  • 7/23/2019 Bottleneck the Goal

    1/15

    By:

    Saumitr Chaturvedi M-065

    Himanshu Chaurasia M-066

    Urvaksh Contractor M-067

    Ajeet umar M-075

    A!himanyu Saras"at M-0#$

  • 7/23/2019 Bottleneck the Goal

    2/15

    Question

    Define bottleneckswith reference from the novel, The Goal. How did they optimize the

    bottlenecks?

  • 7/23/2019 Bottleneck the Goal

    3/15

    %hat is Bott&eneck'

    A (oint o) con+estion in a system thatoccurs "hen "ork&oads arrive at a +iven(oint more ,uick&y than that (oint can

    hand&e them .he ine/ciencies !rou+hta!out !y the !ott&eneck o)ten create a,ueue and a &on+er overa&& cyc&e time

    .he term is used to descri!e (oints o)con+estion in everythin+ )rom com(uter

    net"orks to a )actory assem!&y &ine

  • 7/23/2019 Bottleneck the Goal

    4/15

    Bottleneck According to Jonah

    A manufacturing firmshould distinguishbetween bottleneck andnon-bottleneck resources

    Bottleneck are resourceswhose capacities areequal to or less than the

    demand placed upon it

    The bottleneck resourcesdetermine the flow of

    product through the plant

  • 7/23/2019 Bottleneck the Goal

    5/15

  • 7/23/2019 Bottleneck the Goal

    6/15

    Is Bottleneck Good for a manufacturingplant?

    An hour lost on the bottleneck is an hour lost

    for the entire plant

    An hour lost on a non-bottleneck is a

    mirage

    Manage the plant by the bottlenecks

  • 7/23/2019 Bottleneck the Goal

    7/15

    (timisin+ the Bott&enecks

  • 7/23/2019 Bottleneck the Goal

    8/15

    Jonah: Bottleneck has no slack capacity

    Solution:Alex organized the bottlenecks to work only on overdue

    orders from the most overdue to the least

    In order to keep the bottlenecks constantly busy, the teamformed a new system to inform the workers what materials

    have priority at non bottlenecks.

    Answer: Red and Green Tags

    Twelve Orders got shipped

    Problem No.

    Does Bottleneck has a slack capacity?

  • 7/23/2019 Bottleneck the Goal

    9/15

    Materia&s

    TAG TAG

    Bottleneck Parts

    1on-Bott&eneck

    2arts

  • 7/23/2019 Bottleneck the Goal

    10/15

    Increasing the Production Capacity and Efficiency of the plant

    Solution:

    The production Manager fixed some of the old machines tocomplement what one of the bottlenecks did, thus increasing

    the capacity

    More Workers: One foreman for each location all the time.

    Increasing the Efficiency: Mixing and Matching orders bypriority to process more parts, increasing efficiency by 10%.

    Problem No. 2

  • 7/23/2019 Bottleneck the Goal

    11/15

    3o"er4nventory More

    Bott&enecks

    evea&ed

    Problem No. 3

  • 7/23/2019 Bottleneck the Goal

    12/15

    What actually had happened was a result of some old thinking.Working non-bottlenecks to maximum capacity on bottleneckparts had caused the problem. All parts were stacked up in frontof the bottlenecks and others were awaiting non-bottleneck parts

    for final assembly.

    .here needs to !e !a&ance

    .he red and +reen ta+s need to !e modied

    Observation

  • 7/23/2019 Bottleneck the Goal

    13/15

    Solution

    Schedule for the bottleneck parts can bemade in order to decide when they should bereleased, leading to alleviation of any excessinventory

    For non-bottlenecks: Out of the data for thebottleneck parts to the final assembly, non-

    bottleneck parts can be predicted.

  • 7/23/2019 Bottleneck the Goal

    14/15

    Conc&usion

    ee( !ott&eneck runnin+ su!ject the rest to the !ott&eneck

    Batch si8es: 3on+ on !ott&eneck short e&se"here

    9ive ste(s o) !ott&eneck mana+ement

    4denti)y the systems !ott&enecks

    ;ecide ho" to e

  • 7/23/2019 Bottleneck the Goal

    15/15

    Thank You