Utilizing Alternative Heat Source / Sinks to Heat / Cool Navy Facilities IGHSPA Conference, Nashville, TN October 2, 2008. Bryan Long EIT, CGD-IT NAVFAC ESC Port Hueneme CA 805-982-5177 [email protected]. Presentation Outline. - PowerPoint PPT Presentation
Popular Tags:
25
Bryan Long EIT, CGD-IT NAVFAC ESC Port Hueneme CA 805-982-5177 Bryan.p.long@navy .mil Utilizing Alternative Heat Source / Sinks to Heat / Cool Navy Facilities IGHSPA Conference, Nashville, TN October 2, 2008
Transcript
Page 1: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

Bryan Long EIT, CGD-ITNAVFAC ESCPort Hueneme CA

805-982-5177

[email protected]

Utilizing Alternative Heat Source / Sinks to Heat / Cool Navy Facilities

IGHSPA Conference, Nashville, TNOctober 2, 2008

Page 2: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

2

Presentation Outline

•Energy efficiency / renewable energy drivers for Federal Government

•Existing challenges with implementing traditional GSHP technology in certain locations

•Alternative options to implement high efficient HVAC technology

•Navy projects constructed and proposed–Dam Neck HRSD Loop

Page 3: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

3

Federal Requirements for Energy Efficiency / Renewable Energy

• EPACT 05- Reduce energy expenditures by 2% per year from 2003 baseline for the measurement of energy savings–“… to the extent economically feasible and technically practical, the following (electrical energy

consumption) shall be renewable:”• a) > 3% in FY 2007 - 2009• b) > 5% in FY 2010 - 2012• c) > 7.5% in FY 2013 and thereafter

• EO 13423–(i) ½ renewable energy consumed in an FY comes from “new” renewable sources,–(ii) to the extent feasible, implement renewable energy generation on agency property – Improve energy efficiency and reduce greenhouse gas emissions

• 3 percent annually through the end of fiscal year 2015• or 30 percent by the end of fiscal year 2015

• EISA 2007–Sec. 433 Federal Building Energy Efficiency Performance Standards

• Reduce Fossil Fuel Use–built/renovated in 2010 must cut fossil-fuel dependency by 55%–Eliminate use of fossil fuel energy for new/renovated buildings by 2030

• NDAA 2007 sets a goal of 25% energy produced on site at DOD facilities by renewables by 2025 • FEMP guidance for EPACT 05 and EO13423 (guidance not yet available for EISA 07):

–http://www1.eere.energy.gov/temp/renewable_energy/renewable_fedrequire.html

Page 4: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

4

Challenges with incorporating traditional GSHP technologies

•Land restrictions can make it difficult to install well fields in densely populated areas

–Coastal areas of the country often populated, space a premium

•Poor soil thermal conductivity making traditional GSHP too cost prohibitive

•Certain areas of the country still do not have strong GSHP industry driving up the install cost (western states)

• In certain locations, alternative heat source / sinks exist making them the best / most cost effective option

Page 5: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

5

Alternative Heat Source / Sink Options

•Sea / Lake Water heat source / sink–Renewable, very efficient cooling technology–Reduce energy consumption to generate chilled water–No cooling tower (eliminate fresh water use for evaporative cooling)

•Water / Wastewater Discharge heat source / sink–Navy DamNeck HRSD loop

•Municipal Water Supply heat source / sink??

Page 6: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

6

Alternative Heat Source / Sink Options

Source: Makai Ocean Engineering, Inc.

Chilled Water Distributionand Building Systems

Central Heat Exchange and Pumping Facility

Sea/Lake Water Intake and Return (open loop)

Sea/Lake Water Source System

Page 7: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

7

•Single Building Application–Seawater provides all cooling for about 10 months per year

–Reduced operation/ maintenance costs

–Savings of $117,000/year

–Simple payback of 2.3 years

Source: http://www.ecbcs.org/docs/annex_28_case_study_buildings.pdf

Technology MaturityPurdy’s Wharf Halifax, Canada

Page 8: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

8

•District Cooling Application–Reduces the campus energy use for cooling by 80% –Designed to last over 75 to 100 years, over twice the

typical life of chillers

Technology MaturityLake Source Cooling - Cornell university

Source: http://www.utilities.cornell.edu/utl_ldlsc.html

Page 9: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

9

US NAVY DAM NECK ANNEX HRSD LOOP SYSTEM

Page 10: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

10

• DOE authorization to Trane in Dec 2004

• Request for proposal to Trane in Jan 2006

• Building proposals submitted and approved in May-June 2006

• HRSD Water Reuse MOA signed in Aug 2006

• Final proposal from Trane in Aug 2006

• Navy review of final proposal in Sep 2006

• Congressional notification of proposed project in Sep 2006

• Contract award in Dec 2006

• Contract construction completion in Sep 2008

• Ribbon cutting ceremony on October 9, 2008

Dam Neck Annex Project History

Page 11: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

11

HRSD Atlantic Treatment

Plant

Condenser Cooling Water

Loop (Typ.)

Heat Exchanger

Plant

Atlantic Ocean

HRSD Effluent

Line

Dam Neck Annex Project Site

Page 12: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

12

• 10 Buildings (487,231 SF)

• 451 Tons of HVAC (89 GSHP Units)

• 411 Tons of HVAC on the HRSD Condenser Loop

• Bldg 448 - 40 Tons of HVAC using Vertical Drilling GHP Technology

• Well field Sizing: 326 ft/ton in 40 wells

• GSHP’s are classified as a Renewable Energy Source

Ground Source Heat Pump Energy Conservation Measure

Page 13: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

13

• HVAC Improvements in 14 Buildings (1,624,269 SF)

• Condenser Cooling Water Loop (Cooled by HRSD effluent) provided to 15 Buildings (1,530,155 SF)

• 2,142 Tons of New-Installed HVAC on Condenser Cooling Water Loop

• 1,400+ Tons of Existing HVAC on Condenser Cooling Water Loop

• 10 miles of Condenser Distribution Loop Piping in Sizes from 2” to 36” diameter

• 0.5 miles of HRSD/Heat Exchange Plant Piping, 36” diameter

Heating, Ventilation and Air Conditioning Energy Conservation Measure

Page 14: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

14

• Existing HRSD Atlantic Treatment Plant Effluent Line runs through Dam Neck Annex (HRSD easement)

• Project Uses 14MGD as heat sink for Condenser Loop• Water is used to cool condenser water loop water

• Effluent water and condenser cooling water do not mix

• Qualifies as a renewable energy source

• HRSD Constructed, Own, and Operate Tapping Sleeves and Valves

• Project Paid HRSD for Tapping Sleeves and Valves

• No Cost for Water – only a small annual administration fee.

• MOA in effect until 2027 (HRSD easement expires)

HRSD Effluent Heat Exchange System

Page 15: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

15

Heat Exchanger/HRSD Effluent System

HRSD AtlanticTreatment Plant

Building(GSHP)

Typ.

Building(Chiller)

Typ.

HeatExchangers

Building(Chiller)

Typ.

Building(GSHP)

Typ.

HR

SD

Effl

uen

t L

ine

Condenser Cooling Water Loop

Atlantic Ocean

Page 16: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

16

Tapping Sleeves and Valves

Page 17: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

17

Tapping Sleeves and Valves (cont’d)

Page 18: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

18

Heat Exchanger Plant

Page 19: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

19

Condenser Cooling Water Loop

Page 20: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

20

HRSD Effluent/GSHP Comparison

• GHP Drilling Costs and HRSD Effluent/Condenser Cooling Water GHP Drilling Costs and HRSD Effluent/Condenser Cooling Water Loop Costs approximately equalLoop Costs approximately equal

• Effluent Water is a more efficient source than GSHP (Winter & Effluent Water is a more efficient source than GSHP (Winter & Summer)Summer)

• No issues related to building up ground temperatures over timeNo issues related to building up ground temperatures over time

• Effluent and GSHP Systems equal life expectancyEffluent and GSHP Systems equal life expectancy

• HRSD Effluent System allows use on existing chillers – Greater Use HRSD Effluent System allows use on existing chillers – Greater Use of the Navy investmentof the Navy investment

• Many existing exterior cooling towers eliminatedMany existing exterior cooling towers eliminated

• HRSD Effluent/Condenser Cooling Water LoopHRSD Effluent/Condenser Cooling Water Loop has large growth has large growth potential at minimal costpotential at minimal cost

Greater Use, More Efficient – Costs the SameGreater Use, More Efficient – Costs the Same

Page 21: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

21

Project Savings pay for All Project Costs Trane Manufactured Products Warranted for Project Term

(17 years) Service and Preventative Maintenance provided by Trane

for the Project Term (17 years) Non-Trane Installed Equipment Repair and Replacement

Escrow Fund documented with Project Savings (17 years) Annual Measurement and Verification of Project Savings

(17 years) HRSD Effluent Heat Exchange System Expandable at

minimal cost Equipment protected from corrosive environment (new

equipment either underground or in buildings) Energy Efficient Equipment Infrastructure Improvements

Dam Neck ESPCProject Benefits and Attributes

Page 22: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

22

Project Financial StatisticsProject CostProject Cost $32,885,728$32,885,728

Annual Savings (FY06 Baseline)Annual Savings (FY06 Baseline) $2,828,636$2,828,636

Simple Payback: Simple Payback: 11.6 years11.6 years

Energy SavingsEnergy Savings $2,299,364$2,299,364SteamSteam$2,133,361$2,133,361

ElectricityElectricity $ $ 383,770383,770

Natural GasNatural Gas ($ 556,189)($ 556,189)

Fuel OilFuel Oil $ $ 6,322 6,322

Water /Chilled WaterWater /Chilled Water $ 200,249$ 200,249

SewerSewer $ $ 131,851131,851

Operations and Maintenance SavingsOperations and Maintenance Savings $ 529,272$ 529,272

Service Service $ $ 304,221304,221

PM PM $ $ 225,051225,051

Page 23: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

23

Additional Navy Alternative GSHP projects Underway

•WSHPs to be installed in berthing barges in the Puget Sound, WA

–Barges used to house sailors that work on ships–Currently barges tie into base’s utilities including steam and electricity to provide heating / cooling for the barges

–WSHPs tied directly to the Puget Sound will allow for more efficient heating / cooling of barges

•Conducting feasibility studies on:–SeaWater Cooling in Yokosuka, JP–Utilizing waste heat from a computer datacenter to heat exterior of building in Monterey, CA

–Utilizing water from a remediation site to cool a large maintenance center in Barstow, CA

Page 24: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

24

Key Partners – Dam Neck HRSD Project Presentation Acknowledgements

–Jody Wilkins, Federal Sector Project Developer

–Roger Shull, Norfolk Sales District

–Don Delegrange, Construction Project Manager

•Hampton Roads Sanitation District

–Ted Henifin, HRSD Director–Karen Harr, Chief of Water Reuse

–John (J) Dano, Project Manager

•NAVFAC–Sean Foley, Contracting Officer

–Robert Harvey, Project Facilitator

–Andrew Porter, Navy Technical Representative

–ENS. Michelle Caponigro, Construction Manager

•Trane–David Hayden, Federal Account Executive

Page 25: Bryan Long EIT, CGD-IT NAVFAC ESC Port  Hueneme CA 805-982-5177 Bryan.p.long@navy.mil

25

“All we have to decide is what to do with the time that is given us.”-Gandalf, Lord of The Rings, The Fellowship of the Ring

QUESTIONS??Bryan Long, EIT, CGD-IT

NAVFAC ESCPort Hueneme CA

[email protected]