+ All Categories
Home > Documents > Brookings High School

Brookings High School

Date post: 28-Jan-2016
Category:
Upload: koch-hazard-architects
View: 221 times
Download: 0 times
Share this document with a friend
Description:
Koch Hazard Architects received a 2012 Merit Design Award for its renovation and remodel of Brookings High School in Brookings, South Dakota.
Popular Tags:
14
Brookings High School Brookings, South Dakota
Transcript
Page 1: Brookings High School

Brookings High SchoolBrookings, South Dakota

Page 2: Brookings High School

a

Page 3: Brookings High School

Brookings High School

Brookings High School needed a new kitchen and cafeteria, improved theater, school office and guidance areas and a recognizable front entry.

Together these needs presented an opportunity to create an enhanced sense of place for the school. Working with the building committee, a network of gather-ing and circulation spaces is established to link and highlight key public areas - cafeteria, office, guidance, theater, gymnasium and library.

BEFORE

Page 4: Brookings High School
Page 5: Brookings High School

Brookings High School

Large windows allow natural light to saturate the space. bb

Page 6: Brookings High School

c

Page 7: Brookings High School

Brookings High School

A new entry and commons establish a memorable new image and a clear sense of arrival. The cureved forms are welcoming and contemporary. A substantially more secure environment is created while making the schools’ most important gathering area more accessible, functional, flexible and attractive.

d

Page 8: Brookings High School

e

Page 9: Brookings High School

Brookings High School

Renovated are the existing auditorium, administration and guidance areas. The existing cafeteria becomes a shop and a green room to serve the auditorium.

BEFORE

Page 10: Brookings High School

32.22

4.01

7.14

5.41

8.05

4.01

4.01

8.04

7.22

7.14

7.22

10" 10'-4" 10"

12'-0"

8 1/

2"10

"3"

1'-0

"8

1/2"

5'-4

"

10"

3'-6

"1'

-0"

8

A5.1

7.235.17

10.09

10"

3'-6

"V

ARIE

S

1'-2"

5.09

5.18

9.247.236.134.39

5.175.10

5.10

10.0910" 4'-4" 10"

1'-6

"

10

A5.16'-0"

5.17

MAX

.

1'-6

"

1'-2"

10"

5.17

PROJECT NO.:

SHEET TITLE:

DATE:

PROJECT:

COPYRIGHT:

DRAWN BY:

2010

Brookings, South Dakota

0955A

BUILDING ELEVATIONS

RDH/JDB

A5.1

01/19/10

Brookings School District 05-1

Brookings High School Renovation &Expansion

DIVISION 2 - EXISTING CONDITIONS2.58 INSTALL SALVAGED SLATE PANELS

DIVISION 3 - CONCRETE3.28 ARCHITECTURAL PRECAST CONCRETE

DIVISION 4 - MASONRY4.01 FACE BRICK4.39 3/4" SLATE

DIVISION 5 - METALS5.05 BEAM (SEE STRUCT.)5.09 STEEL TUBE (SEE STRUCT.)5.10 1/2" x 1/2" STEEL TUBE STOP. PAINT BLACK.5.14 PLATE (SEE STRUCT.)5.17 10" x 14" x 3/16" STEEL TUBE (PAINT BLACK)5.18 ¼” STEEL PLATE (PAINT BLACK)5.41 1 ½” PIPE

DIVISION 6 - WOOD, PLASTICS AND COMPOSITES6.13 EXTERIOR PLYWOOD SHEATHING

DIVISION 7 - THERMAL AND MOISTURE PROTECTION7.14 FLASHING PREFINISHED7.22 METAL WALL PANELS7.23 FLASHING (CLEAR FINISHED ALUMINUM). MATCH EXISTING.7.91 EXTERIOR INSULATION AND FINISH SYSTEM

DIVISION 8 - OPENINGS8.03 DOOR8.04 WINDOW UNIT8.05 ALUMINUM CURTAIN-WALL

DIVISION 9 - FINISHES9.24 3 5/8” STEEL STUDS 16” O.C.

DIVISION 10 - SPECIALTIES10.09 ALUMINUM LETTERING10.44 FLAG POLE

DIVISION 23 - HEATING VENTILATION AND AIR CONDITIONING23.02 LOUVER - BY M.C.

DIVISION 32 - EXTERIOR IMPROVEMENTS32.22 RETAINING WALL

GENERAL NOTES

KEYNOTES

1/8" = 1'-0"1 EAST ELEVATION

1/8" = 1'-0"5 WEST ELEVATION

1/8" = 1'-0"3 NORTH ELEVATION

1/8" = 1'-0"2 SOUTH ELEVATION

7. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, ELEVATIONS AND DIMENSIONS.

10. PROVIDE FOR AND VERIFY LOCATION, SIZE, AND QUANTITY OF ALL EQUIPMENT PADS ASSHOWN ON ELECTRICAL AND MECHANICAL DRAWINGS. COORDINATE LOCATIONS WITH ALLPLANS, SECTIONS, AND DETAILS.

12. PROTECT ALL EXISTING UTILITIES.

14. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONALINFORMATION RELEVANT TO DEMOLITION & PATCHING.

16. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATIONAND COORDINATION. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, ANDCONDITIONS.

1/8" = 1'-0"4 NORTH ELEVATION -2

1/2" = 1'-0"7 BUILDING SIGN ELEVATION 1/2" = 1'-0"8 BUILDING SIGN SECTION

1/2" = 1'-0"9 EXT. BENCH ELEVATION 1/2" = 1'-0"10 EXT. BENCH SECTION

1/8" = 1'-0"6 RIBBON ELEVATION

32.22

4.01

7.14

5.41

8.05

4.01

4.01

8.04

7.22

7.14

7.22

10" 10'-4" 10"

12'-0"

8 1/

2"10

"3"

1'-0

"8

1/2"

5'-4

"

10"

3'-6

"1'

-0"

8

A5.1

7.235.17

10.09

10"

3'-6

"V

ARIE

S

1'-2"

5.09

5.18

9.247.236.134.39

5.175.10

5.10

10.0910" 4'-4" 10"

1'-6

"

10

A5.16'-0"

5.17

MAX

.

1'-6

"

1'-2"

10"

5.17

PROJECT NO.:

SHEET TITLE:

DATE:

PROJECT:

COPYRIGHT:

DRAWN BY:

2010

Brookings, South Dakota

0955A

BUILDING ELEVATIONS

RDH/JDB

A5.1

01/19/10

Brookings School District 05-1

Brookings High School Renovation &Expansion

DIVISION 2 - EXISTING CONDITIONS2.58 INSTALL SALVAGED SLATE PANELS

DIVISION 3 - CONCRETE3.28 ARCHITECTURAL PRECAST CONCRETE

DIVISION 4 - MASONRY4.01 FACE BRICK4.39 3/4" SLATE

DIVISION 5 - METALS5.05 BEAM (SEE STRUCT.)5.09 STEEL TUBE (SEE STRUCT.)5.10 1/2" x 1/2" STEEL TUBE STOP. PAINT BLACK.5.14 PLATE (SEE STRUCT.)5.17 10" x 14" x 3/16" STEEL TUBE (PAINT BLACK)5.18 ¼” STEEL PLATE (PAINT BLACK)5.41 1 ½” PIPE

DIVISION 6 - WOOD, PLASTICS AND COMPOSITES6.13 EXTERIOR PLYWOOD SHEATHING

DIVISION 7 - THERMAL AND MOISTURE PROTECTION7.14 FLASHING PREFINISHED7.22 METAL WALL PANELS7.23 FLASHING (CLEAR FINISHED ALUMINUM). MATCH EXISTING.7.91 EXTERIOR INSULATION AND FINISH SYSTEM

DIVISION 8 - OPENINGS8.03 DOOR8.04 WINDOW UNIT8.05 ALUMINUM CURTAIN-WALL

DIVISION 9 - FINISHES9.24 3 5/8” STEEL STUDS 16” O.C.

DIVISION 10 - SPECIALTIES10.09 ALUMINUM LETTERING10.44 FLAG POLE

DIVISION 23 - HEATING VENTILATION AND AIR CONDITIONING23.02 LOUVER - BY M.C.

DIVISION 32 - EXTERIOR IMPROVEMENTS32.22 RETAINING WALL

GENERAL NOTES

KEYNOTES

1/8" = 1'-0"1 EAST ELEVATION

1/8" = 1'-0"5 WEST ELEVATION

1/8" = 1'-0"3 NORTH ELEVATION

1/8" = 1'-0"2 SOUTH ELEVATION

7. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, ELEVATIONS AND DIMENSIONS.

10. PROVIDE FOR AND VERIFY LOCATION, SIZE, AND QUANTITY OF ALL EQUIPMENT PADS ASSHOWN ON ELECTRICAL AND MECHANICAL DRAWINGS. COORDINATE LOCATIONS WITH ALLPLANS, SECTIONS, AND DETAILS.

12. PROTECT ALL EXISTING UTILITIES.

14. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONALINFORMATION RELEVANT TO DEMOLITION & PATCHING.

16. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATIONAND COORDINATION. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, ANDCONDITIONS.

1/8" = 1'-0"4 NORTH ELEVATION -2

1/2" = 1'-0"7 BUILDING SIGN ELEVATION 1/2" = 1'-0"8 BUILDING SIGN SECTION

1/2" = 1'-0"9 EXT. BENCH ELEVATION 1/2" = 1'-0"10 EXT. BENCH SECTION

1/8" = 1'-0"6 RIBBON ELEVATION

Page 11: Brookings High School

Brookings High School

The new Main Street transforms a typical high school hallway into an active, dynamic space, promoting interaction of stu-dents during the day and the community at other times.

Using new floor and ceiling finishes, improved lighting and distinctive“facades”for the theater, gym and library, key public spaces are highlighted and way finding is made intui-tive.

Tying it all together is a ribbon that shifts height to become a threshold, doorway, counter or seat, as needed.

a

b

c

d

e

f g

Brookings High School

Page 12: Brookings High School

f

Page 13: Brookings High School

Brookings High School

g

Page 14: Brookings High School

Recommended