Slide 1
BRTS LAHORE
28.7 km (Shahdra to Gajjumatta)
27 stations (54 platforms)
8 at grade intersections
DepotChungiGhazi QainchiGulab DeviKama ChowkAzadiTimberElevated Portion 8.5 km (Muslim Town to Azadi Chowk) 9 stations
Planning and Execution9 PC-Is (Package 1 to Package 9)Housing Department Executing Department through TEPA (LDA)Other Agencies involved Urban Unit, Transport Planning Unit, NESPAK etcCompleted in Record Time about 11 monthsTotal Cost Over 30 billion PKR
Bidding Process (Single-Stage: Two-Envelope)
DeadlineApproval
ApprovalPreparationEvaluation 1Evaluation 2TechnicalProposal
FinancialProposal
FinancialFinancialTechnicalProposal
FinancialProposal
TechnicalSTOPPrivate ContractorsNLCNESPAKHABIB CONSTRUCTIONIKANSKBZKBPGE And others
45 Articulated Buses operated by Albayrak (Turkish Firm)
Fenced Corridor
E-ticketing (Automated Fare Collection)
Signal Priority System Monotubes, Mast Arm Poles
Pedestrian Push Buttons
ITS (Intelligent Transportation System)SIGNAL PRIORITY SYSTEMCOMMAND AND CONTROL CENTRESCATS AUSTRALIAN SYSTEMSystem Overview
Video WallsVideo Recorders, Servers, StoragesWorkstationsCore NetworkCommand & Control CenterPTZ =20
Stations =27Intersections =08PTZ = 4BOX = 6
Public Address System Stations =27
CCTV/ PAS/ ITS ConnectivityStationCommand & Control CenterStationIntersectionsStationStationStationStationStationStationStationStationGPON-Fiber (SMF)Communication Network (GPON)Primary:48 core single mode
Secondary12 core single mode
Communication networkPrimary communication Gigabit Passive Optical Network (GPON)Secondary communicationAny service provider e.g. PTCL etc.
An RJ-45 node will be provided at each Intersections/Stations Cameras Camera TypeLocationNo of locationsNoTotal CamerasPTZStation (Type-1)18472BoxStation (Type-1)186108PTZStation (Type-2)6424BoxStation (Type-2)61060PTZStation (Type-3)3412BoxStation (Type-3)31442PTZIntersections8218+2PTZ & Box Camera (Outdoor) Heavy Duty1-1.3Mega Pixel IP BasedIP-66 compliant
Ethernet SwitchRemotely manageable at Command & Control Center10/100BaseT10/100/1000BaseT (combo) for uplink Operating Temperature -10oC to +60oC
Video WallProjection of all PTZ & Box cameras MBS Stations, corridor ITS Intersections55(8 x3) Matrix
Screen Management ConsoleVideo wall managementInput / output screen management Decode IP to VGA/DVI/HDMIVideo projection of cameras.
Installations at stationCameras (PTZ & Box):Installation of station cameras using foiled twisted pair cable (FTP) CAT-6
Station Cabinets:Installation of station cabinets for data network communication.Installation of high environmental temperature resistant Ethernet switches for communicationPublic Address SystemInstallation of Public Address System :Voice amplification system at each platform.Outdoor speakers at each platform & pedestrian bridges Provision to playback Pre-Recorded Voice for publicProvision for custom announcement through MBS staff for general purpose as well as in case of emergency etc.
Power at (Intersection / Stations)Power at stations through:National power grid Standby power generatorAt each stationUPS15 kVA for IT & other equipmentsPower at intersectionsPower supply from nearby MBS station / linesUPS at intersection for ITS
CabinetsAt IntersectionsITS cabinets will be used for the installation of Ethernet switches, camera termination etc.
At StationsIT communication cabinets at each MBS station for Ethernet switches, camera termination, etc.DrawingsStationsIntersections
CCTV / Public Address System for MBS Station Drawings
Inauguration 10 Feb 2013
Command and Control System
Ridership 125000 pax per day
Political Will The real motive