BREAK BULK CONSOLIDATION Location Laem Chabang, Thailand Duration 5 Days SCOPE CEA Project Logistics were employed to receive 83 pieces of break bulk cargo from Khao Hin Son, Thailand. The cargo would be consolidated at the CEA cargo consolidation facility in Laem Chabang and preapred for load out at Laem Chabang Port. The cargo consisted of oil refinery parts bound for Mongla, Bangladesh. CEA PROVIDED Man power Cranes, reach stacker, forklifts Cargo consolidation lay down area Lifting equipment as neccessary Trucks, trailers, specialised trailers Transportation from Laem Chabang - LRT Supervise load out operation Port communication, wharfage and handling CASE STUDY CS008 Break Bulk Consolidation 1/2 BREAK BULK CONSOLIDATION As of 2011 Laem Chabang port became the 22nd busiest container port in the world. Much of the international shipping reaching Thailand goes through Laem Chabang OIL REFINERY LADDER SECTION
Transcript
Page 1: Break Bulk Consolidation

BREAK BU

LK CON

SOLID

ATIONLocation

Laem Chabang, Thailand

Duration

5 Days

SCOPE CEA Project Logistics were employed to receive 83 pieces of break bulk cargo from Khao Hin Son, Thailand. The cargo would be consolidated at the CEA cargo consolidation facility in Laem Chabang and preapred for load out at Laem Chabang Port. The cargo consisted of oil refinery parts bound for Mongla, Bangladesh. CEA PROVIDED • Man power • Cranes, reach stacker, forklifts • Cargo consolidation lay down area • Lifting equipment as neccessary • Trucks, trailers, specialised trailers • Transportation from Laem Chabang - LRT • Supervise load out operation • Port communication, wharfage and handling

CASE STUDY CS008Break Bulk Consolidation 1/2

BREAK BULK CONSOLIDATION

As of 2011 Laem Chabang port became the 22nd busiest container port in the world. Much of the international shipping reaching Thailand goes through Laem Chabang

OIL REFINERY LADDER SECTION

Page 2: Break Bulk Consolidation

CEA PROJECT LOGISTICS

41/13 M1 AO-UDOM ROAD

TUNGSUNGKHLA

SRI RACHA

CHONBURI 20230

THAILAND

+66 38 354 019

www.ceaprojects.com

BREA

K BU

LK C

ON

SOLI

DAT

ION

CASE STUDY CS008Break Bulk Consolidation 2/2

LADDER SECTIONS ARRIVE

CARGO ARRIVES AT LAEM CHABANG

CARGO COVERED WITH TARPAULIN

CEA REACH STACKER UNLOADS THE CARGO

CARGO LOADED AND PREPARED FOR PORTCARGO IN THE CEA CONSOLIDATION AREA

CARGO PREPARED FOR LOADING AT PORTUNLOADING AT LAEM CHABANG PORT

CARGO SECURED IN THE SHIPS HOLDCARGO LOADED ONTO THE TWIN DECKS

A CONVOY OF CEA PRIME MOVERS ARRIVE AT LAEM CHABANG PORT

All tarpaulins used in this project are manufactured onsite at the CEA plastics facility in Laem Chabang Thailand