+ All Categories
Home > Documents > BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ PETROLEUM PIPELINE CORP.

Date post: 19-Feb-2016
Category:
Upload: jayden
View: 71 times
Download: 4 times
Share this document with a friend
Description:
BOTAŞ PETROLEUM PIPELINE CORP. BOTAŞ Projects and the Energy World Current Issues & Future Prospects of the Industry. Emre Engür Head of International Projects Department. May, 2011. Established in 1974 Built, Own and Operate 2,332 kms of domestic and cross-border oil pipeline system - PowerPoint PPT Presentation
Popular Tags:
18
BOTAŞ BOTAŞ, Petroleum Pipeline Corporation Slide 1 BOTAŞ PETROLEUM PIPELINE CORP. BOTAŞ Projects and the Energy World Current Issues & Future Prospects of the Industry May, 2011 Emre Engür Head of International Projects Department
Transcript
Page 1: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 1

BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ Projects and the Energy WorldCurrent Issues & Future Prospects of the Industry

May, 2011

Emre EngürHead of International Projects Department

Page 2: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 2

Established in 1974 Built, Own and Operate 2,332 kms of domestic and cross-border

oil pipeline system Built and Operate 1,076 kms BTC Pipeline System (P/L, Loading

Terminal, 4 PS etc) Built, Own and Operate 12,000 kms of pipeline transmission

system with 318 MW Compressor Station power Built, Owned, Operated and Transferred 2 city distribution system

(Bursa, Eskişehir) US $ 12 bn sales revenue (2009)

BOTAŞ with Numbers

Page 3: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 3

Crude Oil Pipelines

IRAN

IRAQ

ARMENIA

GEORGIABULG

ARIA

GREECE

SYRIA

Ankara

Karaman

Konya

Eskişehir

İstanbul

Batman

Kırklareli

Aliağa

Zonguldak

Afyon

ŞanlıurfaGaziantep

DiyarbakırŞırnak

Ardahan

Adıyaman

BayburtSivas

Amasya

Kayseri

Yozgat

Malatya

Kırşehir

Nevşehir

Muğla

Kırıkkale

KarsOrdu Trabzon

Gümüşhane

Artvin

Ceyhan

Mardin

AksarayKahramanmaraş

İzmir Turgutlu

İskenderun

Bartın

Antalya

Edirne

Erzincan Erzurum HorasanBursa

SakaryaÇanakkale

Samsun

Şelmo

AB

C

DF

A : I. KERKUK-CEYHAN CRUDE OIL PL 40" 641 KMB : II. KERKUK-CEYHAN CRUDE OIL PL 46" 656 KM C : BAKU TBILISI CEYHAN CRUDE OIL PL 30“ 42“ 46“ 1076 KM

50 MTA CAPACITY

D : SELMO-BATMAN CRUDE OIL PL 6" 8“ 12“ 41 KM 0.8 MTA CAPACITYE : BATMAN-DORTYOL CRUDE OIL PL 18“ 511 KM 4.5 MTA

CAPACITY F : CEYHAN-KIRIKKALE CRUDE OIL PL 24" 448 KM 7.2 MTA CAPACITY

E

71 MTA CAPACITY

3400 kmsof

Crude OilPipeline

AZ

Page 4: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 4

High Pressure Natural Gas Pipelines

845190 185 19 31

42311 174 122

1,4901,020 833

1,731 1,899

1,009395735 912

6,078

12,024

845 845 1,035 1,220 1,220 1,2391,270 1,693 1,704 1,878 1,8782,000 3,490

4,5105,245

10,620

8.333

7,809

11,629

0

2000

4000

6000

8000

10000

12000

14000

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

kmsProvinces reached: 67

Upon completion of existing investments: 72

Target: All over the country

Length of Pipelines in 1989845 kms

Length of Pipelines in 20001,875 kms

Length of Pipelines in 2010 >12,000 kms

BOTAŞ existing system reached all over the country, waiting to transit to Europe...

Page 5: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 5

Russian Fed (6 BCM+ 8 BCM)

6.6 BCM

Azerbaijan14 BCM Russian Fed (Blue Stream)

16 BCM

LNG

(Alg

eria

+ N

iger

ia) 5.

2 BC

M

Iran

10 BCM

Turkmenistan16 BCM

Planned/Hanging Gas Contracts Existing Imports (Plateau Period)

Iraq

10+ BCM

?

Natural Gas Pipeline System & Supply Contracts

Gas source diversification, Security of Supply!

Page 6: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 6

Natural Gas Supply Contracts

Page 7: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 7

Natural Gas Imports and Consumption

Import by Countries

Consumption by Sectors

32.5 BCM 2010

37.8 BCM 2008

17.0 BCM 2002

0.5 BCM 1987

Page 8: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 8

Supply Potentials to Growing European Demand

European gas

demand grows,Supply sources

waiting to be

developed

83.0%89.6%

83.4%

59.1%

96%

0

100

200

300

400

500

600

700

800

Actual EC 2008 CNRS-OME 2009 IEA 2009 CNRS 2009

Bcm

0%

20%

40%

60%

80%

100%

Production Net Imports Import dependency

2008 2030 2050

Source: OME

Page 9: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 9

Total Pipe Length : 296 km Turkey (Onshore) : 211 km Offshore : 17 kmGas Supply Date : 16 November 2007

First Phase of Interconnector Turkey-Greece-Italy (ITGI)

Interconnector Turkey-Greece Project (ITG) (first phase)

Page 10: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 10

Interconnector Turkey-Greece (ITG): (First Phase) The engineering and EIA studies conducted. Half cost of these studies are granted by EU TEN funds. Basic and Detailed engineering studies of the project completed in 2003.

Construction completed late 2007 Natural Gas Sales and Purchase Agreement was signed on December 23,

2003 in Ankara, by Botas and Depa. Accordingly, delivery volume by the line will be 750 MCM to DEPA. The line is operational since late 2007.

Interconnector Turkey-Greece-Italy (ITGI): (Second Phase) gas volume is envisaged to be increased to 12 BCMA in 2016 of which 8 BCMA for the Italian market and the rest to the Greek market.

BOTAS, DEPA and Edison are in cooperation for the project. Technical feasibility study is completed and studies are ongoing.

IGA signed on the 26th of July 2007 in Rome Latest MoU signed by Botaş, Depa and Edison on the 17th of June 2010

Gas to Southern Europe: Greece and Italy (second phase)

Page 11: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 11

The Turkey-Greece-Italy (ITGI) Project

The first and most important step for the realization of South European Gas Ring Project (SEGR) is Turkey Greece Italy Pipeline‐ ‐ Project. The aim is to transport natural gas from the potential producers of the Caspian and Middle East to Greece and Italy via Turkey.

Page 12: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 12

The Nabucco Project At the first stage, feeder lines to transport gas

from points on the Georgian and Iraqi borders to Sivas, where the main Nabucco pipeline will start.

3,300 to 4,000 kms (depending on feeders) 56” line Approx. 2 million tonnes steel 31 BCM capacity Total budget of the project is estimated to be

some € 8 billion Target Start Date: 2016

Page 13: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 13

The Nabucco Gas Pipeline Project will connect Turkey with Austria via Bulgaria, Romania and Hungary. In February 2002 the project is proposed by Botas to relevant companies and the Co-operation Agreement was signed among the associated companies of respective countries on October 11, 2002.

Five companies, namely BOTAS (Turkey), Bulgargaz (Bulgaria), Transgaz (Romania), MOL (Hungary) and OMV Gas (Austria) have established the Nabucco Gas Pipeline International Co. to invest in a pipeline to transport natural gas from points on the eastern/sothern borders of Turkey to facilities at Baumgarten in Austria.

The project is planned to transport up to 31 bcm/y of natural gas from Caspian Region and the Middle East.

Studies are going on for issues like finance, marketing, legal works, shipping contracts

FEED study ongoing

A new partner joined in Febrary 2008: RWE

IGA signed on the 13th of July 2009 in Ankara

Gas to Central & Western Europe: The Nabucco Project

Page 14: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 14

Source: TAP

Trans-Adriatic Pipeline Project (TAP)

First EGL Proposal

EGL, StatoilHydro & EoN Ruhrgas Partnership

10 BCM planned

20 BCM potential

Page 15: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 15

TAP

IGI ITGI

All projects started in a better world of Supply

Direction of supply to show the first comer

Still target to have all realised at the same period

Transit Through Turkey

Page 16: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 16

Projections for Turkey-More Sources to Reach

Turkey seems to remain as a net importer of natural gas. Economy recovers nd gas consumption to start rising, increasing the bill

for imports to real significant numbers. With current level of dependency on natural gas in power generation and

industry, significant price reductions are needed to keep the industry competitive.

Balanced diversification of supplies is essential to reduce dependency on particular supply sources as well as import prices

International projects of trade and transit will be important for such diversification.

Page 17: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 17

What to Gain from Transit-Security of Supply

ENHANCED SECURITY OF SUPPLY

MORE FAVORABLE GAS

PRICE CONDITIONS

TRADEAND

TRANSIT

Some kind of a netback price mechanism for domestic consumption

Cost-based transmission tariffs

Partial exemption from TPA for trading of excess volumes

Removal of final destination clauses

Balanced diversification of suppliesUnderground storage capacities to serve both domestic market and end consumers in Euope

Use of existing infrastructure and idle capacities to the extent possible

TRADEAND

TRANSIT

Page 18: BOTAŞ PETROLEUM PIPELINE CORP.

BOTAŞ

BOTAŞ, Petroleum Pipeline Corporation Slide 18

Trans-Caspian

Turkmenian Gas

Egyptian GasArab Gas PL

Iraqi Gas

Shah Deniz

Nabucco

ITGIArab Gas

PL

Blue Stream

Russian Gas-West

Nabucco

Trans-Caspian

Kazakh Gas

ITG

Iranian Gas

Bosnia Herzegovina

Austria

İzmir

Ceyhan potential LNG liq.

TAP

Potential Hub


Recommended