+ All Categories
Home > Documents > BO’NESS KINNEIL RAILWAY 2017 - · PDF fileWhilst every effort is made to run to the...

BO’NESS KINNEIL RAILWAY 2017 - · PDF fileWhilst every effort is made to run to the...

Date post: 05-Mar-2018
Category:
Upload: nguyentu
View: 217 times
Download: 3 times
Share this document with a friend
1
BO’NESS & KINNEIL RAILWAY 2017 Afternoon Tea on a Steam Train most Saturdays, Sundays & Tuesdays. See website for details. (must be pre-booked) Trains 1-3 run on green dates and are all steam hauled. Trains 1-4 run on orange dates and are all steam hauled. Trains 1-4 run on yellow days and are all steam hauled except train 4 which is heritage diesel hauled. Other timetables apply for special events. Museum of Scottish Railways open 7 days a week from 1 April to 29 October 1100 to 1630 (last admission 1600) Registered charity no. SC002375. www.bkrailway.co.uk Whilst every effort is made to run to the published timetable, the SRPS reserves the right to vary it, and to use steam or diesel locomotives, without notice.
Transcript
Page 1: BO’NESS KINNEIL RAILWAY 2017 - · PDF fileWhilst every effort is made to run to the published timetable, the SRPS reserves the right to vary it, and to use steam or diesel locomotives,

BO’NESS & KINNEIL RAILWAY 2017

Afternoon Tea on a Steam Train most Saturdays, Sundays & Tuesdays. See website for details. (must be pre-booked)

Trains 1-3 run on green dates and are all steam hauled.Trains 1-4 run on orange dates and are all steam hauled.Trains 1-4 run on yellow days and are all steam hauled except train 4 which is heritage diesel hauled. Other timetables apply for special events.

Museum of Scottish Railways open 7 days a week from 1 April to 29 October 1100 to 1630 (last admission 1600)

Registered charity no. SC002375.

www.bkrailway.co.uk

Whilst every effort is made to run to the published timetable, the SRPS reserves the right to vary it, and to use steam or diesel locomotives, without notice.

Recommended