+ All Categories
Home > Documents > Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks...

Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks...

Date post: 06-Mar-2018
Category:
Upload: doanquynh
View: 218 times
Download: 6 times
Share this document with a friend
41
Bridge Strikes - Risks and Consequences 1 April 2011 Bridge Strikes – Risks and Consequences Keith Ross, National Bridge Strike Champion
Transcript
Page 1: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

Bridge Strikes - Risks and Consequences 1

April 2011

Bridge Strikes –Risks and Consequences

Keith Ross, National Bridge Strike Champion

Page 2: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2

Contents

• Bridge Strike statistics• Consequences of a bridge

strike• Management of bridge

strikes–prevention of bridge

strikes–mitigation– response to a reported

bridge strike

Page 3: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

Bridge Strike StatisiticsSection number to go here

Page 4: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 4

Bridge Strike Statistics

Bridge Strikes at Rail over Road (Underline) Bridges

1538 1613 16781914 1898

20201890

20222161

1736

14391593

0

500

1000

1500

2000

250019

99/2

000

2000

/01

2001

/02

2002

/03

2003

/04

2004

/05

2005

/06

2006

/07

2007

/08

2008

/09

2009

/10

2010

/11

Year

Num

ber o

f rep

orte

d B

ridge

St

rikes

Page 5: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 55

Bridge Strike Statistics

Bridge Strikes at Road over Rail (Overline) Bridges

103 111100

122

142152 146

126143

115 11398

020

406080

100120

140160

1999

/200

0

2000

/01

2001

/02

2002

/03

2003

/04

2004

/05

2005

/06

2006

/07

2007

/08

2008

/09

2009

/10

2010

/11

Year

Num

ber o

f rep

orte

d B

rdig

e St

rikes

Page 6: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 6

Number of Bridge Strikesby Vehicle Type

• Majority of strikes by LGVs

• Light vehicles (small lorries and larger vans)

– often wedged under single lane bridges

• Buses– passengers at risk of injury

• Low loaders carrying plant– can cause significant bridge damage

Bridge Strikes by Vehicle Type at Underline Bridges

0

200

400

600

800

1000

1200

1400

1600

1800

2000

/01

2001

/02

2002

/03

2003

/04

2004

/05

2005

/06

2006

/07

2007

/08

2008

/09

2009

/10

2010

/11

Year

Num

ber o

f Veh

icle

s

Bus and coach

LGVs

Light Goods vehicle

Plant vehicle

Page 7: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 7

Bridge Strike Statistics

Bridge Strikes at Underline Bridges by Permitted Vehicle Height

0

100

200

300

400

500

600

700

800

900

100020

00/0

1

2001

/02

2002

/03

2003

/04

2004

/05

2005

/06

2006

/07

2007

/08

2008

/09

2009

/10

2010

/11

Year

Num

ber o

f rep

orte

d B

ridge

Str

ikes

< 2.5 metres 2.5 - 3.9 metres4.0 - 4.5 metres

> 4.5 metres No Height Recorded

Page 8: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 8

Performance Loss

£3,918£3,900£4,975Average Cost per Bridge Strike

£4.81m£6.82 m£9.6 mAnnual Cost of Delay

132 minutes130 minutes174 minutesAverage Delay per Bridge Strike

162,348minutes

220,465 minutes

335,500 minutes

Annual Delay (minutes)

170423551930Number of Reported Bridge Strikes

20010/112007/082005/06

Page 9: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

Consequences

Section number to go here

Page 10: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 1010

Safety Risk and Costs• Safety risk

– vehicle drivers– members of public– trains and travelling public

• Cost– delay and disruption to

the community– delays to train services– bridge examination– repair of bridge damage– repair of vehicle damage

Page 11: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 1111

Rail Safety Risk - Watling Street 1972

Page 12: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 12

Rail Safety Risk – Oyne 1978

• only derailment due to bridge strike in UK

– Oyne, Aberdeenshire– Seven injured

• vehicle involved– excavator on low loader

Page 13: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 1313

Rail Safety Risk - Buxton

• bridge and track displaced9 inches

– freight route 1 train a week

– found by track inspection team day before train due

– strike not reported by vehicle driver

– bridge ballasted with3 main girders

• 500 Ton crane necessary to reposition bridge

Page 14: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 1414

Fenny Compton 15th February 2011• bridge struck by crane hoist

on low loader• vehicle struck bridge when

exiting from under bridge• bridge carried redundant

siding• other bridges over road

carried main line• track carried on longitudinal

timbers supported in trough beam

• bridge signed to show permitted height 13’ 3’’

Page 15: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 15

Fenny Compton 15th February 2011

Page 16: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 16

Damage to Metallic Bridge Decks

• buckles in flanges • tears to flanges

– rail bearers would require to be replaced

• loss of rivets and bolts to flanges

• holes in webs• gouges• torn or bent stiffeners• paint scrapes

Page 17: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 17

Damage to Bridges

• loss of arch spandrel and/or parapet

• loss of bricks to arch rings• gouges in arch barrel• displacement of voússoir

stone• cracks in arch spandrel and/or

parapet

Page 18: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 18

Risk to Vehicle Drivers• skip lorries can rotate

and hit underside of bridge crushing driver’s cab

• risk of injury if vehicle overturns

• lorry may jack knife if travelling at speed

• risk of loss of control of vehicle

• disruption due to road closure for vehicle recovery

Page 19: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 1919

Overturned Vehicles• vehicle travelling at

speed at skew bridges• risk of severe injuries

to driver• risk to innocent

drivers on other carriageway

• damage to vehicle • damaged loads• disruption due to road

closed• vehicle recovery

necessary

Page 20: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 20

Buses and Coaches• risk of injury to passengers

• risk to following vehicles

• if travelling at speed risk of loss of roof

• danger to passers-by from broken glass

• bridge rarely significantly damaged

• disruption due to road closure

• vehicle recovery necessary

Page 21: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 21

Innocent Road Users• risk to occupants of

other vehicles passing in opposite direction from:

–vehicles overturning at skew bridges

– falling loads

• risk to pedestrians

• disruption due to road closure for vehicle recovery

Page 22: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2222

Vehicles Wedged

• vehicle travelling at speed

• severe damage to body of vehicle

• risk of suspension collapse

• disruption due to road closure

• vehicle may need to be cut up to be removed

• vehicle recovery necessary

Page 23: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2323

Cost to the Community Damaged Loads• risk of injury to passers-by from

load falling from vehicle• disruption due to road closure for

load recovery• businesses affected awaiting for

delivery of replacement goods

Page 24: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2424

Prevention of Bridge Strikes• Education

– increase awareness– guidance– revisions to driving theory

test and driving skill books• Engineering

– road traffic signs and markings

– traffic management– improve visibility

• Enablement– route planning– height measurement

• Enforcement

Page 25: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2525

Better Driver AwarenessGood Practice Guides

Page 26: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 26

Guide for Foreign Drivers

• English

• French

• German

• Spanish

• Italian

• Bulgarian

• Russian

• Polish

Page 27: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2727

Protocol for Highway Managers• developed for Bridge Strike

Prevention Group–CSS Bridges Group–Network Rail–Department for Transport

• Highway Authorities responsible for :

–measuring and determining permitted height shown on road traffic signs

– installation and maintenance of road traffic signs

Page 28: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 2828

Protocol Scope

• correct signage on, adjacent to and in advance

– provision, visibility and maintenance

– Protocol has appendix showing examples of ‘where improvements could be made’

• works in vicinity of low bridges

• liaison with Network Rail

Page 29: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 29

Problems with Signs – Flat Soffits• lack of signs at low

bridges–no or incorrect

chevrons– triangular instead of

roundel at flat soffit bridges

• no advance warning signs

• damaged signs• incorrect dimension• inverted or alternate

chevrons• lack of sign maintenance

Page 30: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 3030

Problems with Signs –Arches

• double white lines through arch conflicting with signed vehicle limits

• chord marking wider than road marking for arch

• roundels not triangular signs

• lack of black and yellow hazard markings

Page 31: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 31

Problems with Signs - Obscuration

• vegetation growth will obscure signs if not controlled

• signs need to be visible to be effective

• other illumination may obscure signs at night

Page 32: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 32

Problems with Signs - Thinking about the Driver

• multiple messages on a sign could cause confusion leading to a wrong decision

• Alternative route should not lead to another bridge lower than the one signed

Page 33: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 33

Good Practice –Challoc/Dunragit

Page 34: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 34

Good Practice –Challoc/Dunragit

Page 35: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 3535

Mitigation

• collision protection beams fixed to bridge to be part of structure

• reconstruction to resist bridge strikes

Page 36: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 3636

Response to a reported Bridge Strike• Bridge Strike reported to Network Rail Control

– bridge identification plate shows telephone number to be used

– telephone number varies according to bridge location

• Signaller implements Operating Instructions

– underline bridge based on

• robustness of bridge

• vehicle type

• number of trains over bridge since strike occurred

– Overline bridge – Rule Book

• Control arranges for bridge examination

• Control advises Highway Authority if road traffic signs damaged

Page 37: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 3737

Operating Instructions Underline Bridges• Signal box special instructions

– based on robustness of bridge to vehicle impact– tracks on bridges over roads are colour coded to define the

action to be taken by Signaller

• Red – Stop trains – this is the default• Amber – First train examines track at 5mph. If track

alignment not affected and no debris trains are permitted at 20 mph until the bridge is examined

• Double Amber – As for Amber but subsequent trains at Normal Speed

• Green – Continue to operate at Normal Speed – applies to very high bridges and massive structures

• light vehicles – cars, vans and motor cycles– train movements not stopped unless vehicle on fire

Page 38: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 3838

Examination• Bridge Strike

Nominees (BSNs)

– Operations staff

– checks against defined damage limits

• Bridge Strike Examiners (BSEs)

– confirms BSNs decision

– able to carry out close examination

– not subject to damage limits

– can instigate repairs

Page 39: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 3939

Response to a Bridge Strike at a Bridge over the Railway

• developed with:–County Surveyors’ Society

(now ADEPT)–Highways Agency–Police organisations

• provides advice to minimise the risk to the operational railway and road users from a bridge strike:

–when damage is caused to the bridge parapet

– to enable train services and road traffic movements over the bridge to be restored safely

Page 40: Bridge Strikes – Risks and Consequences - · PDF fileApril 2011 Bridge Strikes - Risks and Consequences 2 Contents • Bridge Strike statistics • Consequences of a bridge strike

April 2011 Bridge Strikes - Risks and Consequences 40

Principle• prevents incursion of road

vehicles on to the railway prior to installation of an acceptable temporary safety barrier

• interim arrangements of road safety management enable train services to be restored:

–with minimum delay–maintain the safety of the

railway and the highway pending reconstruction or repairs

–must be sufficient to prevent an errant vehicle from landing on the railway