    MINISTRY OF CONSTRUCTION

    PUBLIC WORKS

    N LYSIS O F R TES

    FOR

    BRIDGE WORKS

    GOVERNMENT OF TH E REPUBLIC OF THE UNION OF MY NM R

    SECOND EDITION JUNE 2 13

  • 8/11/2019 BridgeWorks

    2/47

    CONTENTS

    SH NO

    1O

    2.0

    3.0

    4.0

    5.0

    6.0

    NAME OF SUB HEAD

    BRIDGES

    SUB HEADS

    Foundation W ork

    P.C Girder

    Steel Truss

    Steel Plate Girder

    Suspension and Cablestayed Bridge

    Survey

    Miscellaneous Notes

    PAGE NO

  • 8/11/2019 BridgeWorks

    3/47

    Standard Data for Working Out Rates Per Unit Quantity oflte m s of Work

    ForemanCarpenter 1 st Grade)Carpenter 2nd Grade)

    Worker

    SrNo.

    1

    2.

    3.

    Particularsof Materials and Labour

    X IX. RIDGESoundation orks

    Labour For Driving 250 mm) Diameter TimberPiles inordinary Soil With 500 kg drop hammerfrom pulley winch and local trestle and manuallyoperated).Penetration average 6 m.Labour

    PlantsPile driving frame 1)No

    Sundries

    Labour For Driving 250 mm)Diameter TimberPiles inordinary Soil With pile driving machine).Penetrationaverage 6 m.Labour

    Operator

    ForemanCarpenter I st Grade)Carpenter 2nd Grade)

    WorkerFor Operation

    H.S.DGrease

    PlantsPile driving frame 1)No

    Sundries

    Labour for Pile Driving reinforced cement con-crete pile 350 x 350 mm x 12000 mm) inordinary soil with 12m dieselhammer).Penetrationaverage 12 m.Labour

    ForemanPile driving machine operator

    Pile driving machine AsstCrane operator

    Worker

    Unit

    Man-DayMan-DayMan-DayMan-Day

    HourL.S

    Man-Day

    Man-DayMan-DayMan-DayMan-Day

    litre

    kg

    Hour

    L.S

    Man-DayMan-Day

    Man-DayMan-DayMan-Day

    Quantity

    0 3

    0 5

    0 5

    3

    4

    0 3

    0 3

    0 5

    0.53

    3

    0.1

    2.7

    0 3

    0 3

    0 30 3

    6

    Remarks

    Cost of Timber piles

    accordingto varyingdia;

    with all necessary fittings

    is to be includedin the

    main estimate.

    Cost of Timber piles

    accordingto varyingdia;

    with all necessaryfittingsis to be included in the

    main estimate.

  • 8/11/2019 BridgeWorks

    4/47

    Stan dard Da ta for Working Out Rates Per Unit Quantity of Items of Work contd.

    Particulars of Materials and Labour

    001s Required12m)rail line trollies for transport of precast

    bile.One crane for loading unloading erecting

    and pitching of precast pile.Pile driving machine (1) No

    ;or OperationH.S.D for Pile Driving Machine

    H.S.D for CraneEngine Oil

    Sundries

    .abour for Pile Driving reinforced cem ent con-rete pile (350 mmx 350 mm x 12000 mm n~rdinary oil Using drop hammerwith winch~perated y m achine).Penetration Average 12m ..abour

    ForemanOperator

    Workerdachine

    Pile driving machine (1)No:or Operation

    Diesel OilGrease OilSundries

    Making of Stand Pipe rnrn thk; 12mm thk;

    (800 to 1650 mm 0 ) (For 1 Sqm)Steel fixer

    Worker

    Driving Stand PipeDriving of Stand Pipe1350mm 0,1650mmwith Vibro Hamm er for 1200mm ,1500mm Bored Pile. For 1 m)

    Stand pipeSteel fixer

    Head WorkerWorker

    Unit

    HourHour

    Hour

    Man-Da:Man-Da:

    Man-Dti

    Remarks

    Cost for R.C Piles to be

    calculated according to

    the reqd.Size and included in the main estimate.

    Cost for R.C Piles to be

    calculated accord ing to

    the reqd.Size and inclu

    ded in the main estimate.

  • 8/11/2019 BridgeWorks

    5/47

    Standard Data for Working Out Rates Per Unit Quantity of Items o Work contd.

    SrNo.

    b)

    7.

    a)

    b)

    Particulars of Materials and Labour

    Electric HelperOperator /Machine Driver

    SundriesH.S.D

    Driving of Stand Pipel950rnrn 0,2650 mm0with Vibro Hamm er for1800mm 0,2500mm 0Bored Pile. For 1 m )

    Stand PipeSteel Fixer

    Head Worker

    WorkerElectric Helper

    Operator /Machine DriverSundriesH.S.D

    Removing Stand PipeRemoving of Stand Pipe1350mm 0,1650mm 0

    with Vibro Hamm er for 1200 mm0 ,

    1500mm0 Bored Pile. For 1 m )Stand PipeSteel Fixer

    Head WorkerWorker

    Electric HelperOperator M ac hi ne Driver

    Sundries

    Removing of Stand Pipe 1950mm02650 mm 0 with Vibro Hammer for1800mm02500mm 0 Bored Pile. For 1m

    Stand PipeSteel Fixer

    Head WorkerWorker

    Electric HelperOperator /Machine Driver

    SundriesH.S.D

    Unit

    Man-DayMan-Day

    L.Slitre

    NoMan-DayMan-Day

    Man-DayMan-DayMan-Day

    L.Slitre

    NoMan-DayMan-DayMan-DayMan-DayMan-Day

    L S

    NoMan-DayMan-DayMan-DayMan-DayMan-Day

    L.Slitre

    Quantity

    0.50.7

    11

    3.20.50.7

    0.70.52

    0.50.5

    0.70.72.50.50.5

    Remarks

  • 8/11/2019 BridgeWorks

    6/47

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd

    Head W orkerWorker

    Operator M ach ine DriverSundries

    H.S.D

    SrNo.

    8

    9

    10.

    1.

    Remarksarticulars of M aterials and Labour

    Fitting of Drilling Equipment to dig Bored Pile.1200rnm0 , 1500rnm0 ,1800mm 0

    2500rnm 0. For 1 time )Head Worker

    WorkerOperator /Machine D river

    SundriesH.S.D

    Dismantling of Drilling Equipment.For 1 time )

    Drilling of 800mm 0 mini Bored Pile.Ground, Ordinary Soil) For1 m )

    Head WorkerForemanWorker

    Operator M ac hi ne DriverWater Pump Helper

    SundriesH.S.D

    Machinary hair Charges

    Drilling of 800 mm @m ini Bored Pile.Ground , Weathered Soft Rock) For 1 m )

    Head WorkerForemanWorker

    Operator M ac hin e DriverWater Pump Helper

    Sundries

    H.S.DMachinary hair Charges

    Unit

    Man-DayMan-DayMan-Day

    L.Slitre

    Man-DayMan-DayMan-Day

    L.Slitre

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.SlitreL.S

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    litreL.S

    Quantity

    27

    0.8

    70.8

    0.70.5

    2

    0.30.3

    1.314

    0.70.7

  • 8/11/2019 BridgeWorks

    7/47

    5

    Standard Data for Working Out Rates Per Unit Quan tity of Items of Work contd.

    SrNo.12.

    13.

    14.

    15

    Particulars of M aterials and Labour

    Drilling of 800 rnm mini Bored Pile.W ater, Ordinary Soil) For 1 m )

    Head WorkerForemanWorker

    Operator /Machine DriverWater Pump Helper

    SundriesH.S.D

    Drilling of 800mm mini B ored Pile.

    Water , Weathered Soft Rock) For1 m )Head W orker

    ForemanWorker

    Operator /Machine DriverWater Pump Helper

    SundriesH.S.D

    Drilling of 1200mm Bored PileOrdinary Soil) For 1 m )

    Head W orkerForemanWorker

    Operator /Machine DriverWater Pump Helper

    Sundries

    H.S.D

    Drilling o f 1500mm Bored PileOrdinary Soil) For 1 m )

    Head W orkerForemanWorker

    Operator Mac hin e DriverW ater Pump H elper

    SundriesH.S.D

    Unit

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L. Slitre

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.Slitre

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    litre

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.Slitre

    Quantity

    0.8

    0 6

    2.5

    0.4

    0 4

    1.5

    1.2

    5

    0.8

    0 8

    10 5

    3

    0.5

    0 3

    1.2

    0.5

    3.5

    0.5

    0 4

    Remarks

  • 8/11/2019 BridgeWorks

    8/47

    Standard ata for Working Out Rates Per Unit uantity of Items of Work contd.

    Quantity

    1 40 8

    4 3

    0 7

    0 5

    1 5

    0 8

    4 5

    0 8

    0 5

    1 5

    0 8

    4 8

    0 8

    0 5

    1 3

    0 5

    3 5

    0 5

    0 4

    Unit

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.Slitre

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.Slitre

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    litre

    Man-DayMan-DayMan-DayMan-Day

    Man-DayL.Slitre

    SrNo.16

    17

    18

    19

    RemarksParticulars of Materials and Labour

    Drilling of 1500mm R.C.D Bored PileOrdinary Soil) For m )

    Head WorkerForemanWorker

    Operator M ac hin e DriverWater Pump Helper

    SundriesH.S.D

    Drilling of 1800mm , Bored PileOrdinary Soil) For m )

    Head WorkerForemanWorker

    Operator /Machine D riverWater Pump Helper

    SundriesH.S.D

    Drilling of 2500rnm , Bored PileOrdinary Soil) For 1 m )

    Head WorkerForemanWorker

    Operator /Machine DriverWater Pump H elper

    Sundries

    H.S.D

    Drilling of 1200mm Bored Pile.Weathered Soft Rock Layer Only Based on Soil

    Test Result ) For 1 m )Head Worker

    ForemanWorker

    Operator /Machine DriverWater Pump H elper

    SundriesH.S.D

  • 8/11/2019 BridgeWorks

    9/47

    Standard D ata for Working Out Rates Per Unit Quantiry of Items of W ork contd.

    Particulars of Materials and Labour

    lrilling of 1500mm Bored PileWeathered So ft Rock Layer Only Based on Soil

    rest Result ) For 1 m )Head W orker

    ForemanWorker

    Operator Ma ch ine DriverW ater Pump Helper

    SundriesH.S.D

    lrilling of 1500rnrn R.C.D Bored PileWeathered soft rock L ayer only Based on soil

    Testresult For mHead W orker

    ForemanWorker

    Operator Ma ch ine DriverW ater Pump Helper

    SundriesH.S.D

    lrilling of 1800m m Bored PileWeathered Soft Rock Layer Only Based on

    Soil Test Result) For m )Head W orker

    ForemanWorker

    Operator /Machine DriverWater Pump Helper

    SundriesH.S.D

    Drilling of 2500m m Bored PileWeathered Soft Rock Layer Only based on

    Soil Test Result ) For 1 m )Head W orker

    ForemanWorker

    Operator Ma ch ine Driver

    Unit

    Man-Da:Man-Da:Man-Da:

    Man-Da:Man-Da:

    L.Slitre

    Man-D?Man-D?Man-D?Man-Da:

    Remarks

  • 8/11/2019 BridgeWorks

    10/47

    Standard Data for Working Out Rates Per Unit Quantity of hems of Work contd.

    WorkerSundriesH.S.D

    SrNo.

    24.

    25.

    26

    27.

    28.

    Particulars of Materials and Labour

    Water Pump HelperSundries

    H.S.D

    Mixing of Betonite Solution. For 1 cum)WorkerSundriesH.S.D

    After drilling Bored P ile and fitting tremie pipe topour concrete, Proving of Slime W ash with

    Compressor, for cleaning to B ored hole.For 1 hole)

    Hanging of Steel Cage for 800mm0,1000rnrn 0 ,1200mm to Bored Hole with C rane.For 12m length

    Welding RodSteel Fixer

    WorkerSundries

    Hanging of Steel Cage for 1500mrn 0 ,1800 mm 0 ,2 5 0 0 mm to Bored Hole withCrane. For 12m length

    Welding RodSteel Fixer

    WorkerSundries

    H.S.D

    Pouring 1: ?4 3) Cem ent concrete by TremieMethod. 1 cum)

    Head WorkerWorker

    Operator /Machine DriverSundriesH.S.D

    Unit

    Man-DayL.S

    litre

    Man-DayL.Slitre

    Man-DayL.Slitre

    kgMan-DayMan-Day

    L.S

    kgMan-DayMan-Day

    L.Slitre

    Man-DayMan-DayMan-Day

    L.Slitre

    Quantity

    0.7

    0.8

    -

    2

    8

    0.50.80.1

    Remarks

  • 8/11/2019 BridgeWorks

    11/47

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd.

    Particulars of Materials and Labour

    oining, D ismantling, Cleaning, Painting ofarth oil Grease of Trem ie Pipe to be ready.

    For 1 m )Steel Fixer

    HelperSundries

    3reaking of Bored Pile Head. 1cum )Head Worker

    Sundries

    Well Foundation

    Iiggingand sinking of 12 mrn spun pipeo get specifieddepth includingremoving soilmd water pumping. Ground, Ordinary soil)For 1 m)

    WorkerCarpenter

    Head WorkerOperator

    Steel FixerSundries

    Iigging and sinking of 12 mm spun pipeo get specified depth including removing soilmd water pum ping. Ground, Sand) For1 m)

    WorkerCarpenter

    Head WorkerOperator

    Steel FixerSundries

    Digging and sink ingof 12 mm spun pipeto get specified dep th including removing soilmd water pum ping. Ground , Weathered softrock) For 1 m)

    WorkerCarpenter

    Head Worker

    Unit

    vim-Dajvim Daj

    Man-Da:Man-DqMan-Dq

    L.S

    Man-DqMan-Da,Man-Da

    Remarks

  • 8/11/2019 BridgeWorks

    12/47

    1

    Standard ata for Working Out Rates Per Unit Quantity of Items of Work contd.

    SrNo.

    34.

    35.

    36.

    37.

    Particulars of Materials and Labour

    OperatorSteel Fixer

    Sundries

    Diggingand sinkingof 1200mrn0spun pipeto get specifieddepth includingremoving soiland water pumping. Water, Ordinarysoil)For 1 m)

    WorkerCarpenter

    Head WorkerOperator

    Steel FixerSundries

    Digging and sinkingof 1200mm0spun pipeto get specifieddepth includingremoving soiland water pumping. Water, Sand) For 1 m)

    Worker

    CarpenterHead Worker

    OperatorSteel FixerSundries

    Digging and sinkingof 1200mm0spun pipeto get specifieddepth includingremoving soiland water pumping. Water, Weathered softrock) For 1 m)

    WorkerCarpenter

    Head WorkerOperator

    Steel FixerSundries

    Digging and sinkingof 2750mm0 cassionwellto get specifieddepth includingremoving soiland water pumping. Ground Ordinary soil)For 1 m)

    Quantity

    1.61.2

    15.61.21.21

    0.7

    19.6

    1.61.21.21

    31.22.42.21.91.4

    Unit

    Man-DayMan-Day

    L.S

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-Day

    Man-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L,S

    Remarks

  • 8/11/2019 BridgeWorks

    13/47

    1 1

    Standard Da ta for Working Out Rates Per Unit Quantity of Items of Work contd.

    Quantity

    2

    63

    0 5

    10

    3

    6

    6 5

    10 5

    3

    2 5

    78 8

    0 6

    12 5

    3 8

    7 5

    8 1

    11 3

    13 1

    3 8

    4126

    1

    20

    6

    1213

    18

    Unit

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L S

    Man-DayMan-DayMan-DayMan-Day

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L S

    Man-DayMan-DayMan-DayMan-DayMan-Day

    Man-DayMan-DayMan-Day

    SrNo.

    38

    39

    Remarksarticularsof Materials and Labour

    Head WorkerWorkerWelder

    OperatorSteel FixerForeman

    DiverHelperRigger

    CarpenterSundries

    Digging and sinkingof 2750mm0 cassion wellto get specifieddepth including removing soiland water pumping. Ground Sand)For 1 m)

    Head WorkerWorkerWelder

    OperatorSteel FixerForeman

    DiverHelperRigger

    CarpenterSundries

    Digging and sinking of 2750rnm0 cassion wellto get specifieddepth including removing soiland water pumping. Ground, Weathered softrock) For 1 m)

    Head WorkerWorkerWelder

    OperatorSteel Fixer

    ForemanDiverHelper

  • 8/11/2019 BridgeWorks

    14/47

    12

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd.

    Remarksr

    No.

    40.

    41.

    42.

    Particularsof Materials and Labour

    RiggerCarpenter

    Sundries

    Digging and sinking of 2750rnm0 cassion wellto get specifieddepth including removing soiland water pumping. Water Ordinary soil)

    For 1 m)Head Worker

    WorkerWelder

    OperatorSteel FixerForeman

    DiverHelperRigger

    CarpenterSundries

    Digging and sinking of 2750rnrn0 cassion wellto get specifieddepth including removing soiland water pumping. Water, Sand) For 1m

    Head WorkerWorkerWelder

    OperatorSteel FixerForeman

    DiverHelperRigger

    CarpenterSundries

    Digging and sinking of 2750mm0 cassion well

    to get specifieddepth including removingsoiland water pumping. Water, Weathered softrock) For 1 m)

    Head Worker

    Unit

    Man-DayMan-Day

    L.S

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-Day

    Quantity

    216

    2.475.6

    0.6

    123.67.27.8

    10.8

    12.63.6

    94.60.7

    15

    4.6

    99.7

    13.615.7

    4.6

    4.8

  • 8/11/2019 BridgeWorks

    15/47

    3

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd.

    echanic

    orker

  • 8/11/2019 BridgeWorks

    16/47

    Standard Data for Working Out Rates Per U nit Quan tity of Items of Work contd.

  • 8/11/2019 BridgeWorks

    17/47

    5

    Standard Da ta for Working Out Rates Per Unit Quantity of Items of Work contd.

    SrNo.

    4.

    Particulars of Materials and Labour

    Stressing for Post tension HT Wire to getcomplete strength 1 Tendon)

    ErectorSteel Fixer

    Operator Machine DriverMachine HelperElectric Helper

    WorkerSundries

    55 Plugging 1 : 1)Cem ent Concrete into the

    Concrete cavity of the end-block. Girder 1 No)MasonWorkerSundries

    56

    58. ~ i x i n ~owering bar, jacking beam, hanger jack

    Grouting high strength cement motor with Gro-uting machine to sheating pipe. Girder 1 No)

    MechanicElectric Helper

    Operator Machine D riverWorkerSundries

    57.

    ErectorWorker

    Sundries

    Fixing cycle trolley, launching rm and accesso-ries on the bailey girder. with crane and man)Including fixingbreak wedge and sway braces.1 pair)

    ErectorWorkerSundries

    Remarksnit

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Quantii

    10.30.70.30.311

    1

    31

    130

    40

    Man-Day 5Man-Day 35

    L.S

  • 8/11/2019 BridgeWorks

    18/47

    6

    Standard Data for Working Out Rates Per U nit Quan tity ofItem s of W ork c ontd.

    SrNo.59.

    60.

    61.

    62.

    63 .

    64

    Particulars of Materia ls and Labour

    Side shifting P.C Girder from casting positionto Launghing position distancel m 1 time)

    ErectorWorkerSundries

    Making Jack up P.C Girder, timber crib.Tighting in hanging beam with steel cable ,removing crib, fixing to get right alignmentbetween two LaunchingArm 1 time)

    Erector

    CarpenterWorkerSundries

    Pulling Steel cable from electric winch andfixing them top of the launchingArm. 1 time)

    ErectorElectric Helper

    Worker

    Launching P.C Girder by electric winch.Launching 1 time)

    MechanicElectric Helper

    ErectorWorker

    Making Jack Down Launched P.C Girderbracing strut not to fall down. 1 time)

    ErectorCarpenterWorkerSundries

    After making jack down dismantling launchingequipment from P.C Girder,Pushing Launching

    rm

    o the casting stagging. 1 time)ErectorMachine operator driver

    Worker

    Unit

    Man-DayMan-Day

    L.S

    Man-Day

    Man-DayMan-Day

    L.S

    Man-DayMan-DayMan-Day

    Man-DayMan-DayMan-DayMan-Day

    Man-DayMan-DayMan-Day

    L.S

    Man-DayMan-DayMan-Day

    Quantity

    520

    2

    5

    2

    13

    4

    2

    20

    4

    4

    4

    2

    Remarks

  • 8/11/2019 BridgeWorks

    19/47

    SrJo.55

    i6.

    i7

    58.

    69

    17

    Slandard Data for Working Out Rates Per Unit Quantity of Items of Work contd.

    Particulars of M aterials and Labour

    Levelling and carving on the Cross Beam forfittingP C Girder,carving 1200mm x 254mmgrouting hole, fitting bearing plate. 1 sheet)

    MasonErectorWorkerSundries

    Fixing pretension frame with anchor bolt on theconcrete pretension bench according to therequired design. 10 Nos)

    ErectorWorker

    Putting H.T wire coil 3MT)to the Dispencerwith crane using man,fixing bolt nut.1 coil-3 ton)

    ErectorWorkerSundries

    Pulling H.T wire to D ispencer for requiredlength,cutting then with griding machine.60 Nos)

    ErectorMechanic

    Head WorkerWorker

    Skill Electric)Sundries

    Fixing repaired wires in p retension bench,anchorage frame systematically.26m 8 Nos)

    ErectorHead Worker

    WorkerSundries

    18m 8 Nos)Erector

    Unit

    Aan-DajAan-DajAm-Daj

    L.S

    Aan-DajAan-Daj

    Man-DaMan-DaMan-Da

    L.S

    Man-Da

    Remarks

  • 8/11/2019 BridgeWorks

    20/47

    Standard Data for Working Out Rates Per Unit Qu antig of Items of Work contd.

    Erector

    Remarksuantity

    325

    2

    0.10.10.10.10.1

    0.10.10.3

    38321

    Unit

    Man-DayMan-Day

    L.S

    Man-Day

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayMan-DayMan-Day

    L S

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L S

    SrNo.

    70.

    71.

    72.

    73.

    74.

    Particularsof Materialsand Labour

    Head WorkerWorker

    Sandries

    Fixing end plate each end of the P.C Girdersystematically whille arrangingH.T wire.Girder 1 No)

    Stressingfor pretensionH.t wire to get stressingforce3.45MPa. wire 1 No)

    MechanicErector

    Machine operatordriverWorker

    Skill electric)Sundries

    Stressingof 12mm r 13 rnm 7 strand wire

    For No)Foreman

    Steel FixerWorkerSundries

    After fixing and checkingP.C wire and rein-forcement due to design, stressingH.T wire toget required design force and elongation.Wire 38 Nos)

    ErectorWorker

    Skill electric)Hard Worker

    Operator Jack operator)Operator Hydraulicpump)

    Sundries

    Fixing accessorieson the P.C Girder as perdesign.a)Makingand fixinghook 2 points)

  • 8/11/2019 BridgeWorks

    21/47

    9

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd

    Remarksuantity

    7

    3

    0.4

    0.1

    0.8

    0.2

    3

    Unit

    Man-DayL S

    Man-Day

    Man-DayL.S

    Man-DayL.S

    Man-DayL.S

    Man-DayL.S

    Man-DayL.S

    Man-Day

    SrNo,

    75

    76

    77.

    78.

    79.

    Particularsof Materials and Labour

    ErectorSundries

    @)Makingand fixing shoe plate 10 Points)Welder

    c)fixingthrougt bolt nut 10 Nos)Erector

    Sundries

    Fixing of R.S.T Beam, H Beam, Angle,

    M.S Flat Channel for casting bed only.For 10 kg)

    Head WorkerSundries

    Dismantlingof R.S.T Beam, H Beam, Angle,M.S Plate, M.S Flat Channel for casting bedonly. For 10 kg)

    Head WorkerSundries

    Fixing of L.S.T Par t , Bailey Part C.H Partssystem. ( For 10 kg)

    Head WorkerSundries

    Dismantlingof L.S.T Part , Bailey Part C.H

    Parts system. For 10 kg)Head Worker

    Sundries

    Steel Truss

    Labour for Launching of R.S.JS. over bridgesup ports Using two pulleys and winch fromthe other side) 5No x 13000rnrnx 610mrn x190mm)at 43.l)kg per RFT.Total Weight = 9.3 MTons)

    LabourBridge Foreman

  • 8/11/2019 BridgeWorks

    22/47

    2

    Standard Data for Working Out Rates er Unit Quantity of Items o f W ork contd.

    Total Kit oneOne hammer

    Coir rope 25mm 61m)25000 Kg Jacks 2)No

    Bridge Foreman

    WorkerSundries

  • 8/11/2019 BridgeWorks

    23/47

    Standard D ata for Working Out Rates Per Unit Quan tity of Items of W ork contd

    Quantity

    20150

    1150

    Unit

    L S

    Man-DayMan-DayMan-Day

    L S

    SrNo.

    83.

    Remarksarticulars of Materials and Labour

    Tools RequiredTotal Kit one

    One hammerCoir rope 25mrn 61m)

    4000 Kg Hand Winch 2)NoBailey Roller 6)No

    Jumper 10)NoWire Rope 16mm 228m)

    One local JIBDouble pulley 2)NoSingle pulley 1)No

    50000 kg Jacks 2)NoSundries

    b) Labour for assemblingand launchingC.H.bridge 6.5m Road way)bolts and nuts for allsteel works complete 48m) span double depth.Total Weight 150 MTons) By Crane)

    LabourBridge ForemanSkilled Worker

    Unskilled WorkerTools Required

    Total Kit oneOne hammer

    Coir rope 25mm 61m)4000 Kg Hand Winch 2)No

    Bailey Roller 6)No

    Jumper 10)NoWire Rope 16mm 228m)

    One local JIBDouble pulley 2)NoSingle pulley 1)No

    50000 kg Jacks 2)NoSundries

    Labour for assemblingand German bridge3.35m Road way) on scaffolding and lowering

    down on supports or launching 18m)span.Total Weight 17.87 MTons)

  • 8/11/2019 BridgeWorks

    24/47

    Standard Data for Working ut Rates Per Unit Quantity of Items of Work contd.

    Bridge Forem an

    Worker

    Bridge ForemanSkilled workers

    Unskilled workers

    SrNo.

    84.

    85.

    Particularsof Materialsand Labour

    Labour

    Tools RequiredBailey Jacks 2 NoBailey rollers 7 No

    One spannerOne hammer

    Sundries

    Labour for assembling ofR.P.T bridgeonscaffoldingincluding rivettingand loweringdown on supports complete 30m).Span and5m) road way.Total Weight 64.2 MTons)

    Labour

    Tools Required4000 Kg hand winch

    Wire rope 12rnm 457m)Wire rope 16mm 457m)Coir rope 25mm 152m)

    ServiceboltsDouble pulley 2)NoSinglepulley 1)No

    One BellowDollys 2)No

    Rivetting guns 2)NoOne compressorwith 2)No. Hose pipe 152m)

    Local JIB one No.One hammer

    75000 Kg Jacks 2)NoSundries

    Labour for assemblingand launchingof R.P.Tbridge after rivetting completefor all steelworks 3Om)span 5m) road way.Total Weight 64.2 MTons)

    Unit

    Man-Day

    Man-Day

    L.S

    Man-DayMan-DayMan-Day

    L.S

    Quantity

    8

    80

    30100420

    Remarks

  • 8/11/2019 BridgeWorks

    25/47

    3

    Standard Datafor Working Out Rates Per Unit Quantity of Items of Work contd.

    SrNo.

    86.

    87.

    Particulars of Materials and Labour

    LabourBridge Foreman

    Skilled workersUnskilled workersTools Required

    4000 Kg hand winchWire rope (12rnm 457m)Wire rope (16rnm 457m)Coir rope (25mm 152m)

    Service boltsDouble pulley (2)No

    Single pulley (1)NoOne BellowDollys (2)No

    Rivetting guns (2)NoOne compressor with (2)No. H ose pipe (500 )

    Local JIB one No.Bailey rollers (6)No

    Jumpers (10)No75000 Kg Jacks (2)No

    Sundries

    Shifting Steel Truss and Bailey by Crane fromone place to ano ther (Including hooking ,removing, handling with man) (10 MTons)

    ForemanHead Worker

    WorkerSundries

    Sorting arranging the steel truss systemati-cally, Laying out them for preassambling workssystematically. 10 MTons)

    ForemanHead Worker

    WorkerSundries

    Unit

    Man-Day

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    Man-DayL.S

    Man-DayMan-DayMan-Day

    L.S

    Quantity

    35

    120400

    11

    5

    114

    Remarks

  • 8/11/2019 BridgeWorks

    26/47

    Standard Da ta for Working Out Rates Per Unit Quantity ofltems of Work contd.

    Steel FixerHead Worker

    WorkerOperator /Machine Driver

    Electric HelperSundries

    Remarksuantity

    2

    1

    20.50.5

    2

    1

    14

    10 5

    40.5

    0 8

    0.53

    0.5

    Unit

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L S

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayMan-Day

    Man-DayMan-DayMan-DayMan-Day

    Man-DayMan-DayMan-DayMan-Day

    SrNo.88.

    89

    90

    Particulars of M aterialsand Labour

    Checking the steel truss accord ing to the designfor preassembling works on the ground.

    (1 000 kg)

    (a) Erecting the preassembled steel truss frompier to pier with erection crane acco rding tothe design. (1000 kg)

    Steel FixerHead Worker

    WorkerOperator /Machine Driver

    Electric HelperSundries

    (b) Allowing 50 of the above expend iturefor dismentling.

    (a) Installing Bo lts Nuts, Drift Pins Tigh-tenning according to the d esign while erectingsteel truss. (1000 Nos)

    Steel FixerWorker

    Tightening them with Electric Guns againbefore transfering the target place. (1000 Nos)

    Steel FixerHead W orker

    WorkerElectric Helper

    (b) Removing Bolt Nu ts (1 000 Nos)Steel Fixer

    Head WorkerWorker

    Electric Helper

  • 8/11/2019 BridgeWorks

    27/47

    5

    Standard D ata for Working Out Rates Per Unit Quan tity of Items of Work contd.

    SrNo.91.

    92.

    93

    94.

    Particularsof Materialsand Labour

    Final Tightenningthe ready installed BoltsNuts accordingto theTightenningsequence( includingwith checkingthem whetherstandard or not ) 1000 Nos)

    Steel FixerHead Worker

    WorkerElectricHelper

    Sundries

    Checkinghigh tension Bolts Nuts with check

    Wrench whether standard or not. 1 000 Nos)Steel fixerWorkerSundries

    a)Fixingthe safetyNet to the upper lowersteel truss systematically. 100 m)

    CarpenterHead Worker

    WorkerSundries

    b) Removing Safety nets from Steel trussSystemtically. 100 m)

    CarpenterHead Worker

    WorkerSundries

    Fixing Sleeperon the top bottom Chordofthe Steel truss. 200 mm x 200 rnma) Carvingsleepers fixing on Top Chord.100 Nos)

    CarpenterSundries

    b) Drilling holes on the sleepers for hooking.

    100 Nos)CarpenterSundries

    Unit

    Man-DayMan-DayMan-DayMan-Day

    L S

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    Man-DayL.S

    Man-DayMan-DayMan-Day

    L.S

    Man-DayL.S

    Man-DayL.S

    Quantity

    216

    1.5

    1.5

    4

    6

    50

    23

    25

    4.5

    2.4

    Remarks

  • 8/11/2019 BridgeWorks

    28/47

    Standard Da fa or Working Out Rates Per Unit Quantity of Items o f W ork contd.

    rParticulars of Materials and Labour Unit Quantity Remarks

    0

    c) Shifting the sleepers within 30m with man

    and arranging them Systemtically not more

    than one time.) 100 Nos)Carpenter Man-Day 4

    Sundries L.S -

    d) Fixing the railway on the sleeper firmly on

    the Top Chord of Installed steel truss.- fixing with the required G.Bolt, U.Bolt along

    the rail length for UIS& DIS. 10 m)Steel Fixer Man-Day

    Carpenter Man-Day 2

    Head Worker Man-Day 1

    Worker Man-Day 9

    Operator /Machine Driver Man-Day 1

    Electric Helper Man-Day 0.5

    Sundries L.S

    e) Fixing the railway on the the sleeper firmly

    on the strainger of installed steel truss.fixing with the J.Bolt or Do g Sp ike for Up

    Stream and Down S tream. 10 m)Steel Fixer Man-Day 1

    Carpenter Man-Day 1

    Head Worker Man-Day 1

    Worker Man-Day 4 5

    Sundries L.S

    f) Disman tling the railway 50 of fixing)

    95. Installing Erection Tower, Mast Crane Multi-purpose Crane on the Top Chord of the SteelTruss. 1000 kg)

    a) With universal member

    Steel Fixer Man-Day 5

    Head Worker Man-Day 2

    Worker Man-Day 13

    Sundries L.S

  • 8/11/2019 BridgeWorks

    29/47

    7

    Standard Da ta for Working Out Rates Per Unit Quantity of Items of Work contd.

  • 8/11/2019 BridgeWorks

    30/47

    Standard Data for Working ut Rates Per Unit Qu anti v of Items of Work contd.

    Quantity

    0.51

    11

    2020101002020

    4

    827

    7

    7

    592

    Unit

    Man-DayMan-Day

    Man-DayMan-Day

    L.S

    Man-DayMan-DayMan-DayMan-DayMan-DayMan-Day

    L S

    Man-Day

    Man-DayMan-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayMan-DayMan-Day

    SrNo.

    99

    100.

    Remarksarticulars of Materials and Labour

    Steel FixerWorker

    Operator /Machine DriverElectric Helper

    Sundries

    Shifting Erection Tower on the To p Chord fiomone span to another with winch, Pretension theSteel Cables Final tens ionwith 500 MT Jackand Checking Erection Tower. 1 Time)

    ForemanSteel Fixer

    Head WorkerWorker

    Operator /Machine DriverElectric Helper

    Sundries

    While erecting steel truss fiom one Pier to

    another for the required level, fixing with 100 MTon jack, 3001350 MT on jack,500 MTon jack,on the bearingof the piers.

    After that, making jack up JackdownShifting horizontally longitudinallyOther components Work

    a) 100 MTon Jack10 Nos per 1 Time)

    Foreman

    Steel FixerHead Worker

    WorkerOperator /Mach ine Driver

    Electric HelperSundries

    b) 3001350 MTon Jack10 Nos per 1 Time)

    ForemanSteel Fixer

    Head Worker

  • 8/11/2019 BridgeWorks

    31/47

    9

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd.

    SrNo.

    101.

    102.

    a)

    b)

    c)

    103.

    Particulars of Materials and Labour

    WorkerOperator/Machine D river

    Electric HelperSundries

    c) 500 MTon Jack10 Nos per 1 Time)

    ForemanSteel Fixer

    Head WorkerWorker

    Operator /Machine D riverElectric Helper

    Sundries

    Fixing of Bearing. 1000 kg)Steel Fixer

    Head WorkerWorkerSundries

    Cutting steel plate to get required size With gas)12mm thk: for 2500 mm

    WelderOxygen gasPropane gas

    16 mm to 20 rnm thk: for 2500 rnrnWelder

    Oxygen gasPropane gas

    25 mm to 30 rnrn thk: for 2500mm )Welder

    Oxygen gasPropane gas

    Welding work. one ply:)for 2500mm)

    welding rod 5kglpkt)Welder

    Unit

    Man-DayMan-Day

    Man-DayL.S

    Man-DayMan-DayMan-DayMan-Day

    Man-DayMan-Day

    L.S

    Man-DayMan-DayMan-Day

    L.S

    Man-Day

    kgkg

    Man-Day

    kgkg

    Man-Day

    kgkg

    PktMan-Day

    Quantity

    88

    8

    113

    8.5

    1010

    229

    14.51.5

    1.5

    51.5

    26

    1.5

    0.21

    Remarks

  • 8/11/2019 BridgeWorks

    32/47

    Standard D ata for Working Out Rates er Unit Quanlily of Items of Work contd.

    Remarks

    Including Loading ,

    Unloadtig and shifting

    Quantio

    2.53.3

    1.5

    0.8

    111

    0.1

    Moving m ain cable coin

    to cutting place by cran

    Cleaning main cable

    Levelling ground and

    setting turn table for

    cuttingmain cablewithwheel cutter chain

    block to get specified

    length.

    Transferring cutted mai

    cable

    Unit

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L. S

    Man-DayMan-Day

    L.S

    Man-DayL.S

    Man-DayL.S

    Man-DayMan-DayMan-DayMan-Day

    L S

    ;rJo.

    04.

    05.

    06.

    07.

    ,08.

    109.

    Particulars of Materials and Labour

    Steel Plate GirderPreassembling of steel plate girder according

    to design on the ground. 1000 kg)Skilled WorkerWorkerSundries

    Fixing , nitial final tightenning of boltnuts and drip pins according to the design whileassembling steel plate girder . I000 Nos)

    Skilled WorkerWorker

    Sundries

    Installation of preassembled steel plate girderby crane as per drawing from pier to p ier.1 000 kg)

    Skilled WorkerWorkerSundries

    Checking to final tightenned bolt nuts withchecking spanner whether standard or not.1000 Nos)

    Skilled WorkerSundries

    Placing bearing plateand fixing bolt nut.

    Skilled WorkerSundries

    Suspension and Cablestayed B ridgeCutting and cleaning main cable For 10m)

    Skilled M anHead Worker

    WorkerMachine D river/ Operator

    Sundries

  • 8/11/2019 BridgeWorks

    33/47

    Standa rd Data for Working ut Rates Per Unit Quantity ofl lems of Work confd.

    SrNo.110.

    111.

    112.

    113.

    114.

    Particulars of Materials and Labour

    Taking out and cleaning running cable from

    Cable Drum and placing them o n timber crib

    For 1 0 m)

    Skilled Man

    Head Worker

    Worker

    Sundries

    Fixing running cable on Winch Drum at

    Up stream and Down stream For one winch)

    Skilled Man

    Head Worker

    Sundries

    Taking out and cleaning Pilot Cable from Cable

    Drum and placing them on

    timber Crib For 10 m)

    Skilled Man

    Head Worker

    WorkerSundries

    Fixing step by step steel wire rope Pilot C able

    on each side of Anchor on high Level.

    For lm)

    Skilled Man

    Head Worker

    WorkerSundries

    Fixing Travelling C age by safety belt on high

    level of Tower with Pulley Travelly.

    For 1 Cage)

    Skilled Man

    Helper for Skilled Man

    Head WorkerElectrician

    Sundries

    Unit

    Man-Day

    Man-Day

    Man-Day

    L.S

    Man-Day

    Man-Day

    L.S

    Man-DayMan-Day

    Man-DayL.S

    Man-Day

    Man-Day

    Man-DayL. S

    Man-Day

    Man-Day

    Man-DayMan-Day

    L.S

    Quantity

    0.1

    0.1

    0.1

    3

    4.5

    0.30.2

    0.4

    0.3

    0.2

    0.1

    13.5

    7.5

    1.50.8

    Remarks

    Including installationof

    lock Bull Dog Grip

  • 8/11/2019 BridgeWorks

    34/47

    Standard Data for Working Out Rates er nit Quantity of Items of Wo rk confd.

    Alignment For one winch)

    Skilled M anHelper for Skilled Man

    Sundries

    3rParticulars of Materials and Labour

    qo.15. Fixing 5 Mton winch According Tower Anchor

    Fixing Supporting Frame Anchor Plate system-tically according cable alignment behindAnchorage. For 1 Anchor Supporting Frame)

    Skilled M anWelderWorkerSundries

    After installation main cab le, dismantlingand cutting supporting Anchor F rame, extraAnchor Plate ( For 1 Anchor Supporting

    Unit

    Frame.)

    Quantit

    Skilled M anWelderWorkerSundries

    Man-DayMan-Day

    L.S

    3

    4.5

    Man-DayMan-Day

    Man-DayL.S

    31.5

    Man-DayMan-DayMan-Day

    Welder

    Operator of welding M /C

    WorkerSundries

    1

    0.51.8

    11 8. Fixing roller by welding o n high level of Towerwith safety belt. For 1 No)

    Skilled M an

    119. Making for Cable clam p systemmatically andmaking hole for Bolt Nut For Tower Tiltingwork. For Cable clamp1 set)

    WelderHelper For Welder

    Sundries

    Man-Day

    Man-DayMan-Day

    L.S

    0.5Man-DayMan-Day

    Man-DayL.S

    120. Fixing firmly Over lapping a t least 5MTon Chain

    0.31.3

    1.8

    block, Steel Wire rope with Bull Dog Grip at

    Remarks

    Including timber support

    and wedging according

    inline of A nchor slab

    Including temporary

    welding work

  • 8/11/2019 BridgeWorks

    35/47

  • 8/11/2019 BridgeWorks

    36/47

    Standard Data for Working Out Rates Per nit Quantity of Items of Work contd.

    Head W orkerElectrician

    Sundries

    Head WorkerWorkerSundries

    Remarks

    Taking out cable from

    Anc hor Plate of Ancho-

    rageChecking Cable of Back

    stay between Tow er and

    Anchorage

    Numbering cable by

    layer and layer

    Installation of M ain

    Cable on high level over

    water by life jacket and

    safety belt

    Joining heavy Cable

    lamp to

    Travelly by pulley and

    chain block

    Specified cable marking

    on main cable

    Doing difficulty on high

    level of Main Cable

    Fixing Suspender Rod

    on main cab le with ing

    shaft and safetypin

    Transfering suspender

    rod to working area

    by Manpower

    Quantity

    14

    34

    0.30.1

    0.4

    7

    2

    0.5

    Unit

    Man-Day

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Man-DayL.S

    Man-Day

    Man-DayMan-Day

    L.S

    SrNo.

    125.

    a)

    b)

    c)

    126.

    a)

    Particulars of M aterials and Labour

    Installation of C able Top Clamp.For Cable Clamp 1 set)

    Skilled Man

    Tightening Bolt Nut for one timeFor 10 Nos of Bolt)

    Skilled ManElectricianSundries

    Painting Enamel paint for cable Top Clam p onhigh level For 1 no of Top Clamp)

    Skilled ManSundries

    Installation Suspender RodFor Suspender Rod No)

    Skilled an

  • 8/11/2019 BridgeWorks

    37/47

    5

    Standard Data for Working Out Rates Per Unit Quantity of Items o f W ork contd.

    Skilled ManMechanic for GroutpumpElectrician

    Head W orkerSundries

    Remarksuantity

    0.10.1

    0.10.1

    0.20.1

    10.1

    3 5

    0.50.55

    0.5

    Unit

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Man-DayMan-DayMan-DayMan-Day

    L.S

    Man-DayL.S

    SrNo.

    b)

    c)

    127.

    128.

    129.

    130.

    Particularsof Materialsand Labour

    ThreadingSuspender U bolt ,painting grease,Checking Bolt Nut washer and SpecifingU Bolt marking

    Skilled Ma nHead Worker

    Sundries

    PaintingEnamel paint for Suspenderrod bysafetybelt on high level

    Skilled ManHead Worker

    Sundries

    AdjustingBack stayed for 1Om)Skilled Man

    Head WorkerSundries

    StressingMain Cable and SpecifingElongationwithin Anchor accordingspecified tension.For 1Om)

    Skilled ManHead Worker

    Sundries

    GroutingCement motor for Cable Guide Tubewithin Anchor after stressing Main cable.For 1Om)

    Releasingbinding cable Working length position

    of Main Cable For Enclosing Blockafterstressing.

    For 1 No of cable )Skilled Man

    Sundries

  • 8/11/2019 BridgeWorks

    38/47

    6

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd .

    Skilled ManSundries

    SrNo.131.

    132.

    133.

    134.

    135.

    6

    137.

    Particularsof Materialsand Labour

    Adjustingand cutting layer of cable toinstall Anchor Plate For Stressing.

    For 1 No of cable)

    Shiftingbailey or) Steel truss on ground forPreAssemblingwork. For 1000Kg)

    Skilled ManHead Worker

    Sundries

    Preassemblingwork for bailey or) steel truss.For 1000Kg)

    Skilled ManHead Worker

    Sundries

    Shiftingheavy bailey or) Steel Truss from

    PreassembledYard to join cable car by CraneFor 1000Kg)

    Skilled ManHead Worker

    Sundries

    Fixingpreassembledbailey or)Steel Truss onSuspenderRod of Main Cable.For 1000Kg)

    Skilled ManHead Worker

    Sundries

    Fixing SafetyNet For 1m)Skilled Man

    Sundries

    RemovingsafetyNet For 1m)Skilled Man

    Sundries

    Unit

    Man-DayL.S

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.

    Man-DayMan-Day

    L.S

    Man-DayMan-Day

    L.S

    Man-DayL.S

    Man-DayL.S

    Quantity

    0.1

    1.51.5

    50.5

    0.8

    7.5

    10

    0.5

    0.2

    Remarks

  • 8/11/2019 BridgeWorks

    39/47

    7

    Standard Data for Working Out Rates Per Unit Quantity ofItems of Work contd.

    SrNo.138.

    139.

    140.

    141.

    142.

    143.

    144.

    Particularsof Materials and Labour

    Laying systematicallysmall Transon walk wayand Checking,Laying Decking BeamFor 1000 Kg)

    Skilled ManSundries

    Canying DeckingBeam and small Transondifficultyby man power on temporarywalkwayat high level of main bridge. For 1000Kg)

    Skilled ManSundries

    Puttingheavy Decking slab on main bridgeby crane For 1000Kg)

    Skilled ManHead Worker

    Sundries

    Adjustingbailey or)Steel truss of main bridgeto get specifiedcamber by wing temporarycable and Cushion Block. For SuspenderHanger 1 Point)

    Skilled ManSundries

    JackingDown bailey or)Steel truss with rightalignmentto get final R.L by using 30 MTonJack Cushion Blockand M.S Plate. For one Pier)

    Skilled ManSundries

    Fixing Bearing Bolt to Bearing Mat and Baileyor)Steel truss Pin to Bearing Mat Baileyor)Steel truss. For one Pier)

    Skilled ManSundries

    Pouring High Strength Concrete to get requiredBearing Level For Bearing)

    Skilled Man

    Unit

    Man-DayL.S

    Man-DayL.S

    Man-DayMan-Day

    L.S

    Man-DayL.S

    Man-DayL.S

    Man-Day

    L.S

    Man-Day

    Quantity

    9 5

    2

    0.81.3

    3.5

    13.5

    12

    Remarks

    Include adjusting bottom

    surface of Bearing Mat

    to get specified R L

    Including cushion

  • 8/11/2019 BridgeWorks

    40/47

  • 8/11/2019 BridgeWorks

    41/47

    9

    Standard Data for Working Out Rates Per Unit Quantity of Items of W ork contd.

    Quantity

    0.50.5

    0.50.5

    0 5

    0.5

    0.31

    1

    1

    1

    1

    0.50.5

    Unit

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-Day

    Man-Day

    SrNo.152.

    153.

    154.

    155.

    156.

    157.

    158.

    Remarksarticulars of M aterials and Labour

    Reading and specifying the centre of the Boredpile when driving stand pipe from control point

    by using theodolite. l Time)SurveyorHelper

    Surveying and specifying concrete top level topour bored concrete. l Time)

    SurveyorHelper

    Checking Bored Pile position after pouringconcrete. 1 Time)

    SurveyorHelper

    Surveying and Chec king Bored Pile after pouringconcrete to know stable or unstable. 1 Time)

    SurveyorHelper

    Surveying and specifying Cap position ofAbutment or Pier. l Time)

    Surveyor

    Surveying and C hecking settlemen t of pier cap inwater. 1 Time)

    Surveyor

    Surveying and specifying Shaft position of Abu tment

    159.

    160.

    or Pier. l Time)Surveyor

    Surveying and spec ifling B earing position ofAbutment or Pier. 1 Time)

    Surveyor

    Specifling and Ch ecking Level tofix M.S Rod inPile Cap, Shaft Cross-beam. 1 Time)

    SurveyorHelper

    Man-Day

    Man-Day

    Man-DayMan-Day

  • 8/11/2019 BridgeWorks

    42/47

    Standard Data for Working Out Rates Per Unit Quantity ofl tem s of W ork contd.

    Particulars of Materials and Labour

    Levelling Cap or) Shaft or) Cross Beam in theirform works before pouring concrete. 1 Time)

    SurveyorHelper

    Helper

    162 Rechecking position of Pile or)C ap or) Shaft or)Cross Beam after concreting. 1 Time)

    Surveyor

    before pouring concrete for one pier. 1 Time)SurveyorHelper

    163

    Surveying Checking and specifying centre ofAbutment or) pier systematically. 1 Time)

    SurveyorHelper

    Surveying bearing hole d epth to get right depth

    Surveying and Checking bottom ground of Pier inwater. 1 Time)

    SurveyorHelper

    Transfering and rechecking level M ark for specifiecplace from one bench Mark to another. 100 m)

    Surveyor

    Helper

    Unit Quantity

    Man-DayMan-Day

    0.31

    Man-Day

    SurveyingEcho SoundingPier in water and waterlevel daily. 1 Time)

    Surveyor

    0 5

    Man-Day 0 5

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-Day

    Man-Day

    0 5

    0 5

    0 3

    0 5

    0 3

    0 3

    Man-Day

    Remarks

    0 5

    Fixing bearing for one pier of main bridge or)Approach bridge Position or Grouting to ix bearinghole position Bearing.) 1 Time)Surveying Position

    SurveyorHelper

    Man-DajMan-Daj

  • 8/11/2019 BridgeWorks

    43/47

    4

    Standard Data for Working Out Rates Per Unit Quantity of Items of Work contd.

    Quantity

    3

    3

    0.50.5

    0.50.5

    0.31

    0.31

    0.3

    1

    0.50.5

    0.50.5

    Unit

    Man-Day

    Man-Day

    SrNo.

    b)

    169.

    Remarksarticulars ofMaterialsand Labour

    Recheckingposition.Surveyor

    Helper

    Fixing bearing for one pier of main bridge or)

    a)

    b)

    170.

    171.

    a)

    b)

    172

    173.

    Approach bridge Positionor Groutingto ix bearinghole position Bearing.) 1 Time)Levelling

    SurveyorHelper

    RecheckinglevelSurveyorHelper

    Surveyingand Rechecking 18m or)21m or)24m or)27m or)30m Girder for pouring concrete. 1 No)

    SurveyorHelper

    Surveyingfor erection of main truss to get specifiedlevel. 1 Time)

    SurveyorHelper

    Surveying Levelingand checkingfor erection ofmain truss to get specified level. 1 Time)

    Surveyor

    Helper

    Surveyingand Checking Level for Laying Precastslab and finished level. 1 Time)

    SurveyorHelper

    Surveyingand specifjingCenter line for installationof Road Curb and Hand Rail. 1 Time)

    SurveyorHelper

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-Day

    Man-Day

    Man-DayMan-Day

    Man-DayMan-Day

  • 8/11/2019 BridgeWorks

    44/47

    Standard Data for Working Out Rates Per Unit Quantity ofItems of Work contd.

    Road Curb and Hand Rail. 1 Time)

    Surveyor

    SrNo.174.

    Helper

    Particulars of Materials and Labour

    Surveying and specifLing level for installation of

    Man-DayMan-Day

    Remarksnit

    0.50.5

    175.

    176.

    177.

    178.

    a)

    @

    179.

    a)

    Quantitj

    0.5

    0.5

    0.3

    0.3

    0.50.5

    0.50.5

    0.50.5

    Surveyingand specifling level for layingAC. l Time)SurveyorHelper

    SurveyingOverlay, Road Curb, Hand Rail and AC

    to get right alignment. 1 Time)SurveyorHelper

    SurveyingPrecast Slab, Overlay, Road Curb,Hand Rail level. 1 Time)

    SurveyorHelper

    Surveyingposition of anywork before starting work

    Excavationor Fixing Reinforcementand forrnwork

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    or Pouringconcreteor embeddedplate or Hand Railor Road Curb or P.C Girder or CollosionBarrier orDecking slab or Girder Overlayor AC or AnchorBox or Bored Pile or Stand Pipe or Keyline or CapSkirtingor Road or Drain or Box Culvert or SteelTruss or Pier Cap or shaft Cross-beam r Abutmentor RetainingWall or Rail Road or Vertical devia

    tion.) 1 Time) SurveyorHelper

    Man-DayMan-Day

    Recheckingposition of anywork after working. l Time)SurveyorHelper

    Man-DayMan-Day

    Surveyingalignment Center Line)ofanyworkbefore

    working. 1 Time)SurveyorHelper

    Man-DayMan-Day

  • 8/11/2019 BridgeWorks

    45/47

    4

    Srandard Data for Working Out Rates er Unit Quantity oflte ms of Work contd

    Quantity

    0.50.5

    0.50.5

    0.50.5

    0.50.5

    0.50.3

    0.50.3

    0.50.5

    0.51.5

    4

    Unitr

    No.Remarksarticulars of Materials and Labour

    b)

    180.

    a)

    b)

    181.

    182

    a)

    b)

    c)

    183.

    184.

    Rechecking alignment Center Line)of anywork afterworking. 1 Time)

    SurveyorHelper

    Surveying and levelling anywork before working.1 Time)

    SurveyorHelper

    Man-DayMan-Day

    Man-DayMan-Day

    Rechecking level of anywork before working. l Time)SurveyorHelper

    Surveying and checking settlement Main Bridge orApproach Bridge or Highway or Railway.) l Time)

    SurveyorHelper

    Man-DayMan-Day

    Man-DayMan-Day

    Checking for theodolite level and E.D.M instrumentwhich are used for surveying in bridge construction.Theodolite Calibration. 1 Time)

    SurveyorHelper

    Level Calib ration. 1 Time)SurveyorHelper

    E.D.M Calibration. 1 Time)

    SurveyorHelper

    Determination o f Pier Position by E.D.M includingfinding distance between piers etc; other relevantor equivalent works. l Time)

    SurveyorHelper

    Level Net Survey Calculation Drawing. l Time)SurveyorHelper

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

    Man-DayMan-Day

  • 8/11/2019 BridgeWorks

    46/47

    44

    Standard Dat afo r Working Out Rates Per Unit Quantity of Items of Work-contd.

    SrNo.185.

    a)

    b)

    c )

    Particulars of Materials and Labour

    Triangulation Net SurveyBasic Line Measurement(1 Time)

    SurveyorHelper

    Calculation Drawing. l Time)SurveyorHelper

    Check Base Distance Measurement 1 Time)Surveyor

    Helper

    Unit

    Man-DayMan-Day

    Man-DayMan-Day

    Man-Day

    Man-Day

    Quantity

    4 5

    24

    0 5

    0 5

    Remarks

  • 8/11/2019 BridgeWorks

    47/47

    45

    Standa rd Data for Working Oui Rates Per Unit Quantity o f tems of Work contd.

    SrNo.

    1

    Particulars of Materials and Labour

    MISCELLANEOUS NOTES

    For contractor s profit and overheadsTaxes afety charges managem ent etc.)

    For Bridge M achinery WorkUse according to rateo analysis of MachanicalDepartment.)

    Unit

    L.S

    L.S

    Quantity

    -

    Remarks


Recommended