3
First – a wee bit history
4th April 2000
– Holyrood Building Debate –
A presentation was arranged prior to the debate
ONLY SIXTEEN MSPs TURNED UP
15th January 2009
- Forth Replacement Crossing Debate –
Scotland’s biggest ever project.
ONLY SEVENTEEN MSPs TURNED UP
So before we start let’s deal with the politicians
4
SCOTLAND’S RECENT
MAJOR PROJECTS RECORD
UK average motorway cost per
mile is £30m
M8 motorway missing link and
other work to cost £415m
M8 was £70m per mile
5
EDINBURGH TRAMS
Now over £1,000 million
The TIE Directors who made a mess of this resigned
They were awarded severance payment totalling
£406,635.
Originally 2003 cost was £375 million
6
SKYE BRIDGEcost £25m
now £93m
BORDERS
RAILWAYWas £155m now £295M
Edinburgh Infirmary
Cost £185m
Repayment £1,000+
Stirling-Kincardine
Railway line-just finished
needs to be rebuilt
Would you like to see some more
disasters for the taxpayer?
7
Wendy AlexanderSarah Boyack Iain Gray Nicol Stephen
Tavish Scott Jack McConnell Stewart Stevenson Keith Brown
Holyrood started business in 1999
How many Ministers of Transport
do you think have been appointed ?
Less than two years in office????
Alex S
“870 of the 1,041 orders have gone to Scottish companies” (84%)
Something’s missing Alex!!
“118 Subcontracts awarded to Scottish firms from the total of 155” (76%)
First Minister’s Questions 2 Feb 2012
Who is actually building the bridgeCONTRACT COMPANY NATIONALITY
CONSTRUCTIONCONSORTIUM
DRAGADOS SPANISH
HOCHTIEF GERMAN
AMERICAN BRIDGE USA
MORRISON CONSTRUCTION ENGLISH (Now)
9
CONTRACT COMPANY NATIONALITY
MAJORMANUFACTURERS
Zhenhua Heavy Industries CHINA
Tecade-Megusa SPAIN
Crist-Gdansk POLAND
Cleveland Bridge ENGLAND
Scottish contractor awards = £143 million (1%)
“870 of the 1,041 orders have gone to Scottish companies” (84%)
“118 Subcontracts awarded to Scottish firms from the total of 155” (76%)
Cable Stayed Bridge
11
Before we begin you should be you should be
aware of the difference between these structures
A SUSPENSION BRIDGE
A CABLE STAYED BRIDGE
A MULTIMODAL BRIDGE
SUSPENSION BRIDGE STRUCTURE
ORIGINAL FORTH ROAD BRIDGE
14
LET’S START WITH A LOOK AT THE
GOVERNMENT’S COST OF THE 1965
FORTH ROAD BRIDGE
Their 1965 cost is £19.5m
Their 2005 inflation figure is £250
My 2016 inflation figure is £340m
Their data can be verified on their web
15
STRUCTURE COST COMPARISON
The old bridge is a
SUSPENSION BRIDGEThe new bridge is a CABLE
STAYED BRIDGE
Structural engineers will tell you that suspension bridges are
10% more expensive than cable stayed bridges
SO WHY IS THE NEW BRIDGE
5 TIMES MORE EXPENSIVE
Made in
UK
Made in
China
16 miles of road
24 other bridges
8 miles of roadNo other bridges
16
NOWADAYS – Can a cable stayed bridge of
similar structure be built for around £340m
OF COURSE IT CAN - IT HAS BEEN DONE
AND by one of the main contractors
involved with Scotland’s FRC
Hong Kong’s Stone Cutters Bridge
Examine the locationOver one of the world’s busies sea routesLand prices 10 times the costLocated over a built up areaPlease examine the access roads...
And the cost??
£245m
18
THE COST FLUCTUATION FARCE
• THE COST REVISIONS ARE QUITE STAGGERING
• DESIGN CHANGES ARE MINIMAL
• ONE CHANGE ILLUSTRATES THE POINT
19
No Date Source Cost
2 Jan 05 Faber and Maunsell £500m
1 Jun 04 FETA £500m
3 Feb 07 Scottish Government £1,000+m
4 Dec 07 Scottish Government £2,790 to £3,630m
5 Jan 08 Scottish Government £3,250 to £4.220m
7 Mar 11 Scottish Government £1,470 to £1.620m
6 Sep 09 Scottish Government £1,700 to £2,300m
£4,220m
20SKYSCRAPERCITY.COM
Scotland to build theWorld's most expensive bridge
This pretty average 2km bridge
has a budget of up to £4.2 billion
This is a larger amount than even the entire
Fehmarn Belt project.
Scottish Finance Secretary, John Swinney,
announced … "Forth Replacement Crossing",
22
COST of VARIOUS TYPES TYPES OF WORLD BRIDGES -£M
The FRC was the world’s most expensive bridge.
£3
6
£8
4
£1
02
£1
06
£1
36
£1
46
£1
63
£1
98
£3
19
£3
57
£3
67
£3
92
£4
97
£4
98
£5
10
£5
61
£5
67
£5
76
£7
96
£8
54
£9
41
£1
,08
1
£1
,08
1
£4,050
£4,109 £4,220
£-
£500
£1,000
£1,500
£2,000
£2,500
£3,000
£3,500
£4,000
£4,500
23
36
84
10
2
10
6
14
6
16
3 31
9
36
7
39
2
49
7
56
1
56
7
57
6
79
6 94
1 1,0
81
4,220
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
COST of ONLY CABLE STAYED BRIDGES -£m
Again – the FRC wasby far the most costly
0240
5000
10000
15000
20000
25000
30000
35000
40000
45000
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94 97 100103106109112115118121124127
COMPARATIVE LENGTH of WORLD BRIDGES
The FRC is tiny: a mere 127th in world ranking..
25
£-
£200
£400
£600
£800
£1,000
£1,200
£1,400
£1,600
£1,800
WORLD AVERAGE COST PER METRE
£200K
The FRC COST PER METRE WAS £1,500
LET’S NOW EXAMINE THE COST PER METRE
WE’VE SEEN TOTAL COST
LET’S NOW CHECK THE COST PER LENGTH£1,563
26
US CONSTRUCTION INDUSTRY DATA (Jan 2004)
Between $4k and $5K per square metre
The FRC cost- $60k per sq m.
COST OF (Cable Stayed) BRIDGES
PER SQUARE METRE
2009
THE WORLD’S THREE
MOST EXPENSIVE BRIDGES
27
1st - Scotland’s Multimodal FRC
2nd - Japan’s Pearl Bridge
3rd - Sweden/Denmark’s -Oresund Crossing
Cost over £4,000m+ world crossings
028
2nd -The Pearl Bridge Japan Opened in 1998 for
$4,300m
The world’s longest suspension bridge -3,910m
Tornadoes (180mph) – hinged-girder system
Fierce sea currents & deep water
Why is it so expensive
Earthquakes (8.5 Richter scale) –TMD pendulumstuned mass damper
30
Bridge
Tunnel
DENMARK SWEDEN
Island
SATELLITE VIEW
The Oresund Project
Let’s build it in Fife!!!!!
34
Oresund Crossing cost £4,100m *
Oresund Project 8 times the size of the FRC
Built in 5 ½ years; and the FRC???
5 ½ years
* Transport Scotland data says £4,400m
Forth Crossing cost £4,220m
35
Professor John Kay.
Do you know this man?
Chosen Financial Adviser
to the
SCOTTISH
GOVERNMENT.
Public lecture – Sept 2007 on
the FRC
“Expressed astonishment”
“..more than 4 times the final cost of
the Oresund bridge”
36
THE NEW
MERSEY GATEWAY BRIDGE
England’s MULTI-MODAL Comparison
COMPLETION 2016
STRUCTURE MULTI-MODAL
TYPE CABLE STAYED
LENGTH 2.3 Km
TOWERS 3
LANES 6
COST UNDER £600 million
37
The OccasionProject DirectorSteve NicholsonFeb. 27th, 2012
The Statement“ Dropping the double deck and other measures will save
..£30m
38
The OccasionFinance Secretary
John SwinneyScottish Parliament
Dec. 19th, 2007
The Statement“The tram section removed..”“A revised saving will be…”
..£580m
AN EXCELLENT COMPARISON
Both UK projects
Similar environments
Contemporary
Cable Stayed Structures
40
041
Second Severn Crossing FORTH REPLACEMENT CROSSING
“MADE IN CHINA”“MADE IN UK”
Six+hs Lanes Four+hs
5,200 m Length 2,700
18.5 km Roads 4.5 km
4 years Build time 5.5 years
£810 m Cost ± £1,500*Transport Scotland have it at £890m
Hard
Shoulder
FRC IS HALF THE SIZE & TWICE THE PRICE
200 STEEL PIPES2 METRE IN DIAMETER30 METRE IN LENGTH
BURIED IN THE SEA BED46
800 pipes –200 per pier - 2m diameter – 25/30 m long
049
Length
m
Lanes Towers Build
Time
Cost
2016
Rio Antirio 2880 6 4 6.0 £576m
Forth 2700 4 3 5.5 £1,600m
Rio Antirio
Opened in 2004
at a cost of
€630M
WORLD’S MOST
DIFFICULT BRIDGE
WORLD’S
HIGHEST BRIDGE
MILLAU
VIADUCTFrance
Opened in 2004
€350m
Length
m
Lanes Towers Build
Time
Cost
2016
Millau 2460 4 7 3 £400m
Forth 2700 4 3 5.5 £1,600m
051
VASCO de
GAMA
Opened in 1998
at a cost of
$1000m
Length
m
Lanes Towers Build
Time
Cost
2016Vasco de
Gama17200 6 2 1.5 £941m
Forth 2700 4 3 5.5 £1,600m
EUROPE’S
LONGEST BRIDGE
52
THE TUNNEL OPTION
The best till last!!
If YOUR credibility has been stretched
THE FINAL DATA IS
(ALMOST) UNBELIEVABLE
worst
1. 5km more roadway
3. 4 million tonnes of spoil
4. Multi-modal option needs another tunnel
5. Prohibited goods (like whisky)
8. More expensive
7. No pedestrians or cyclists
6. Would take 7.5 years
2. Special Protection Areas
GOVERMENT LIST AGAINST A TUNNEL
An underground tunnel has less environmental impact.
The bridge is 2.7km the tunnel is 8km –why more
The Eurotunnel used their spoil to prevent erosion.
The tram link was dropped – simply not valid.
London’s M25 tunnel escort goods- we still have a bridge
How come - the 31 mile Channel Tunnel was built in 6 years
Tourists would prefer the bridge stupid
LET’S EXAMINE THIS CLAIM IN DETAIL……..
The best means available to assess this cost is again by comparison
You are about to see why!!!!
Gotthard Base Tunnel
A single comparison here will suffice
We’ll use the world’s longest tunnel
MAIN SHAFT
58 kM
AUXILIARY SHAFTS
152 kM
Let’s build it across the Forth for comparison
Oor wee tunnel
Now the Swiss one
66
This detailed 80 page report was commission to examine FRC options
FORTH ESTUARY TRANSPORT AUTHORITYSecond Forth Road Crossing Consolidated report
Jan 2005 FABER MAUNSELL
70
The OccasionFinance Secretary
John SwinneyScottish Parliament
Dec. 19th, 2007
The Statement“I have the cost estimates..” “A bored tunnel would cost.”.
..£6,600m
71
BACK TO HOLLYROOD
I'm still awaiting an answer to the following simple question
Quote to me “.. Remember we are just laymen”
Not one MSP has questioned these outrageous costs
Labour started this cost fiasco SNP continued
AUDIT SCOTLAND has never investigated these costs
“Please provide a list of more
expensive comparable bridges”
YOUJUDGE