Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR Commissioner Janette SadikKhan New York City Department of Transportation Presented February 21, 2013 to Community Board 6
Transcript
Page 1: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

Brooklyn Waterfront Greenway

ATLANTIC BASIN CONNECTOR

Commissioner Janette Sadik‐Khan  New York City Department of TransportationPresented February 21, 2013 to Community Board 6

Page 2: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

PROJECT BACKGROUNDWATERFRONT  DEVELOPMENT

Waterfront has seen major changes• Growing residential and recreational uses• Brooklyn Bridge Park and the Greenway draw people to the waterfrontColumbia Street Path (Opened 2008)• >400 weekend cyclists per dayPier 6 (Opened Summer 2011)• >1000 weekend pedestrians per day• >300 weekend bike riders per dayNumbers will increase as park grows

Page 3: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

PROJECT BACKGROUNDGREENWAY IMPLEMENTATION PLAN

Community‐based planning process• Visioning workshops• Preferred route• 24 Capital projects

Page 4: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

Columbia Street

Atlantic AvenueVan Brunt Street

Valentino Park and Pier

Atlantic Basin

PROJECT BACKGROUNDGREENWAY DEVELOPMENT

Brooklyn Bridge Park

Page 5: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

PROJECT BACKGROUNDIMPLEMENTATION PLAN ‐ ATLANTIC BASIN 

Route Alternatives Preferred Route

Page 6: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

Van Brunt StreetGreenway Path(In Construction)

(2) Connection to Van Brunt Street Path:

Summit StreetImlay Street

(1) Access to Atlantic BasinGate at Verona StreetGate at Pioneer Street

Valentino Park and Pier

ATLANTIC BASIN CONNECTORPROJECT ROUTE

Pier 44Waterfront Garden

(3) Connection toValentino ParkConover Street

King Street/Sullivan StreetFerris Street 

Page 7: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

ACCESS TO ATLANTIC BASINISSUES AND OPPORTUNITIES

Greenway will cement public access to Basin• Provides access to waterfront where it is limited 

• Goal in Comprehensive Waterfront Plan 

• CB has heard various schemes ensuring access

• Integrates waterfront into neighborhood• Encourages cruise passengers to explore Brooklyn waterfront neighborhoods and the Greenway

Page 8: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

ACCESS TO ATLANTIC BASINPROPOSED IMPROVEMENTS 

Page 9: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

CONNECTION TO VAN BRUNT STREET PATHISSUES AND OPPORTUNITIES

Summit Street and Imlay Street• Connects Basin north to Van Brunt Street• Low vehicular volumes and edge condition

• Used by bikers/joggers already • Sub‐standard two‐way street

Page 10: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

SidewalkWest

10’

CONNECTION TO VAN BRUNT STREET PATHEXISTING CONDITIONS – IMLAY STREET

NorthboundMoving

LaneEast

SidewalkParking

Lane

10’Southbound

MovingLane

30’

ParkingLane

Page 11: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

CONNECTION TO VAN BRUNT STREET PATHPROPOSED IMPROVEMENTS – IMLAY STREET

•Conversion to one‐way northbound•Removal of parking on west curb•Two‐way bike path along the west curb

East Sidewalk

10’

Combined Parking/Loading/

Moving Lane

4’4’

West Sidewalk

10’19’

30’

3’

Buffer

Page 12: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

CONNECTION TO VAN BRUNT STREET PATHVEHICULAR FLOW – PEAK HOUR VOLUMES

Imlay Street(Verona/Commerce):

61 NB90 SB 

Van Brunt Street(Delevan Street):

454 NB300 SB

Conover Street(Dikeman/Coffey):

107 NB26 SB

Van Brunt Street(Dikeman/Coffey):

272 NB302 SB

Page 13: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

Van Brunt Street• Accommodates additional SB volumes• Potential for reduced NB volumes due to improved flow on Imlay Street 

CONNECTION TO VAN BRUNT STREET PATHVEHICULAR FLOW – PEAK HOUR VOLUMES

One‐way Conversion• Summit Street (EB)• Imlay Street (NB)• Pioneer Street (EB)• Conover Street north of 

Sullivan Street (NB)Potential One‐way Conversion

• Conover Street south of Sullivan Street (NB)

• Reed Street (WB)• Beard Street (EB)

Page 14: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

CONNECTION TO VALENTINO PARKISSUES AND OPPORTUNITIES

King, Sullivan, and Ferris Streets• Connects Basin to Valentino Park• Maintains proximity to waterfront• Uses quiet, industrial streets• Avoids cobblestones

Page 15: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

CONNECTION TO VALENTINO PARKEXISTING CONDITIONS & PROPOSED IMPROVEMENTS

King Street (WB)Sullivan Street (EB)• Quiet 30’ wide streets • Shared lane connection to Ferris Street

Hoyt Street, Brooklyn

Page 16: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

CONNECTION TO VALENTINO PARKEXISTING CONDITIONS & PROPOSED IMPROVEMENTS

Ferris Street• Very low traffic volumes • Wide sidewalks• Signed route 

Page 17: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

VAN BRUNT STREETCOMPLEMENTARY BIKE ROUTE

• Commercial corridor • Desire for bike route expressed at Greenway workshops• Alternative to waterfront route; serves different purpose• Too narrow for bicycle lanes 

Page 18: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

VAN BRUNT STREETPROPOSED IMPROVEMENTS

Fifth Avenue, Brooklyn

Page 19: Brooklyn Waterfront Greenway ATLANTIC BASIN CONNECTOR · 2/21/2013  · ATLANTIC BASIN CONNECTOR SUMMARY OF PROPOSED IMPROVEMENTS Pier 44 Waterfront Garden Atlantic Basin: Two‐way

Van Brunt StreetGreenway Path(In Construction)

Valentino Park and Pier

ATLANTIC BASIN CONNECTORSUMMARY OF PROPOSED IMPROVEMENTS

Pier 44Waterfront Garden

Atlantic Basin:Two‐way path through Basin

Safe access at Verona/Conover Streets

Summit/Imlay Streets:Two‐way on‐street path 

Ferris Street:Signed  connection to  

Valentino Park

One‐way Conversion• Summit Street (EB)• Imlay Street (NB)• Pioneer Street (EB)• Conover Street north of 

Sullivan Street (NB)

Van Brunt Street:Bike route with shared lanes

Complements waterfront route

Potential One‐way Conversion

• Conover Street south of Sullivan Street (NB)

• Reed Street (WB)• Beard Street (EB)

King/Sullivan Streets:On‐street connection to Ferris Street


Recommended