Description:
Boeing 777 First Flight and the Days Before
Popular Tags:
31
W029f. Boeing 777 Boeing 777 First Flight First Flight And the Days Before And the Days Before Third European Third European Flight Test Safety Conference Flight Test Safety Conference Vienna, Austria Vienna, Austria November11 – 12, 2009 November11 – 12, 2009 John Cashman John Cashman Boeing Commercial Boeing Commercial Airplanes (Retired) Airplanes (Retired)
Transcript
Page 1: Boeing 777 First Flight

W029f.

Boeing 777Boeing 777

First FlightFirst Flight

And the Days Before And the Days Before

Boeing 777Boeing 777

First FlightFirst Flight

And the Days Before And the Days Before

Third EuropeanThird European

Flight Test Safety ConferenceFlight Test Safety Conference

Vienna, AustriaVienna, Austria

November11 – 12, 2009November11 – 12, 2009

John CashmanJohn Cashman

Boeing Commercial Boeing Commercial Airplanes (Retired)Airplanes (Retired)

Page 2: Boeing 777 First Flight

2

First TakeoffJune 12, 1994

Page 3: Boeing 777 First Flight

3

First Takeoff June 12, 1994

Page 4: Boeing 777 First Flight

4

PhilosophizingPhilosophizing

• “One test flight is worth a thousand theories” – Tex Johnston– Boeing Airplane Company ~ 1952– First flights – B52, 707

– This simple statement is as true today, 57 years later, as– it was in Tex’s day.

• First flights present ample possibilities to test a – number of theories and generally provide – opportunities for all concerned to excel.

• Modern jet transports, even those developed with– sophisticated technical tools, still need a disciplined– first flight ground and flight test plan to minimize risk– to the program and crew.

• “One test flight is worth a thousand theories” – Tex Johnston– Boeing Airplane Company ~ 1952– First flights – B52, 707

– This simple statement is as true today, 57 years later, as– it was in Tex’s day.

• First flights present ample possibilities to test a – number of theories and generally provide – opportunities for all concerned to excel.

• Modern jet transports, even those developed with– sophisticated technical tools, still need a disciplined– first flight ground and flight test plan to minimize risk– to the program and crew.

Page 5: Boeing 777 First Flight

5

First Flight Goal SettingFirst Flight Goal Setting

• The Basics• Have a safe flight• Demonstrate readiness of airframe and

engine to start the test program• Provide a positive media event• To get the team focused on the

remainder of the test program, not just one flight

• The Basics• Have a safe flight• Demonstrate readiness of airframe and

engine to start the test program• Provide a positive media event• To get the team focused on the

remainder of the test program, not just one flight

First flight goals are not just technical – they may have elements of financial, political, schedule, or public relations goals intermixed

Page 6: Boeing 777 First Flight

6

First Flight Goal Setting - cont’dFirst Flight Goal Setting - cont’d

• Demonstrate to our customers that the airplane is ready to test and that the aggressive schedule is achievable and will result in an on time delivery

• Demonstrate to the certification authorities that the airplane program is “mature” and has the potential to receive over water approval from the time of initial certification rather than after 250,000 engine hours in fleet service

• Demonstrate confidence to the public as well as organizations representing airline labor and the public press

• Demonstrate to our customers that the airplane is ready to test and that the aggressive schedule is achievable and will result in an on time delivery

• Demonstrate to the certification authorities that the airplane program is “mature” and has the potential to receive over water approval from the time of initial certification rather than after 250,000 engine hours in fleet service

• Demonstrate confidence to the public as well as organizations representing airline labor and the public press

Additional 777 Goals

Page 7: Boeing 777 First Flight

7

• Why the worry?

• Previous experience with our 747-400 in the late 1980’s pointed out that large scale integrated digital system design and flight testing required more preparation, planning, and full up system testing than earlier mechanical or analog systems. Not anticipating these factors had:

• slid schedule – flight test, delivery, crew training

• cost money – us and our customers• given our customers not quite service

ready products (airplane, support products, additional training)

• Why the worry?

• Previous experience with our 747-400 in the late 1980’s pointed out that large scale integrated digital system design and flight testing required more preparation, planning, and full up system testing than earlier mechanical or analog systems. Not anticipating these factors had:

• slid schedule – flight test, delivery, crew training

• cost money – us and our customers• given our customers not quite service

ready products (airplane, support products, additional training)

Insuring Success – First Flight and BeyondInsuring Success – First Flight and Beyond

Page 8: Boeing 777 First Flight

8

• Led certification authorities to question our design and manufacturing test processes and to add many hours of additional testing

• * “Normal” flight testing of the 747-400 had failed to find many problems that occurred in daily“real world” airline operations

• commercial aircraft power cart variability• power interrupts• maintenance manual errors and outdated

training for fixing faults

• Led certification authorities to question our design and manufacturing test processes and to add many hours of additional testing

• * “Normal” flight testing of the 747-400 had failed to find many problems that occurred in daily“real world” airline operations

• commercial aircraft power cart variability• power interrupts• maintenance manual errors and outdated

training for fixing faults

Insuring Success – First Flight and Beyond Insuring Success – First Flight and Beyond

Page 9: Boeing 777 First Flight

9

• 1) Co-located Integration Lab (500,000 sq. ft) which included

• A) Fixed base simulators (2)

• Flight deck engineering development

• Flight control law definition

• Initial cadre training of FAA, customer pilots, prior to full flight training simulator

• Flight test engineering sequence tests, including engineering run through of first flight and first two months of testing

• 1) Co-located Integration Lab (500,000 sq. ft) which included

• A) Fixed base simulators (2)

• Flight deck engineering development

• Flight control law definition

• Initial cadre training of FAA, customer pilots, prior to full flight training simulator

• Flight test engineering sequence tests, including engineering run through of first flight and first two months of testing

Elements of the PlanElements of the Plan

Page 10: Boeing 777 First Flight

10

* Checkout of changes to flight controls airplane information management systems (devices used for real aircraft parts)

* First up 3 years before first flight

A) Simulators – cont’

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 11: Boeing 777 First Flight

11

Remember, pull back - houses get smaller, push forward - houses get

bigger.

Page 12: Boeing 777 First Flight

12

• B) System Integration Laboratory

» Cockpit with simulated aero data

» Systems using real production» hardware

» Ships generators and wiring

» Digital bus simulated outside» parameters to real boxes

• B) System Integration Laboratory

» Cockpit with simulated aero data

» Systems using real production» hardware

» Ships generators and wiring

» Digital bus simulated outside» parameters to real boxes

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 13: Boeing 777 First Flight

13

• Included flight test wiring bundles and data• systems

• Full test plans, DR&O validation,

• “what if” scenarios

• Supported by design engineering, flight test• pilots and engineers, FAA and other • certification agencies

• Included flight test wiring bundles and data• systems

• Full test plans, DR&O validation,

• “what if” scenarios

• Supported by design engineering, flight test• pilots and engineers, FAA and other • certification agencies

B) System Integration Laboratory – cont’

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 14: Boeing 777 First Flight

14

• B) System Integration Laboratory – cont’

• “Discoveries” written and tracked as flight squawks (before first flight)

• Used as a shadow for first flight - program test pilot, flying profile and concurrent with first flight, available by radio

• 24 hours/day, 7 days a week, 3-4 pilots/day for six months leading up to first flight (2493 hours out of 4477 hours total using 34 different pilots)

• Key element for solving problems early and avoiding surprises

• B) System Integration Laboratory – cont’

• “Discoveries” written and tracked as flight squawks (before first flight)

• Used as a shadow for first flight - program test pilot, flying profile and concurrent with first flight, available by radio

• 24 hours/day, 7 days a week, 3-4 pilots/day for six months leading up to first flight (2493 hours out of 4477 hours total using 34 different pilots)

• Key element for solving problems early and avoiding surprises

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 15: Boeing 777 First Flight

15

C) Flight Control Test Rig (Iron Bird)C) Flight Control Test Rig (Iron Bird)

• ½ of the primary flight controls, hydraulics,• computers wiring, flight test instrumentation• Simulator cab for control input• System familiarization – flight test and • engineering as well as Instrumentation checkout• Flight test procedure used• “Flight” squawks written and tracked – also• reviewed by FAA for program status. (Total flight• and engineering items 7400 before first flight)

• ½ of the primary flight controls, hydraulics,• computers wiring, flight test instrumentation• Simulator cab for control input• System familiarization – flight test and • engineering as well as Instrumentation checkout• Flight test procedure used• “Flight” squawks written and tracked – also• reviewed by FAA for program status. (Total flight• and engineering items 7400 before first flight)

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 16: Boeing 777 First Flight

16

• Modified 757 aircraft• F/O controls FBW• Disconnected from aircraft mechanics• Worked through autopilot flight control

computers when engaged (some single channel and some dual)

• Critical to basic control law validation of C*U control law (ie; blend of Θ and Nz command and speed off reference)

• Modified 757 aircraft• F/O controls FBW• Disconnected from aircraft mechanics• Worked through autopilot flight control

computers when engaged (some single channel and some dual)

• Critical to basic control law validation of C*U control law (ie; blend of Θ and Nz command and speed off reference)

2) Fly-By-Wire Test Bed

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 17: Boeing 777 First Flight

17

» New feature validation for engine out control, ground effects, turn and configuration compensation

» Demonstrated concepts to company management, customers, certification authorities, and pilot organizations, as well as a variety of our own internal pilot cords.

» Flew 250 hours, 1 – 1½ years before first flight

» New feature validation for engine out control, ground effects, turn and configuration compensation

» Demonstrated concepts to company management, customers, certification authorities, and pilot organizations, as well as a variety of our own internal pilot cords.

» Flew 250 hours, 1 – 1½ years before first flight

2) Fly-By-Wire Test Bed

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 18: Boeing 777 First Flight

18

757 Test Bed757 Test Bed

Page 19: Boeing 777 First Flight

19

• #1 747-100 airframe for 2 engine companies • #16 747-100 used by other

• Initially resisted by two of the three engine

• companies

• Boeing Propulsion staff due to • belief that ground testing is adequate

• #1 747-100 airframe for 2 engine companies • #16 747-100 used by other

• Initially resisted by two of the three engine

• companies

• Boeing Propulsion staff due to • belief that ground testing is adequate

3) Flying Engine Test Bed

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 20: Boeing 777 First Flight

20

• FTB was insurance policy for program• Schedule, certification, and public relations• Plan on early over water approval

• Many “discoveries” were made that, in fact,

• would have had significant impact on engine • operability and restart capability

• Initial testing done 7 months before first flight • for first engine

• FTB was insurance policy for program• Schedule, certification, and public relations• Plan on early over water approval

• Many “discoveries” were made that, in fact,

• would have had significant impact on engine • operability and restart capability

• Initial testing done 7 months before first flight • for first engine

3) Flying Engine Test Bed

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 21: Boeing 777 First Flight

21

747 Engine Test Bed

Page 22: Boeing 777 First Flight

22

747 Engine Test Bed

Page 23: Boeing 777 First Flight

23

• 4) Flight Emulation Test System (FETS Van)• Ground base simulation of flight data and• airplane aero data

• Can “fly” the airplane with all systems running as if in flight, (this includes engines)

• Flew numerous profiles including full• production flight test factory first flight

profiles, as well as actual first flight profiles

• 4) Flight Emulation Test System (FETS Van)• Ground base simulation of flight data and• airplane aero data

• Can “fly” the airplane with all systems running as if in flight, (this includes engines)

• Flew numerous profiles including full• production flight test factory first flight

profiles, as well as actual first flight profiles

Elements of the Plan – cont’dElements of the Plan – cont’d

Page 24: Boeing 777 First Flight

24

Contingency Planning for First FlightContingency Planning for First Flight

• Perform all production system checks, engineering,• high speed taxi/shimmy tests several days before first flight

• Load nominal to forward c.g./GW• Leave APU running for takeoff• Fuel to reach Edwards from end of flight• Practice loss of all signaling capability to primary • controls (have 2 roll spoilers, stabilizer available on• cable)

• Perform all production system checks, engineering,• high speed taxi/shimmy tests several days before first flight

• Load nominal to forward c.g./GW• Leave APU running for takeoff• Fuel to reach Edwards from end of flight• Practice loss of all signaling capability to primary • controls (have 2 roll spoilers, stabilizer available on• cable)

Page 25: Boeing 777 First Flight

25

Contingency Planning – cont’dContingency Planning – cont’d

• Hand held radio and GPS• Proof pressure test hydraulic system with• instrumentation installed to 3900 PSI (3000 normal) to build confidence for handling surge spikes

• Bailout door aft of wing• Concern over fuel gaging system• Chase/photo (2 T33, 1 T38)• Shadow flight in system integration• 2 pilots on board, all other data transmitted to ground

• Radio room staffed with experienced system experts

• Hand held radio and GPS• Proof pressure test hydraulic system with• instrumentation installed to 3900 PSI (3000 normal) to build confidence for handling surge spikes

• Bailout door aft of wing• Concern over fuel gaging system• Chase/photo (2 T33, 1 T38)• Shadow flight in system integration• 2 pilots on board, all other data transmitted to ground

• Radio room staffed with experienced system experts

Page 26: Boeing 777 First Flight

26

First Flight Readiness IndicatorsFirst Flight Readiness Indicators

Indicators – number of events1) “I thought you should know…”2) Test limitations and advisories3) “Just this week we found…”4) Media briefs5) “Just in case the ___ doesn’t work remember…”6) Engine ground runs (if new engine)7) “Did you know that…”

Page 27: Boeing 777 First Flight

27

OutcomeOutcome

So, How Did It Go?So, How Did It Go?

Page 28: Boeing 777 First Flight

28

• Just Fine!

• Flew 3+48• Completed production flight test systems

tests with no surprises (including engine shutdowns)

• Initial HQ, flutter kicks, FBW reversion modes• Tailwind takeoff of 12 knots (Engine TB went

to over 20 TW)• Instrumentation worked extremely well• Multiple chase worked reasonably well

• Just Fine!

• Flew 3+48• Completed production flight test systems

tests with no surprises (including engine shutdowns)

• Initial HQ, flutter kicks, FBW reversion modes• Tailwind takeoff of 12 knots (Engine TB went

to over 20 TW)• Instrumentation worked extremely well• Multiple chase worked reasonably well

28

OutcomeOutcome

Page 29: Boeing 777 First Flight

29

Page 30: Boeing 777 First Flight

30

• Integration lab paid off in discoveries, flight test planning, safety, and in training the testers early

• Flying test beds were invaluable in avoiding basic development work during validation/certification

• We spent a lot of money• Next time we can do it for less (Delete)• An empowered and motivated work force can achieve miracles

• First airplane entered commercial service in under one year from first flight (Five airplanes, 3700 hours)

• Integration lab paid off in discoveries, flight test planning, safety, and in training the testers early

• Flying test beds were invaluable in avoiding basic development work during validation/certification

• We spent a lot of money• Next time we can do it for less (Delete)• An empowered and motivated work force can achieve miracles

• First airplane entered commercial service in under one year from first flight (Five airplanes, 3700 hours)

30

SummarySummary

Page 31: Boeing 777 First Flight

31

Boeing 777 First Flight And the Days BeforeBoeing 777 First Flight And the Days Before

Any Questions??