APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE
BRID GE + ELE VATOR: OVERVIE W
ALIGNMENT OPPORTUNITIES
1” = 200’
CAM
PUS D
R
SAM
JACK
SON
PARK
RD
CAMPUS DR
TERWILLIGER BLVD
GIBBS ST
WHITAKER ST
WOODS ST
2ND
AVE
1ST
AVE
PATH OF TRAM
Casey EyeIns�tute
Garage D
GarageE
DornbecherChildren’sHospital
VA PrimaryCare Clinic
AerialTram
KohlerPavilion
Physician’sPavilion
Sam JacksonHall
BiomedicalResearchBuilding
MultnomahPavilion
Ha�ieldResearch
Center
Elks Children’sEye Clinic
VA Skybridge VA MainHosp.
Shriner’sHosp.
OHSU Hosp.
Poten�alHospital
Expansion
24
1
3
#3 includes overcrossing
Parkway boundary
Gibbs St. Sta�on
ECEC Casey Eye Ins�tute
Barbur Blvd.
Gibbs Street Sta�on
Poten�alHospital
Expansion
Terwilliger Blvd.
31
Base of Campus Drive
Historic Viewpoint
Historic Viewpoint
Casey Eye Institute
1
2
3
4
PRECEDENT IMAGES
Edmonton, Canada
Neckartenzlingen, Germany
Ennetbaden, Switzerland
200’
DESTINATION OPPORTUNITIES
Alignment Opportunity
Current and Future Paths
APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE
BRID GE + ELE VATOR: CONCEP TUAL E X AMPLE
ADA Path
Parking Garage
Terwilliger Blvd
Barbur BlvdCamp
us Dr
ivePr
otec
ted
View
Prot
ecte
d Vi
ew
Casey Eye Institute
Elevator Tower
BusStop
Bridge
465'
Terwilliger Blvd.
Barbur Blvd./Gibbs St. Station
Bridge Elevator Tower
136'
Stair
Casey Eye Institute
18'
Stair
Casey Eye Institute
Terwilliger Blvd.
Bridge Elevator Tower
Stair
Barbur Blvd./Gibbs St. Station
108'
265'
315'
265’
108’
Casey Eye Institute
Terw
illige
r Blv
d.
Elevator TowerBridge
Barb
ur B
lvd.
Gib
bs S
t. St
atio
n
240’
Station Area Design In Progress
Parkway Boundary
VIEW FROM BASE OF HILL, LOOKING WEST
VIEW FROM BASE OF CAMPUS DRIVE, LOOKING EAST
200’
APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE
BRID GE + ELE VATOR: E VALUATION
ACCESS
SAFETY
CONTEXT
OPERATIONAL
CATEGORY
“The Marquam Hill Connector should...”
GOALS DRAFTEVALUATION
NOTES
ENVIRONMENTAL
BUDGET/SCHEDULE
EXPERIENCE
• Provide connections between the light rail station and destinations on Marquam Hill
• Provide an efficient, convenient, equitable and comfortable connection for all types of users
• Create a safe and secure connection for all users
• Best fit with, enhance, and improve the unique historic, scenic, recreational and design character of this area
• Protect or enhance the area’s natural resources and sensitive habitat
• Provide a long-term, sustainable connection for current and future users
• Be cost effective and timely within the Southwest Corridor Light Rail Project
• Create a signature connection that provides a high-quality user experience and inspires civic pride
• Provides for dispersal to many destinations at Terwilliger Blvd & bus stop
• Physical effort needed to use bridge & connect to uphill destinations
• Flexible to design & locate, many potential alignments
• Bridge & elevator structures likely to be visible from Terwilliger Parkway & surroundings
• Challenging to avoid protected view points
• Relatively low disruption to surroundings during construction
• Construction footprint will include tree impacts, with some opportunity for replanting/habitat restoration post-construction
• Security lighting may impact wildlife
• Relatively simple, predictable to build & operate• Based on precedents, likely to operate 24/7 & be
free for users
• Approximate cost: $15-25 million• Relatively straight forward construction type
• Canopy walk & views may be an attraction• Terwilliger Parkway interpretive opportunity
• Users are highly visible from surroundings with limited areas of seclusion or isolation
• Safety considerations for at-grade crossing at Terwilliger Blvd for stair users