Prof. Dr.-Ing. Bernhard W. Vosteen
http://www.vosteen-consulting.de
Bromine-based Mercury Abatement – Experiences in USA and Europe
9. VDI-Fachkonferenz "REA-, SCR- und Entstaubungsanlagen in Großkraftwerken", 28. - 29. November 2013 in Düsseldorf
VOSTEEN Consulting GmbH Thermal Engineering and Environmental Protection
2
VOSTEEN Consulting
2
VOSTEEN Consulting
Precombustion Bromide Addition to Coal or Boiler Bromide Addition – Enhancing Mercury Oxidation and Thus Improving Cobenefit Mercury Capture (wet and dry)
Main topic at any large Conference on Air Pollution Control in USA and EU Example: EUEC 2012 in Phoenix AZ: “Hg Control Demonstrations & Bromine”
3
VOSTEEN Consulting
Meeting at Ministry in Beijing on Pre-Combustion Bromide Addition in October 2008: “Cheap technical solution available, but: Regulations on Hg still not given - though in focus”
Vosteen Consulting and Israel Chemicals Ltd at Ministry in Beijing Left: Prof. Dr.-Ing. Bernhard Vosteen, Dipl.-Ing. Konrad Vosteen; Dr. Mira Freiberg, Ronit Shafrir (ICL-IP)
Right: Dr. Yonghong Li, Having Li (Ministry of Forreign Affairs) and Prof. Dr. Lei Duan (Tsinghua University)
4
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
5
VOSTEEN Consulting
Recent Treaty from January 2013:
China utilities emit 200 – 300 tons / year
USA utilities emit 48 tons / year
6
VOSTEEN Consulting
Mercury Limit lowered by the
Factor 65
EPA‘s MATS Rule (February 16, 2012), Table 3 for EGUs firing high rank coals (excerpt)
Range about: 1.4 µg/dscm @ 6 % O2
Range about : 22 ng/dscm @ 6 % O2
CRAZY!
(VOSTEEN 2012)
7
VOSTEEN Consulting
8
VOSTEEN Consulting
Range about : 0.31 µg/dscm
@ 6 % O2
ACHIEVABLE
9
VOSTEEN Consulting
Mercury and Air Toxics Standards (MATS) – Status November 2013
The 1.4 mg/Nm3 as 30 day rolling average limit might be compared with those
30 µg/Nm3 as minimum daily mean limit in the German 13th and 17th BImSchV
from January 2013 respectively with those 50 µg/Nm3 as minimum daily mean limit in
other European countries
Former „crazy“ 0.022 µg/Nm3 @ 6 % O2 were corrected in 2013
to actual 0.31 µg/Nm3 @ 6 % O2 as 30 day rolling average limit
10
VOSTEEN Consulting
Industrial Emission Directive 2010/75/EU (integrated pollution prevention and control) The IED is based on several principles, namely (1) an integrated approach, (2) best available techniques *), (3) flexibility, (4) inspections (5) public participation. *) see IED articles 14.3, 15.3 and 11b The permit conditions including emission limit values (ELVs) must be based on the Best Available Techniques (BAT), as defined in the IPPC Directive. BAT conclusions (documents containing information on the emission levels associated with the best available techniques) shall be the reference for setting permit conditions. To assist the licensing authorities and companies to determine BAT, the Commission organises an exchange of information between experts from the EU Member States, industry and environmental organisations. This work is co-ordinated by the European IPPC Bureau of the Institute for Prospective Technology Studies at the EU Joint Research Centre in Seville (Spain). This results in the adoption and publication by the Commission of the BAT conclusions and BAT Reference Documents (the so-called BREFs).
11
VOSTEEN Consulting
TL/MC/AP/EIPPCB/LCP_ Draft 1 June 2013 page 415 C5.1.4.4.3.1 Fuel pretreatment Description Pretreating the fuel before combustion by cleaning or blending with another fuel or with additives are options to consider that can enable achieving good levels of mercury reduction in emissions to air, without implementing, or in combination with, additional end-of-pipe or specific techniques. Coal additives: The amount of mercury capture generally increases as the amount of halogens in coal and unburnt carbon increases. Therefore, mercury capture in coals with low halogen content can be increased by adding halogens such as bromine or chlorine salts. Alternatively, hydrogen chloride or ammonium chloride may be added. Bromine is thought to have an advantage over chlorine as its Deacon-type reactions are more favourable and it is consumed by SO2 to a lower degree than chlorine, thus requiring the use of fewer additives.
BAT Reference Document for the Large Combustion Plants (Draft 1)
12
VOSTEEN Consulting
Ulrich Klinkert an Prof. Vosteen am 6. 12. 2012
Sehr geehrter Herr Prof. Vosteen! Nach kritischer Durchsicht Ihrer E-Mail vom 30.11. und Rücksprache mit unseren Immissionsschutz-Fachkollegen habe ich festgestellt, dass Sie mit Ihrer Annahme, dass es aufgrund des natürlichen Bromgehaltes der im Kraftwerk Lippendorf eingesetzten Braunkohle keinen Sinn machen würde, Bromid dem Kohlestrom zuzusetzen, Recht haben. Während der Anhörung am 15.10. habe ich in Reaktion auf meine Vorredner und auf Anfrage zwar gesagt, dass wir diesbezügliche Versuche unternommen hätten, die kein positives Ergebnis gebracht haben, doch war dies ein Irrtum meinerseits. Mir wurde in Vorbereitung auf die Anhörung von den zuständigen Fachkollegen korrekt mitgeteilt, dass bei den Versuchen im KW Lippendorf auf die Bromidzugabe auf den Kohlestrom verzichtet wurde, da das Quecksilber im Rauchgas zum ganz überwiegenden Teil oxidiert vorliegt, so dass eine zusätzliche Bromiddosierung kein Ergebnis bringen würde, was Sie mir auch sinngemäß geschrieben haben.
Ulrich Klinkert, Vattenfall, als SV der CDU/CSU am 15. 10. 2012
Inkorrekte Behauptungen vor dem Bundestagsausschuß Private Richtigstellung
Oh. Sorry!
13
VOSTEEN Consulting
Der „Halogenmangel“ der meisten heutigen und zukünftigen Importkohlen blieb in der Studie unberücksichtigt.
Vosteen:
„Die Bromidzugabe in geringer Menge soll und kann den Halogenmangel ausgleichen.“ „Im Fall hoher nativer Bromgehalte braucht man diese Technik natürlich nicht.“
Hauptmangel dieser VGB/KEMA Studie vom 17. April 2013:
Oh. Sorry!
14
VOSTEEN Consulting
Südafrikanische Kohlen als Beispiel:
15
VOSTEEN Consulting
low chlorine
low chlorine
low chlorine
low chlorine
low and high chlorine
16
VOSTEEN Consulting
Industrial Boiler MACT
Information on the IB rules can be downloaded at
http://www.epa.gov/ttn/atw/boiler/boilerpg.html
The IB rules regulate toxic air pollutants – including mercury emissions – from coal-fired industrial, commercial, and institutional boilers.
17
VOSTEEN Consulting
Portland Cement MACT
The final cement kiln MACT was published on February 12, 2013.
The new compliance date for the mercury limits is September 9, 2015.
There is currently litigation on the new compliance date and the new particulate matter limit.
The oral argument before the D.C. Circuit Court is October 24.
US EPA expects a decision sometime in December 2013. *)
Regardless of the court decision, the current mercury limit will not change because it is not part of the litigation.
If the Court rules against US EPA on the new compliance date, the most likely outcome would be
that the date would move back to the date in the 2010 rule of September 9, 2013, which has already passed.
*) US EPA suggests to check back at the end of December to see how the Court ruled.
18
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
PS: Dry Mercury Capture
19
VOSTEEN Consulting
BAYER AG - CURRENTA GmbH & Co. OHG, Germany
... speaking about Hazardous Waste Combustion in 2000
20
VOSTEEN Consulting
1
8 9
10
11
12
2
3
4 5
7
16
13
14 15
17 6
Fig. 1
1st Successful Industrial Applications, working since 2001
Hazardous Waste Combustion (HWC) (4 plants with 30,000. .. 80,000 Nm³/h dry)
of CURRENTA GmbH & Co OHG in Leverkusen, Dormagen and Uerdingen
Hg-spiking (continuous)
Hg-spiking (continuous)
Hg-CEMs
Hg-spiking (discontinuous)
Quench
Hg-spiking (continuously)
Hg-spiking (continuously)
Hg-CEMs
Hg-SCEM
Hg-spiking (discontinuously)
Quench
Process Developement with CURRENTA GmbH & Co OHG (Project leader: Prof. Vosteen)
21
VOSTEEN Consulting
Dosierbehälter mit
HCl- stabilisierter
HgCl2- Lösung
Schlauchpumpe
zum Dosieren der
HgCl2- Lösung
wassergekühlte
Dosierlanze am
Kopf der NBK
dosing pump
spraying nozzle
HgCl2 container
Hgmet bomb
Erfassung von HgmetErfassung von Hgges
beheizte Entnahmesonde Notebook zum
Auslesen der DatenData
notebook Heated ducts
for flue gas to CEMs
CEM Hgtotal CEM Hgmet
Continuous spiking Discontinuous spiking
Mercury Spiking During
Tests in 2000
22
VOSTEEN Consulting
Source: Vosteen, Kanefke et al.: „Mercury-Related Chemistry in Waste Incineration and Thermal Process Flue Gases“, Air Quality (VI) Conference, Arlington, VA, Sept. 2003
23
VOSTEEN Consulting
Fig. 5
0
200
400
600
800
1000
1200
1400
1600
1800
2000
08:30 09:30 10:30 11:30 12:30 13:30 14:30 15:30
Time [hh:mm]
98,0
98,2
98,4
98,6
98,8
99,0
99,2
99,4
99,6
99,8
100,0
52
Mas
sra
tio B
r/Hg
Hg rem
oval rate [%]
51
0
Influence of mass ratio Br/Hg on mercury removal efficiency η at HWC Plant of BAYER AG
(raw gas mercury concentration 9600 µg/Nm³ dry by continuous spiking)
mass ratio
Br-/Hg
η
24
VOSTEEN Consulting
Anlieferung
Abwasser Abwasser
Befüllung und Anforderung Bromid
NBK VA2
NBK VA1
Brennersteuerung VA1 Brennersteuerung VA2
PIAS+-
AP26P4101
XS
AP26X4101
GOS+-
AP26G4101
XS
AP22X7720
PIAS-
AP22P7710
FICAS+-
AP22F7710
GOS
AP22G7710
Startposition
CaBr2-Standby
CaBr2-Betrieb
Anforderung CaBr2-Zugabe VA1
CaBr2-Zugabe VA1 beenden
= Grundstellung Dreiwegehahn
Quelle: CUR-UW-Abfallverbrennung,
Stand : 15.2.2008
LIAS+
AP26L4102
AP26L4101
LIAS
HOS
AP26H4102
HOS
AP26H4101
XS
AP26X4101
GOS
AP26X4101
XS
AP26X4102
GOS
AP26X4102
LA+
AP26P4101
FICAS+-
AP32F6520
GOS
AP32F6520
PIAS-
AP32P6040
XS
AP32X6030
Befüllung
Steuerung AP26K4101
XS
AP32X6520
XS
AP22X7710
25
VOSTEEN Consulting
Products of ICL-IP:
Merquel® 45 (45 % NaBr solution) Merquel® 52 (52 % CaBr2 solution)
Merquel® 45 and Merquel® 52 are not posing concerns for human health and environment
if used in accordance with MSDS instructions and local regulations.
MSDS for both solutions available from ICL-IP. ____________
NaBr (45 %) solutions are used in large quantities in the paper industries.
NaBr (45%) / CaBr2 (52 %) solutions are used since many years
in offshore oildrilling industries in large quantities.
Lots of data/studies on toxicity/ecotoxicology available.
NaBr and CaBr2 solutions are not even classified as dangerous goods for transportation, see IMO, ADR/RID, IMDG, ICAO/IATA, US DOT
In Deutschland: Kein Gefahrgut, Wassergefährungsklasse 1
26
VOSTEEN Consulting
Mobiler Lagerbehälter für CaBr2 Druckbehälter, Stahltank, innen beschichtet mit Vinylesterharz und Glasglimmer (Flakes)
27
VOSTEEN Consulting
Pumpengehäuse am Mobilen Behälter (Einhausung aus Gründen des Lärmschutzes) 2 Amatec Kolben-Membran-Pumpen (Teflonmembranen)
Rohrleitungen aus Stahl mit innerer PTFE-
Beschichtung
28
VOSTEEN Consulting
NaBr-Solution Tank and Pumps at Sewage Sludge Incineration Plant of Town Karlsruhe in Karlsruhe – Neureuth ( 2 stationary Fluidized Bed Incinerators)
29
VOSTEEN Consulting
Messung
von
Hgges und Hgmet
Messung
von
Hgges und Hgmet
Eindosierung von HgCl2 und NaCl
Spiking with
HgCl2 and NaBr
CEMs for
Hgtotal and Hgmet
CEMs for
Hgtotal
bituminouscoal
bituminouscoal
air
air
FGD
Source: Vosteen, Nolte et al.: „Chlorine- and bromine-enhanced Hg sorption on ESP fyl ash from a coal-fired slag-tap boiler and on cement raw meal“, VDI Seminar 431802, September 29 - 30, 2003 in Duesseldorf (Germany)
Multi-stage APC System – APC Type: dry/wet
BAYER/Currenta GmbH& Co oHG in Uerdingen: PC-fired Boiler (100 MWtherm) Co-Combustion of Industrial Sewage Sludges
30
VOSTEEN Consulting
Fire side bromide addition (internal bromination) is improving Hg-adsorption at fly ash UBC by the factor 2,5
170 °C
Hgtotal-concentration in flue gas behind ESP (µg/Nm3 dry)
Source: Vosteen, Nolte et al.: „Chlorine- and bromine-enhanced Hg sorption on ESP flyash from a coal-fired slag-tap boiler and on cement raw meal“, VDI Seminar 431802, September 29 - 30, 2003 in Duesseldorf (Germany)
Sorption isothermes of the ESP-fly ash of high LOI (22,3 % UBC)during test runs in April, 2002
with and without fire side bromide addition to boiler
0
10
20
30
40
50
60
0 20 40 60 80 100 120 140 160 180 200
Hgtotal-concentration in flue gas behind ESP [!g /Nm? dry]
Hg-
conc
entr
atio
n in
ESP
-fly
ash
[mg/
kg]
no bromide addition to boiler
with bromide addition to boiler
31
VOSTEEN Consulting
CaBr2
The bromine-based VOSTEEN Technology: Pre-combustion Bromide Addition onto the Coal
32
VOSTEEN Consulting
Particle trajectories in a Lignite Boiler (20 m x 20 m x 75 m)
- tangentially fired
- lignite design (pulverizers feed vertical burner row)
- bad internal mixing, i.e. strands of gas and particles
Three-Dimensional Evaluation (1996)
with courtesy of
Prof. Dr. techn. Reinhard Leithner, Institute for Thermal and Fuel Technologies ,
Technical University Braunschweig (Germany)
Danger of insufficient bromide pre-distribution
33
VOSTEEN Consulting
CaBr2 (52 % solution) as Coal Additive – drums and pumps
in early full scale test (Arizona)
34
VOSTEEN Consulting
CaBr2 (52 % Solution) added to coal band feeders up-stream of coal pulverizers
Extended Tests at PRB-fired Plant Miller (Birmingham, AL) in 2006, 2008 and 2010
35
VOSTEEN Consulting
Choose to feed bromide solution to pulverizers F and G
52 % CaBr2-Solution at Plant Miller, Birmingham, AL
36
VOSTEEN Consulting
Source: Tom Pearson: „In Pursuit of the New-Plant MATS Hg Control Limit: - Full Scale Test Results using Alstom’s KNXTM Mercury Control Technology with Norit’s PAC Products“, EUEC 2013 in Phoenix, AZ, January 28, 2013 Thomas E. Pearson
37
VOSTEEN Consulting
Source: Tom Pearson: „In Pursuit of the New-Plant MATS Hg Control Limit: - Full Scale Test Results using Alstom’s KNXTM Mercury Control Technology with Norit’s PAC Products“, EUEC 2013 in Phoenix, AZ, January 28, 2013 Thomas E. Pearson
38
VOSTEEN Consulting
Other Mid-West Utilities Typical KNXTM System
Storage ~6500 gallons (23.5 m3)
Feed ~3.3 gph / pump (12.5 liter/hour)
Source: Tom Pearson: „In Pursuit of the New-Plant MATS Hg Control Limit: - Full Scale Test Results using Alstom’s KNXTM Mercury Control Technology with Norit’s PAC Products“, EUEC 2013 in Phoenix, AZ, January 28, 2013 Thomas E. Pearson
39
VOSTEEN Consulting
>3000 MW of Commercial KNXTM Operations - TEP - 30 Jan 2012 – P 39
Western Utilities, Plant D
Storage ~30,000 gallons (113,7 m3)
KNXTM Storage & Feed System
40
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
41
VOSTEEN Consulting
USGS CoalQual data base - data excerpt from Open-File Report 94-177 (1994) 5000 samples - evaluated by Vosteen Consulting
with courtesy of Prof. Dr. Belkin, Febr. 20, 2010
Powder River Basin
Northern, Central and Southern Appalachian
42
VOSTEEN Consulting
PRB
43
VOSTEEN Consulting
44
VOSTEEN Consulting
45
VOSTEEN Consulting
Sulfur in 5000 US coal samples (courtesy Prof. H. Belkin, USGS) Vosteen 2010
46
VOSTEEN Consulting
47
VOSTEEN Consulting
Source: Allan Kolker and Jeffrey C. Quick, U.S. Geological Survey and Utah Geological Survey: “Geologic Controls on Halogens in Coal”, MEC 9 - Mercury Emissions fromCoal, St. Petersburg (Russia), May 2012
47
VOSTEEN Consulting
Cl
Br
Bromide Addition needed to cover “Halogen-Deficit” as e.g. in case of subbituminious PRB coals (at about 140 GWe)
48
VOSTEEN Consulting
Source: Allan Kolker and Jeffrey C. Quick, U.S. Geological Survey and Utah Geological Survey: “Geologic Controls on Halogens in Coal”, MEC 9 - Mercury Emissions from Coal, St. Petersburg (Russia) in May 2012
49
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
50
VOSTEEN Consulting
800 MWBOILER
AIR HEATERS
ELECTROSTATICPRECIPITATORS
SCRUBBERS
STACK
ID Fans
TXU Energy’s Monticello Steam Electric Station (793 MWe) Unit 3 tested in 2005 (DOE/EPRI Project on BCA)
50 % PRB coal and 50 % Tx-Lignite
51
VOSTEEN Consulting
0
10
20
30
40
50
60
70
80
90
100
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Halogen Addition Rate (ppmw in coal, dry)
Red
uctio
n of
Bas
elin
e E
lem
enta
l Hg
(% o
f Bas
elin
e H
g(0)
)
NaCl - PRB
MgCl2 - PRBCaCl2 - PRBHCl - PRBCaBr2 - PRBNaCl2 - NDL
MgCl2 - NDLCaCl2 - NDLSEA2 - NDLCaCl2 - TxL/PRBCaBr2 - TxL/PRB
Reduction of Baseline Elemental Mercury Overview over all sites tested by EPRI
in 2002 … 2005 (chlorine) and repectively 2004 … 2005 (bromine)
S
Monticello 3 Limestone 1
52
VOSTEEN Consulting VOSTEEN Consulting
License granted in 2008 to WE Power Stations Pleasant Prairie (2 x 600 MWe Units with SCR, ESP, WFGD in commercial
opperation since January 1st, 2010)
2 x 600 MWe
Base Load (24 hours/day)
PRB coal
2 x 315 tons/hour 0.11 ppm Hg
KNX (as CaBr2)
25 ppm Br on coal
Hgtotal at stack < 1 µg/dscm (both units)
53
VOSTEEN Consulting
July 29h, 2008 September 16th, 2008 date
Power Station WE Pleasant Prairie with SCR, ESP, WFGD 25 ppm Br per Coal only, SCR in service with NH3
54
VOSTEEN Consulting
Mercury Removal as achieved in 2007 By Bromide Addition (Tests at WE Plant Pleasant Prairie, 2 x 600 MWe)
Source: M. Rini and B.W. Vosteen, “Full-Scale Test Results From a 600 MW PRB-Fired Unit Using Alstom’s KNXTM Technology for Mercury Control,” Paper # 73, as presented at A&WMA‘s Power Plant Air Pollutant Control MEGA Symposium, August 30 - September 2, 2007, Baltimore, MD
55
VOSTEEN Consulting
Source: M. S. Berry and B. W. Vosteen: „Bromine Injection Technology Demonstrations at Plant Miller for Removing Vapor Phase Mercury “, 12th ICESP in Nuremberg, May 2011
56
VOSTEEN Consulting
Source: M. S. Berry and B. W. Vosteen: „Bromine Injection Technology Demonstrations at Plant Miller for Removing Vapor Phase Mercury “, 12th ICESP in Nuremberg, May 2011
57
VOSTEEN Consulting
Source: M. S. Berry and B. W. Vosteen: „Bromine Injection Technology Demonstrations at Plant Miller for Removing Vapor Phase Mercury “, 12th ICESP in Nuremberg, May 2011
58
VOSTEEN Consulting
Source: M. S. Berry and B. W. Vosteen: „Bromine Injection Technology Demonstrations at Plant Miller for Removing Vapor Phase Mercury “, 12th ICESP in Nuremberg, May 2011
59
VOSTEEN Consulting
Source: M. S. Berry and B. W. Vosteen: „Bromine Injection Technology Demonstrations at Plant Miller for Removing Vapor Phase Mercury “, 12th ICESP in Nuremberg, May 2011
60
VOSTEEN Consulting
Source: M. S. Berry and B. W. Vosteen: „Bromine Injection Technology Demonstrations at Plant Miller for Removing Vapor Phase Mercury “, 12th ICESP in Nuremberg, May 2011
61
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
62
VOSTEEN Consulting
KNXTM Testing with Holcomb DFGD, 350 MWe, PRB coal
Sorbent Injection
Sorbent Storage and Feeder
SDA
FF
63
VOSTEEN Consulting
Sharon Sjostrom: „Mercury Control for PRB and PRB/Bituminous Blends“, presented at EUEC, Tucson/Arizona, January 24, 2006
1 lb/MMacf = 16 mg/m3 , 290 °F = 143.4 °C
2006
64
VOSTEEN Consulting
Sharon Sjostrom: „Mercury Control for PRB and PRB/Bituminous Blends“, presented at EUEC, Tucson/Arizona, January 24, 2006
1 lb/MMacf = 16 mg/m3
Meramec
300 MWe, PRB
65
VOSTEEN Consulting
66
VOSTEEN Consulting
Synergistic Effect of KNXTM + Mer-CureTM
500 MW PRB with Particulate Scrubber
0
1
2
3
4
5
6
7
8
Baseline Mer-Cure @ 1 lb/MACF Mer-Cure & KNX
Stac
k Hg
Lb/
TBtu
55% incremental performance improvement
67
VOSTEEN Consulting
Source: Tom Pearson: „In Pursuit of the New-Plant MATS Hg Control Limit: - Full Scale Test Results using Alstom’s KNXTM Mercury Control Technology with Norit’s PAC Products“, EUEC 2013 in Phoenix, AZ, January 28, 2013 Thomas E. Pearson
68
VOSTEEN Consulting
Source: Tom Pearson: „In Pursuit of the New-Plant MATS Hg Control Limit: - Full Scale Test Results using Alstom’s KNXTM Mercury Control Technology with Norit’s PAC Products“, EUEC 2013 in Phoenix, AZ, January 28, 2013 Thomas E. Pearson
69
VOSTEEN Consulting
Source: Tom Pearson: „In Pursuit of the New-Plant MATS Hg Control Limit: - Full Scale Test Results using Alstom’s KNXTM Mercury Control Technology with Norit’s PAC Products“, EUEC 2013 in Phoenix, AZ, January 28, 2013 Thomas E. Pearson
70
VOSTEEN Consulting
71
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
72
VOSTEEN Consulting
Preferred approach towards new patents in the US - even in case of no inventive height
73
VOSTEEN Consulting
See also: http://www.wikinvest.com/stock/Arthur_J._Gallagher_%28AJG%29/Clean-
energy_Related_Ventures
74
VOSTEEN Consulting
See also: http://www.wikinvest.com/stock/Arthur_J._Gallagher_%28AJG%29/Clean-
energy_Related_Ventures
75
VOSTEEN Consulting
76
VOSTEEN Consulting
See also: http://www.wikinvest.com/stock/Arthur_J._Gallagher_%28AJG%29/Clean-
energy_Related_Ventures
77
VOSTEEN Consulting
See also: http://www.wikinvest.com/stock/Arthur_J._Gallagher_%28AJG%29/Clean-
energy_Related_Ventures
78
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
79
VOSTEEN Consulting VOSTEEN Consulting 56 US Power Stations are applying Pre-Combustion Bromide Addition commercially
79
Source: Katherine Dombrowski, Katie Arambasick (URS), Nanda Srinivasan(EPRI), Corey Tyree (Southern Company): “Bromine Balance of Plant Study”, Power Plant Air Pollutant Control MEGA Symposium,
Baltimore MD, October 2013
80
VOSTEEN Consulting VOSTEEN Consulting
APC Systems of these 56 US Power Stations applying Pre-Combustion Bromide Addition
80
Source: Katherine Dombrowski, Katie Arambasick (URS), Nanda Srinivasan(EPRI), Corey Tyree (Southern Company): “Bromine Balance of Plant Study”, Power Plant Air Pollutant Control MEGA Symposium,
Baltimore MD, October 2013
81
VOSTEEN Consulting
81
VOSTEEN Consulting
Source: Katherine Dombrowski, Katie Arambasick (URS), Nanda Srinivasan(EPRI), Corey Tyree (Southern Company): “Bromine Balance of Plant Study”, Power Plant Air Pollutant Control MEGA Symposium,
Baltimore MD, October 2013
No Corrosion in case of enameled cold end baskets and optimized soot blowing, but:
82
VOSTEEN Consulting
Source: Katherine Dombrowski, Katie Arambasick (URS), Nanda Srinivasan(EPRI), Corey Tyree (Southern Company): “Bromine Balance of Plant Study”, Power Plant Air Pollutant Control MEGA Symposium,
Baltimore MD, October 2013
83
VOSTEEN Consulting
Source: Katherine Dombrowski, Katie Arambasick (URS), Nanda Srinivasan(EPRI), Corey Tyree (Southern Company): “Bromine Balance of Plant Study”, Power Plant Air Pollutant Control MEGA Symposium,
Baltimore MD, October 2013
84
VOSTEEN Consulting
Source: Katherine Dombrowski, Katie Arambasick (URS), Nanda Srinivasan(EPRI), Corey Tyree (Southern Company): “Bromine Balance of Plant Study”, Power Plant Air Pollutant Control MEGA Symposium,
Baltimore MD, October 2013
85
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
86
VOSTEEN Consulting
Source: M. Kramer, A. Gruber Waltl: “Effective ways to reduce mercury content in FGD byproducts “, Poster at ICMGP in Edinburgh, July 28th – August 2nd, 2013
87
VOSTEEN Consulting
Source: M. Kramer, A. Gruber Waltl, Andritz E&E, September 2013
88
VOSTEEN Consulting
89
VOSTEEN Consulting
90
VOSTEEN Consulting
Source: M. Kramer, A. Gruber Waltl: “Effective ways to reduce mercury content in FGD byproducts “, Poster at ICMGP in Edinburgh, July 28th – August 2nd, 2013
91
VOSTEEN Consulting
Source: M. Kramer, A. Gruber Waltl: “Effective ways to reduce mercury content in FGD byproducts “, Poster at ICMGP in Edinburgh, July 28th – August 2nd, 2013
92
VOSTEEN Consulting
Agenda
• Introduction: UN Treaty, EU IED/BAT, US MATS
• The bromine-based VOSTEEN Technology
• US Coals (Mercury, Chlorine, Bromine, Sulfur)
• Wet Mercury Capture at TXU Monticello, Miller and Pleasant Prairie
• Dry Mercury Capture
• Clean Coal Law - Internal Revenue Code, Section 45
• US EPRI Balance of Plant Report
• Cooperation VOSTEEN/STEAG/Andritz E&E
• Conclusions
93
VOSTEEN Consulting
Conclusions
The VOSTEEN technology has been successfully operated in USA and Germany over many years at dozens of PC-fired Power Plants (USA) and many Waste-to Energy plants (Germany). It might be applied in China, as well.
The effectiveness of CaBr2 and its rapid response to fuel Hg
variations has been demonstrated in wet and dry APC systems. The combination of pre-combustion bromide addition and normal
non-brominated activated carbon injection (ACI) reliably controls Hg emissions with variable load and fuel Hg content.
The newly developed VOSTEEN/STEAG/ANDRITZ process for power plants with wet FGD emission control is effective with respect to both air and water, and also allows for mercury-free gypsum