of 20
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
1/20
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
2/20
BonFIRE2
2FIRE open calls info call
Agenda
Project vision and objectives
Three Scenarios overview Project activities
Open call data sheet
Topic A Experiments
Topics B Cloud provider
Open call objectives and calendar
Experiment structure
Experiment submission
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
3/20
BonFIRE3
3
BonFIRE data sheet
Type of project: Integrated Project
Project coordinator: ATOS
Project start date: 1st June 2010
Duration: 42 months
EC contribution: 7.2M (orig 6.7 M)
(1.34 M for 2 open calls)
The BonFIRE (Building service testbeds for Future InternetResearch and Experimentation) project is designing, buildingand operating a multi-site cloud facility to support researchacross applications, services and systems targeting servicesresearch community on Future Internet.
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
4/20
BonFIRE4 4
Access and Controlleddeployment
Monitoring
Heterogeneous andvirtualised
Compute, storage and
networking resources
Permanent & On-Request
infrastructure facilities
Testing experiments selected in open calls
Service Components invirtual machines to bedeployed on the Cloud
BonFIRE Overview
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
5/20
BonFIRE5 5
Three Scenarios
1. Extended multi-site clouds connected through normalinternet
2. Cloud scenario with emulated network
3. Extended Cloud scenario with controlled network (impliesfederationwith network facility)
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
6/20
BonFIRE6 6
Permanent (
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
7/20
BonFIRE7 7
Bonfire (simplified!) Architecture*
(*details later)
Portal
BonFIREBroker
CloudProvider
BonFIRE API
Cloud API (OCCi)
Experimentmanagerscheduler
Enactor
ExperimentdescriptorRestf
uly
CloudProvider
OCCi
Resourcemanager
orchestrator
OVF
Monitoring
ID
Open NebulaCellsVMWareESXi
KVM XEN
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
8/20
BonFIRE8 8
Project Activities
Each newexperiment will
be a WP in theActivity 5
Cloud Providerwill mainlyparticipate in Act3 (Act2/6 partially)
FIRE open calls info call
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
9/20
BonFIRE9 9
BonFIRE Partnership
Facility
operation
Researchers
OPEN CALLS
EXPERIMENTS
Facilityconstruction
Facilitysustainability
Project coordination
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
10/20
BonFIRE10 10
Open call for new experiments and acloud provider
This open call: 600.000 total available EC funding
Two Topics;
A) Experiments (500K) in Scenarios 1-2-3 Funding per experiment: max 150K (about 3-4 experiments, round
100K typical)
Participants: 1 or 2 organizations/experiment max
Duration: maximum 12 months
B) Cloud provider (100K) 1 company offering infrastructure and becoming a BonFIRE Cloud site
(Proof of Concept)
Duration: 15 months
Start date in the project: September 2012Evaluation (FP7 rules): external evaluators and consensusmeeting
Note: Payment scheme: 30% advance payment. Q1 cost. Rest at the end.
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
11/20
BonFIRE11 11
What are we looking for?(Topic A - Experiments)
Testing Experiments to trial on the Cloud semi-consolidated softwaretechnologies or semi-mature resultsof R&D Internet of Servicescommunity.
Pre-comercial software or prototypes to be optimised, consolidated orstudy their behaviour on the cloud facility
Not pure eScience (Grid-like) applications looking only for capacity /storage but innovative multi-cloud usage scenarios on the facility.
Typically the experiment would need to be distributed, with VMs deployedacross at least 2 sites/admin domains (scenario 1&3).
Certain emphasis is given to scenario 3 (FI research that is very sensibleto network parameters (bandwidth reservation)
Justify the need of a multi-cloud facility (scenario 1&3) or sophisticatednetwork emulation (scenario 2) in your experiment.
Combination of scenarios in an experiment proposal is possible (pahsesin an increase of realism). Explain the approach in detail.
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
12/20
BonFIRE12 12
What are we looking for?(Topic B Cloud provider)
Company with proven commercial experience in Cloud serviceprovision (with its own IaaS off-the-shelf solutions portfolio) andreference clients
Cloud provider offering access to its own infrastructure becomingBonFIRE site (IaaS). Dedicated computing environment whereexperiments can be deployed.
Access via OCCI-based API and web-based interfaces (explainapproach)
Mnimum requested capacity from 8 to 16 nodes x 4 cores (3GHz) 8GB RAM and 2-3 Tb SAN (Note: the purchase of hardware is notcovered by the project not elegible costs)
Organization willing to install and test the BonFIRE stack (broker andportal) in their environment and report the experience
Contribute with feedback on sustainability and exploitation tasks
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
13/20
BonFIRE13 13
Open call for new experiments
What we offer: BonFIRE features:
Controlled deployment on multi-site clouds (scenario 1,2,3)
Monitoring of standard metrics at VM or physical level Monitoring of user specified metrics (application level) at
VM level
Controlled/advanced emulated network (emulab) (forscenario 2) VirtualWorld
Controlled deployment with network bandwidth guarantee
between 2 cloud sites (scenario 3)
Access to heterogeneous resources.
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
14/20
BonFIRE14 14
Open call: structure of experiments
To smooth integrate the experiments into the project:
Basic task list set
Common deliverable list Participation in project reporting by partner and Workpackage
Interactions with cross activities: experiment support
(more on the applicant guide & proposal template)
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
15/20
BonFIRE15 15
Open call experiment structure: tasks
Task 1 Motivation and Design
Task 2 - Experimental set up Task 3 Execution and subsequent iteration
Task 3 Execution and subsequent iteration
Task 4 - Experimental write up
Task 5 Dissemination and Case studies
FIRE open calls info day
Gantt diagram can be adapted to specifities of each call (explain this) Synchronised timescale (approx) Control Points (asociated milestones or deliverables) Other structure is possible but must be well justified.
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
16/20
BonFIRE16 16
Our Open Call Calendar
Date (2012) Period Action
Jan 3rd (or before) -30 days Call announcment to PO
February 1st Day 1: call open Call publication (last of 3 newspapers + internationalmagazine) + Cordis
February 7th InfoCall
March 7th At least +5 weeks Close Call : 17:00 Brussels time (WED)
March 23rd Weeks 6,7( 2 weeks)
Finalise Call Evaluation Preparations, CommunicateExperts to the Commission, Conduct Evaluation
April 13th Week 10(3 weeks)
Submit Evaluation Report to the PO and requestaccession of the new beneficiaries
June 27th Week 17(7 weeks but can beless)
Project Officer approves accession of new beneficiariesto grant agreement; project communicates the result ofeach proposal to the proposer
July - August Contract Amendment to reflect new Partners
September 1 New Partners operative / starting date
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
17/20
BonFIRE17 17
IPR issues
BonFIRE Project interest in the open call experiments is theuse and improvement of the BonFIRE facility and not the(protected) content per se.
The new cloud site is treated separately in terms of IPR.Access API (TBD depending on development contributionsand starting point). No ownership rights over Broker (access &use)
Experiments are considered sub-projects. Access rights withinthe sub-project are reserved to sub-project members.
In general terms, sub-project partners are not granted accessto the foreground or background of the other Parties and the
other Parties are not granted access to the foreground orbackground of the sub-project members. (CA available on-demand)
All experiments have to provide a publishable report of their
experiment / case study.
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
18/20
BonFIRE18 18
Open call: support
Support documentation available Full call text
Template for proposal and guidelines
FAQ / also set up as a blog for interactive questions Support mailing list (process and technical questions)
http://www.bonfire-project.eu/involved/open-call-info
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
19/20
BonFIRE19 19
Open call: submission
Submission of proposals:
Use proposal template provided
PDF format one file Language - ENGLISH
By email with subject: "Call 2 BonFIRE /your proposalacronym vx.x"
SUBMISSION EMAIL: [email protected]
DEADLINE: 7th March 17:00 Brussels time
8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information
20/20
Building service testbeds on FIRE
Thank you for your attention