  • 7/31/2019 Bms Check List

    1/36

    3]DVR REMOTE ACCESS CLIENT SOFTWARE REQUIRED

    4]AUTO IRIS CAMERA REQUIRED

    5]ENTRY AND EXIT NPR CAMERA REUIRED WITH AUTO WHITE BALANCING WITH NIGHT M

    6]OUT SITE ALL CMOUNT CAMERA CLEARITY REQUIRED WITH NIGHT VISION

    7]ALL CAMERA SMPS CENTRALLY REQUIRED WITHOUT POWER DROPE

    1]MIC REQUIRED

    2]KEYBOARD/MOUSE REQUIRED INDIVIAL DVR

  • 7/31/2019 Bms Check List

    2/36

    10]DVR BACKUP REQUIRED MIN 30 DAYS

    11]EPABX SYSTEM CABLING REQUIRED FOR CLIENT SITE.

    12]TELEPHONE INSTUMENT REQIRED FOR CLIENT RECEPTION.

    8]LIFT CAMERA CABLING PROBLEM WHEN LIFT MOVE CAMERA UPS BACKUP REQUIRED

    9]LIFT INTERCOM PROPER SYSTEM REQUIRED CENTRALLY

  • 7/31/2019 Bms Check List

    3/36

    13]AS PER DRAWING CABLING NOT DONE SO PROPERLY QWALITY TESTING REQUIRED.

    14]WATER LEVAL SENSORS REQUIRED FLEXIBAL POSIBLE TO REOMVE AND INSTALL NOW PSENSORS IF ANY ONE SENSORS FAULTY SO WE HAVE TO CHANGE ENTIRE 4 SENSORS UNNE

    15]WATER LEVAL CERTIFICATE.

    16]WATER LEVAL SLD REQUIRED

  • 7/31/2019 Bms Check List

    4/36

    22]LIFT CLEARITY REQUIRED

    23]DG YARD SPEAKER REQUIRED WITH PARKING AREA

    24]ALL WATER TANK SENSORS CERTIFICATE REQUIRED

    17]ALL FLOOR CR /CT REQUIRED FOR CLIENT FAS INTRIGATION

    18]MCP REQUIRED AT ALL STAIRCASE

    19]LIFT CAMERA FLUCTUATING

    20]LIFT CAMERA SIGANAL NOISE

    21]MCP BRACKET REQUIRED

  • 7/31/2019 Bms Check List

    5/36

    25]STAIRCASE PRESARISIATION INTRIGATION REQUIRED

    26]LIFT FIRE INTRIGATION REQUIRED

    27]LIFT RCB JOB REQUIRED FOR TAKING INPUTS ON EBI SERVER [WITHOUT LIFT RCB JOB

    28]ENTRY AND EXIT CAMERA REQUIRED WITH NPR WHITE BALANCE IRDA FOR CAPTURINUNDER NIGHT MODE.

  • 7/31/2019 Bms Check List

    6/36

    34]CENTRAL INTERCOM REQUIRED.

    29]VANTILATION FAN REQUIRED INDIVIAL STATUS FOR EBI FOR GETTING AT ACTUAL CON

    30]LG1/LG2 STAIRCASE PRESARISATION REQUIRED

    31]DG PANEL INTRIGATION REQUIRED

    32]POINTS TESTING OF PFC

    33]BATTARY BACKUP REQUIRED FOR FAS

  • 7/31/2019 Bms Check List

    7/36

    35]AS PER BUIT DRAWING AND AS PER WORK DONE AT SITE NOT MATCH.

    36]FAS SDU MASTER FILE WORK SHOULD REQUIRED

    37]GRAFICS LINKING PROBLEM

    38]MCP UNPROGRAM SO REQUIRED PROGRAM

  • 7/31/2019 Bms Check List

    8/36

    39]WHENEVER HANDOVER START FIRST BRIFING REQUIRED WHAT IS AS PER BUILD AND WBRIFING ABOUT HOW SYSTEM ZONEING DONE AT SITE.

    39]HVAC SYSTEM CONNECTION REQUIRED PROPER AS PER DESIGNED

  • 7/31/2019 Bms Check List

    9/36

    40]WHENEVER CABLING WORK DONE AT SITE SO NOT MORE THAN THREE VENDORS ALS WHENEVER THERE IS CABLING PROBLEM WE WILL EASYLY TRACK VENDOR

    41]FAS CABLE PATCHING OR JOINTS NOT REQUIRED ONLY LOOP VISED DETAILS REQUIRED

    42]EXTRA EPABX CARD EXTENTION REQUIRED.

    43]NETWORK SLD REQUIED

  • 7/31/2019 Bms Check List

    10/36

    BELOW HANDOVER DOCUMENT REQUIRED

    1]AS PER BUILT DRAWING OF FAS/CCTV/PA

    2]BOQ REUIRED

    3]CAUSE & EFFECT EXCEL

    44]ALL PTZ CAMERA SETTING REQUIRED

    4]CCTV/PA/FAS CHECKLIST

    5]INSTALLATION REPORT

    5]MATERIALS RECONCILATION

    6]SOP REQUIRED

    7]COMMISIONING REPORT

    8]PASSWORD OF FAS AND DVR

    45]

  • 7/31/2019 Bms Check List

    11/36

    15]ALL SYSTEM HARD AND SOFT COPY REQUIRED

    16]PRODUCT SERIAL NUMBER LIST REQUIRED

    9]WARRANTY CERTIFICATE

    10]SERVICE ESCALLATION MATRIX

    11]PROJECT CLOSEOUT DOCUMENT

    12]USER AND OPRATIONAL MANUAL AS PROVIDED SYSTEM

    13]TESTING CERTIFICATE REQUIRED

    14]FAS BACKUP REQUIRED.

  • 7/31/2019 Bms Check List

    12/36

    1 Armored FRLS cables not used2 Cable not laid properly3 In case of fir e Lift, Staircase pressur4 PFC contract was not provided for a5 As Built Drawing not proper.

    HVAC

    1 Cable terminations not done proper

    2 PFC contacts were not provided in3 Points Linking in EBI for most panels4 DG Status connections were not ma

    Water management

    1 Sensors were not laid properly.2 Most of the sensors dint had proper3 Points Linking in EBI for most Tanks

    FASBelow points received from Honeywell

  • 7/31/2019 Bms Check List

    13/36

    DE.

    To ckeck announcement of PA system

    Separate keyboard/mouse reqired for indivisual operation

    To free from manual operation and technical upgradation

    iris is an adjustable control the amount of light coming through the l

    is opened, the more light it lets in and the brighter the scene.

    Because this two are considered the most security zone-ENTRY & EXI

    DAY/NIGHT camera is the best option than normal

    SMPS is the DC power supply unit

  • 7/31/2019 Bms Check List

    14/36

    Building intercome must be at reception

    wireless camera should be used in Lift with networking through wifi,sfails/cutdown ,a contineous recording wil be in process.

    By setting the proper resolution mode or by putting network strorage

    ok,updated RCP or as build required

  • 7/31/2019 Bms Check List

    15/36

    ROBLEM WITH POD B THEY FIXSSESORY

    AS build drawing required if cabling not as per specified drawing

    Single line diagram required with separate system wise-FIRE,PA,CCTV,

  • 7/31/2019 Bms Check List

    16/36

    ok

    MCP required at the most accessable area.

    Proper flexibility in cabling required

    Cable for camera not to be interfere with high tension electrical cablefield generate,while crossing over & the genetared emf produce nois

    But bracket should not be lockable

    PA system should be in common area for general announcement

  • 7/31/2019 Bms Check List

    17/36

    E CANT GET DATA IN PUTS.

    NUMBER PLATE ALSO WORK

    ok

    lift calling should be operated through fire calling

  • 7/31/2019 Bms Check List

    18/36

    ITION

  • 7/31/2019 Bms Check List

    19/36

  • 7/31/2019 Bms Check List

    20/36

    HAT IS CURRENT SENERIO ALSO

  • 7/31/2019 Bms Check List

    21/36

    WORK AND ZONE DEFINED SO

  • 7/31/2019 Bms Check List

    22/36

  • 7/31/2019 Bms Check List

    23/36

  • 7/31/2019 Bms Check List

    24/36

    ization fans were not connected.ctivation of Fans

    ly for most of electrical panels.

    any of electrical panels.were not done properly.

    de.

    cable terminations.were not done properly.

  • 7/31/2019 Bms Check List

    25/36

    ens. The more the iris

  • 7/31/2019 Bms Check List

    26/36

    o that if cabling

    card on server

  • 7/31/2019 Bms Check List

    27/36

    ,AUTOMATION,BMS

  • 7/31/2019 Bms Check List

    28/36

    ,because a mangneticor humming effect.

  • 7/31/2019 Bms Check List

    29/36

  • 7/31/2019 Bms Check List

    30/36

  • 7/31/2019 Bms Check List

    31/36

  • 7/31/2019 Bms Check List

    32/36

  • 7/31/2019 Bms Check List

    33/36

  • 7/31/2019 Bms Check List

    34/36

  • 7/31/2019 Bms Check List

    35/36

  • 7/31/2019 Bms Check List

    36/36