Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC January 29 th , 2010. History. 1993 – Greenway Plan for NYC 1997 – Bicycle Master Plan 2005 – Brooklyn Greenway Initiative’s Plan for Community Boards 2 and 6 - PowerPoint PPT Presentation
8
1 December 2010 Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC January 29 th , 2010
Transcript
Page 1: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

1December 2010

Brooklyn Waterfront Greenway

DOT Master Planning Process

Brooklyn Greenway Initiative TAC

January 29th, 2010

Page 2: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

2December 2010

History

1993 – Greenway Plan for NYC1997 – Bicycle Master Plan2005 – Brooklyn Greenway Initiative’s Plan for Community Boards 2 and 62008 – Brooklyn Greenway Initiative’s Plan for Community Board 12008 – UPROSE’s Conceptual Plan for Sunset Park Greenway2009 – DOT Sponsored Brooklyn Waterfront Greenway Master Plan

Page 3: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

3December 2010

History

Columbia Street, Red Hook•Sidewalk widened•Trees planted with pervious pavement•Separated bike lane with adjacent sidewalk

Page 4: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

4December 2010

DOT Role

•The Brooklyn Waterfront Greenway is an agency priority•Hired a full-time project manager•Hired RBA Group to complete a master plan

Page 5: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

5December 2010

DOT Role

• Much of the plan will be on public right of way

• Primary Concerns:– Safety to cyclists and other

street users– Accessibility & Directness to

major origins/ destinations– Connections with other routes– Attractiveness of the route– Low Conflicts with other users

• We will cooperate with sister agencies create the more complex sections

Kent Avenue, Williamsburg•One-way conversion•Floating parking•Protected two-way bike path on waterfront side of street

Page 6: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

6December 2010

1) Master Planning ProcessCreating a plan that will guide the development of the Greenway-Literature Review Report describing Gap Analysis results-Site reconnaissance and field investigations-Outreach Meetings Mid March: Existing Conditions-Development of Preliminary Route Alternatives-Outreach Meetings June: Proposed Alternatives-Develop preferred route-Preparation of illustrative design for preferred route-Outreach Meetings January: Final Alternatives-Preparation of draft design guidelines-Develop Project Phasing/Implementation Plan

2) Preliminary DesignWorking towards construction-Engineering work-Permits and approvals-Construction materials

RBA Process

Page 7: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

7December 2010

Next Steps

Manhattan Ave. Street End Park, Greenpoint

• Mid-March Outreach– Collaboration with BGI and RPA,

they will be assisting with outreach.

– 4 Meetings in 4 Communities• Sunset Park• Red Hook• Downtown Brooklyn• Greenpoint/Williamsburg

– 3 Series of Meetings: • Workshop 1: Existing Conditions• Workshop 2: Proposed

Alternatives• Workshop 3: Final Alternatives

• Continue to work with other City Agencies

• Work within DOT on existing projects that effect the Greenway

Page 8: Brooklyn Waterfront Greenway DOT Master Planning Process Brooklyn Greenway Initiative TAC

8December 2010

Ted Wright, AICP, LEEDAP

[email protected](212) 839-7199