+ All Categories
Home > Documents > Brewer Marina Bay Boston2r1zv21ppnasx281823qrrr1-wpengine.netdna-ssl.com/... · Brewer Marina Bay...

Brewer Marina Bay Boston2r1zv21ppnasx281823qrrr1-wpengine.netdna-ssl.com/... · Brewer Marina Bay...

Date post: 09-May-2019
Category:
Upload: vuphuc
View: 214 times
Download: 0 times
Share this document with a friend
2
Brewer Marina Bay Boston 2016/2017 Storage & Dockage Lease Agreement 333 Victory Road N. Quincy, MA 02171 (P) 617-847-1800 (F) 617-847-1840 marinabay@shmarinas.com Name Address City/State/Zip Home# Work# Cell# Email DOCKAGE: Boat Name Mfg / Model/Yr Boat Length Draft Reg # / USCG Doc# Insurance Co Name Policy# ELECTRICITY FLAT RATE PER SEASON: Beam Slip# Exp Date Less than 26' $ 2,800 • 30 Amp= $300 • (2) 30 Amp= $500 *Does not apply to 26' to 31' $ 140/ft • 50 Amp= $500 • (2) 50 Amp= $750 vessels under 26' 32' and up $ 165/ft • 100 Amp= $1,000 Minimum LOA's apply to all docks. T-Head +5% NEW CUSTOMER INCENTIVES Dockage $5/ft Off Storage - $5/ft Off ** New customer is defined as anyone who has not been a customer within last 12 months. Cannot be combined with any other promotion. ** OUTSIDE WINTER STORAGE o $58/ſt With Dockage o $68/ft Storage Only Includes: Haul, Wash, Block & Launch in spring PAYMENT OPTIONS SUMMER DRY STORAGE WET WINTER STORAGE D Option 1 - Payment in full o $68.00 per linear ſt D $75/FT+ Electric D $85/ft Live-Aboard+ Electric D Option 2 - Payment plan (May 1, 2017 - Oct. 31, 2017) Vessels subject to inspection for wet storage A 5% convenience fee a1mlies to 0tion 2 O�tion 2 - PAYMENT PLAN PAYMENT CALCULATOR Check Payment type: 2017 Dockage $ D Credit Card • 25% payment due upon signing 2016/17 Winter Storage $ D Check 5% Discount (in full/10-1) $ o Cash • 25% payment due December 1 Convenience Fee 5% $ D Auto Pay Environmental Fee $ 25.00 Contracts due by Nov. 1, 2016 to reserve slip • 25% payment due February 1 Electric Hook-Up Fee $ Note: • Final Payment due April 1 TOTAL $ Payment plans must remain current Less Deposit $ to maintain reserved slip. Balance $ Divide Bal by# of Remain Pymts Payment Plan Amount $ Winter storage & dockage fees will be charged by Length Over All (LOA) of the vessel or the slip minimum, if applicable, in accordance with manufacturing specifications. There are no refunds on storage & dockage fees. Winter storage season is November 1st - April 30th. Dockage season is May 1st - October 31st. For Storage Customers Onl Storage and winterization charges are billed separately. All contracts must be guaranteed with a major credit card. Contracts received without a credit card to guarantee payment will not be processed. Finance charges will occur at a rate of 1.5% per month on all past due accounts. I hereby give my permission for my credit card to be processed. I have read, understood, and agree to the terms and stipulations of the Harbor Rules & Regulations on both sides of this agreement. Credit Card# Exp. Date I Signature: Date I ---------------------------- /20
Transcript

Brewer Marina Bay Boston 2016/2017 Storage &

Dockage Lease Agreement

333 Victory Road

N. Quincy, MA 02171

(P) 617-847-1800

(F) 617-847-1840

[email protected]

Name

Address

City/State/Zip

Home#

Work#

Cell#

Email

DOCKAGE:

Boat Name

Mfg / Model/Yr

Boat Length

Draft

Reg # / USCG Doc #

Insurance Co Name

Policy#

ELECTRICITY FLAT RATE PER SEASON:

Beam

Slip#

Exp Date

Less than 26' $2,800 • 30 Amp= $300 • (2) 30 Amp= $500 *Does not apply to

26' to 31' $140/ft • 50 Amp= $500 • (2) 50 Amp= $750 vessels under 26'

32' and up $165/ft • 100 Amp= $1,000

Minimum LOA's apply to all docks. T-Head +5%

NEW CUSTOMER INCENTIVES

Dockage $5/ft Off Storage - $5/ft Off ** New customer is defined as anyone who has not been a customer within last 12 months. Cannot be combined with any other promotion. **

OUTSIDE WINTER STORAGE

o $58/ft With Dockage o $68/ft Storage Only

Includes: Haul, Wash, Block & Launch in spring

PAYMENT OPTIONS SUMMER DRY STORAGE WET WINTER STORAGE

D Option 1 - Payment in full o $68.00 per linear ft D $75/FT + Electric

D $85/ft Live-Aboard+ Electric

D Option 2 - Payment plan (May 1, 2017 - Oct. 31, 2017) Vessels subject to inspection for wet storage

A 5% convenience fee a1mlies to 0(!tion 2 O�tion 2 - PAYMENT PLAN PAYMENT CALCULATOR

Check Payment type: 2017 Dockage $ D Credit Card • 25% payment due upon signing 2016/17 Winter Storage $ D Check 5% Discount (in full/10-1) $ o Cash • 25% payment due December 1 Convenience Fee 5% $ D Auto Pay Environmental Fee $ 25.00

Contracts due by Nov. 1, 2016 to reserve slip • 25% payment due February 1 Electric Hook-Up Fee $

Note: • Final Payment due April 1 TOTAL $ Payment plans must remain current Less Deposit $ to maintain reserved slip. Balance $

Divide Bal by# of Remain Pymts

Payment Plan Amount $ Winter storage & dockage fees will be charged by Length Over All (LOA) of the vessel or the slip minimum, if applicable, in accordance with manufacturing specifications.

There are no refunds on storage & dockage fees.

Winter storage season is November 1st - April 30th. Dockage season is May 1st - October 31st.

For Storage Customers Onlll

Storage and winterization charges are billed separately.

All contracts must be guaranteed with a major credit card. Contracts received without a credit card to guarantee payment will not be processed.

Finance charges will occur at a rate of 1.5% per month on all past due accounts. I hereby give my permission for my credit card to be processed.

I have read, understood, and agree to the terms and stipulations of the Harbor Rules & Regulations on both sides of this agreement.

Credit Card# Exp. Date I

Signature: Date I ----------------------------

/20


Recommended