Brackish Stream Treatment Plan. Possum Engineering: Josh Ogle Meg Przybyla Kyle Smith Alex Stodtmeister 12 April 2013. Problem. Brackish Stream running backyard Desire to “go green” and make use of stream - PowerPoint PPT Presentation
Popular Tags:
17
Brackish Stream Treatment Plan Possum Engineering: Josh Ogle Meg Przybyla Kyle Smith Alex Stodtmeister 12 April 2013
Transcript
Page 1: Brackish Stream Treatment Plan

Brackish Stream Treatment Plan

Possum Engineering:Josh Ogle

Meg PrzybylaKyle Smith

Alex Stodtmeister

12 April 2013

Page 2: Brackish Stream Treatment Plan

Problem

• Brackish Stream running backyard

• Desire to “go green” and make use of stream

• Possum Engineering chosen to explore the option and choose the most viable option

Possum Engineering 2

Page 3: Brackish Stream Treatment Plan

Field Work

• GPS Mapping of Dr. Chandler’s Property

• Water Quality Analysis

• Water Capacity Analysis

Possum Engineering 3

Page 4: Brackish Stream Treatment Plan

Field Work - GPS Mapping

Possum Engineering 4

Page 5: Brackish Stream Treatment Plan

Results - GPS Mapping

Possum Engineering 5

Page 6: Brackish Stream Treatment Plan

Field Work - Water Quality Analysis

Possum Engineering 6

Page 7: Brackish Stream Treatment Plan

Field Work - Water Quality Analysis

Possum Engineering 7

• On-site analysis with water quality sondes– Dissolved oxygen, specific conductivity,

temperature, pH, chlorophyll• Samples taken for further testing at BYU– Total solids, total suspended & volatile solids– Chemical oxygen demand– Metal concentrations

Page 8: Brackish Stream Treatment Plan

Results – On-site Analysis

LocationTemp

[°F]

pH

[Units]

SpCond

[µS/cm]

Sal

[ppt]

TDS

[g/l]

LDO%

[Sat]

LDO

[mg/l]

Chlorophyll

[µg/l]

Mouth 60.09 8.86 4057 2.21 2.6 105.7 8.61 0.36

Throat 58.6 8.90 4060 2.21 2.6 106.0 8.79 0.35

SD 61.1 8.84 4053 2.21 2.6 106.8 8.61 0.36

Possum Engineering 8

Page 9: Brackish Stream Treatment Plan

Results – Solids and COD

LocationTotal Solids

[mg/L]Total Suspended Solids [mg/L]

Total Volatile Solids

[mg/L]

COD

[mg/L]

Mouth 3904.1 2.64 1.025 4.3

Throat 3870.4 2.65 0.395 4.6

SD 4645.6 3.25 0.44 3.6

Possum Engineering 9

Page 10: Brackish Stream Treatment Plan

Results - ICP

IonMouth

[ppm]

Throat

[ppm]SD [ppm]

Ca 653.80 746.90 672.30

K 86.55 75.36 65.67

Mg 180.80 181.80 158.90

Na 132.70 139.00 114.60

S 470.90 523.80 449.20

Possum Engineering 10

Page 11: Brackish Stream Treatment Plan

Possum Engineering 11

Results – Water Chemistry

Mineral log IAP Sat. indexAragonite -6.479 1.803Artinite 8.082 -2.21Brucite 14.879 -2.877

CaCO3xH2O(s) -6.479 0.61Calcite -6.479 1.954CaS(s) -9.61 -20.79

Dolomite (disordered) -13.276 2.997Dolomite (ordered) -13.276 3.587

Epsomite -5.046 -2.853Gypsum -4.728 -0.112

Halite -4.142 -5.671Huntite -26.87 2.478

Hydromagnesite -12.309 -4.8KCl(s) -4.558 -5.458Lime 15.197 -18.618

Mineral log IAP Sat. indexMagnesite -6.797 0.778

Mg(OH)2 (active) 14.879 -3.915Mg2(OH)3Cl:4H2O(s) 19.207 -6.793

MgCO3:5H2O(s) -6.797 -2.257MgS(s) -9.928 -27.608

Mirabilite -7.107 -5.536Natron -8.858 -7.168

Nesquehonite -6.797 -2.266Periclase 14.879 -7.575

Portlandite 15.197 -8.247Sulfur -11.135 -9.084

Thenardite -7.107 -7.481Thermonatrite -8.858 -9.555

Vaterite -6.479 1.361

Page 12: Brackish Stream Treatment Plan

Possum Engineering 12

Slingshot Option

• 264.2 gallons of water/day

Cost - $100,000

Page 13: Brackish Stream Treatment Plan

Possum Engineering 13

Heat Exchange Option

Cost - $20,000ROI - $1,200/year(Cutting Power Bill by 42-50%)

• 15,000 linear feet of pipe lay coiled 10 feet underground in horizontal slinky loop

• Paxman Heating installed Dr. Astle’s system

Page 14: Brackish Stream Treatment Plan

Possum Engineering 14

Water Purification Option

Total Cost ≈ $15,500ROI ≈ $420/year

(If 50% of monthly water use provided by RO System)

COST ≈ $500

COST ≈ $14,250

COST ≈ $250

Page 15: Brackish Stream Treatment Plan

Possum Engineering 15

Legal Constraints• After receiving all

Water Users' Claims, the State Engineer then prepares a proposed determination of water rights of all water users in the drainage or sub-drainage that is served on water users and filed in court

Page 16: Brackish Stream Treatment Plan

Possum Engineering 16

Final Recommendation • Ground Heat Exchange System

Benefits:• Cut Power Bill in half

Investment Cost:• $20,000

Return on Investment:• $1,200 per year• Pay for itself in 16 years

Page 17: Brackish Stream Treatment Plan

Possum Engineering 17

Acknowledgements• Dr. Mike Chandler• Dr. Gus Williams• Dr. Jim Nelson• Dr. Wood Miller• Dr. Craig Astle• Craig Hammer• Paxman Heating• Jay Sandberg, P.E.• Phil Stewart• Zola Adjei