Ubicacin 1. (Alado del quiosco)
Se encontraron 3 bombas:
Bomba 1:
7/24/2019 bombas usp.docx
2/20
Maraca: hidrostal.
Modelo: A1E-0.8M.
El caudal dela bomba es de 2.4 l/s ane!o 1"
Calculo del NPSH.
(P+ZY)PV
PO=1X105pa
H2
O=9810N/m3
z=1.20m
Determino PV (Psaturacin).
TH0
o=25.7 (de latabla termodinamica)
# $ %&a"
2' 3.1()1
2'.* &+
4.24613.169125.7253025
=PV3.1691
7/24/2019 bombas usp.docx
3/20
30 4.24(1 PV=3.3198kpa
Prdidas !ara material de acero "al#ani$ado.
Perdidas !rimarias.
Lr=0.606m
Dr=0.02545.06x 104
m2
Velocidad:
v=
!=
2.4X103
m3/"
5.06x104
m2
V=4.74m /"
%e&nolds:
=V X D
# =
4.74m
" x0.0254 m
1x106
m2
"
=120396=1.2x 105$
%u"osidad relati#a.
e
d=
0.15x103
m
0.0254m =5.90x103 0.0059
%=0.029
'cuacin de darc& eisbac*.
&%=% x l xV
2
2x ' x D
0.029x 0.606m x 4.74
2
m2
/"2
2x 9.81m"2x 0.0254
&%=0.792m
7/24/2019 bombas usp.docx
4/20
Perdidas secundaria.
+ codos de 900
k=3020.023=1.38
&L=(V2
2' =1.38
4.742 m2/"2
29.81m/"2
&L=1.58m
&T2=&%+&L=2.37 m
Prdidas !ara material de !#c.
&L=(V2
2' =
20.554.742 m2/ "2
29.81m/ "2
&L=1.25m
&T2=&%+&L=2.41m
=&T1+&T2
=4.78m
Perdidas !rimaria.=2.4x 103 m3/ "
Dr=0.0254
V=4.74
7/24/2019 bombas usp.docx
5/20
=2.451m
%u"osidad relati#a
e
d
=0.00015x10
3
0.0254
=5.90x105
%=0.0105
'cuacin de dara& erbac*.
&%=% x L x V
2
2x ' x D=
0.0105x2.451m x 4.742
m2/"2
2x9.81m
"2x 0.0254m
&%=1.16
Calculo NPSH
(P0+ZY)Pv
9810N/m3+(1.20m )(4.78m)
1x105Pa
9810N/m3
(10.20m1.20m4.78m )0.338m
NP)H=3.88m
7/24/2019 bombas usp.docx
6/20
Bomba +:
Maraca: hidrostal.
Modelo: A1E-1.4M.
El caudal dela bomba es de 2.' l/s ane!o2"
Calculo del NPSH.
(P +ZY)PV
PV=3.3198 kpa
H2
O=9810N/m3
z=1.12m
Determino PV (Psaturacin).
# $ %&a"
2' 3.1()1
7/24/2019 bombas usp.docx
7/20
2'.* &+
4.24613.169125.7253025
=PV3.1691
30 4.24(1 PV=3.3198
kpa
Prdidas !ara material de acero "al#ani$ado.
Perdidas !rimarias.
Lr=0.52m
Dr=0.02545.06x 104
m2
Velocidad:
v=
!=
2.5X103
m3 /"
5.06x104
m2
V=4.94m /"
%e&nolds:
=V X D
#
=4.94
m
" x0.0254 m
1x106
m2
/"
=120376=1.2x 105
%u"osidad relati#a.
e
b=
0.15x 103
m
0.0254 m =5.90x103 0.0059
%=0.029
'cuacin de darc& eisbac*.
&%=% x l xV
2
2x ' x D
0.029x 0.52m x 4.942
m2
/"2
2x9.81m
"2x 0.0254
7/24/2019 bombas usp.docx
8/20
&%=0.738m
Perdidas secundaria.
1 codos de 900
k=0.69
&L=(V2
2' =
0.694.942 m2/"2
29.81m /"2
&L=0.858m
&T2=&%+&L=1.60m
Perdidas !rimaria.
Dr=0.0254
V=4.94
=2.50m
%u"osidad relati#a
eb=0.00015
x10
3
0.0254 =5.90x 105
%=0.0105
'cuacin de dara& erbac*.
&%=% x L x V
2
2x ' x D=
0.0105x2.50m x 4.942
m2
/ "2
2x9.81m
"2x0.0254m
&%=1.285m
Calculo NPSH
7/24/2019 bombas usp.docx
9/20
(P0+ZY)Pv
(10.20m1.12m2.88m)0.338m
NP)H=5.86 m
Bomba ,:
Maraca: hidrostal.
Modelo: A1E-1.4M.
El caudal dela bomba es de2.' l/s ane!o 2"
Calculo del NPSH.
7/24/2019 bombas usp.docx
10/20
(P+ZY)PV
PV=3.3198kpa
H2
O=9810N/m3
z=1.05m
Determino PV (P saturacin).
TH0
o=25.7 (de latabla termodinamica)
# $ %&a"
2' 3.1()1
2'.* &+
4.24613.169125.7253025
=PV3.1691
30 4.24(1 PV=3.3198 kpa
Prdidas !ara material de acero "al#ani$ado.
Perdidas !rimarias.
Lr=0.33m
Dr=0.02545.06x 104
m2
Velocidad:
v=
!=2.5X10
3m
3 /"5.06x10
4 m2
V=4.94m /"
%e&nolds:
7/24/2019 bombas usp.docx
11/20
=V X D
# =
4.94m
" x0.0254 m
1x106
m2/"
=120376=1.2x 105
%u"osidad relati#a.
e
b=
0.15x 103
m
0.0254 m =5.90x103 0.0059
%=0.029
'cuacin de darc& eisbac*.
&%= % x l xV2
2x ' x D 0.029x 0.33m x 4.94
2
m
2
/"2
2x 9.81m
"2x 0.0254
&%=0.468m
Perdidas secundaria.
1 codos de 900
k=0.69
&L=(V2
2' =
0.694.9 42 m2/"2
29.81m /"2
&L=0.85m
&T1=&%+&L=1.32m
Prdidas !ara material de !#c.
Perdidas !rimaria.
Dr=0.0254
V=4.94
7/24/2019 bombas usp.docx
12/20
=2.50m
%u"osidad relati#a
e
b
=0.00015x 10
3
0.0254
=5.90x 105
%=0.0105
'cuacin de dara& erbac*.
&%=% x L x V
2
2x ' x D=
0.0105x2.50m x4.942
m2/ "2
2x9.81m
"2x0.0254m
&%=1.285m
Perdidas secundarias.
2 codos de 900(pvc) ,
Calculo NPSH
(P0+ZY)Pv
(10.20m1.05m1.43m)0.338m
NP)H=7.38m
Ubicacin N-+
7/24/2019 bombas usp.docx
13/20
Bomba 1Marca:$edrollo
Modelo:m'1
El caudal de la bomba es ' l/s ane!o 1"
Calculo de NPSH:
(P0+ZY)Pv
Datos "enerales:
P0=1*105Pa
a'+a=9810N/m3
, -04' m
7/24/2019 bombas usp.docx
14/20
Determinando
PV=)at+racion
Ta'+a=25.6 , tiliando tabla termodinmica"
# $ %&a"
2' 3.1()1
2'.( &+
4.24613.169125.6253025
=PV3.1691
30 4.24(1 PV=3.2983 kpa
Prdidas !ara materiales de aceros "al#ani$ados
Perdidas Primarias:
LT=0.285m
Dr=0.0381
!=1.14x 103
7/24/2019 bombas usp.docx
15/20
Velocidad:
V=
!=5x10
3m
3
"
1.14x103
m2
V=4.38m /"
%e&nolds:
-e=VD
. =
4.38m "0.0381m
1x 106
m2 "
-e=1668781.6x105
%u"osidad %elati#a:
e
D=
0.15x103
m
0.0381m =3.93x 103=0.0039
%=0.028
'cuacin de Darc& /eisbac*:
&%=%LV2
2 'D=
0.0280.285m4.38m2"2
29.81m "20.0381m
&%=0.204 m
Perdidas Secundarias:
Se encuentra 1 codo )0
k=0.69
&L=(V2
2' =
0.694.382m2 /"2
2
9.81
m /"
2
&L=0.674m
&T1=&%+&L=0.878m
7/24/2019 bombas usp.docx
16/20
Prdidas !ara materiales de PVC
Perdidas !rimarias:
Datos:
Dr=0.03811.14x103
m2
5 , 4.38 m /"
LT=0.85m
%u"osidad %elati#a:
e
D=
0.0015x103
0.0381=3.93x105=0.0000393
%=0.01
'cuacin de Darc&:
&%=%LV2
2 'D=
0.010.85m4.382 m2"2
29.81m "20.0381
& %=0.218m
Perdidas Secundarias:
k=0.55
&L=(V2
2' =
0.554.382m2/"2
29.81m /"2
7/24/2019 bombas usp.docx
17/20
&L=0.53m
&T2=&%+&L=0.748m
Calculo NPSH:
(P0+ZY)Pv
(10.20m1.45m1.6m )0.336m
NP)H=7.79m
Bomba +:
Marca:idrostal
Modelo:A1E-0.(M
El caudal de la bomba es 2.2 l/s Ane!o 2"
Calculo del NPSH:
(P0 +ZY)Pv
Z=0.55
PV=3.2983(pa
7/24/2019 bombas usp.docx
18/20
Perdida !ara materiales de acero "al#ani$ado
Perdidas !rimarias:
Datos:
LT=0.290m
Dr=0.02545.06x 104
m2
Velocidad:
V=
!=
2.2x 103
m3
"
5.06x104
m2=4.34m /"
%e&nolds:
-e=
VD
. =
4.34 m"0.0254m
1x106 m2"
-e=1102361.1x 105
%u"osidad %elati#a:
7/24/2019 bombas usp.docx
19/20
e
D=5.90x 103=0.00590
%=0.029
'cuacin de Darc&:
&%=%LV2
2 'D=
0.0290.290m4.3 42 m2"2
29.81m "20.0254
& %=0.317m
Perdidas Secundarias
&L=(V2
2' =
0.694.342 m2/"2
29.81m /"2
&L=0.662m
&T1=&%+&L=0.979m
=&T1+&T2=1.55m
Perdida !ara materiales de PVC
Perdidas Primarias:
Dr=0.0254
Vr=4.34
LT=1.45
%u"osidad %elati#a:e
D=
0.0015x103
0.0254=0.000059
%=0.0105
'cuacin de Darc& 0 /eisbac*
7/24/2019 bombas usp.docx
20/20
& %=%LV2
2 'D=
0.01051.45m4.342 m2"2
29.81m"20.0254m
&%=0.575m
Calculo de NPSH
(P0+ZY)Pv
(10.20m0.55m1.55m )0.336m
NP)H=7.76 m