Bond Construction Update Citizen’s Oversight Committee

Date post: 30-Dec-2015
Category:
Upload: price-mclaughlin
View: 35 times
Download: 4 times
Share this document with a friend
Description:
Bond Construction Update Citizen’s Oversight Committee. Long Beach Community College District January 25, 2010. EDUCATE  ENGAGE  EMPOWER. Agenda. Completed Construction Projects LAC South Quad Complex PCC Industrial Tech Phase 1 Los Coyotes Property Upgrades - PowerPoint PPT Presentation
Popular Tags:
25
Bond Construction Bond Construction Update Update Citizen’s Oversight Citizen’s Oversight Committee Committee Long Beach Community College District January 25, 2010 EDUCATE ENGAGE EMPOWER 1
Transcript

Bond Construction Bond Construction UpdateUpdate

Citizen’s Oversight Citizen’s Oversight CommitteeCommittee

Bond Construction Bond Construction UpdateUpdate

Citizen’s Oversight Citizen’s Oversight CommitteeCommittee

Long Beach Community College District January 25, 2010

EDUCATE ENGAGE EMPOWER 1

Agenda Completed Construction Projects

LAC South Quad Complex PCC Industrial Tech Phase 1 Los Coyotes Property Upgrades Bldg. F - Conversions of rooms F104 and F106 to new classroom space. Bldg. G and H - Repainting

Current & Upcoming Construction Projects LAC Building A, Student Services Retrofit LAC Math Technology Building LAC Parking Structure LAC Building O Complex LAC Infrastructure Improvements LAC Q & R ADA/HVAC UpgradesLAC Q & R ADA/HVAC Upgrades LAC Building I (Bookstore)LAC Building I (Bookstore) PCC MDAB (Multi-Disciplinary Academic Building) PCC Building CC Retrofit District Wide – Electronic Signage Plan Upcoming Projects Planned Phasing of Future Projects

Q & A

2

CompletedConstruction Projects

Space includes Approx. 68,000 ASF 32 modern classrooms and labs 38 faculty offices Executive offices Multipurpose room State of the art Board Room

South Quad Complex – Measure E 2002South Quad Complex – Measure E 2002

3

CompletedConstruction Projects

Modern facility houses Welding Department and other trade programs

Replaces existing antiquated structures New Northern face of the campus

PCC Industrial Technology Center Phase 1PCC Industrial Technology Center Phase 1

Measure E 2002Measure E 2002

4

Current and UpcomingConstruction Projects

LAC Building A – Student Services RetrofitLAC Building A – Student Services Retrofit

Measure E 2008Measure E 2008

5

Plans submitted to DSA September 2009 Adds 6,500 Sq. Ft. to existing building Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc. Estimated start of construction end of Fall 2010

Current and UpcomingConstruction Projects

Completed Schematic Design Will house Math and Culinary Arts instructional

program as well as Reprographics Estimated start of construction Winter 2013

LAC Math Technology Building – Measure E 2008LAC Math Technology Building – Measure E 2008

6

Current and UpcomingConstruction Projects

LAC Parking Structure – Measure E 2008LAC Parking Structure – Measure E 2008

7

Spaces for 900 Vehicles Photovoltaic Electrical Generation Array on top level To be located Southeast corner of Lot J adjacent to the Verizon building Outfitted with single-axis tracking system Minimum 450 KW+ output Curriculum building opportunity Exhibit classroom Groundbreaking anticipated February, 2010

Current and UpcomingConstruction Projects

LAC Building O Complex – Measure E 2008LAC Building O Complex – Measure E 2008

8

Two structures totaling 87,000 square feet

Current Occupants: ERD, Foundation, Warehouse

Facility, and one leasee Future Occupants:

IITS and BMT Potential rental spaces being

assessed

9

LAC Infrastructure Improvement ProjectsLAC Infrastructure Improvement Projects

Measure E 2008Measure E 2008

Current and UpcomingConstruction Projects

Project to be completed in a phased construction schedule

Total annual estimated savings of 1.5 million Kwh

Project started Fall 2009. Anticipated completion Summer 2011

Upgrades include; Reclaimed Water, Domestic Water, Data, etc.

Majority of existing building HVAC systems to be connected to new infrastructure

Landscaping upgrades to be implemented in conjunction with infrastructure project phasing

Current and UpcomingConstruction Projects

10

Complete building ADA upgrade: includes restrooms, stair lift, etc. (Bldg. R)

All new infrastructure: new piping, fixtures, etc. (Bldg. R) Minor renovations to offices (Bldg. R) Total renovation of locker/training rooms (Bldg. R) HVAC upgrade: includes new air handlers, ductwork, etc.

(Bldg. Q & R) Update fire alarm system (Bldg. Q & R) Construction will be done in phases so as to minimize

disruption of classes Final construction documents submitted to DSA Fall 2009 Estimated start of construction Summer 2010

LAC Q & R ADA/HVAC - Measure E 2008LAC Q & R ADA/HVAC - Measure E 2008

Current and UpcomingConstruction Projects

11

Add additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme Submitted for DSA review Construction scheduled for Summer 2010

LAC Building I - Measure E 2008LAC Building I - Measure E 2008

Current and UpcomingConstruction Projects

PCC MDAB PCC MDAB (Multi-Disciplinary Academic Building) - Measure E 2002(Multi-Disciplinary Academic Building) - Measure E 2002

12

Received reviewed plans from DSA. Currently in construction drawing technical review phase Install portables for swing space at PCC Spring 2010 Anticipated start of MDAB construction Summer 2010 Project to be completed in two phases

Current and UpcomingConstruction Projects

PCC Building CC Retrofit - Measure E 2008PCC Building CC Retrofit - Measure E 2008

13

To be designed by Hill Partnership Architects Houses the Fitness Center, Gymnasium, Weight Room, and

Faculty and Staff Offices Swing space to be located on PCC Campus (Bldg. GG) To be completed concurrently with MDAB project phase 2 Anticipated start of construction Summer 2011

Current and UpcomingConstruction Projects

District Wide – Electronic Signage PlanDistrict Wide – Electronic Signage Plan Measure E 2008Measure E 2008

14

District Wide Signage Plan complete Final site locations determined Construction bids received/NTP to be issued Anticipated construction completion of

Marquee Signs Summer 2010

LAC Facility Site Plan

l i b

e r

a l

a r

t s

Liberal Arts CampusSite Plan

PCC Facility Site Plan

p a

c i f

i c

c

o a

s t

Pacific Coast CampusSite Plan

Current and UpcomingConstruction Projects

17

LAC Expansion of Building I (Awaiting DSA approval)

Bookstore swing space to be located West of J building. Relocate Bond Management Team Offices to O Building (Community Outreach and

Services Facility) and removal of W trailers (Fall 2010)

Increase parking at Faculty and Lew Davis St. IITS relocation to O building Bldg. K – Roof extension over Kiln area Bldg. J – Theater lighting control panel replacement CDC – new carpet installation

PCC Bldg. JJ – Add new landscaping around perimeter MDAB swing space preparation Install exterior lighting at Tech1 Demolition of UU and VV

Upcoming ProjectsUpcoming Projects

Planned Phasing of Future Projects

18

2009-10 Parking Structure – groundbreaking anticipated

February 2010 Building O2 occupancy scheduled

BMT and IITS – Fall 2010 Begin infrastructure construction – Fall 2009

Master landscaping implementation will follow this project

Install portables for swing space at PCC – Spring 2010

Begin construction of Buildings DD and EE at PCC Anticipating Summer 2010 start

Anticipating swing space move for Building A at LAC – Summer 2010

Marquees complete – Summer 2010

Planned Phasing of Future Projects

19

2010-11 Begin Building R (Gym) HVAC and ADA upgrades –

Summer 2010 Anticipating Summer 2011 completion

Begin construction of Building I (Bookstore) and move to portable swing space – Summer 2010

Retrofit completion of Building Z – Summer 2010 Begin construction of Building A at LAC – Fall 2010

Begin Schematic Design for Buildings C and F at LAC

Submit plans to DSA no later than Summer 2011

Planned Phasing of Future Projects

20

2011-12 Infrastructure project complete at LAC – Summer 2011 Submit plans to DSA for Math/Technology Building at LAC –

Summer 2012

Construction completion of Buildings DD and EE at PCC – Summer 2011

Begin construction of Buildings AA, BB and CC at PCC – Summer 2011

Anticipated construction completion of Building I (Bookstore) at LAC – Fall 2011

Anticipated construction completion of Parking Structure at LAC – Spring 2012

Planned Phasing of Future Projects

21

2012-13 Move Buildings C and F programs into Swing Space (M/N

Building) and begin construction – Summer 2012

Anticipated Construction completion of Building A at LAC – Summer 2012

Submit plans to DSA for M/N Building at LAC and Building MM (Phase 1) at PCC – Summer 2012

Begin Schematic Design for Building P at LAC and Building MM (Phase 2) at PCC – Summer 2012 Submit to DSA – Spring 2013

Begin construction of Math/Technology Building at LAC – Winter 2013

Planned Phasing of Future Projects

22

2012-13 (continued)

Begin Schematic Design for Building D and E renovations – Fall 2013

Anticipated Construction completion of Buildings AA, BB and CC at PCC – Spring 2013

Planned Phasing of Future Projects

23

2013-14 Anticipated Construction completion of Buildings C and F at

LAC – Fall 2013

Begin construction of Buildings M/N at LAC and MM (Phase 1) at PCC – Fall 2013

Submit plans to DSA for Buildings D and E renovations at LAC – Fall 2013

Schematic design for Performing Arts Building (G & H) and Building R at LAC – Spring 2014

Planned Phasing of Future Projects

24

2014-15 Anticipated Construction completion of Math/Technology

Building at LAC – Summer 2014

Begin construction on Buildings D and E at LAC – Fall 2014

Submit plans to DSA for Performing Arts Building and Building R (Gym) at LAC – Spring 2015 Anticipate construction start – Spring 2016

Anticipated construction completion of Buildings M/N at LAC and MM at PCC – late Spring 2015

Begin construction on Buildings P at LAC and MM (Phase 2) at PCC – Spring 2015

QUESTIONS&