+ All Categories
Home > Documents > BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS...

BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS...

Date post: 20-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
43
Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February, May, July, September, and November. Major Projects are presented to the Board of Trustees for final design approval and are defined as new construction, additions, renovations, or infrastructure projects that have a total project budget (construction costs and all soft costs) equal to or greater than $10,000,000. Please consult with the Design Resources Coordinator on timing and submission requirements for these presentations. Projects will also be presented to the Facilities Planning Advisory Board (University Park projects only) and the Project Decision Review Board (all locations) before the final design approval with the Board of Trustees. Please consult with the Project Manager or the University Architect on timing and submission material for these presentations. 2. Submission Requirements A. Final Plan Approval Submission (see appendix for presentation material examples and Data Sheet form) will include: 1) A completed Data Sheet 2) A site plan 3) Floor plans 4) Full color rendering(s) Elevations and/or sections may be required if needed to fully explain the project. You, the designer of the project, will not present the project and do not need to attend the presentation. B. Submit information via email or file transfer - PDF’s with site plan and floor plans in separate files. Submit the rendering in a common digital graphic format, such as, .pdf, .tif or .jpg. Digital images must be a minumum of 9”x 5” at 150 pixels/inch (Photos will be inserted into Powerpoint with a 16:9 (widescreen) aspect ratio at a maximum resolution of 220pixels/inch). Computer files may be e-mailed to Madeline Cantú, Design Resources Coordinator [email protected]. C. Depending on the complexity of the project, a meeting may be required to review floor plans with the Design Resources Coordinator. 3. Basic Graphic Guidelines and Notes A. Major projects are presented via Microsoft Powerpoint and HD projector. The presentation is prepared by the Design Resources Coordinator. B. Complete the appropriate Data Sheet and confirm information, especially costs and square footages, with OPP Project Manager. C. Plans should include a graphic scale and north arrow. D. Orient the site plan and floor plans to correspond with the accepted map north for each campus. Use the “official” Campus Map for your project; request a campus map from the OPP Project Manager. Site plans and floor plans should be oriented accordingly. E. Site plans should show the roof outline and roof plan of the proposed structure.
Transcript
Page 1: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Updated: June 2018

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS

MAJOR PROJECTS

1. Formal Presentations are made to the University's Board of Trustees in February, May, July, September, and November. Major Projects are presented to the Board of Trustees for final design approval and are defined as new construction, additions, renovations, or infrastructure projects that have a total project budget (construction costs and all soft costs) equal to or greater than $10,000,000. Please consult with the Design Resources Coordinator on timing and submission requirements for these presentations. Projects will also be presented to the Facilities Planning Advisory Board (University Park projects only) and the Project Decision Review Board (all locations) before the final design approval with the Board of Trustees. Please consult with the Project Manager or the University Architect on timing and submission material for these presentations.

2. Submission Requirements

A. Final Plan Approval Submission (see appendix for presentation material examples and Data Sheet form) will include:

1) A completed Data Sheet 2) A site plan 3) Floor plans 4) Full color rendering(s)

Elevations and/or sections may be required if needed to fully explain the project. You, the

designer of the project, will not present the project and do not need to attend the presentation.

B. Submit information via email or file transfer - PDF’s with site plan and floor plans in separate files.

Submit the rendering in a common digital graphic format, such as, .pdf, .tif or .jpg. Digital images must be a minumum of 9”x 5” at 150 pixels/inch (Photos will be inserted into Powerpoint with a 16:9 (widescreen) aspect ratio at a maximum resolution of 220pixels/inch). Computer files may be e-mailed to Madeline Cantú, Design Resources Coordinator [email protected].

C. Depending on the complexity of the project, a meeting may be required to review floor plans with the Design Resources Coordinator.

3. Basic Graphic Guidelines and Notes

A. Major projects are presented via Microsoft Powerpoint and HD projector. The presentation is prepared by the Design Resources Coordinator.

B. Complete the appropriate Data Sheet and confirm information, especially costs and square

footages, with OPP Project Manager. C. Plans should include a graphic scale and north arrow.

D. Orient the site plan and floor plans to correspond with the accepted map north for each campus.

Use the “official” Campus Map for your project; request a campus map from the OPP Project Manager. Site plans and floor plans should be oriented accordingly.

E. Site plans should show the roof outline and roof plan of the proposed structure.

Page 2: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Campus Planning and Design OFFICE OF PHYSICAL PLANT The Pennsylvania State University Page 2

F. All walls in new construction floor plans must be pochéd (solid black color).

G. For renovation projects, please submit both existing floor plans and proposed floor plans.

H. Do not use legends. A more general indication of broader areas by use, department, etc., may be more meaningful than labeling individual spaces. If files are PDF – please send one set with room/area labels, and one without.

I. The colors used in renderings should accurately represent the true color of the materials.

J. Do not show “exotic” cars or people on the perspective. Perspectives should be as life-like and

realistic as possible.

K. Keep drawings clean and simple.

L. Show only work which exists or that will be part of the scope of work for the project. Do not show proposed walkways, roads, parking, or landscape which will not be a part of the project.

M. See appendix for examples of site plans, floor plans and renderings and use these examples as

guides for your submission. 4. Submittal Schedules

It is imperative that submission deadlines for Final Plan Approval be met. Material must be received by the date set by the Design Resources Coordinator. Because of preparation schedules for the Board of Trustees meeting, a late submission may require that your project be removed and placed on the next bimonthly BOT meeting. If there are budget or design issues which have not been resolved and may affect your submission time frame, contact the University Architect as soon as possible for instructions.

University Architect:

Greg Kufner--(814) 865-8177, E-mail [email protected]

Design Resources Coordinator:

Madeline Cantú--(814) 863-4242, E-mail [email protected]

Page 3: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Campus Planning and Design OFFICE OF PHYSICAL PLANT The Pennsylvania State University Page 3

APPENDIX

Data Sheet (New Construction,

Addition/Renovation, and Parking Construction)

Site Plan Examples Floor Plan Examples Rendering Examples

Page 4: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Campus Planning and Design OFFICE OF PHYSICAL PLANT The Pennsylvania State University Page 3

APPENDIX

Data Sheet (New Construction,

Addition/Renovation, and Parking Construction)

Site Plan Examples Floor Plan Examples Rendering Examples

Page 5: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Campus Planning and Design OFFICE OF PHYSICAL PLANT The Pennsylvania State University Page 1

Prepared: New Construction Data Sheet Revised: Project Name Campus

PSU Project Manager:

Architect:

Total Project Budget:

DGS Portion Budget:

Construction Estimate:

New Gross Sq Feet:

Renovated Gross

Square Feet: ________________________

Efficiency Ratio:

New Parking

Spaces Created: ________________________

Number of Existing

Spaces Destroyed: ________________________

Net Space Gain: ________________________

Est. Const. Start Date:

Est. Completion Date:

Design Concepts:

Construction (exterior materials, interior materials, structure, structure of parking decks, garages, finishes, paved surface finishes):

Program (Colleges, departments, etc, housed, and how design meets program requirements):

Page 6: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Campus Planning and Design OFFICE OF PHYSICAL PLANT The Pennsylvania State University Page 2

Site Improvements

(storm water, lighting,

Drives, walkways,

landscaping, etc.):

Page 7: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

HUB Addition & Renovation – Site Plan

N

HENDERSON

MCALLISTER

HUB

GRANGE

HUB PARKINGDECK

WHITE

BIOBEHAVIORALHEALTH

BIOBEHAVIORALHEALTH

Page 8: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

HUB Lawn Entrance Level

Gallery

MechanicalMechanical

Storage

ID OfficePNC Bank

Food StorageMechanical

Mechanical Equipment Replaced

Bookstore Merchandising

N

PSFCU

BookstoreOffices & Support

Page 9: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

HUB Parking Deck Entrance Level

NFood Service Renovations

Ex. Radio StationConverted to TBD

(Student Function)

Student Commons

THONCopy StoreRadio

Bookstore Retail

Page 10: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Pollock Road Entrance Level

N

Heritage Hall

Lounge/ Study

Lounge/ Study

Coff

ee

Library

Auditorium

Lounge/ Study

Green Roof

Student Affairs

Student CommonsBelow

Meeting Room

Meeting Room

Multipurpose Flex Theater

Seating

Support

Center for Character, Conscience, and Social Responsibility

Page 11: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Upper Level

OfficesOffices

Offices

StudentOffices

N

Offices

Multipurpose Flex Theater below

Meeting Rooms

Mechanical

Offices

Page 12: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

HUB Addition & Renovation – Interior Rendering

Page 13: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

HUB Addition & Renovation - Rendering

Page 14: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

HUB Addition & Renovation - Rendering

Page 15: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Building 7R - First FloorN

Lecture Hall

ClassroomsAdministrative Offices

GalleryEquipmentGallery

Mec

h.LobbyMech. M

ech. IT

IT

Restrooms

Stormwater Infiltration & Collection

Page 16: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Building 7R - Second FloorN

Lecture Hall

Classrooms

Upper Gallery

Restrooms

Upper Lobby

Page 17: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Building 7R – View from Kitty Hawk Avenue

Page 18: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Building 7R – View from Building 661

Page 19: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Building 7R – Interior

Page 20: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

MateerN

South Halls Site PlanMateer

New Building

N

Page 21: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Haller/Lyons and Ewing/Cross – Ground Floor

CommonLounge/OverflowBedroom

BikeStorage

TrashVending/Laundry

Vending/Laundry

Storage Mechanical

MechanicalMechanical Storage

TeleCom

Existing Crawlspace

Staff Apartment

N

Site Map

Page 22: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Cooper/Hoyt – Ground Floor

CommonLounge/OverflowBedroom

Bedrooms

Bedrooms

Mechanical

Laundry

Storage

TeleCom

Bike Storage

MechanicalStorage

Offices Storage

BreakRoom

StaffBreak Area

Mechanical

Trash

N

Existing Crawlspace

Site Map

Page 23: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

South Halls Typical Upper Floor

Sorority Suite

Sorority Suite

Bedrooms

Bedrooms Bedrooms

Bedrooms

Bedrooms Bedrooms

Bed-rooms

BedroomsLobby

Lobby

N

Site Map

Page 24: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Redifer Commons Enhancements – First Floor

Dining Rooms

Dining Kitchen

Store Room Salad Prep

Din

ing

Offices

Dining

Conference Room

Offices

N

Site Map

Page 25: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

New South Halls Building – Ground FloorN

Bedrooms

Bedrooms

Kitchen/LoungeElevator

Control Room

LaundryMechanical

BikeStorage

Trash

Electrical

StorageStaff

Lounge

Storage

Lobby

Vestibule

Page 26: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

New South Halls Building – First FloorN

Bedrooms

Bedrooms

Bedrooms

Bedrooms

Lounge

Lobby

Page 27: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

New South Halls Building – Typical Upper FloorN

Bedrooms

Bedrooms

Bedrooms

Bedrooms

Telecom

Trash

Commons

Lobb

y

Page 28: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Entry to Residence Hall

Page 29: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Redifer Commons and Connector

Page 30: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

New Residence Hall

Page 31: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Site PlanCurtin Road

Bryce Jordan Center

Shields

Holuba Hall

Tennis

PegulaIce Arena

N

Page 32: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Project Goals

Shields

Holuba Hall

UniversityDriveField Hockey

North – South Section

East – West Section

Event Level

Event Level

Main Concourse Level

Main Concourse Level

Club and Suite Level

Club and Suite Level

Sections

Page 33: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Event Level Floorplan

CommunityRinkSpectator Seats

Main Rink

Locker Rooms

ConcessionSkate Rental

Multipurpose Rooms

AdvancedTicket Sales

Locker Room Suites

Training & Weight Rooms

Visiting Team Locker Room

Administrative and Management Offices

Big Ten Network

2 Zambonis

Page 34: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Main Concourse Level Floorplan

GeneralAdmissionSeatsStudent Seats Premium

Seats

PremiumSeats

PremiumSeats

Mt. NittanyRoomCyber Cafe

Press

Concessions

ConcessionsConcessions

Concessions

Tickets Tickets

Page 35: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Balcony Level Floorplan

SuitesSuite Opera Box

Suite Opera Box

Club Seats

Club Lounge

Kitchen

Page 36: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Bird’s Eye View

Page 37: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Exterior Rendering One

Page 38: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Interior Rendering

Page 39: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Interior Rendering

Page 40: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Exterior Rendering Two

Page 41: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

University Park Campus

Nittany Parking Deck

Chambers

Mateer

Rackley

Moore - Phase I

N

Music II

Music I

NittanyParking

Deck

ChambersRackley

Moore Building Renovation

Moore - Phase II

CEDAR Building Renovation

CEDAR

NMoore Building Addition

Page 42: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Moore / CEDAR Buildings – First Floor

Moore - Phase I

Moore/CEDARConnector

N

Page 43: BOT Submission Guidelines 4 · Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are

Moore and CEDAR Renovations

View from the north


Recommended