    Ubicacin 1. (Alado del quiosco)

    Se encontraron 3 bombas:

    Bomba 1:

  • 7/24/2019 bombas usp.docx

    2/20

    Maraca: hidrostal.

    Modelo: A1E-0.8M.

    El caudal dela bomba es de 2.4 l/s ane!o 1"

    Calculo del NPSH.

    (P+ZY)PV

    PO=1X105pa

    H2

    O=9810N/m3

    z=1.20m

    Determino PV (Psaturacin).

    TH0

    o=25.7 (de latabla termodinamica)

    # $ %&a"

    2' 3.1()1

    2'.* &+

    4.24613.169125.7253025

    =PV3.1691

  • 7/24/2019 bombas usp.docx

    3/20

    30 4.24(1 PV=3.3198kpa

    Prdidas !ara material de acero "al#ani$ado.

    Perdidas !rimarias.

    Lr=0.606m

    Dr=0.02545.06x 104

    m2

    Velocidad:

    v=

    !=

    2.4X103

    m3/"

    5.06x104

    m2

    V=4.74m /"

    %e&nolds:

    =V X D

    # =

    4.74m

    " x0.0254 m

    1x106

    m2

    "

    =120396=1.2x 105$

    %u"osidad relati#a.

    e

    d=

    0.15x103

    m

    0.0254m =5.90x103 0.0059

    %=0.029

    'cuacin de darc& eisbac*.

    &%=% x l xV

    2

    2x ' x D

    0.029x 0.606m x 4.74

    2

    m2

    /"2

    2x 9.81m"2x 0.0254

    &%=0.792m

  • 7/24/2019 bombas usp.docx

    4/20

    Perdidas secundaria.

    + codos de 900

    k=3020.023=1.38

    &L=(V2

    2' =1.38

    4.742 m2/"2

    29.81m/"2

    &L=1.58m

    &T2=&%+&L=2.37 m

    Prdidas !ara material de !#c.

    &L=(V2

    2' =

    20.554.742 m2/ "2

    29.81m/ "2

    &L=1.25m

    &T2=&%+&L=2.41m

    =&T1+&T2

    =4.78m

    Perdidas !rimaria.=2.4x 103 m3/ "

    Dr=0.0254

    V=4.74

  • 7/24/2019 bombas usp.docx

    5/20

    =2.451m

    %u"osidad relati#a

    e

    d

    =0.00015x10

    3

    0.0254

    =5.90x105

    %=0.0105

    'cuacin de dara& erbac*.

    &%=% x L x V

    2

    2x ' x D=

    0.0105x2.451m x 4.742

    m2/"2

    2x9.81m

    "2x 0.0254m

    &%=1.16

    Calculo NPSH

    (P0+ZY)Pv

    9810N/m3+(1.20m )(4.78m)

    1x105Pa

    9810N/m3

    (10.20m1.20m4.78m )0.338m

    NP)H=3.88m

  • 7/24/2019 bombas usp.docx

    6/20

    Bomba +:

    Maraca: hidrostal.

    Modelo: A1E-1.4M.

    El caudal dela bomba es de 2.' l/s ane!o2"

    Calculo del NPSH.

    (P +ZY)PV

    PV=3.3198 kpa

    H2

    O=9810N/m3

    z=1.12m

    Determino PV (Psaturacin).

    # $ %&a"

    2' 3.1()1

  • 7/24/2019 bombas usp.docx

    7/20

    2'.* &+

    4.24613.169125.7253025

    =PV3.1691

    30 4.24(1 PV=3.3198

    kpa

    Prdidas !ara material de acero "al#ani$ado.

    Perdidas !rimarias.

    Lr=0.52m

    Dr=0.02545.06x 104

    m2

    Velocidad:

    v=

    !=

    2.5X103

    m3 /"

    5.06x104

    m2

    V=4.94m /"

    %e&nolds:

    =V X D

    #

    =4.94

    m

    " x0.0254 m

    1x106

    m2

    /"

    =120376=1.2x 105

    %u"osidad relati#a.

    e

    b=

    0.15x 103

    m

    0.0254 m =5.90x103 0.0059

    %=0.029

    'cuacin de darc& eisbac*.

    &%=% x l xV

    2

    2x ' x D

    0.029x 0.52m x 4.942

    m2

    /"2

    2x9.81m

    "2x 0.0254

  • 7/24/2019 bombas usp.docx

    8/20

    &%=0.738m

    Perdidas secundaria.

    1 codos de 900

    k=0.69

    &L=(V2

    2' =

    0.694.942 m2/"2

    29.81m /"2

    &L=0.858m

    &T2=&%+&L=1.60m

    Perdidas !rimaria.

    Dr=0.0254

    V=4.94

    =2.50m

    %u"osidad relati#a

    eb=0.00015

    x10

    3

    0.0254 =5.90x 105

    %=0.0105

    'cuacin de dara& erbac*.

    &%=% x L x V

    2

    2x ' x D=

    0.0105x2.50m x 4.942

    m2

    / "2

    2x9.81m

    "2x0.0254m

    &%=1.285m

    Calculo NPSH

  • 7/24/2019 bombas usp.docx

    9/20

    (P0+ZY)Pv

    (10.20m1.12m2.88m)0.338m

    NP)H=5.86 m

    Bomba ,:

    Maraca: hidrostal.

    Modelo: A1E-1.4M.

    El caudal dela bomba es de2.' l/s ane!o 2"

    Calculo del NPSH.

  • 7/24/2019 bombas usp.docx

    10/20

    (P+ZY)PV

    PV=3.3198kpa

    H2

    O=9810N/m3

    z=1.05m

    Determino PV (P saturacin).

    TH0

    o=25.7 (de latabla termodinamica)

    # $ %&a"

    2' 3.1()1

    2'.* &+

    4.24613.169125.7253025

    =PV3.1691

    30 4.24(1 PV=3.3198 kpa

    Prdidas !ara material de acero "al#ani$ado.

    Perdidas !rimarias.

    Lr=0.33m

    Dr=0.02545.06x 104

    m2

    Velocidad:

    v=

    !=2.5X10

    3m

    3 /"5.06x10

    4 m2

    V=4.94m /"

    %e&nolds:

  • 7/24/2019 bombas usp.docx

    11/20

    =V X D

    # =

    4.94m

    " x0.0254 m

    1x106

    m2/"

    =120376=1.2x 105

    %u"osidad relati#a.

    e

    b=

    0.15x 103

    m

    0.0254 m =5.90x103 0.0059

    %=0.029

    'cuacin de darc& eisbac*.

    &%= % x l xV2

    2x ' x D 0.029x 0.33m x 4.94

    2

    m

    2

    /"2

    2x 9.81m

    "2x 0.0254

    &%=0.468m

    Perdidas secundaria.

    1 codos de 900

    k=0.69

    &L=(V2

    2' =

    0.694.9 42 m2/"2

    29.81m /"2

    &L=0.85m

    &T1=&%+&L=1.32m

    Prdidas !ara material de !#c.

    Perdidas !rimaria.

    Dr=0.0254

    V=4.94

  • 7/24/2019 bombas usp.docx

    12/20

    =2.50m

    %u"osidad relati#a

    e

    b

    =0.00015x 10

    3

    0.0254

    =5.90x 105

    %=0.0105

    'cuacin de dara& erbac*.

    &%=% x L x V

    2

    2x ' x D=

    0.0105x2.50m x4.942

    m2/ "2

    2x9.81m

    "2x0.0254m

    &%=1.285m

    Perdidas secundarias.

    2 codos de 900(pvc) ,

    Calculo NPSH

    (P0+ZY)Pv

    (10.20m1.05m1.43m)0.338m

    NP)H=7.38m

    Ubicacin N-+

  • 7/24/2019 bombas usp.docx

    13/20

    Bomba 1Marca:$edrollo

    Modelo:m'1

    El caudal de la bomba es ' l/s ane!o 1"

    Calculo de NPSH:

    (P0+ZY)Pv

    Datos "enerales:

    P0=1*105Pa

    a'+a=9810N/m3

    , -04' m

  • 7/24/2019 bombas usp.docx

    14/20

    Determinando

    PV=)at+racion

    Ta'+a=25.6 , tiliando tabla termodinmica"

    # $ %&a"

    2' 3.1()1

    2'.( &+

    4.24613.169125.6253025

    =PV3.1691

    30 4.24(1 PV=3.2983 kpa

    Prdidas !ara materiales de aceros "al#ani$ados

    Perdidas Primarias:

    LT=0.285m

    Dr=0.0381

    !=1.14x 103

  • 7/24/2019 bombas usp.docx

    15/20

    Velocidad:

    V=

    !=5x10

    3m

    3

    "

    1.14x103

    m2

    V=4.38m /"

    %e&nolds:

    -e=VD

    . =

    4.38m "0.0381m

    1x 106

    m2 "

    -e=1668781.6x105

    %u"osidad %elati#a:

    e

    D=

    0.15x103

    m

    0.0381m =3.93x 103=0.0039

    %=0.028

    'cuacin de Darc& /eisbac*:

    &%=%LV2

    2 'D=

    0.0280.285m4.38m2"2

    29.81m "20.0381m

    &%=0.204 m

    Perdidas Secundarias:

    Se encuentra 1 codo )0

    k=0.69

    &L=(V2

    2' =

    0.694.382m2 /"2

    2

    9.81

    m /"

    2

    &L=0.674m

    &T1=&%+&L=0.878m

  • 7/24/2019 bombas usp.docx

    16/20

    Prdidas !ara materiales de PVC

    Perdidas !rimarias:

    Datos:

    Dr=0.03811.14x103

    m2

    5 , 4.38 m /"

    LT=0.85m

    %u"osidad %elati#a:

    e

    D=

    0.0015x103

    0.0381=3.93x105=0.0000393

    %=0.01

    'cuacin de Darc&:

    &%=%LV2

    2 'D=

    0.010.85m4.382 m2"2

    29.81m "20.0381

    & %=0.218m

    Perdidas Secundarias:

    k=0.55

    &L=(V2

    2' =

    0.554.382m2/"2

    29.81m /"2

  • 7/24/2019 bombas usp.docx

    17/20

    &L=0.53m

    &T2=&%+&L=0.748m

    Calculo NPSH:

    (P0+ZY)Pv

    (10.20m1.45m1.6m )0.336m

    NP)H=7.79m

    Bomba +:

    Marca:idrostal

    Modelo:A1E-0.(M

    El caudal de la bomba es 2.2 l/s Ane!o 2"

    Calculo del NPSH:

    (P0 +ZY)Pv

    Z=0.55

    PV=3.2983(pa

  • 7/24/2019 bombas usp.docx

    18/20

    Perdida !ara materiales de acero "al#ani$ado

    Perdidas !rimarias:

    Datos:

    LT=0.290m

    Dr=0.02545.06x 104

    m2

    Velocidad:

    V=

    !=

    2.2x 103

    m3

    "

    5.06x104

    m2=4.34m /"

    %e&nolds:

    -e=

    VD

    . =

    4.34 m"0.0254m

    1x106 m2"

    -e=1102361.1x 105

    %u"osidad %elati#a:

  • 7/24/2019 bombas usp.docx

    19/20

    e

    D=5.90x 103=0.00590

    %=0.029

    'cuacin de Darc&:

    &%=%LV2

    2 'D=

    0.0290.290m4.3 42 m2"2

    29.81m "20.0254

    & %=0.317m

    Perdidas Secundarias

    &L=(V2

    2' =

    0.694.342 m2/"2

    29.81m /"2

    &L=0.662m

    &T1=&%+&L=0.979m

    =&T1+&T2=1.55m

    Perdida !ara materiales de PVC

    Perdidas Primarias:

    Dr=0.0254

    Vr=4.34

    LT=1.45

    %u"osidad %elati#a:e

    D=

    0.0015x103

    0.0254=0.000059

    %=0.0105

    'cuacin de Darc& 0 /eisbac*

  • 7/24/2019 bombas usp.docx

    20/20

    & %=%LV2

    2 'D=

    0.01051.45m4.342 m2"2

    29.81m"20.0254m

    &%=0.575m

    Calculo de NPSH

    (P0+ZY)Pv

    (10.20m0.55m1.55m )0.336m

    NP)H=7.76 m