bayside waterfront park Constructed wetlands mix use development mix use development bay trail completion of the park belt that connects all of mission Bay an d ga rd en s public transit D. secondary parking garage to accommodate higher use in- tensities mariposa street AT&T parking garage construction of over 2000 homes on 900000 sq ft of build- ing footprint Wetlands remain as phytoremediation contiunes to clean soils and water n Removal of asphalt parking lots and old factory buildings
Popular Tags:
1
masterplan phase 1 phase 2 phase 3 commercial and recreational spaces Removal of asphalt parking lots and old factory buildings construction of - the home-plate inn and resort - park space expanded from existing systems - giants stadium and general use parking garage - over 300 sq ft of mix use buildings A. 25 acres of Wetlands introduce phytoremediation,rhizor emediation, bioremediation and physical methods of water and soil clean up B. development of the bayside waterfront park Residential development construction of over 2000 homes on 900000 sq ft of build- ing footprint completion of the park belt that connects all of mission Bay Bicycle and pedestrian paths become a full loop Introduction of agri-cultural practices for community Wetlands remain as phytoremediation contiunes to clean soils and water c. local shops and grocery built mix use development New mix use development to accommodate for site growth on phytoremediated land All park spaces completed wetlands accentuate new development as it influences its development and design Recycled water collected and reused for irrigation of surrounding areas D. secondary parking garage to accommodate higher use in- tensities AT&T parking garage mix use development bayside waterfront park residential development community residential development china basin channel agua vista park 3rd street 16th street channel street 4th street mariposa street pier 48 c a e mission creek park and gardens b d Constructed wetlands Local shops and grocery secondary parking garage third phase mix use development c a d e bay trail mission bay The bay trail enters mission bay through 3rd street bike lanes and continues along the pro- posed bayside parkway to reconnect with 3rd street in the south side of mission bay. Mission bay be- comes a destination and recreational hub for bay trail users public transit busroute through 3rd street with 3 stations within the site and 7 within a 1/4 mile outside missionbay additional 3 stations added to the area of mission bay. new route increases connectivity with the whole site . completion in 2017 completion in 2022 completion in 2027 0 100 200 n
Transcript

masterplan

Execution

phase 1

phase 2

phase 3

commercial and recreational spaces

Removal of asphalt parking lots and old factory buildings

construction of - the home-plate inn and resort - park space expanded from existing systems- giants stadium and general use parking garage- over 300 sq ft of mix use buildings

A. 25 acres of Wetlands introduce phytoremediation,rhizoremediation, bioremediation and physical methods of water and soil clean up

B. development of the bayside waterfront park

Residential development

construction of over 2000 homes on 900000 sq ft of build-ing footprint

completion of the park belt that connects all of mission Bay

Bicycle and pedestrian paths become a full loop

Introduction of agri-cultural practices for community

Wetlands remain as phytoremediation contiunes to clean soils and water

c. local shops and grocery built

mix use development

New mix use development to accommodate for site growth on phytoremediated land

All park spaces completed

wetlands accentuate new development as it influences its development and design

Recycled water collected and reused for irrigation of surrounding areas

D. secondary parking garage to accommodate higher use in-tensities

AT&T parking garage

mix use development

bayside waterfront park

residential development

community residential development

china basin channel

agua vista park

3rd street

16th street

channel street

4th street

mariposa street

pier 48

c

a

e

mission creek park and gardens

b

d

Constructed wetlands

Local shops and grocery

secondary parking garage

third phase mix use development

c

a

d

e

bay trail

mission bay

The bay trail enters mission bay through 3rdstreet bike lanes andcontinues along the pro-posed bayside parkway to reconnect with 3rdstreet in the south side of mission bay.Mission bay be-comes a destination and recreational hub for bay trail users

public transit

busroute through 3rd street with 3 stations within the site and 7

within a 1/4 mile outside missionbay

additional 3 stations added to the area of mission bay. new route increases connectivity with the whole site .

completion in 2017

completion in 2022

completion in 2027

0

100

200

n