Darren Draper Sinem Sargin Ryan Vo Marquel Jones-Francis. Bridge and ROV System. Exploring Engineering Darin Gray Group 5 July 15 th , 2011. Our Build Plan and Process. General Process. - PowerPoint PPT Presentation
Popular Tags:
17
Exploring Engineering Darin Gray Group 5 July 15 th , 2011 Darren Draper Sinem Sargin Ryan Vo Marquel Jones-Francis
Transcript
Page 1: Bridge and ROV System

Exploring EngineeringDarin Gray

Group 5July 15th, 2011

Darren DraperSinem Sargin

Ryan VoMarquel Jones-Francis

Page 2: Bridge and ROV System
Page 3: Bridge and ROV System

To better understand bridges, we used design programs, index card tests, and sample structures to get an idea of how we wanted our final bridge to turn out

Once we created a successful scale model, we constantly refined it and added newer and stronger portions to our full scale bridge

We also created the ROV within the length limits and finally tested the strength of the completed bridge

Page 4: Bridge and ROV System

First Step: Before we could start drawing or thinking

about our designs, we used a Bridge Design Program to better understand the basic structure, tension and compression of bridges

We determined that the ratio of size of the bridge and the ROV are directly proportional

Page 5: Bridge and ROV System

Second Step: After we used the design program, we

created a very basic design of a bridge on paper and determined the dimensions within the parameters given

We also used trial and error design methods to test strengths and weaknesses in design

We also began making some sketches of the ROV model

Page 6: Bridge and ROV System

Third Step: We then spent a lot of time determining

how much material we would use and refined our design to get rid of any weak points in the design

This step mainly focused on material management and reinforcement of design pieces

The ROV plan was finalized and reviewed for efficiency and stability

Page 7: Bridge and ROV System

Fourth Step Once we had a list of all of the items we

would need to construct the bridge, we began systematically cutting, gluing, and constructing the bridge pieces

We interchanged parts of the ROV for stronger and/or lighter parts in hopes to create a successful design

Page 8: Bridge and ROV System

Once we finished constructing the bridge, we added in as many final supports that we could and we tested the final product with the ROV!

Page 9: Bridge and ROV System

With only four group members, we relied heavily on each other to work together and get the job done well

The success we had was because of our clear plan from the beginning and great teamwork and work management

Splitting into two groups helped us focus on two different but related tasks and greatly increased the amount of work we were able to get done

Page 10: Bridge and ROV System

Darren Draper helped with the design and construction of the bridge and ROV

Sinem Sargin helped with the design and construction of the bridge as well as taking pictures

Ryan Vo helped with the design and construction of the ROV

Marquel Jones-Francis helped the design and construction of the ROV

Page 11: Bridge and ROV System

Overall, we didn’t face many obstacles throughout construction

After seeing many designs of other groups and online, the design of the bridge changed on a day to day basis with new information that we learned◦ This made us rethink the best design to create a

bridge, but we made sure we never made cuts until we knew exactly how it was going to look

Our main obstacle was that the ROV was too big for the bridge width◦ We eventually redesigned the ROV three times to

create the best size possible

Page 12: Bridge and ROV System

We also faced some problems with the ROV construction, making sure it had enough power, and making sure everything was tight and compact◦ This problem was not fully overcome by the end

of day two of design/building, and thus why our robot is not fully functional

◦ This problem posed the biggest threat to our success because our bridge was strong enough to hold the ROV, but the ROV had trouble getting mobile

Page 13: Bridge and ROV System

Instead of building the entire bridge as one big piece, we tried to separate the sections and then connected them at the end◦ This decreased strength because not all

measurements were perfect, and made it harder to put it all together

When we cut the Balsa wood, the wood would splinter or crunch, and decrease integrity of the pieces we put together◦ We solved this by doubling and trpling some

sections of the bridge we constructed in hopes of strengthening the supports

Page 14: Bridge and ROV System

We also had a lot of trouble correlating the design measurements of the ROV and bridge and that took time and labor to fix

Another obstacle we ran into was time◦ Although we were given two days to construct the

bridge and ROV, it still wasn’t enough time to create a perfect ROV that filled all of our expectations

Page 15: Bridge and ROV System

We would improve the project first and foremost by getting better, stronger pieces of wood to work with◦ The Balsa wood given was an equivalent to sponge, and

lacked concrete strength to begin with

Another path we would take if we had more time, would be attempting to plan in depth to create a design that would use less materials, and use them in the most beneficial way possible

We would also improve the project by trying to find a smaller robotics kit to make a smaller but still capable robot to do the job◦ This would take some stress off the bridge design and

allow it to be as small as possible

Page 16: Bridge and ROV System

First and foremost, we all learned that frustration and exhaustion is part of engineering. ◦ This is just a fact of eningeering of every type of engineering and we definitely felt the

effects of it after putting in two 11 hour days

We again learned about the importance of job distribution and the need for good communication between partners

With only four group members, we split into two groups and focused two people on the bridge and two people on the ROV-this saved time, focus, and materials

We learned a lot about material consumption and more importantly, the importance of precision of creation. ◦ Even though we may have designed the pieces correctly, it was important that we cut

them and glue them together in a fashion that maintained strength and integrity of the bridge without using too much material

We learned about the importance of the step-by-step process needed before construction can even start◦ Planning is key to an engineers success and always relying on basic sketches and designs

will ensure that success

We also learned the importance of team work and division of labor◦ Without this fact in mind, we wouldn’t have been able to finish as much as we did

Page 17: Bridge and ROV System