqrm-J as per Rule-47 of MCDR' 1988 for the drilling of borehole in Khub Limestone Mine-II of M/s CementManufacturing Company Limited, Lumshnong village, Jaintia Hills District, Meghalaya.
lir the saicl MI- area, nrining is going on in thc Urnlatdoh Lirnestone Band. It was necessaD, to sink thetorehole so as to asccttain the quality and qr-rantit;, of underlyirrg I-airador.rg Sandstonc and l.akadongLiincstone band for futurc use.
I do hope you rvill find the Form in order.
Thanking you.
Yours faithfully,
(P. Jagdish Babu)Agent,Khub Limestone Mines
Enclosed: Form-J
Cc:The Controller of Mines (CZ)Indian Bureau of Mines6th Floor, Block'D',lndira Bhavan, Civil Lines,Nagpur - 444 102
The Regional Controller of MinesIndian Bureau of MinesCP-I3, Sector-V, Salt Lake City,Kolkata - 700 091
The Director,Dircctorate of Mineral Resources,Risa Colony, Shillong - 793003
o/.
-!l osu
1.
2.
3.
*2.
*3.
4.
FORM-J(Notice ofsinking shafts and boreholes)
(See rule 47)
Indian Bureau of Mines,Indira Bhavan, Civil Lines, Nagpur44O 102.
The Controller of Mines (CZ),Indian Bureau of Mines,Indira Bhavan, Civil Lines, Central Zone, Nagpur - 440 102
The Regional Controller of Mines,Indian Bureau of Mines,Plot No: 13, Block-CP, Sector- V, Salt Lake City, Kolkata - 700091
The Director,Directorate of Mineral Resources, Risa Colony, Shillong.
Place: LumshnongDate:2447-2012
Signature:Name in frrll:Designation:
@P. Jagdish Babu
O.*ne r/Agen Ul4ining€Bgineer/Geotegis+gt+anager
* This should be sent to the Controller of Mines and Regional Controller of Mines in whose territorial jurisdiction the
area/minc falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the
Mineral Conservation and De Rules, 1988.
MINE CODE: 38 MEG 03006
Notice in this form shall be sent to the concerned authorities within fifteen days after the commencement of sinkingshafts/boreholes.
I Nang ol prospeeVmine and mineralrvorl:ed /crsqc::*o+l-
Khrrb l-inrestone lu{ine-llLimestone fi Sandstone
2. Name and address of tiee*see/Lessee M/s Cerncnt lv{anufacturing Co. Ltd.,Lumshnong village, I(hliehriat sub -division,Jaintia Hills District, Meghalaya - 793 200
3, Location(0 Toposheet Number 83 CAV (restricted)(ii) Villaee Lumshnone(iii) Taluka I(hliehriat(lv) District Jaintia Hills(v) State Meghalaya
4. Number of shafte/boreholes intended to be sunkor extended (Attach a plan on a scale not less thanI centimetre = 40 metres indicating the preciselocation of the sha$/borehole).
I no. ofboreholePlan attached as
5. Purpose for which each ofthe shaf{s/boreholes is
intended to be sunk or extended. il;:Tff6. Type of shaft(s)/contemplated and its/their
dimension(s).NA /4{{RN
7. Type ofdrill used and size ofcore to be obtained. Hyd raul i c core dl'illihy'macbiap:NX Bi6. Intended depth upto which shaft/boreholes is to
be extended.5omtr llF/ q1 FV\
9. If the shaft/borehole commences fromuuderground the depth of the level at which theshaff;/borehole is sunk.
llsI\\':{
NA
)st10. Name and qualification of the geologist or mining
engineer in charee ofthe ooeration.Sh. Hijam nat\ y..,N"" /
lt Date of commencement of proposed sha$siekine/driUins ooeration.
l4'"July,2012 ru!\Nr>Z
I,t
\-l3rqa-I.
CEMENT MANUFACTURING CO. LTD.VILIAGE LUMSHNONG, P.O, KI1LIEHRIATJAINTIA HILLS DISTRICT, MEGHALAYA
KHUB LIMESTONE MINE - ll (4.70 hectares)
50 ttn. N 0 50 tN iln.
INDIA BENCH }'TARKLOCA LUMSHNONGVILT.AGE
UT:LANC: 92'22RL=51/. I 99M
SHNO:10.2A
.+
q1KHUBMII\tsS OFFICB(Pl) j
tif: 25'09;55.998?LONQ 92:2224.J12',
cEr.{ENT MANUFACTTTRING CO. LTD.LIIT4SHNO J'IG, JAINTIA HILLS DIST., MEGHALAYAPI.AN SHO\\TNG LOCATION OF BPREI]OTE AT KHUB LIMESTONE MINFtr
APPR,O\/EDBYYBYED &PRLPAP.I]D i}Y
Art nt EXuRE - I7
CEMENT MANUFACTUzuNG COMPANY T.;fD. - MEGHALAYARef. No.: CMCLEHS-F-0I (a)lisue No.; 01, Date of lssue: 24.08.20t3Rev. No. 00, Date of Rev.
Report NO. 01
AMBIENTAIR UALITY SURVERY REPORT
Ambient Temperature
Ilelativc I{umidity (%)Mo:imum:Minimum:
Location of Sampli KHUB MINE'[, Lumshnon06.04.20 I 4 - 07.04.201 4
Distance between the Industry and
Time duration of sam
Total Rain Fall. mm (on Date
28.0 0C
19.2 0C
89.2%51.204
'Wind Direotion
Pollutants
Analvsis
PermissibleLimits for
RuralAreas
Station No. & AirOualitv Survey No.1
(Mines EntranceHaul Road)
K-l/01/14-t5
2(ROC Drilling
*.,[]ll] ,dJ
ilffiil{:,,24 Hrs. 24 Hrs.a.Sg{F iliJsrqlHrs.
SuspendedPartioulate Matter(Size less than l0um) or PMl0 uelm3
s0.84 58.54 59.84 100
SuspenciedParticulate Matier(Size less than 2.5um) or PM2.5 rsJms
30.5 r "r{ufnrrT{Ci7 . :...
ffi'\h\ 60
Sulphui Dioxide SOr(uslmr) 6.85
'H6 ffi?85,| g 80
Nitrogen DioxideNO' (uslm3) 9.84 10\i:\ ffiq'g#/ 80
Remarks: The parameters analyzed were found to U" *i*,) #g#,**KimitsorAmbient Air Quality Standards (National) for Rural Areas as per NationalAmbient Air Quality Standards, Notification dated l8'h November 2009.
CEMENT MANUFACTT.IRING COMPANY LTD. - MEGHALAYA
Ref. No.: CMCLEHS-F-0I (b)lssuc No.: 0I, Date of lssue: ii.OS.ZOffRev. No. 00; Date of Rev.
Report NO. - 01
AIVTBIENT AIR QUALITY SURVERY REPORTLocation of Sampling KHUB MINE - II. LumshnoneDate of Samolins 06.04.20 t4 - 07.04.20r4Distance between the Industry andsampling Location
200 meters
Time duration of samriline 24 hrsWeather DryTotal Rain Fall. rnrn (on Dzrte)
Artibient Temperature (oC):Ma>linrurn:Minimum:
28.0 0C
19.20CRelative Humidity (%)Ma.ximum:'Minimum:
89.2 %51.2%
Wind Direction N-WWind Speed (km/hr) 10.6
Remarla: The parhmeters analyzed were found to be within the permissible limits ofAmbient Air Quality Standards (National) for Rural Areas as per NationalArnbient Air Quality Standards, Notification dated 18ft November 2009.
l.-i!I
I
^ftk
Pollutants
Analvsis
PermissiblcLimits for
RuralAreas
Station No. & Air Oualitv Survev No.I
(Mines EntranceHaul Road)
K-2l01/14-rs
2(ROC Drilting
Point)K-2t02/t4-15
3
(Excavator
effifi}.,,24 Hrs. 24 Hrs. .--6ftffi".
SuspendedParticulate Matler(Size less than t0um) or PMl0 us/ml
51.34 57.23
'"f'tq
58.24,-/==:::---S
./'1.s 9tri,t'1 ;
100
SuspendedParticulate Matter(Size less than 2.5um) or PM2.5 uslml
31.52 34.23 $'Sulphur Dioxide SOz(us/m3) 6.88 7.45 13\'m /"vNitrogen DioxideNO' (uey'mr) 9.68 10.12 \M# 'Vto
CEMENT MANUFACTURING COMPANY LTD. - MEGHALAYARef. No.: CMC1,EHS-F-01 (a)Issue No.: 01, Date of lssue: 24.0E.2013Rev. No. 00, Date of Rev.
Report NO. 02
AMB II,N'I.' AIR QUALITY SURVI IRY REPORTLosation of Sampling KHUB MINE - l- LumshnonsDate of Samolins 22.04.20r 4 - 23.04.20 14
Distance between the Industry andsampling Location
200 meters
Time duration of samnlinp 24 hrsWeather DrvTotal Rain Fall, mm (on Date)Ambient Terhperature (oC) :
llaximum:Ir4iniinurn:
34.1 0C
19.2 0C
Relative Humidity (%)Ma:iimum:Minimum:
74.5 0A
24.2yoWind Direction N-WWind Speed ftm/hr) 7,8
Pollutants
Analysis
PermissibleLimits for
RuralAreas
Station No. & Air Oualitv Sunev No.I
(Mines EntranceHaul Road)
K-l/04/14-15
)(ROC Drilling
Point)K-1/05/r4-ls
3
(ExcavatorPoint)
K-l/06/14.1524 Hrs. 24 Hrs. 24 IIrs.
SuspendedParticulate Matter(Size less than 10um) or PMIO uslml
52.74 s6.84 fiffi 100
SuspendedPa(iculate Matter(Size less than 2.5um) or PM2.5 upy'm3
33.6s 34.95
4
_3110
#@>o60
Sulphur Dioxide SOz(us/m3) 5.42 6.43. l€, '**\Sr 80
Nitrogen DioxideNO, (us/m3) 931 10.81
*6' 84 !l! 80
Remarks: The parameters analyzed were found to be withiAmbient Air Quality Standards (National) for RrArnorenr Ar quatlty uranqarcs, Notltlcatron dated I u* NrN€€uix$v
M*
CEMENT MANUFACTURTNG COMPANY I.JTD. - MEGHALAYA
Ref. No.: CMCLEHS-F-OI (b)Issue No.: 01, Dete of lssue: 24.08.2013Rev, No. 00, Date of Rev..
Report NO. - 02
ALITYAMBIENT AIR OUALITY SURVE RY REPORTLocation of Sampline KHUB MINE - II, LumshnongDate of Samoline 22.04.201 4 * 23.04.20t 4Distance between the Industry andsampling Location
200 meters
Time duration of samplins 24 hrsWeather Drylotal Rain Fall, mm (on Date)Arnbient Temperature (oC):llaxirnum:lr4inimum:
34.1 0C
l g.2 0c
Relative Humidity (%)Maximum:Minimum:
74.5 0h
24.2VoWind Direction N-WWind Speed ftm/hr) 2.8
Pollutants
Analysis
PermissibleLimits for
RuralAreas
Strition No. & Air Oualitv Survev No.1
(Mines EntranceHaul Road)
K-2/04/14,15
2(ROC Drilling
Point)K-21051r4-t5
3
(ExcavatorPoint)
K-2t06114-t524 Hrs. 24 Hrs. 24 Hrs.
SuspendedParticulate Matter(Size less than l0um) or PM10 upy'm3
52.20 58.61
-4tI6l .86 100
SuspendedParticulate Matter(Size less than 2.5rrm) or PM2.5 uslml
31.84 38 37 60
Sulphur Dioxide SO:(us/mr) 6.03 :r. 7'58 80
Nitrogen DioxideNO' fuelm3)
9.13 t$,\q.ut 80
Remarks: The parameters analyzed were fouAmbient Air Quality Standards (Nr
Ambient Air Quality Standards, Noti
'F/ iItd be wiB{t). rot
wf;Fi'o
.4i\ q*"
'KeF
tre penF\A ooo.
;\rqsfr/
limits ofNntional
{th'l6)' ')z'
;f':*
) CEMENT MANUFACTURING COMPANY UI'D. - MEGHALAYARef. No.: CMCL-EHS-F-01 (a)lssue No.: 01, Dale of lssue: 24.08.201f,Rcv. No. 00, Date of Rev.
Rcpor( NO. 03
AMBIBNTAIR QUALITY SURVBRY REPORTLqqqq!9lr of Sampling KHUB MINE - I. LumshnonDate of Sampling 04.05.2014 - 05.05.201 4Distance betu'een the lndustry andsampling Location
200 meters
Time duration of sampling 24 hrsWeather RainvTotal Rain Fall, nrm (on Date) 04Arnbient Tenrperature (oC;:lr4aximum:ir4iiiirnunt:
28.5 0C
21 .0 0C
Relative I-lunridity (%)Maximurn:Minimum:
96.1 %56.1 oh
Wind Direction N-Ww nd Sneed (km/hr) 8.1
Pollutants
AnalysisStation No. & Air Ouatifv Survev No.
_---_lPermissibte
I
Limits for i
Rural I
Areas I
I(Mines Entrance
Haul Road)K-UQ7n4-t5
2(ROC Drilling
Point)K-l/08/14-15
-1
(ExcavatorPoint)
K- t/09/14.1s24 Hrs. 24 Hrs. Hrs.24
SuspendedParticulate Matter(Size less than l0llUsrjN,qq!s&!'
56.37 65.85 68.75 100
SuspendedParticulate Matter(Size less than 2.5um) or PM2.5 uslml
34.52
Sulphur Dioxide SOz(us/mr) 6.78 7.81 7 .31 80
Nitrogen DioxideNO, (ue/mr) 9.89
Fto76/i:;.{: @K 80
Remarks: The parameters analyzed were found to be
Ambient Air Quality Standards Q.{ational)' Ambient Air Quality Standards, Notification r
fil-t'tAMlyzed Btl ffi of
ral
,l
CEMENT MANUFACTURING COMPANY LTD. _ MEGHALAYA
Ref. No.: CMCL-EHS-F-01 (b)Issue No.: 01, Date of Issue: 24.08.2013Rev. No. 00, Date of Rev.Report NO. - 03
AMBIENTAIR UALITY SURVERY REPORTKHUB MINE - II Lum
Date of Samplin 04.05.20 I 4 - 0s.05.20 l 4
Distance between the Industry andsamolins LocationTime duration of sam
Total Rain Fall, mm (on DateAmbient Temperature (oC) :
Maximum:lr4inirnurn:Ilelative I{umidity (%)Maxirnum:Minimurn:
29.5 0C
_2l.ooc _ _96.r %56.1%
Wind Direction
Pollutants
Analysis .
PermissibleLimits for
RuralAreas
Station No. & Air Oualitv Survev NoI
(Mines EntranceHaul Road)
K-2t07il4-15
2(ROC Dritling
Point)K-2108tr4-15
J
(ExcavatorPoint)
K-2t09n4-t524 Hrs. 24 Hrs. 24 Hrs.
SuspendedParticulate Matter(Size less than l0um) or PMl0 uclml
55.32 64.25
ffiffi"100
SuspendedParticulate Matter(Size less than 2.5um)or PM2.5 uslml
33.82EF
43.82 45 85 60
Sulphur Dioxide SOz(pglm') 6.88 7.81 Z ia5l2a 80
Nitrogen DioxideNo: (pgimr) 9.72 ,;ffi ;dN 80
Renrarks: The parameters anall'zed were found toAmbient Air Qualitl' Standards (NationalAmbient Air Quality Standards. Notificatio
(ffi,^,\'1Anall,zed tsl
n thulffimlsslRurallfrSHr as
l8"q0htdeinbe
:'*TZ!6_,q)
\'"11'\
r',\"*riI cre
its of
6a
CEMENT MANUFACTURING COMPANY LTD. _ MEGHALAYARef. No.: CMCLEHS-F-O1 (a)Issue No.: 01, Date of Issue: 24.08.2013Rev. No. 00, Date of Rev.
Report NO. 04
AMBIENT AIR QUALITY SURV RY REPORTLocation of Sampl KHUB MINE - 1. LumshnonsDate of Sampllng 19.05.2014 - 20.05.201 4
Distance between the Industry and
samolins Location200 meters
Time duration of sarnpling 24 hrsWeather Dry'lbtal Rain Fall. mrrr (on Date)Arnbient Temperature (oC):
N{aximum:Ir4inimr.rm:
28.5 0C
243 aC
Itelative Hunridity (9'o)
Maximym:Minimum:
89.s %72.4 %
Wind Direction N-WWind Soeed (km/hr) 7.0
Pollutants
Analvsis
PermissibleLimits for
RuralAreas
$tation No. & Air Quality Survey NoI
(Mines EntranceHaul Road)
K- l/10/14- l5
2(ROC Drilling
Point)K-l/11/14-r5
3
(ExcavatorPoint)
K-vt2n4.t524 Hrs. 24 llrs. 24 Hrs.
SuspendedParliculate Matler(Size less than l0um) or PM t0 us/ml
57.85 6732l', l! un'o 100
SuspendedParticulate Matter(Size less than 2.5
um) or PM2.5 uglml
i5 62
F.E45.42 60
Sulphur Dioxide SOz(uslm)) 6.7 | NJ*u 80
Nitrogen DioxideNOr (ue/mr) 9.92 //{*e"ffin \\'' 80
Renarks: The parameters analyz-ed rvere {b""d {lFJAmbient Air Quality' Standards 61',tatioH1l)rlAmbient Air Quality Standards, Notificatibd'
*',#ro$*10.,*,IdL
i:"$t'$lff:##;limits ofNational
' i "{,!'t'---.]:,,,,,;99i- \v",ifugx-"
I
IJ
ffi
CEMENT MANUFACTURING COMPANY LTD. - MEGHALAYA
Ref. No.: CMCI-EHS-F-01 (b)Issue No.: 01, Date of Issue: 24.08.2013Rev. No. 00, Date of Rev.Report NO. - 04
MBIA T,N'I' AIII Q UALI'TY SURVERY REPORTLocation of Sampling KHUB MINE - il, LumshnongDate of Sampline I 9.0s.201 4 - 20.05.2014Distance between the industry andsamplins Location
200 meters
Time duration of samplins 24 hrsWeather DryTotal Rain Fall, nrm (on Date)Ambicnt Temperaturc (oC):Maximum:Minimum:
28.5 :C2430C
Relative Humidity (%)Maximum:Minimum:
89.5 0A
72.4%Wind Direction N-WWind Speed ftm/h) 7.0
Pollutants
Analysis
PermissibleLimits for
Rural' Areas
Station No. & Air Oualitv Survev No.1
(Mines EntranceHaul Road)
K-2/l0lr4-15
2
(ROC DrillingPoint)
K-2/l l/14- 1s
3
(ExcavatorPoint)
K-zlr2lr4-t524 Hrs. 24 Hrs. 24 Hrs.
SuspendedParticulate Matter(Size less than l0um) or PM10 uglm3
s5.62 6s.21 atl ttQo,SYB
100
SuspendedParticulate Matter(Size less than 2.5um) or PM2.5 us/ml
3 3.65 43.58 45.62 60
Sulphur Dioxide SOz(udmr) 6.75 7.os/6 R 80
Nitrogen DioxideNO, (us/mr) 9.86 ,or{f/
E *€*bA 80
D^-^-r--. 'I'L^ -^-^-^+^-^ ^-^1..-^J ...^-^ t^..^J ;[.,_ ,i'$lffi',.'o)&t{ibas.as dsF-}dli.i -"fqd. /^9,^t
its oftional
"J'J"i ?i;'4il',r';;ffi ' d;"1'"'iiffi\ii,leI
Ambient Air Quality Standards, Notification aqtxl){'u
6l*lnAnElyzed By
A"rHEXt, <E-- I IGOVERNI\I ENT OF NI BGHALAYAMINTNG & GEOI-OGY DI1PART'MBN'r
No:. 1r,1G.47 l20Q4l t t' c
l;rorrt: Shri. S. S. Grrpln IAS(lorntnissiorrcr & Sccrctary to thc (iovt. ol'McghalnyaMirring & Ceology Dcpartnrcrrt. Shillorrg
To: 'I'he Depu(y CornrnissiorrerJaintia Hills DistrictJorvai.
Sub: Grartt of Mining Lease lor Linrestone altd Sandstone over an area of 4.96 Hectares atLurnshrrong, Jaintia I.lills District, Meglralal'a in {hvour of Nl/s Cements lv{anufacturing Co.Ltd (ClvlCL).
Madarn,
l. I arn directeC to say that the Governor of Meghalaya is pleased to grant a lv'lining Lease onLimestone and Sandstone to M/s Cements N{anufacturing Co. Ltd (CMCL). a companyhaving its registered office at Shillong. Meghalaya for a period of 20 (trventy) years inaccordance with the provision of the Mines and Minerals (Development and Regulation) Act,1957 and the Mineral Concession Rules, 1960 made thereunder. A draft Mining Lease deedunder Rule 3l of theg"rrpRule, containing the terms and conditions both general arrd local onrvlrich the Mining l".ease is granted is fcrrrvarded lter,cornpany.
i'ing l..ease is granted is fcrrrvarded lrerewith for extfiilfftFlru and the said
?. t arn to say r.har the Mining l.,ease should be execured within aanF)'.)'m,ffi,n the date ofissue of this letter and if it is not so executed within this period due to any default on the partof the applicant, the State Government may revoke the order granting the Lcase and in thateverfthe application lee and prelinrinary expenses deposited by the applicant shall be
forfeited to the State Government.'I'he Minirrg Lease should be registered after execution. Asrequired under Rule 32 of the Mineral Concession Rules I shall before theMining Lease is executed deposit an amount of Rs. 10, ) orrly as "Security Deposit " for due observance of the tennsdeposit should be in the form of a Term Deposit
. The securityRecognised
Bank pledged in favour of the Director of Mineral R
3. I arn to request you to take action on the followingLease:-
f the lvlining
a. 'l'he date of execution liom rvhich the Mirringmention in the blank space at Para I and 4 of the P+earnble ofthe draft tease.
b. The blank spaces in Part I of the draft lease duly filled in regarding the situation andlocation of the areaarc to be verified. The boundaries of the area have been {illed inon the basis of the desoiption in the application for Mining Lease submitted by theapplicant.
c. A Map or Plan sltowing the location of the leased area should be annexed to eachcopy of the lease deed.
d. As required under Rule 27 (lxd) of the lr4ineral Concession Rule 1960, you areauthorized to fix the rate of surface rent Per Hectares Per Annum and the water ratePer Hectares Per Annum and filled up in the blank spaces under Clause 4 of Part V.
I am also to say that the lessee should be demarcate the boundaries of the Mining Lease arearvithin a period of I (one) month frorn tlre date of execution of the Milring Lease and theDirector of Mineral llesources should verily the boundaries before the lessee commenceMining Operation.
J'lte lessee should ensure tlrat natural Caves rvithin the area are protected and rnining in thearea where the Caves is locate{-rfo,,E{$ited.
l-he |essee sho uId enOerivo'iii t6-BjotEer,i |qvironrnent by taking rneasures for reclamationnat ation.
7, I'he lessee should
4.
5.
6.
of the larrd by elat*infflg*1f
area should beBureau of Mines.Concession Rules" I
lbr l,imestoneMining Plan
ided under
and Sandstone in the leasedduly approved by the lndianRule 22 A of the Mineral
8. Tlre amount of anticip",.o;#i#+tX6t for the purpose of stamp dury for registration ofMining Lease is Rs.91"00,0001- (Rupees ninety one lakhs) only.'I'his amount has beendeterrnined on tlte leasis of the lessees estimated annual production lor a period of 5 (fir,e)years as furnished in the application of lv{inirrg Lease. l'he blank space in Clause 9 of Part lXof the draft lease'lms been filled in accordingly.
' "GrI arn further to say that the copies of Mining Lease duly executed slrould be furnished to theController General, Indian Bureau of Mines* Nagpur, 'I'he Director Ceneral of Mines Safety,Dhanbad and The Director of Mineral Resourceso Shillong as well as to this Deptt. forrecords.
1l .:!r,-.: ':- -lrlr':r:i'i rv: {/Ur! -L:!j:.r&t !
commissioner & r**lr6ilor"t. of tr4eghalayaNlining & Geologr Deptt.
Shillong
ttHrt.t4:liilbrA. ,i{, \:.
i' 9.Ii
l:.
: .".
A"rHEx\, <,e- I 8GOVERNI\I BNT OF N,IBGHALAYAMINING & GEOI.OGY DEPART'MBN'I
No:. lvlC.47 12004/ i r'r Dt. Shillong the
l;rorn: Slrri. S. S. Gullln IASC'orttntissiorrcr & Sccrctary to tlrc (iovt. ol'Mcghalnvalv'lining & Ceology Dcparturcrrt, Shillotrg
To: 'I'he Dcpu(y Conr nrissiorrerJaintia llills DistrictJorvai.
Sub: Grant of Mining Lease fbr Linrestone and Sandstone over an area of 4.96 Hectares at
Lunrshnong. Jaintia I"lills District, Meghalaya in favour of N{ls Clements Manufacturing Co.Ltd (cMCL).
Madarrq
l. I arn directel to say that the Governor of Meghalaya is pleased to grant a N'lining Lease onLirnestone and Sandstone to M/s Cernents N{anufacturing Co. Ltd (CMCL), a companyhaving its registered office at Shillong. Meghalaya for a period of 20 (trventy) years inaccordance with the provision of the Mines and Minerals (Development and Regulation) Act,1957 and the Mineral Concession Rules, 1960 rnade thereunder. A draft Mining Lease deed
under Rule 3l of thes*ipRule, containing the terms and conditions both general arrd local onrvlrich tlre Mining l.ease is granted is lorrvarded lrerervitlr kconrpany.
ease is grartted is lorrvarded lrerervitlt for extfiilfiFou and the said
2. I arn to say tlut ttre Mining l..ease should be executed rvithin 6 (lix) ffitlis-li5rn the date ofissue of this letter and if it is not so executed within this period due to any default on the partof the applicant, the State Government rnay revoke the order granting the Lease and in thateveritthe application fee and prelinrinary expenses deposited by the applicant shall be
forfeited to the State Government. The Mining Lease should be registered after execution. Asrequired under Rule 32 of the Mineral Concession Rules l9Mining Lease is executed deposit an amount of Rs. 10, orrly as "Security Deposit " for due observance of the tenns a The security
Recogniseddeposit should be in the forrn of a Term DepositBank pledged in favour of the Dircctor of Mineral
I arn to request you to take action on tlrc followingLeasc:-
f the tvlining
'l'he dale of execution liom which the Mining L
^ r']tl t'-'c" / Di(/':r(-Lr.....' . {.... ..'i,' r .. '...
3.
a.
mention in the blank space at Para I and 4 of the Preanrble efthe draft tease.
Merno No: MC.47l20rN/lf t' ' r"1
Copy furwardcd to:-
l. 'l'lre llrivale Secy ttl tlrc Ministcr. Mirring & (ieokrgy lbr lhvour <ll'inlirrrrration of theMinister.
2' The Sectiorr Officer. Ministry of Mines, Govt. of lndia, Shastri Bhawan, New Delhi - I forinlbrrnation.
3. 'l'he Controller General, Indian Bureau of Mines, Nagpur for inforlration.
4. The Director General of Mines safety, Dlranbad for inforrnation.
5. The Director of Mineral Resclurces Meghalaya, Shillong for inforrnation.
6. Slrri. Tejbir Singh (Authorised Signatory). Cernents Manulacruring C'o. Ltd. Lurlstlnong,\" P.O. Khlie hriat. Jaintia I Iills Distt, Meghalaya for inforrnation ancl ,r.l"rrory acrion.
Srytnoll6e.I{t <- ---r''
Commissioner & Seuetary to the Gor,t. of MeghalayalVlining & Geologr Deptt.
Shillong
GOVERNMET\TT OF MEGHALAYAilRECTORATE OF MINERAL RESOURCES
s H.r L L O lt cNoMG. 2t/Lc')zf 43g, ool"iStiU-g ,tu ttt{' tunj,
.- .fa-2006 "
E- From : Cotumissioner & Secretary to theGovernmert of Mqfalaya.Mining and Geologgr DqstmenqShillong
Thc Dquty C.ornmissicncr,Jaintia Hills Distdcr ,Jorvsi
CR.4,NT OF T'INING I^&4,S.8 FOR LIT'ESTONE AND S,\NDSTONEOVER Al.i AREA OF 4.70 HECTARES AT LUtofSHt\iONC VILLAGE,JAINTIA HILLS DISTRICT, and MEGHALAYA lN FAVOUR OF M/SCEh{ENT MANUFACTIJRING CO\{PA}{Y, UTD.
Str,
I am directcd to say that thc Goycrnor of Meghalaya is pleascd togrant a mining lcase over an area of 4.70 hectares at Lumshnong viltage, JaintiaHills on limestone a.nd snndslonc lo M/s Ccmcnl Marufas{urirg Compury Lrd.,P.O. Khliehrict, Jaintia Hills Districr, Mcghalal.a for a period of 20 {twcnt;J years
in accordance rrith the provision of tle Mines and Miacrals {Derelopmett andRegulation) Act. 1957 and the Mineral Concession Rules, t960 made thcrcunder- Adraft mining lease deed under Rnle 3l of the rni the lernrs and
conditions both general and local on ,TS ease is granted isforwarded for execution bv you and the
I am also to say rhat tbe miniag lease shbuld be executed wirhin 6
{six; months from the date of issue of this lcttcr and if it is not so executedwithin this period due to any default oe the pan of the applicant, the Stats Gsrt.may revoke the order gracting the lease and in that €Yest, application fee andprelimirary experrsss deposited by the applicant shall bc fotfeit6:6-.gffi-l
To,
Sub
'na.
Rule 32 of the Mineral Concessiou Rulcs, 1960,rhemining lease is executed deposit an amornt of Rs-10,000-ronly as Security for dae obscrvance ofthe terms andSecurity Deposit should be in the furm of a *Term
Nationolised.rRecoginised Baak pledgr in favour gfResours&$, Meghalaya,' ghillong.
I am fo request you to take setion on. thcexecuticn of mining lease :-
(a)
(b)
th;'.,')
. ruel ' I'
T&e date of execution from which the mining lease will come ioto forccshould be meation in thc blank spacc at Para-I and 4 of thc prcamble ofthe draft lease.
Tte blant rpaces in Part-I of rhe draft lcse duly fillc.d in rcgarding thesituatioa aad location ofthe arsa tre to be vcrified- The bouadaries ofthearea tave bocn fi1led in on tlre tasis of tbc descriptior io rhc applicationfor mining lessc submitrcd by thc applicant.
(Cond-..-.pC..2/-)
2
tc' ffhc.sep otjlrr rho*ilg tbe locrtiol rrcr stoutd ic rnncrcd tc terh
" .Ifo.*!F.$f abc lcrsc dccd.
(d) As rcquircd urder R$lc 2?(l) (dl pf lhc Mineral (lonccssion Rulcs,1960, you *e euthoriscd to lir thc rrtr of rurfecc rcnt p.r hccterc pctrrruur rnd thc srtcr nlc per hcclrc pcr rrnuu eud tittcd up thcblank sp*cc nndcr Clruse 4 cf Plrt-V-
f em rlso to sep'thrt tbc lcssct stould dcmercltc tbc boundrrics oftbt oriniag lcese aru ritLin r pcriod of l(gac) moafh from thc dafc ofcxccutlaa of thc urining trert lnd tbt Dircttor of *lintrel Rtiourrcr rhouldvcrify tbc boundlricr bc{orc thc lcscc torrtmctcc mining opcr*tion.
TIre hsrrc should errsurc the( nrturrl c*t.cs within thr lrel areprotccted rcd micicg ia' the area rrherc t[c cavcs is located be prohibited.
Thc lcssec siould cnd:rvor to protcct the enrironmcnf by taliingmcssur€s for rechmrtiou of thc llnil by plaafiag trcer end other natoralYcgctrtio$-
Thc lcsrec cbould cfisurc thet nining opcration for limcstotc andsendstocc iu the less€ eres shacld bc conductcd in eccordrsce witL l miniagplel approvcd by fhc confrollcr Gepcrelr Indien Bnrcau of Mine*n Govt oflndie rs providcd undcr Rulc 22A rof thc illincr*l Couccrsioa Rutcs, 1960.
Tbr emount of uticipelcd Eanual royalty for thr purposc of$trm$ dug for rcgistrrtion of mining leert is *.r.{5,10"0{10/- (Rupcer fortylirc l:rcr nnd tcn tholsend) oaly- Thc luount hrs bccn dctersincd on thcbrsis of the lcssce cgtimated aunuel producfion for e period, of S(fivc) yc*rsas furnished in the applicrtion af mining lease at the currcni ratc of r*yalrg
Coqmiscicrct & Sccp. ,. aJ" Govt of itcghaley*$firing rnd Gcologlr Deprrtmetrt
Shilloag
{fontd,.,...pE,.,3l-}
llrEMO No.iilG.1^ l/ 7c r' 3 f 4 3* *t4 t
Drtcd $Lillolg *c tlh Je_.--t,a:a, 2gg5
Copy forrrrdcd to :-t. Thc scctior officcr. Illinietry of }lincs, Govt of ladir. sh*tri Bbevra,.
Xcr Dclhi for informrtion-2. Thc Controllcr Gcncrd, ludin Burcru of *litc*n Nrgpur.3. TLc Dircctor Gcncrrl of il{iace Srfcty" Dheabtd.4- Tbe Privetc Sccrctrry Cbicf Ministcr, for liod i.oformation of Chicf
!ilinirtcr.5- Thc Privetc Sceretrry to Chief Sccrctrry, Gorernment of llcghdey*.6. The Privntc Secrctary to tlinistcr, trl!.ining ead Gcology dcprrfdcnt?. Thc Priyafe Secrclary to *finisttr, fodustri*r dtpertmcnt.8. Thc Privrtc Sccrctery to fiIinister, Farcrt & .Environmcnt.9. l'bc l)ircctor of lllircral X.csources, Sbillong-
,_lS.-IrUt Ccmcnt Manufacturing Compeny Ltd., Lumshaong, P,O. Iibaliehriet,Jaintir Hills Dictrict-
By Ordcr ctc.
&*Commisrion." e Scc$. ro6-" Gorr. of ltcgbelrya
--l]fiinirg erd Gcology DcprrtmcDtZ='<_ Shi$ong
---'i',i r'", .
r! :
Ar{NaxuR.E - I
I'L&RYAN* Affidnvit 3*fie nT*{*?
I. Devender K.ttmar Bans:tl Slo Sh. l-lanumtn ltrssarl lt/o (iaii Modan, llalluB*:;rr [lhirvnni at presenr address etr. No. g50ll l, (-.M.('.1, Clanrpus vill
v^4(4'-z
f
fLf
I
I
I
l
+
$\,\*l.i/.tl- ,'/
l"
'!
'lhut
1-h (
Der
That'i. z; );,---- .- -':. ,
That rhe'i$bils*radilic
ol above notcrd address.
vencler Kumar Bansal but my incorrect
I and
correct to the best of nny
-:-. -.;*t u'f\t
Verification:
That
1 ,'.,]|,li'\:ii.$i
...i;:l-..,n\i$l!
i:ii',| :r$'l
L'untshn*ng Distt. Fest Jairrti^ ttitt*rp{llllf hcrchy serlrmnly alfirm ancl
d$4:09pM
*fr*ared & $gntlsnd
e
at{
-s
ANNCx u (E -20CEMENT MAI{UFACTURII{G COIJ|PANY 1ru.
UNDERTAKING BY THE APPLICAIIT
I, Devender Bansal, Nominated Mines Owner on behalf of M/s Cement ManufacturingCompany Ltd. at Lumshnong village, P.O. Lumshnong, P.S. Khliehriat, District EastJaintia Hills, Meghalaya-793210, hereby undertake that, Boundary Pillars and IntermediatePillars as shown in Surface Plans and other Plans of Amalgamated Khub LimestoneMine over an area of 9.66 hectares will be erected in the field as per the specification laiddown in The Gtzette of India, Notification pubtished on 08th October, 2014 (Regardingthe manner of construction and upkeep of boundary Pillars).
I, Devender Bansal, on behalf of IWs Cement Manufacturing Company Ltd. at Lumshnongvillage, P.O. Lumshnong, P.S. Khliehriat, District East Jaintia Hills, Meghalaya -793210, isgiving an undertaking that I shall fulfill the same before 3l't December,2015.
Place : LumshnongDate : 10.06.2015
Signature {the LesseeName: Shri BansalDesignation: Nominated Mines Owner
A4--ftrtqrrlr*,1flcrH, [email protected]+?t-tlxtatat.tufrttattrh:tBl,ltl.|.lrrj:trr-- lurd.fi.trfi.Crrf krh*n1?O;Hrl,h,:plf,Hff,ltulUf&fitglll|tr:Otl*liltt r.rJ:frfnarlOndonrtr ttllct, D talt l atLt trat om[tltomtnt
,qFilEFttPnovE
IHUI-ll la"tdt..|
rHulll+gd*l
PIAilTANOil OUT$OE THE illr{Nc I"EASE ARGA
--l'+'-i-....?'..-
;nx,a
i_s.},JL
f-*ry' "".-i'J ! !q' ' \
g].';ilJ)!.-i "