+ All Categories
Home > Documents > BonFIRE 2012 Open Call 2 InfoCall General Information

BonFIRE 2012 Open Call 2 InfoCall General Information

Date post: 06-Apr-2018
Category:
Upload: bonfire
View: 213 times
Download: 0 times
Share this document with a friend

of 20

Transcript
  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    1/20

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    2/20

    BonFIRE2

    2FIRE open calls info call

    Agenda

    Project vision and objectives

    Three Scenarios overview Project activities

    Open call data sheet

    Topic A Experiments

    Topics B Cloud provider

    Open call objectives and calendar

    Experiment structure

    Experiment submission

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    3/20

    BonFIRE3

    3

    BonFIRE data sheet

    Type of project: Integrated Project

    Project coordinator: ATOS

    Project start date: 1st June 2010

    Duration: 42 months

    EC contribution: 7.2M (orig 6.7 M)

    (1.34 M for 2 open calls)

    The BonFIRE (Building service testbeds for Future InternetResearch and Experimentation) project is designing, buildingand operating a multi-site cloud facility to support researchacross applications, services and systems targeting servicesresearch community on Future Internet.

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    4/20

    BonFIRE4 4

    Access and Controlleddeployment

    Monitoring

    Heterogeneous andvirtualised

    Compute, storage and

    networking resources

    Permanent & On-Request

    infrastructure facilities

    Testing experiments selected in open calls

    Service Components invirtual machines to bedeployed on the Cloud

    BonFIRE Overview

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    5/20

    BonFIRE5 5

    Three Scenarios

    1. Extended multi-site clouds connected through normalinternet

    2. Cloud scenario with emulated network

    3. Extended Cloud scenario with controlled network (impliesfederationwith network facility)

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    6/20

    BonFIRE6 6

    Permanent (

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    7/20

    BonFIRE7 7

    Bonfire (simplified!) Architecture*

    (*details later)

    Portal

    BonFIREBroker

    CloudProvider

    BonFIRE API

    Cloud API (OCCi)

    Experimentmanagerscheduler

    Enactor

    ExperimentdescriptorRestf

    uly

    CloudProvider

    OCCi

    Resourcemanager

    orchestrator

    OVF

    Monitoring

    ID

    Open NebulaCellsVMWareESXi

    KVM XEN

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    8/20

    BonFIRE8 8

    Project Activities

    Each newexperiment will

    be a WP in theActivity 5

    Cloud Providerwill mainlyparticipate in Act3 (Act2/6 partially)

    FIRE open calls info call

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    9/20

    BonFIRE9 9

    BonFIRE Partnership

    Facility

    operation

    Researchers

    OPEN CALLS

    EXPERIMENTS

    Facilityconstruction

    Facilitysustainability

    Project coordination

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    10/20

    BonFIRE10 10

    Open call for new experiments and acloud provider

    This open call: 600.000 total available EC funding

    Two Topics;

    A) Experiments (500K) in Scenarios 1-2-3 Funding per experiment: max 150K (about 3-4 experiments, round

    100K typical)

    Participants: 1 or 2 organizations/experiment max

    Duration: maximum 12 months

    B) Cloud provider (100K) 1 company offering infrastructure and becoming a BonFIRE Cloud site

    (Proof of Concept)

    Duration: 15 months

    Start date in the project: September 2012Evaluation (FP7 rules): external evaluators and consensusmeeting

    Note: Payment scheme: 30% advance payment. Q1 cost. Rest at the end.

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    11/20

    BonFIRE11 11

    What are we looking for?(Topic A - Experiments)

    Testing Experiments to trial on the Cloud semi-consolidated softwaretechnologies or semi-mature resultsof R&D Internet of Servicescommunity.

    Pre-comercial software or prototypes to be optimised, consolidated orstudy their behaviour on the cloud facility

    Not pure eScience (Grid-like) applications looking only for capacity /storage but innovative multi-cloud usage scenarios on the facility.

    Typically the experiment would need to be distributed, with VMs deployedacross at least 2 sites/admin domains (scenario 1&3).

    Certain emphasis is given to scenario 3 (FI research that is very sensibleto network parameters (bandwidth reservation)

    Justify the need of a multi-cloud facility (scenario 1&3) or sophisticatednetwork emulation (scenario 2) in your experiment.

    Combination of scenarios in an experiment proposal is possible (pahsesin an increase of realism). Explain the approach in detail.

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    12/20

    BonFIRE12 12

    What are we looking for?(Topic B Cloud provider)

    Company with proven commercial experience in Cloud serviceprovision (with its own IaaS off-the-shelf solutions portfolio) andreference clients

    Cloud provider offering access to its own infrastructure becomingBonFIRE site (IaaS). Dedicated computing environment whereexperiments can be deployed.

    Access via OCCI-based API and web-based interfaces (explainapproach)

    Mnimum requested capacity from 8 to 16 nodes x 4 cores (3GHz) 8GB RAM and 2-3 Tb SAN (Note: the purchase of hardware is notcovered by the project not elegible costs)

    Organization willing to install and test the BonFIRE stack (broker andportal) in their environment and report the experience

    Contribute with feedback on sustainability and exploitation tasks

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    13/20

    BonFIRE13 13

    Open call for new experiments

    What we offer: BonFIRE features:

    Controlled deployment on multi-site clouds (scenario 1,2,3)

    Monitoring of standard metrics at VM or physical level Monitoring of user specified metrics (application level) at

    VM level

    Controlled/advanced emulated network (emulab) (forscenario 2) VirtualWorld

    Controlled deployment with network bandwidth guarantee

    between 2 cloud sites (scenario 3)

    Access to heterogeneous resources.

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    14/20

    BonFIRE14 14

    Open call: structure of experiments

    To smooth integrate the experiments into the project:

    Basic task list set

    Common deliverable list Participation in project reporting by partner and Workpackage

    Interactions with cross activities: experiment support

    (more on the applicant guide & proposal template)

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    15/20

    BonFIRE15 15

    Open call experiment structure: tasks

    Task 1 Motivation and Design

    Task 2 - Experimental set up Task 3 Execution and subsequent iteration

    Task 3 Execution and subsequent iteration

    Task 4 - Experimental write up

    Task 5 Dissemination and Case studies

    FIRE open calls info day

    Gantt diagram can be adapted to specifities of each call (explain this) Synchronised timescale (approx) Control Points (asociated milestones or deliverables) Other structure is possible but must be well justified.

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    16/20

    BonFIRE16 16

    Our Open Call Calendar

    Date (2012) Period Action

    Jan 3rd (or before) -30 days Call announcment to PO

    February 1st Day 1: call open Call publication (last of 3 newspapers + internationalmagazine) + Cordis

    February 7th InfoCall

    March 7th At least +5 weeks Close Call : 17:00 Brussels time (WED)

    March 23rd Weeks 6,7( 2 weeks)

    Finalise Call Evaluation Preparations, CommunicateExperts to the Commission, Conduct Evaluation

    April 13th Week 10(3 weeks)

    Submit Evaluation Report to the PO and requestaccession of the new beneficiaries

    June 27th Week 17(7 weeks but can beless)

    Project Officer approves accession of new beneficiariesto grant agreement; project communicates the result ofeach proposal to the proposer

    July - August Contract Amendment to reflect new Partners

    September 1 New Partners operative / starting date

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    17/20

    BonFIRE17 17

    IPR issues

    BonFIRE Project interest in the open call experiments is theuse and improvement of the BonFIRE facility and not the(protected) content per se.

    The new cloud site is treated separately in terms of IPR.Access API (TBD depending on development contributionsand starting point). No ownership rights over Broker (access &use)

    Experiments are considered sub-projects. Access rights withinthe sub-project are reserved to sub-project members.

    In general terms, sub-project partners are not granted accessto the foreground or background of the other Parties and the

    other Parties are not granted access to the foreground orbackground of the sub-project members. (CA available on-demand)

    All experiments have to provide a publishable report of their

    experiment / case study.

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    18/20

    BonFIRE18 18

    Open call: support

    Support documentation available Full call text

    Template for proposal and guidelines

    FAQ / also set up as a blog for interactive questions Support mailing list (process and technical questions)

    http://www.bonfire-project.eu/involved/open-call-info

    [email protected]

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    19/20

    BonFIRE19 19

    Open call: submission

    Submission of proposals:

    Use proposal template provided

    PDF format one file Language - ENGLISH

    By email with subject: "Call 2 BonFIRE /your proposalacronym vx.x"

    SUBMISSION EMAIL: [email protected]

    DEADLINE: 7th March 17:00 Brussels time

  • 8/3/2019 BonFIRE 2012 Open Call 2 InfoCall General Information

    20/20

    Building service testbeds on FIRE

    Thank you for your attention


Recommended