Booster Enclosure Corrector Prototype Installation
Filter InstallationDissolved O2Update
7/6/07
Maurice BallFluids EngineeringAD/Mechanical Support
Maurice Ball
Subject:Meeting with Janine Pigue of Siemens Water Technology, formerly US Filter,Start:Wed 7/11/2007 9:30 AMEnd:Wed 7/11/2007 11:30 AMRecurrence:(none)http://www.liqui-cel.com/http://www.industry.siemens.com/Water/en/http://www.industry.siemens.com/Water/en/?gkey=[us+filter]&gr=Branded&s=g&WT.srch=1 Us Filter-Interlake2600 S 17th AveBroadview, IL 60155#(708) 345-7672Broadview Sales person for Siemens Water TechnologyJanine Pigue #(708) 345-7290Discuss modifying the system to accommodate Pbar and Booster LCW SystemsUpgrade Liqui-cel membrane contactors with higher pressure rating, remove booster pumps
Filter for Booster Installation Prototypehttp://www.shelco.com/pdfs/MH_final.pdfPleated polypropylene media cartridge0.5 micron, 90% efficiency ratingOver 5-1/2 square feet of media, very high dirt holding capacity than other cartridges.$24 eachPressure drop vs GPM at 0.5 micronAt 2 GPM, delta P at less than 1 PSIDRecommended Changeout 25 PSID
Filter MonitoringTap on Filter housing for inlet and outlet pressure monitoringLocal pressure gaugesRemote Pressure Transducers, 0.5% of full scale accuracy4-20 mA output signalRemote monitoring from Main Control RoomAcknowledgement to Kent Triplett, Sensor testing and verificationLoop Power Source, 10-30 VDC
Alarm Set PointFilter Delta P Clean, at 1 GPM, 0.3 PSIDCorrector needs 80 PSID for 0.6 GPMBooster 95 LCW System provides S=120 PSID min
Bottom LineInstalling Small Filter in Enclosure will teach us :Impact on New Corrector ProgramHealth of the Booster 95 LCW SystemProtect prototype corrector during critical testing