+ All Categories
Home > Documents > Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23,...

Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23,...

Date post: 31-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
38
Board Report | August 23, 2016 ANYONE WISHING TO SPEAK BEFORE THE VOTE ON ANY AGENDA ITEM MUST FILL OUT A PURPLE FORM ON THE SIGN-IN TABLE. COMMENTS WILL BE LIMITED TO THREE MINUTES. Audience Questions and Comments PERSONS WISHING TO SPEAK MUST FILL OUT A WHITE FORM, LOCATED ON THE SIGN-IN TABLE, BEFORE THE MEETING. COMMENTS WILL BE LIMITED TO THREE MINUTES.
Transcript
Page 1: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

Board Report | August 23, 2016

ANYONE WISHING TO SPEAK BEFORE THE VOTE ON ANY AGENDA

ITEM MUST FILL OUT A PURPLE FORM ON THE SIGN-IN TABLE.

COMMENTS WILL BE LIMITED TO THREE MINUTES.

Audience Questions and Comments

PERSONS WISHING TO SPEAK MUST FILL OUT A WHITE FORM,

LOCATED ON THE SIGN-IN TABLE, BEFORE THE MEETING.

COMMENTS WILL BE LIMITED TO THREE MINUTES.

Page 2: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

Board Report | August 23, 2016

CHAIR REPORT

Page 3: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

EXECUTIVE MANAGEMENT REPORT

August 23, 2016

Justin T. Augustine, III

Site Visit (FTA)/Quarterly Review –

Mr. Sam Snead, Program Manager -

September 15-16, 2016

City Council Transportation Committee –

Update

Page 4: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

August 23, 2016

Canal/Algiers Point and

Lower Algiers/Chalmette Ferry Routes

Financial and Operations Report For the Period January 1, 2015 through July 31, 2016

Page 5: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

5

Ferry Operations Statement of Expenses and Revenues

JULY 2016

Fiscal year January 2016—July 31, 2016 JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY

Total Expenses 557,807.01 706,369.92 680,379.88 755,691.75 429,927.86 399,778.30 487,759.37

Less Fares and Credits (109,233.09) (209,814.13) (146,825.45) (207,103.12) (140,329.21) (174,445.23) (159,089.86)

Transdev Net Billing 448,573.92 496,555.79 533,554.43 548,588.63 289,598.65 225,333.07 328,669.57

FY 2015-16 LADOTD Ferry Subsidy 3,326,008.50 2,859,297.18 2,309,590.50 1,736,813.91 1,129,649.04 811,930.64 530,975.41

Less Ferry diesel fuel provided by RTA (16,974.40) (29,498.89) (28,880.16) (10,900.24) (22,455.75) (23,700.16) (22,076.91)

RTA Ferry Grant Revenues 4,691

94,568.00

41,365 190,705.00 22,655.00 127,692.00 29,967.00

Less RTA Grant Expenses (5,864) (118,210) (51,707) (238,381.00) (28,319.00) (159,614.00) (37,459.00)

Less Transdev’s Net March 2016 Billing (448,573.92) (496,555.79) (533,554.43) (548,588.63) J(289,598.65) (225,333.07) (328,669.51)

Balance of LADOTD Subsidy 2,859,287.18 2,309,590.50 1,736,813.91 1,129,649.04 811,930.64 530,975.41 172,736.99

Page 6: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

6

Ferry Operations Statement of Expenses and Revenues

JULY 2016

Fiscal year July 1, 2015—December 2015 July August September October November DECEMBER

Total Expenses 593,604.76 769,953 470,671.08 569,549.53 651,342.37 485,311.83

Less Fares and Credits (166,127.83) (213,761.00) (92,801.75) (134,893.26) (106,499.18) (108,775.05)

Transdev Net Billing 427,476.93 556,192.00 377,869.33 434,656.27 544,843.19 376,536.78

FY 2015-16 LADOTD Ferry Subsidy 1,747,505.63 1,266,532.30 3,491,547.30 4,986,969.33 4,347,462.06 3,709,376.87

Less Ferry diesel fuel provided by RTA (41,817.40) (12,693.00) (37,639.64) (24,511.00) (47,429.00) (6,831.59)

RTA Ferry Grant Revenues 183,253.00 -0-

Less RTA Grant Expenses (11,679.00) (6,100.00) (6,100.00) (180,340.00) (229,066.00) -0-

Less Transdev’s Net March 2016 Billing (427,476.93) (556,192.00) (377,869.33) (434,656.27) (544,843.19) (376,536.78)

Balance of LADOTD Subsidy 1,266,532.30 691,547.30 3,069,938.33 4,347,462.06 3,709,376.87 3,326,008.50

Page 7: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

7

Ferry Operations RIDERSHIP

August 23, 2016 January 1, 2015 through July 31, 2016

Date Pedestrians Scooters Total Pedestrians Vehicles Total

Jan-2015 29,641 13 29,654 305 25,638 25,943

Feb-2015 73,606* 15 73,621 23 27,432 27,455

Mar-2015 41,781 15 41,796 11 23,509 23,520

Apr-2015 55,955 8 55,963 11 25,748 25,759

May-2015 35,123 34 35,157 385 26,046 26,431

Jun-2015 37,053 1 37,054 255 22,231 22,486

Jul-2015 37,053 11 37,064 255 22,475 22,730

Aug-2015 28,928 82 29,010 443 30,798 31,241

Sep-2015 26,303 113 26,416 307 18,807 19,114

Oct-2015 37,499 129 37,628 319 26,136 26,455

Nov-15 37,050 46 37,096 814 23,865 24,679

Dec-15 40,121 34 40,155 295 21,793 22,088

Jan-16 37,657 30 37,687 381 22,856 23,237

*Feb-16 75,696 69 75,765 397 26,536 26,933

Mar-16 46,971 97 47,068 359 27,479 27,838

Apr-16 77,303 81 77,384 280 23,824 24,104

May-16 52,729 90 52,819 405 27,787 28,192

Jun-16 50,095 80 50,175 420 26,738 27,158

Jul-16 56,231 96 56,327 360 26,738 27,158 *Mardi Gras - Saturday, February 6, 2016 through Tuesday, February 9, 2016 33,733

Page 8: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

INFRASTRUCTURE

DEPARTMENT

BOARD REPORT

August 23, 2016

Page 9: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

2015

N. Rampart Street / St. Claude Avenue Streetcar Expansion

Project Status Update

Period: January 5, 2015 – August 23, 2016

1947

Page 10: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

10

Construction Progress

All Underground Utility Work Completed

All Trackwork and OCS Completed

All historic and new streetlights installed and energized

Streetcar shelters furniture to be completed in the last week of August

New landscaping to be finished by 08/21

ADA ramps and Asphalt Overlay to be finished by 08/28

Project completion - End of August / First week of September (due to the weather)

Streetcar line integrated testing - End of August & Early September

Page 11: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

11

Construction Progress Photos

Reconstructed Esplanade Intersection with the Streetcar Stop

Page 12: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

12

Construction Progress Photos

Barracks Street looking down towards Canal Street

Page 13: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

13

Construction Progress Photos

Elysian Fields Streetcar Stop looking down towards Canal Street

Page 14: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

14

Financial Status

• Original Contract Value: $ 41,154,229

• Change Orders Value: - $ 513,944

• Revised Contract Value: $ 40,640,285

• Estimated Value of Change Orders under Negotiation: $ 100,000

• 66 Differing Site Conditions to Date:

» All for underground conflicts

» To date value approx. $ 500,000

» Billed to associated Bid Items or the Bid Item for Differing Site Conditions - $ 300,000 available in the Original Contract

• Internal Monthly Cost Review Meetings (AWC, Transdev, PB, and TMG)

» The final contract value expected ~ $41.5 M due to QTY variances

• Current DBE Goal at 32% (28.56% Required by Contract)

Page 15: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

Carrollton Streetcar Facility

State of Good Repair

Page 16: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

• Board awarded contract for A&E Services in August 2012 to Royal

Engineering

• Notice to Proceed issued on September 5, 2012

• Received 100% plans and specs

• Approval to solicit for construction at March 2014 Board Meeting

• Bidding process pending with bids due end of April 2014

• Bidding process resulted in only one bid over budget, June 24, 2014

Board Meeting to Reject and Resolicit

• Engineers Plans and Specifications out for bids, bids due December

18, 2014

• Notice To Proceed (NTP) was issued on February 26, 2016

• Construction Kick Off Meeting was held on February 25, 2016

• Change Order CO-01 $19,628.07 Issued to Add Builder’s Risk

Insurance

• Change Order CO-02 $31,639.96 Requesting Board Approval to

Replace Corroded Underground Pipes Found After Excavation

Carrollton Facility – State of Good Repair

Page 17: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,
Page 18: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,
Page 19: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,
Page 20: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

Infrastructure

End of Report

Page 21: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

JULY 2016

FINANCIALS

August 23, 2016

Ronald G. Baptiste, Jr.

Page 22: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

2016 2015 2016 2015

ACTUAL BUDGET VARIANCE ACTUAL ACTUAL BUDGET VARIANCE ACTUAL

OPERATING REVENUES

Passenger Revenue 1,501,750$ 1,711,586$ (209,836)$ 1,460,175$ 10,533,998$ 11,735,470$ (1,201,472)$ 10,916,252$

General Use Sales Tax 5,254,848 5,357,977 (103,129) 4,638,019 37,411,352 37,517,533 (106,181) 35,967,272

Hotel/Motel Sales Tax 411,050 542,658 (131,608) 422,330 3,354,284 3,539,861 (185,577) 2,913,272

State Motor Vehicle Sales Tax 369,227 455,273 (86,046) 514,573 4,174,658 3,607,857 566,801 4,137,301

Other Revenue 150,796 123,173 27,623 886,439 1,402,596 1,344,834 57,762 2,026,943

TOTAL OPERATING REVENUES 7,687,672$ 8,190,667$ (502,995)$ 7,921,535$ 56,876,889$ 57,745,555$ (868,666)$ 55,961,040$

OPERATING REVENUES

Labor and Fringe Benefits 19,863$ 40,036$ 20,173$ 15,926$ 122,358$ 283,535$ 161,177$ 112,235$

Services 6,517,489 6,424,841 (92,648) 5,771,773 43,788,687 44,027,336 238,649 39,942,039

Materials and Supplies 249,528 362,843 113,315 339,637 1,495,045 2,408,598 913,553 1,946,370

Utilities 104,178 119,569 15,391 88,642 755,506 811,831 56,325 691,057

Casualty & Liability 502,214 582,223 80,009 544,211 3,562,843 4,070,559 507,716 3,891,112

Taxes 24,512 34,978 10,466 35,676 207,333 234,370 27,037 204,759

Miscellaneous 6,042 17,813 11,771 103,471 44,968 125,644 80,676 148,631

TOTAL OPERATING REVENUES 7,423,826$ 7,582,303$ 158,477$ 6,899,336$ 49,976,739$ 51,961,873$ 1,985,134$ 46,936,203$

NET OPERATING REVENUE 263,846$ 608,364$ (344,518)$ 1,022,199$ 6,900,149$ 5,783,682$ 1,116,467$ 9,024,837$

Month of July Year-to-Date July

Page 23: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

2016 2015 2016 2015

ACTUAL BUDGET VARIANCE ACTUAL ACTUAL BUDGET VARIANCE ACTUAL

TMSEL LEGACY COSTS

TMSEL Pension Costs -$ 133,333$ 133,333$ 166,667$ -$ 933,333$ 933,333$ 1,166,667$

TMSEL Health Benefit Costs 250,645 225,766 (24,879) 89,906 1,213,260 1,580,366 367,106 1,586,621

TMSEL Workers' Comp. Costs 93,724 41,667 (52,057) 108,657 497,515 291,667 (205,848) 480,563

TMSEL All Other Costs 71,504 61,333 (10,171) 79,605 432,956 429,333 (3,623) 427,968

TMSEL LEGACY COSTS 415,874$ 462,099$ 46,225$ 444,835$ 2,143,731$ 3,234,699$ 1,090,968$ 3,661,818$

NET REVENUE (152,028)$ 146,265$ (298,293)$ 577,364$ 4,756,419$ 2,548,983$ 2,207,436$ 5,363,019$

(Before Operating Assistance)

MARITIME OPERATIONS

Passenger Fares 159,090$ (587,647)$ 14,969$ 118,495$ 1,146,840$ 1,019,067$ 127,773$ 990,305$

Services (487,759) (587,647) (99,888) (417,257) (4,025,890) (4,155,345) (129,455) (3,106,232)

Materials and Supplies (22,015) (57,823) (35,808) (41,719) (153,992) (406,044) (252,052) (237,319)

Other Operating Expenses (62) (108) (46) (1,536) (495) (758) (263) (4,981)

Grant Expenses (37,459) (37,459) 0 (11,679) (582,917) (582,917) 0 (26,418)

Preventive Maintenance 0 0 0 0 0 0 0 193,475

Grant Revenues 29,967 29,967 0 9,343 466,334 466,334 0 21,135

State Subsidy 358,238 508,949 (150,711) 344,353 3,150,120 3,659,663 (509,543) 2,170,035

TOTAL MARITIME OPERATIONS 0$ 0$ 0$ 0$ 0$ 0$ (0)$ 0$

Month of July Year-to-Date July

Page 24: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

2016 2015 2016 2015

ACTUAL BUDGET VARIANCE ACTUAL ACTUAL BUDGET VARIANCE ACTUAL

GOVERNMENT OPERATING ASST.

Preventive Maintenance 983,658$ 883,582$ 100,076$ 1,352,362$ 7,223,680$ 6,185,071$ 1,038,609$ 8,011,987$

State Parish Transportation 128,889 153,925 (25,036) 184,036 1,082,551 1,077,476 5,075 1,296,592

Federal - Other 8,279 3,788 4,491 22,088 70,367 26,517 43,850 156,295

Other State Funds 4,167 4,167 0 6,147 28,313 29,167 (854) 45,541

TOTAL GOV'T. OPERATING ASST. 1,124,992$ 1,045,462$ 79,530$ 1,564,632$ 8,404,911$ 7,318,231$ 1,086,680$ 9,510,414$

NET REVENUE 972,964$ 1,191,727$ (218,763)$ 2,141,996$ 13,161,330$ 9,867,214$ 3,294,116$ 14,873,433$

(after Government Operating Asst.)

GOV'T NON-OPERATING REV. (EXP.)

Federal - Capital 1,264,563$ 2,024,749$ (760,187)$ 104,797$ 2,733,345$ 9,685,423$ (6,952,078)$ 1,701,902$

Local - Capital 2,721,542 1,016,027 1,705,515 2,105,007 15,013,243 17,073,396 (2,060,153) 10,528,292

Capital Expenditures (4,254,756) (3,435,488) (819,268) (2,229,684) (18,372,343) (28,893,831) 10,521,489 (12,590,020)

FEMA Insurance Reimbursement 0 0 0 0 0 0 0 0

FEMA Project Worksheets 15,268 876,158 (860,890) (5,679) 211,983 6,133,104 (5,921,121) 188,821

FEMA Project Worksheet Expenditures (10,037) (876,158) 866,121 5,679 (39,312) (6,133,104) 6,093,792 (181,064)

TOTAL GOV'T NON-OPER. REV. (EXP.) (263,420)$ (394,712)$ 131,292$ (19,880)$ (453,084)$ (2,135,012)$ 1,681,928$ (352,069)$

TOTAL REVENUE (EXPENSE) BEFORE 709,545$ 797,015$ (87,470)$ 2,122,116$ 12,708,246$ 7,732,202$ 4,976,044$ 14,521,364$

CAPITAL EXPENDITURES AND DEBT

Month of July Year-to-Date July

Page 25: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

2016 2015 2016 2015

ACTUAL BUDGET VARIANCE ACTUAL ACTUAL BUDGET VARIANCE ACTUAL

CAPITAL EXPENDITURES

Interest Income - Capital (bonds) 31,271$ 15,000$ 16,271$ 61,175$ 315,745$ 105,000$ 210,745$ 364,959$

Capital Interest Expense (420,540) (417,933) (2,607) (433,377) (2,909,795) (2,925,532) 15,737 (3,028,620)

Interest from Disaster Borrowing (110,380) (110,380) 0 (117,945) (772,657) (772,658) 1 (825,623)

TOTAL CAPITAL EXPENDITURES (499,648)$ (513,313)$ 13,665$ (490,148)$ (3,366,708)$ (3,593,190)$ 226,482$ (3,489,283)$

PRINCIPAL ON LONG TERM DEBT

Principal on Long Term Debt (531,168)$ (531,169)$ 1$ (516,143)$ (3,718,179)$ (3,718,179)$ 0$ (3,613,000)$

Principal on Disaster Borrowing (170,621) (170,621) 0 (163,054) (1,194,345) (1,194,346) 1 (1,141,379)

TOTAL PRINCIPAL ON L-TERM DEBT (701,789)$ (701,790)$ 1$ (679,197)$ (4,912,524)$ (4,912,525)$ 1$ (4,754,379)$

OTHER FUNDING SOURCES

BP OPA Settlement 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

Restricted Operating / Capital Reserve 491,893 418,088 (73,805) (952,772) (4,429,014) 773,513 5,202,527 (6,277,702)

TOTAL OTHER FUNDING 491,893$ 418,088$ (73,805)$ (952,772)$ (4,429,014)$ 773,513$ 5,202,527$ (6,277,702)$

NET OPERATING REVENUE 0$ 0$ 0$ 0$ 0$ 0$ 0$ 0$

Month of July Year-to-Date July

Page 26: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

August 23, 2016

Operations Report July 2016

Page 27: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

27

Operations July Accidents

BUS – 23 Traffic Accidents/4 requiring retraining

0.82 Preventable accidents per 100,000 miles

STREETCAR – 15 Traffic Accidents/4 requiring retraining

3.97 Preventable accidents per 100,000 miles

LIFT – 5 Traffic Accidents/2 requiring retraining

1.88 Preventable accidents per 100,000 miles

Page 28: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

28

Operations System Usage

July 2016

Mode Passengers Per Revenue

Hour

YTD Passengers Per

Revenue Hour

Bus 21.76 24.37

Streetcar 46.97 44.11

Paratransit 1.89 1.96

TOTAL 24.03 25.92

Page 29: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

29

Operations Call Center Statistics

July 2016

• Average Time on Hold: 1 minute and 48 seconds

• Time to Close Complaint: 0.97 Average days to close 173 complaints

• Abandoned Calls: 13.07%

JULY

2016

FIXED-ROUTE

BUS

STREETCAR

PARATRANSIT

OTHER

TOTAL

COMPLAINTS 134 29 6 4 173

VALIDATED

COMPLAINTS

82 10 4 0 96

COMMENDATIONS 0 3 4 0 7

Page 30: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,
Page 31: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

31

Operations On-Time Performance

July 2016

Bus - 76.31%

Streetcar - 73.05%

Paratransit - 89.27%

Page 32: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

Customer Complaints for July 2016

- Driver-Pass Up - Driver-Attitude

- Driver-Running Late - Other (Complaints)

Service Disruptions: 15 Lines

Short Term Detours: 5 Lines

Long Term Detours: 9 Lines

Page 33: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

33

Operations

Page 34: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

34

Operations On-Time Performance

July 2016

Page 35: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

35

Operations

Page 36: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

36

Operations

Page 37: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

August 23, 2016

PROCUREMENT REPORT

Page 38: Board Report | August 23, 2016 Meetings...2016/08/23  · EXECUTIVE MANAGEMENT REPORT August 23, 2016 Justin T. Augustine, III Site Visit (FTA)/Quarterly Review – Mr. Sam Snead,

THE END @NewOrleansRTA

Cleaner, Smarter Transit.


Recommended