+ All Categories
Home > Documents > BRIDGE + ELEVATOR: OVERVIEW - TriMet · 2019. 6. 10. · GIBBS ST AKER ST WOODS ST VE VE TH OF...

BRIDGE + ELEVATOR: OVERVIEW - TriMet · 2019. 6. 10. · GIBBS ST AKER ST WOODS ST VE VE TH OF...

Date post: 27-Jan-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
3
APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE BRIDGE + ELEVATOR: OVERVIEW ALIGNMENT OPPORTUNITIES CAMPUS DR SAM JACKSON PARK RD CAMPUS DR TERWILLIGER BLVD GIBBS ST WHITAKER S WOODS ST 2ND AVE PATH OF TRAM Casey Eye Ins�tute Garage D Garage E Dornbecher Children’s Hospital Aerial Tram Kohler Pavilion Physician’s Pavilion Sam Jackson Hall Biomedical Research Building Multnomah Pavilion Ha�ield Research Center Elks Children’s Eye Clinic VA Skybridge VA Main Hosp. Shriner’s Hosp. OHSU Hosp. Poten�al Hospital Expansion 2 4 1 3 #3 includes overcrossing Parkway boundary Gibbs St. Sta�on ECEC Casey Eye Ins�tute Barbur Blvd. Gibbs Street Sta�on Poten�al Hospital Expansion Terwilliger Blvd. 3 1 Base of Campus Drive Historic Viewpoint Historic Viewpoint Casey Eye Instute 1 2 3 4 PRECEDENT IMAGES Edmonton, Canada Neckartenzlingen, Germany Ennetbaden, Switzerland 200’ DESTINATION OPPORTUNITIES Alignment Opportunity Current and Future Paths
Transcript
  • APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE

    BRID GE + ELE VATOR: OVERVIE W

    ALIGNMENT OPPORTUNITIES

    1” = 200’

    CAM

    PUS D

    R

    SAM

    JACK

    SON

    PARK

    RD

    CAMPUS DR

    TERWILLIGER BLVD

    GIBBS ST

    WHITAKER ST

    WOODS ST

    2ND

    AVE

    1ST

    AVE

    PATH OF TRAM

    Casey EyeIns�tute

    Garage D

    GarageE

    DornbecherChildren’sHospital

    VA PrimaryCare Clinic

    AerialTram

    KohlerPavilion

    Physician’sPavilion

    Sam JacksonHall

    BiomedicalResearchBuilding

    MultnomahPavilion

    Ha�ieldResearch

    Center

    Elks Children’sEye Clinic

    VA Skybridge VA MainHosp.

    Shriner’sHosp.

    OHSU Hosp.

    Poten�alHospital

    Expansion

    24

    1

    3

    #3 includes overcrossing

    Parkway boundary

    Gibbs St. Sta�on

    ECEC Casey Eye Ins�tute

    Barbur Blvd.

    Gibbs Street Sta�on

    Poten�alHospital

    Expansion

    Terwilliger Blvd.

    31

    Base of Campus Drive

    Historic Viewpoint

    Historic Viewpoint

    Casey Eye Institute

    1

    2

    3

    4

    PRECEDENT IMAGES

    Edmonton, Canada

    Neckartenzlingen, Germany

    Ennetbaden, Switzerland

    200’

    DESTINATION OPPORTUNITIES

    Alignment Opportunity

    Current and Future Paths

  • APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE

    BRID GE + ELE VATOR: CONCEP TUAL E X AMPLE

    ADA Path

    Parking Garage

    Terwilliger Blvd

    Barbur BlvdCamp

    us Dr

    ivePr

    otec

    ted

    View

    Prot

    ecte

    d Vi

    ew

    Casey Eye Institute

    Elevator Tower

    BusStop

    Bridge

    465'

    Terwilliger Blvd.

    Barbur Blvd./Gibbs St. Station

    Bridge Elevator Tower

    136'

    Stair

    Casey Eye Institute

    18'

    Stair

    Casey Eye Institute

    Terwilliger Blvd.

    Bridge Elevator Tower

    Stair

    Barbur Blvd./Gibbs St. Station

    108'

    265'

    315'

    265’

    108’

    Casey Eye Institute

    Terw

    illige

    r Blv

    d.

    Elevator TowerBridge

    Barb

    ur B

    lvd.

    Gib

    bs S

    t. St

    atio

    n

    240’

    Station Area Design In Progress

    Parkway Boundary

    VIEW FROM BASE OF HILL, LOOKING WEST

    VIEW FROM BASE OF CAMPUS DRIVE, LOOKING EAST

    200’

  • APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE

    BRID GE + ELE VATOR: E VALUATION

    ACCESS

    SAFETY

    CONTEXT

    OPERATIONAL

    CATEGORY

    “The Marquam Hill Connector should...”

    GOALS DRAFTEVALUATION

    NOTES

    ENVIRONMENTAL

    BUDGET/SCHEDULE

    EXPERIENCE

    • Provide connections between the light rail station and destinations on Marquam Hill

    • Provide an efficient, convenient, equitable and comfortable connection for all types of users

    • Create a safe and secure connection for all users

    • Best fit with, enhance, and improve the unique historic, scenic, recreational and design character of this area

    • Protect or enhance the area’s natural resources and sensitive habitat

    • Provide a long-term, sustainable connection for current and future users

    • Be cost effective and timely within the Southwest Corridor Light Rail Project

    • Create a signature connection that provides a high-quality user experience and inspires civic pride

    • Provides for dispersal to many destinations at Terwilliger Blvd & bus stop

    • Physical effort needed to use bridge & connect to uphill destinations

    • Flexible to design & locate, many potential alignments

    • Bridge & elevator structures likely to be visible from Terwilliger Parkway & surroundings

    • Challenging to avoid protected view points

    • Relatively low disruption to surroundings during construction

    • Construction footprint will include tree impacts, with some opportunity for replanting/habitat restoration post-construction

    • Security lighting may impact wildlife

    • Relatively simple, predictable to build & operate• Based on precedents, likely to operate 24/7 & be

    free for users

    • Approximate cost: $15-25 million• Relatively straight forward construction type

    • Canopy walk & views may be an attraction• Terwilliger Parkway interpretive opportunity

    • Users are highly visible from surroundings with limited areas of seclusion or isolation

    • Safety considerations for at-grade crossing at Terwilliger Blvd for stair users


Recommended