Date post: | 17-Mar-2016 |
Category: |
Documents |
Upload: | paul-houchin |
View: | 213 times |
Download: | 0 times |
masterplan
Execution
phase 1
phase 2
phase 3
commercial and recreational spaces
Removal of asphalt parking lots and old factory buildings
construction of - the home-plate inn and resort - park space expanded from existing systems- giants stadium and general use parking garage- over 300 sq ft of mix use buildings
A. 25 acres of Wetlands introduce phytoremediation,rhizoremediation, bioremediation and physical methods of water and soil clean up
B. development of the bayside waterfront park
Residential development
construction of over 2000 homes on 900000 sq ft of build-ing footprint
completion of the park belt that connects all of mission Bay
Bicycle and pedestrian paths become a full loop
Introduction of agri-cultural practices for community
Wetlands remain as phytoremediation contiunes to clean soils and water
c. local shops and grocery built
mix use development
New mix use development to accommodate for site growth on phytoremediated land
All park spaces completed
wetlands accentuate new development as it influences its development and design
Recycled water collected and reused for irrigation of surrounding areas
D. secondary parking garage to accommodate higher use in-tensities
AT&T parking garage
mix use development
bayside waterfront park
residential development
community residential development
china basin channel
agua vista park
3rd street
16th street
channel street
4th street
mariposa street
pier 48
c
a
e
mission creek park and gardens
b
d
Constructed wetlands
Local shops and grocery
secondary parking garage
third phase mix use development
c
a
d
e
bay trail
mission bay
The bay trail enters mission bay through 3rdstreet bike lanes andcontinues along the pro-posed bayside parkway to reconnect with 3rdstreet in the south side of mission bay.Mission bay be-comes a destination and recreational hub for bay trail users
public transit
busroute through 3rd street with 3 stations within the site and 7
within a 1/4 mile outside missionbay
additional 3 stations added to the area of mission bay. new route increases connectivity with the whole site .
completion in 2017
completion in 2022
completion in 2027
0
100
200
n