+ All Categories
Home > Documents > B&R Engineering Corp

B&R Engineering Corp

Date post: 17-Mar-2016
Category:
Upload: b-r-engineering
View: 221 times
Download: 0 times
Share this document with a friend
Description:
B&R Engineering Corp Projects
Popular Tags:
23
LIST OF MAIN COMPLETED PROJECTS Soares da Costa 7240 NW 12th Street Miami, FL 33126 Phone: (305) 592-9399 Paco Rabanne Condos 5900 Collins Avenue Miami Beach, Florida Performed: 1994-1998 Maison Paco Rabanne Condominiums is a twenty four story residential apartment project located in Miami Beach. Size of Project: 355,000 Square Feet HVAC System: Direct Expansion, Pressurization Systems and Garage C.O Control (1994-1998) Everglades Farm Villages SW 384 & 192 Ave Florida City, FL (Housing project) Performed: 2000-2002 The facility was designed for the use of migrant workers, to provide them with affordable housing. The project consisted of a mix used facility, containing apartments, residential housing, a child care facility center, and commercial. Size of Project: 2,160,000 Square Feet, in 48 acres HVAC System: Direct Expansion (2000-2002)
Transcript
Page 1: B&R Engineering Corp

LIST OF MAIN COMPLETED PROJECTS

Soares da Costa

7240 NW 12th Street

Miami, FL 33126

Phone: (305) 592-9399

Paco Rabanne Condos 5900 Collins Avenue

Miami Beach, Florida

Performed: 1994-1998

Maison Paco Rabanne Condominiums is a twenty

four story residential apartment project located in Miami Beach.

Size of Project: 355,000 Square Feet

HVAC System: Direct Expansion, Pressurization

Systems and Garage C.O Control (1994-1998)

Everglades Farm Villages

SW 384 & 192 Ave

Florida City, FL (Housing project)

Performed: 2000-2002

The facility was designed for the use of migrant workers, to provide them with affordable housing. The project consisted of a mix used facility, containing apartments, residential housing, a child care facility center, and commercial. Size of Project: 2,160,000 Square Feet, in 48 acres

HVAC System: Direct Expansion (2000-2002)

Page 2: B&R Engineering Corp

Soares da Costa (Continued)

Ponce de Leon Condo

1607 Ponce de Leon Blvd

Coral Gables, Florida

Performed: 2006-2008 Ponce de Leon Condo is a 12 story luxury Coral Gables condominium with 50 fifty residential units, 11 commercial spaces and nine office units

HVAC System: Direct Expansion, Pressurization

Systems and Garage C.O Control (2006-2008) City 24 Condominium

2347 Biscayne Blvd

Miami, Florida

Performed: 2007-2008

City 24 Condominium is a 15-story mid-rise with

120 units that overlooks the Biscayne Bay. The building is 176 feet tall.

HVAC System: Cooling Tower and Heat Pump

Pressurization Systems and Garage C.O Control

(2007-2008)

Page 3: B&R Engineering Corp

Arkin Construction Co. 1827 Purdy Avenue

Miami Beach, Fl 33139

Phone: (305) 538-8721

West Brickell Apartments 925 SW 1st Ave

Miami, Florida (14 Floors)

Performed: 1995-1996

West Brickell Apartment is a 14 story mid-rise building located in downtown Miami for low income rental units.

HVAC System: PTAC Units and Direct Expansion

(1995-1994)

200 Ocean Drive Condo 200 Ocean Drive

Miami Beach, Fl.

Performed: 1997-1999

200 Ocean Drive is an eight story Condominium

with 20 apartments. HVAC System: Direct Expansion (1997-1999)

Page 4: B&R Engineering Corp

Altman Contractor 1515 S. Federal Hway, Suite 300

Boca Raton, Fl

Phone: (305) 970-7426

Sapphire Condos

2883 North Ocean Blvd

Ft Lauderdale, Florida

Performed: 2007-2008

Sapphire Condo consists of a pair of mid-rise (12 story) buildings located in Ft. Lauderdale.

There are 172 apartments for both buildings HVAC System: Direct Expansion, Pressurization

Systems and Garage C.O Control (2007-2008)

______________________________________________________________________________

Wass-Phillips-Adler Group 1400 NW 107 Ave

Miami, Fl 33172

Phone: (305) 392-4061

Homeless Assistance Center 28205 SW 125 Ave

Homestead, Florida

Performed: 1998-1999

The 300 bed-unit South Dade Center has facilities for single and family residents and includes a multi-purpose room, vocational center, child care facility

and medical facilities.

HVAC System: Direct Expansion (1998-1999)

Page 5: B&R Engineering Corp

Design Management & Builders 5514 NW 72 Ave

Miami, Fl 33166

Ph: (305) 218-1586

Miami River Park (14th Floors, 183 Apartments)

Miami, Florida

Performed: 2000-2001

Miami River Park Apartment is a 14 story building

with 183 Apartment, 7 townhouses and common areas located in Miami designated for affordable housing

HVAC System: Direct Expansion, PTAC Units

and Pressurization (2000-2001)

Paradise Point Condos 11060 SW 196

th Street

Miami, Florida (192 Apartments)

Performed: 2004- March 2005

Consist of 3 building with 192 apartments of affordable housing

HVAC System: Direct Expansion, Pressurization

and 100 % Outside Air RTU (2004-2005)

Page 6: B&R Engineering Corp

Design Management & Builders (Continued)

Bridge Water Condos

1881 NE 79 Street

City of North Bay (21 Floors)

Performed: 2004-2006

The Bridgewater is a luxury Condo located in North Bay Village. The building is 21 stories

with 118 units.

HVAC System: Cooling Tower & Heat Pump,

Pressurization and 100 % Outside Air RTU

(2004-2006)

Moon Bay Condos

500 N.E 29 Street

Miami, FL 33137

Performed: 2006-2007

Moon Bay Condo condominium is located in the Midtown area Miami, Florida. The building is 12

stories with 61 units HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU

(2006-2007)

Biscayne Court 5514 NW 72 Avenue

Miami, Florida

Performed: 2008-2009

This project consisted of an (8) story building of

affordable housing. Total (60) Apartments

HVAC System: Split Systems, 100% OA RTUs

Page 7: B&R Engineering Corp

Design Management & Builders (Continued)

Blue-water at Tavernier 100 Burton Drive

Tavernier, Florida 33070

Performed: 2010-2011

This project consisted of single story buildings of

affordable housing. Total (36) apartments &

Clubhouse

HVAC System: Split Systems, 100% OA RTUs

Casa Matias Apartments 14340 SW 260 Street

Homestead, Florida

Performed: 2010-2011

This project consisted of an (8) story building of

affordable housing. Total (80) Apartments &

Parking

HVAC System: Split Systems, 100% OA RTUs

Sclad Plaza 5201 East 2

nd Street

Hialeah, Florida

Performed: 2009-2010

This project consisted of a (4) story building of

affordable housing. Total (18) Apartments &

Parking

HVAC System: Split Systems

Page 8: B&R Engineering Corp

Design Management & Builders (Continued)

Rita Gardens Center 10201 NW 58

th Street

Doral, Florida

Performed: 2010-2011

This project consisted of a (4) story Commercial

Building & Parking

HVAC System: Split Systems, 100% OA RTUs

____________________________________________________

John Moriarty & Associates

1942 Tyler Street

Hollywood, Florida 33020

Cordoba at Doral, Phase II 8070 NW 53

rd Street

Doral, Florida

Performed: 2011-Present

This project consists of Two (4) story Rental Residential & Commercial Building with a total of

(230) Apartments and Clubhouse.

HVAC System: Split Systems, 100% OA RTUs

Page 9: B&R Engineering Corp

Jose Milton & Associates

International Builders Co 3211 Ponce de Leon Blvd.

Coral Gables, Fl 33134

Center Way Club Apartments

7771 NW 7th

Street

Miami, Florida 33126

Performed: 2002-2003

This project is at the intersection of the Dolphin Expressway and the Palmetto. The project

consists of a complex of Three Buildings of ten stories each. There are a total of 344 apartments.

HVAC System: Direct Expansion, pressurization and 100 % Outside Air RTU

(2002-2003)

Page 10: B&R Engineering Corp

Jose Milton & Associates (Continued)

The King David Condos NE corner 175

th & Atlantic

Sunny Isles, Florida (15 Floors)

Performed: 2003-2004

This project is a 15 story mid rise condominium located in Sunny Isles

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU (2003-2004)

Country Club Tower 18255 NW 68

th Ave.

Miami, Florida

Performed: 2007-Jan 2008

This project consist of a total of 330 rental

apartments

HVAC System: Direct Expansion and RTU

(2007-2008)

Brickell First Apartments

101 SW 13th

Street

Miami, Florida

Performed: 2009-2010

This project consisted of a (22) Story building with 131

rental apartments

HVAC System: Split Systems, RTUs, Ventilation,

pressurization and Smoke Evacuation

Page 11: B&R Engineering Corp

Milton Construction Co. 3711 SW 27

th Street

Miami, Florida 33134

Phone: (305) 444-8326

Alhambra Grand Plaza Condo 2000 Douglas Road

Coral Gables, Florida

Performed: 2003-2004

This project is a ten story condominium with 120

luxury Apartments located in Coral Gables

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU and Garage CO

Control System (2003-2004)

Nautica Condominium 5970 Indian Creek

Miami Beach, Florida

Performed: 2002-2003

This project is a six story condominium with 33

luxury units located in Miami Beach

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU (2002-2003)

Page 12: B&R Engineering Corp

Milton Construction (Continued)

Altos de Miami

SW 22 Ave. & Flagler

Miami, Florida

Performed: 2006-2007

This project is a 17 Stories mid-rise building with 131

residential units and 10,000 sq. ft. of retail space in

the ground floor located in Little Havana.

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU and Garage

Ventilation (2006-2007)

San Lorenzo 12 Ave & NW 2

nd Street

Miami, Florida (12 Floors)

Performed: 2007-2008

This project is a 12 Stories mid-rise apartment building located in Little Havana

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU and Garage

Ventilation (2007-2008)

Page 13: B&R Engineering Corp

Milton Construction (Continued)

Coco-walk Extension

Grand Avenue Coconut Grove

Miami, Florida

Performed: 2001-2002

This project is a 12 Stories Apartment Building located in Coconut Grove

HVAC System: Cooling Tower and Heat Pump,

Garage Ventilation (2001-2002)

_____________________________________________________________________________

B. J & K Construction 970 West Mc Nab Road

Fort Lauderdale, Florida

Phone: (954)-974-9181

Midtown Lofts 3180 Coral Way (15 Floor)

Miami, Florida

Performed: 2004-2006

This project is a 15 stories loft mid rise building located in Coral Gables

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU and Garage

Ventilation (2004-2006)

Page 14: B&R Engineering Corp

B. J & K Construction (Continued)

Villa Patricia Phase I 234 NE 79

th Street

Miami, Florida (12 Floors, 124 Apartments)

Performed: 2008 - Jan 2009

This project is a 12 story building with 124

apartments of affordable housing in Miami

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU (2008-2009)

Coral Place 1101 NW 54

th Street

Miami, Florida (10 Floors, 100 Apartments).

Performed: 2007- Dec 2008

Coral Place is a 10 story building with 100

apartments of affordable housing in Miami

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU (2007-2008)

Page 15: B&R Engineering Corp

Miller and Solomon 8491 NW 17

th Street Suite L

Miami, Florida

Phone: (305) 898-8100

The Yorker Condos 444 NE 30

th Street

Miami, Florida (11 Floors)

Performed: 2002-2003

This project consisted of a 11 story condo building

located in Miami.

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU and Garage

Ventilation (2002-2003)

______________________________________________________________________________

Build-Tech L.L.C 407 Lincoln Road-Suite 8R

Miami Beach, FL 33139

Phone: (305) 345-7174

Atlantic Building 119 Washington Avenue

Miami Beach, Florida

Performed: 1999-2000

Eight Story Office Building located in Miami Beach

HVAC System: Cooling Tower and Heat Pump

pressurization and 100 % Outside Air RTU and

Garage Ventilation (1999-2000)

Page 16: B&R Engineering Corp

Built-Tech LLC (Continued)

The Wave Hotel 350 Ocean Drive

Miami Beach, Florida

Performed: 1999-2000

Hotel Conversion

Existing Building was demolished in the interior and

converted into a boutique hotel in Miami Beach

HVAC System: Direct Expansion and Room Air

Flow Control (1999-2000)

____________________________________________________

V.M. Construction 2973 SW 36

th Ave

Miami, Florida

Ph (305) 970-3683

Belen Jesuit Arts Center

500 SW 127th

Avenue

Miami, Florida

Performed: 2002-2004

(Auditorium/100 R. Tons) (2002-2004)

(Administration Office) (2003-2005)

HVAC System: Direct Expansion, RTU

Page 17: B&R Engineering Corp

Cazo Construction 3461 SW 8th Street

Miami, Florida

Phone: (305) 448-1898

Elizabeth Virrick Center Cultural and Sport Center

3255 Plaza Street

Miami, Florida

Performed: 1999-2000 HVAC System: Direct Expansion (1999-2000)

Jubilee Villas 627 NW 11 Ave

Miami, Florida

Performed: 2001-2002

Project Consists of 30 Affordable homeownership Units Funding from the City of Miami Department of Community Development

HVAC System: Direct Expansion and Ventilation

(2001-2002)

Page 18: B&R Engineering Corp

Cazo Construction (Continued)

Latin Quarter Center

1433 SW 8th

Street

Miami, Florida.

Performed: 2002-2004

Project Consists of 45 Homeownership Units Funding from the City of Miami Department of Community Development

HVAC System: Direct Expansion, pressurization

and 100 % Outside Air RTU and Garage

Ventilation (2002-2004)

____________________________________________________

Zurqui Construction 10421 N.W 28

th Street

Miami, Florida 33172

Phone: (305) 597-8869

F.I.U President’s House

107 Avenue & 14 Street (Main Campus)

Miami, Florida.

Performed: 2000-2001

This project was the main residence for the president of the university. The project consisted of seven system with sophisticated control system.

HVAC System: Direct Expansion and Control

System (2000-2001)

Page 19: B&R Engineering Corp

Groden/Stamp Construction 65 NW 168

th Street

North Miami Beach, Fl

Phone: (305) 493-1243

Marriot Court Yard 1530 Washington Ave

Miami Beach, Fl

Performed: 2000-2001

This project is located in Miami Beach and consisted

of a full mechanical renovation of the HVAC

systems to an existing building

HVAC System: Chiller and Fan Coils (150 Tons)

(2000-2001)

Inres / Lindsay Building 235 Lincoln Rd

Miami Beach, Florida

Performed: 2001-2002

This is an office building located in Miami Beach

HVAC System: Chiller and Fan Coils (150 Tons)

(2000-2001)

Page 20: B&R Engineering Corp

M.C.M Corp 6201 SW 70 Street, 2

nd Floor

Miami, Fl 33143

Phone: (305) 541-6869

Windwood Loft 250 N.W 23

rd Street

Miami, Fl 33137

Performed: 2004-2005

This project consisted of a six story building

for affordable housing

(Over Town Development)

HVAC System: Direct Expansion and

Garage Ventilation (2004-2005)

______________________________________________________________________________

F.I.R.C 6201 SW 70 Street, 2

nd Floor

Miami, Fl 33143

Phone: (305) 541-6869

Shoppes at Doral 107 Avenue N.W 36

th Street

Miami, Florida

Performed: 1999-2000

This project consisted of Roof Top Units serving

several commercial spaces for future tenants

HVAC System: Roof Top Units

Page 21: B&R Engineering Corp

Port of Miami 1015 N American Way

Miami, Florida

Performed: 2009-2010

This project consisted of Split Systems serving

Passenger Boarding Bridges

HVAC System: Split Systems

Pembroke Pines Complex Senior Residence

501 NW 103rd Ave

Pembroke Pine, FL

Performed: 1995-1996

This project consist of Two Buildings of Six

Stories for Affordable Housing

HVAC System: Split Systems, PTAC Units

Mater Academy 7901 NW 103 Street

Hialeah, Florida 33016

Performed: 2007-2008

This project consisted of an educational facility

HVAC System: Split Systems, RTUs,

Ventilation and Smoke Evacuation

Page 22: B&R Engineering Corp

ADDITIONAL PROJECTS

GENERAL CONTRACTOR PROJECT NAME

AAYRA Supply and Discharge Well (Metro-Dade)

Altman Construction (5) Retail Stores at Satori Condo, Ft Lauderdale

A.N.F Construction Hialeah Cancer Center

Arkin Construction River Mont Apartments (Affordable Housing)

Arkin Construction Union Bank Building (Intersection 107 Ave N.W 25 Street)

Biscayne Housing Super-Market Store at South Miami Avenue

Biscayne Housing Super-Market Store at Flagler Street

Castle Group Academic, 70,000 SQFT Learning Facility, On-Going

Cazo Construction West Haven

Corradino Group Univision

Design Management Georgia Ayers (72) apartments, low income On-Going

Epic Construction Macabi Cigars at South Beach

F.B.S T.R.T (3) 14 stories Miami-Dade Housing On-Going

F.B.S Casablanca Hotel / Condo, (271) units, Miami Beach

Fenton Construction Monty’s Restaurant (Miami)

Fenton Construction Monty’s Restaurant (Key West)

F.I.R.C Jacaranda Plaza Shoppes

Ibero Construction Coral Gable Woman Club

J.S.K Construction Toras Academy

Jose Milton & Associates Colony at Dadeland (92) apartments

Jose Milton & Associates Intercostals Yatch Club (Roof Equipment Replacement)

John Moriarty & Associates Veranda II (197) apartments, On-Going

KM Plaza North Beach Senior Center

KM Plaza Giraffas Restaurant

KM Plaza Broadspan at Brickell

Page 23: B&R Engineering Corp

KM Plaza Damiani, Saw-grass Mall

KM Plaza Pagnifique, (3) Chillers, Industrial, Miami

KM Plaza American Express at Brickell, Miami

Los Ranchos Los Ranchos at Bayside

Milton Construction Camelot (57) Apartments, On-Going

Network Construction 364 Minorca Avenues

Network Construction Cordis Medical Building

Soares Da Costa Miami Dade Kendal Campus, Building No.5

Soares Da Costa Miami Dade – School of Art

Sierra Construction Coulter Laboratories, Medical Facility

Trigram Construction Buffalo Wild Wings

Trigram Construction Porto Cervo, Fisher Island

Trigram Construction Yogurtbella, Store

Trigram Construction Zoom Tan Store in Kendall

Trigram Construction Play-Au-Lait at Downtown Dadeland

Trigram Construction Vanderbilt at Fisher Island, On-Going

Unitech Builders The Police Station 2950

Was Phillip Adler Just For Feet (Coconut Grove)


Recommended