Presentation Overview - Road Map
Where we started:• Background• Goals
What we did:• Team Selection• Scope Development • Project Tools Development
Where we’re going:• Implementation• Planning, and Data Collection
Background: Water Resources
Task Force• Task Force Report - January 2011
• Included 40 recommendations in the areas of:
• Water conservation• Reuse planning and
development• Regional water supply projects• Investigation and modeling
Eleven (11) recommendations specific to reuse including;
• Recommendation #19
Regional Reuse Master Plan
Background: Water Resources
Task Force
Challenges:• Developed urban areas
• 25 distinct water providers
• 15 distinct wastewater providers
• Seasonal demand fluctuations
• Treatment costs/disposal options
Background: Water Reuse
Challenges
Background: Water Reuse Drivers
• Water/Wastewater concurrency
• Saltwater intrusion• Costs for alternatives
Key Drivers in the Past
• Regional Water Availability Rule
• Ocean Outfall Rule• Climate Change• Regulatory
Requirements
Key Drivers Today
Reclaimed Water
Feasibility Study
Renewing Facility Permits
Renewing Water Use
PermitsRenewing UIC Permit
Background: Regulatory Reuse
Drivers
• To develop a Regional Reuse Master Plan that will build upon current municipal and county efforts and coordinate a regional approach to reuse planning, maximizing cost-effective reuse development within Broward County
• To create a platform for shared communication
• To provide flexible and interactive planning tools
Background: Reuse Master Plan
Goal
• Water and Wastewater Providers/Local Gov’ts
• Consultants• Hazen and Sawyer, P.C.• Craven Thompson & Associates, Inc. • Cordova Rodriguez & Assoc., Inc. • Steve Lamb
• Broward County:• Natural Resources Planning and Management• Development and Environmental Review• BC Water and Wastewater Services
• FLDEP, DOH, DOT, SFWMD
Work Effort: Team Selection
• Review of Previous Studies/Reports
• Stakeholder Meetings
• Stakeholder Specific Interactive Project Analysis
• Reclaimed Water Planning Tools Development
Work Effort: Team Collaborations
• Foundation for data storage and interpretation
• Database of existing and planned reclaimed water infrastructure
• Addition of planned County Public Works Projects
• Google Earth platform allows for easy manipulations of alternatives
• Tool was used to develop proposed regional projects
Work Effort: GIS Planning Tool
• Evaluated potential users based on distance from WWTP
• Two scenarios:• With utility
boundaries• Without utility
boundaries
Broward NRWWTP
5 Miles
3 Miles
1 Mile
Broward WWS Utility Boundary
Work Effort: BC WWS Example
Scenarios Within Utility Boundary No Utility Boundary
No. of Customers
Demand (mgd)
No. of Customers
Demand (mgd)
Potential Partners
One mile radius
3 0.37 4 0.39 Pompano Beach
Three mile radius
38 3.63 78 9.42 Pompano Beach, Deerfield Beach, Margate
Five mile radius
59 4.55 154 13.83 Pompano Beach, Deerfield Beach, Margate, Coral Springs, Fort Lauderdale, North Lauderdale, Parkland
Work Effort: BC WWS Example, cont.
• Criteria were developed with stakeholders
• Final criteria included the following categories• Project Benefits• Project Implementation• Project Reliability• General Acceptance of Project• Project Costs
• Weights and scaling factors were established
• Model is in Excel – simplifies revisions
Work Effort: Project Evaluation Model
• Existing and planned reclaimed water infrastructure
• Planned County Public Works projects
• Costs and carbon footprint of potential reclaimed water projects
• Climate change impacts on reclaimed water options
• Potential reclaimed water opportunities by utility
• Regional reclaimed water projects
• Regional projects using Criteria Model
• Guidelines for future maintenance of tools
Work Effort: Master Reuse Plan
Implementation: Benefits
Current:
• Database of existing reclaimed water infrastructure-not previously available
• Catalyst for multijurisdictional partnering • Documents reuse projects for future funding under SB
444 or otherFuture: • Reduction in engineering costs for future planning efforts• Ability to visually analyze options• Platform to coordinate with future public works projects
and potentially reduce construction costs
Implementation: Potential Projects for
Analysis
$0
$2
$4
$6
$8
$10
$12
$14
$16
$18
Estimated Capital Cost ($/gpd)
Average
• Initial Implementation Plan is based on criteria today
• The Implementation Plan is flexible• Will be updated as drivers change
over time• To be updated by utilities in the
future
Implementation: Initial
Regional Projects Implementation Phasing
Capital Cost per Gallon
Total Capital Cost Reason for Grouping:Project Name
Reclaimed Water
Demand (mgd)
Phase & Timing
MGD per
PhaseCumm. MGD
BC - PBC Agreement (to PBC) 15.00
I2015 - 2020
24.54 24.54
$5.43 $104M ongoing/ocean outfall requirementBC - PBC Agreement (within BC) 4.2
Sunrise Sawgrass Large User - Phase A 2.00 $14.62 $29M ongoing/ FDEP permit requirement
Davie Large User - Phase A 3.34 $10.23 $34M ongoing/outfall compliance
Cooper City (credit sharing with other) 0.96
II2020 - 2025
23.61 48.15
TBD TBD outfall compliance by 2025
Pompano Beach Residential Irrigation – Phase A for BC Outfall Compliance 2.25 TBD TBD outfall compliance by
2025
Hollywood Aquifer project 20.40 $8.92 - $13.82 $182M - $282M outfall compliance by 2025
Implementation: Preliminary
Project Name Reclaimed Water
Demand (mgd)
Total Capital Cost
Partners
BC - PBC Agreement (to PBC) 1
15.00 $104 M Palm Beach County, Deerfield Beach,Coconut CreekBC – PBC Agreement
(within BC) 14.20
Sunrise Sawgrass Large User – Phase A 2 2.00 $29 M Plantation
Davie Large User – Phase A 3 3.34 $34 M Sunrise
PHASE I RECLAIMED WATER DEMAND 24.54
1 – BCWWS will progress in incremental amounts.2 – City is required to construct 2 mgd but may install additional capacity.3 – Town is presently constructing.
Implementation: Phase I 2015-2020
Project Name Reclaimed Water
Demand (mgd)
Total Capital Cost Partners
Cooper City Credit Sharing 1 0.96 TBD TBD
Pompano Beach Residential Irrigation – Phase A for BCWWS 2
2.25 TBD --
Hollywood Floridan Aquifer 20.40 $182 M –$282 M --
PHASE II - RECLAIMED WATER ADDED
23.61
TOTAL RECLAIMED WATER DEMAND 48.15
1 – City will pay another utility to construct for ocean outfall compliance.2 – BCWWS compliance alternative for ocean outfall compliance.
Implementation: Phase II 2020-2025