SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Bachelor of Science (Honours) in Architecture
INTERNSHIP REPORT INTERNSHIP TRAINING AND REPORT (ARC2615,
ARC2613 & ARC2622)
Prepared by: Tan Jo Lynn (0318518)
Architecture Firm: Unit One Design Sdn. Bhd.
Tutor: Ar. Zahari Zubi
Internship Training and Report Page !1
Internship Training and Report Page !2
ARC2615 / ARC2613 / ARC2622ARCHITECTURE INTERNSHIP LOG SHEETS AND REPORT
CoverPage Page1
Student Details
Internship Company Taylor's University
Student Full Name Lakeside Campus
Stu.No No.1
Home Address Jalan Taylor's PJS7/1347500 Subang Selangor
Malaysia
Phone No. Home Phone No. Mobile
VoIP Software (Skype) / Overseas No.Email
School of Architecture, Building & DesignLecturer DetailsLocation Name Email Office No.
Kuala Lumpur Zahari Zubir [email protected] 603-5629 5000
UNIT ONE DESIGN
TAN JO LYNN
0318518
NO. 19, JLN BAYAN 1A, BDR PUCHONG JAYA, 47170 PUCHONG, SELANGOR DARUL EHSAN, MALAYSIA.
+603-80805815
+6012-2179259
TABLE OF CONTENT
CHAPTER 1.0 ACKNOWLEDGEMENT 4
CHAPTER 2.0 INTRODUCTION TO MODULE 5
CHAPTER 3.0 INTRODUCTION TO COMPANY 6
CHAPTER 4.0 REPORT
Section 5.1 Programming 7
Section 5.2 Schematic Design 8
Section 5.3 Contract Documentation 17
CHAPTER 5.0 CONCLUSION 25
CHAPTER 6.0 APPENDIX 27
CHAPTER 7.0 LOG SHEET 34
Internship Training and Report Page !3
1.0 ACKNOWLEDGEMENT
The internship opportunity I had with Unit One Design was a great chance for learning and
professional development.
To begin with, I would want to thank Mr. John Ding (Chief Director) for providing us the
opportunity to experience and learn in this company, as well as Ar. Ken Wong (Executive Chief
Director) for his patience in guiding and advising us throughout our internship.
Besides that, I want to express my gratitude to Mr. Joel (Project Director) for his effort in
managing our daily job scope during the whole of internship. I would also like to thank Mr. Hilmi,
Ms. Fong and Ms. Audrey, who have gave us guidance on our assigned work. As well as Mr. Bryan,
Mr. Jay and Ms. Christie for providing information during site visits.
Lastly, I would like to Ar. Zahari Zubir, my tutor, for guiding us to have a better
understanding towards this module, its objectives and requirements.
In conclusion, we were able to learn and experience professional information about
architecture field. I perceive this opportunity as a big milestone in my development and I would use
gained skills and knowledge in best possible way.
Tan Jo Lynn Student of Taylor’s University
Bachelor of Science (Honours) Architecture
Internship Training and Report Page !4
2.0 INTRODUCTION TO MODULE
This module intends to introduce understanding of requirements, activities and management
as well as operations in real life architectural practices. It is aimed to enable students to be involve
in professional practices. Hence, allow them to gain knowledge and generate awareness of
principles and procedure of law and legislation applied to proper architectural drawings as well as
different activities that occur within an architecture firm.
Therefore, students are required to produce a weekly assessment log sheet for their tutor to
keep track of their job scope given in the office. They are also require to generate a final report,
which include the log sheet collected, as a documentation of their experiences, learnings and
observations.
Internship Training and Report Page !5
3.0 INTRODUCTION TO COMPANY
Unit One Design was establish in the year of 1996, founded by Mr. John Ding and Ar. Ken
Wong. It was previously placed in Sri Hartamas and is currently located in Solaris Dutamas,
Publika. It started off as a small architecture firm, where it has grown into a company consists of
approximately 30 members now with 42 awards won.
Their design philosophy is to create progressive works with clear function and design
integrity. Based on that, they search for solution for their projects by analysing, observing and
communicating to achieve detail understating of clients’ needs. Their intention is to combine
architecture, interior design, graphics, retail and product design in their production.
Company Name Unit One Design
Address D4-1-12 Solaris Dutamas No. 1 Jalan Dutamas 1 50480 Kuala Lumpur, Malaysia
Contact Number +603 6411 6122
Email [email protected]
Internship Training and Report Page !6
4.0 REPORT
4.1 Programming
The first job I was appointed to is to key in planned schedule and job scope of members in the
company into a programming software called the smart sheet. It is an online application used by the
company to manage their working schedule, job scope and deadlines as fail to plan, is plan to fail.
After completing the assigned job, I understood the importance of time management and
planning. I have also gained awareness of the basic flow chart of the architecture firm, where it
usually starts with generating concepts and schematic designs, goes through D.O., design
development and B.P. submission, lastly ends with tender and construction drawings that needs the
most time to be completed.
During the process of completing drawings for the Kepong project, I was briefed by Mr.
Hilmi about certain stages of the flow chart. For example, B.P. stand for Building Plan, where the
submission of B.P. drawings is to achieve authority approval to build the architecture. In the design
development stage, engineers are involved due to the consideration of position of structures and
M&E. While during the tender stage, the drawings will be sent to the quantity surveyor to estimate
the cost , which will then goes through the process award.
Internship Training and Report Page !7
Figure 4.1.1 Smart sheet
4.2 Schematic Design
Sketching, 3D modelling and Rendering
SERAI CONDOMINIUM - BERNARD CHAN
Serai Condominium | Bukit Bandaraya, 59000 Bangsar, Kuala Lumpur | Condominium
This building is located in Bangsar, developed by Bandar Raya Development, consisting of
approximately 121 units. Each standard unit is about 4,025 sf and 14,000 sf. Their common area
consists of recreational podium, wading pool, lounge etc. The project Unit One Design involve in is
a refurbishment of one of the unit in the building.
I was assigned to construct a 3D model of a furniture in an alcove with Loh Wei Shuen
based on a series of drawings done by Loh Wei Shuen previously. It is located decide a dining area,
viewing towards Personas Twin towers. We also generated its perspectives in PDF form with
SketchUp for further rendering which will be done by others.
Through this accredited job, I have learnt new skills in using SketchUp. For example, I have
learnt how to create a scene for conveniency of setting the angle of point of view for later purposes.
I have also learnt to set style of rendering depending of the purpose of the perspective.
Internship Training and Report Page !8
Figure 4.2.1 SketchUp model of the interior fitting.
ISOLA KLCC
Isola KLCC | Jalan Yap Kwan Seng, 50450 Kuala Lumpur | Service Residence
The building is located in Kuala Lumpur city, developed by the OCR Land Holdings Sdn. Bhd.. It
consists of 4 towers with approximately 680 to 3,080 sf built up area and 140 units. Facilities
included in the building are sky swimming pool, yoga deck, outdoor screening etc.
I have involved in amending the 3D model, which is done by one of my colleagues earlier,
by using SketchUp. I was assigned to create additional structure that is located along the openings
at the side of the 4 towers.
Internship Training and Report Page !9
Figure 4.2.2 Perspective of the interior fitting.
Figure 4.2.3 SketchUp model of Isola KLCC.
Site Visit and Site Measurement
SERAI
Serai Condominium | Bukit Bandaraya, 59000 Bangsar, Kuala Lumpur | Condominium
This project is located in the same building as the previous mentioned project, Serai Condominium
- Bernard Chan. The unit is approximately 4025 sf. which consists of basic spaces like 4 bedrooms,
one living, one dining, a gym, wet and dry kitchen, laundry etc. But instead of having drafted
furnitures, this project was still in the site measurement stage.
Lee Yih and I was in charge of measuring the interior of the unit in this assigned job. It was
to generate base drawings of the unit for further development of the project. We were given the
accessibility to the whole space to measure its dimensions which include the built in furnitures,
windows and doors as well as the sanitary appliances. Later, we were require to produce its floor
plan, elevations and sections based on our sketches and measurements.
In this assigned job, I was able to use my skills gained during Measured Drawing (Semester
2.5). I was glad that I have experienced this job scope before hand so that I knew the brief idea of
the procedure. At the same time, I have learnt the process of a design stage where the base drawings
are required before a design development produce to understand the space better.
Internship Training and Report Page !10
Figure 4.2.4 Interior perspective of the unit.
Internship Training and Report Page !11
--
--
1247
.TD
.XX-
XXX
SEC
TIO
N 1
, 2, 3
, 4
SECTION 01
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
Figure 4.2.5 Base drawing of the unit.
--
--
1247
.TD
.XX-
XXX
WET
KIT
CH
EN -
ELEV
ATI
ON
1, 2
, 3, 4
ELEVATION 01 ELEVATION 02
ELEVATION 04ELEVATION 03
2800
2800
2800
2800
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
Figure 4.2.6 Elevations of kitchen.
BBCC SALES GALLERY
Built Bintang City Centre | Jalan Hang Tuah, 55100 Kuala Lumpur, Malaysia | Sales Gallery
The sales gallery is sited in Jalan Hang Tuah, on the old Pudu prison site. It is redeveloped by UDA
and Eco World Development Sdn. Bhd. The sales gallery is placed beside the old Pudu prison’s
gate, which is left as preservation of history. Its purpose is to promote the master plan that is
situated on a 19.4 acre land that includes commercial area, residential area, office suites and
entertainment hub.
During the site visit, we were requested to observe and to ask questions. Ms. Christie and
Mr. Jay were there to give us guidance and provide us information. We have pay attention to
methods of how they have communicated with the clients and their problem solving skills to meet
clients’ needs.
Besides that, we were brought to two show units, which were located at a temporary show
gallery beside the sale gallery construction site. We were assigned to take photos of overall and
every corner and detail of the designed and furnished show units. It is then to be compiled and
documented with drawn point of view on the floor plans. The purpose of this is to enable shifting of
the show units into the complete sales gallery in the future.
Internship Training and Report Page !12
Figure 4.2.7 BBCC site.
We were accredited to head towards the site later for interior accessorising when the
construction process is completed. There were two tasks of accessorising, one was to arrange the
space of the show unit base on photo documented by us previously, while the second one was
interior accessorising of other spaces of the sales gallery for example, boardroom, bar backdrop,
discussion room etc.
Internship Training and Report Page !13
Figure 4.2.8 Meeting with clients at BBCC site.
Figure 4.2.10 Photo taken for documentation.
Figure 4.2.9 Interior construction.
Internship Training and Report Page !14
Figure 4.2.10 Completed interior of show unit.
Figure 4.2.11 Lounge of the sales gallery.
Figure 4.2.12 Boardroom.
ALEXIS
Alexis Bistro | Jalan Mesui, Bukit Bintang, 50200 Kuala Lumpur, Malaysia | Casual Dining, Bar
This project is situated in Bukit Bintang. It is a dining bar that serves Italian cuisines, which
consists of spaces like a bar, dining area, kitchen, store room etc. The project handled by Unit One
Design is the interior spaces including its built in furnitures for example its bar counter.
The appointed job was to measure and produce a reflected ceiling plan of the kitchen, which
is located at the back of the shop. We were required to assess the dimensions of the pipes, exposed
roof structures, their position and purposes. Later, we sketched out a draft of the drawing and took
photos for further documentation. Based on the data collected, we produced a reflected ceiling plan
by using AutoCAD. We were also required to complete a photo documentation for better reference.
With this experience, I have learnt types of pipe for example, AC pipes, trunking, conduit,
water pipes, ventilation ducts etc. I have understood the standard dimensions of them as well as the
distance between each pipe and their purposes. It has also enable me to have awareness to observe
different type of pipes in different spaces of vary functions.
Internship Training and Report Page !15
Figure 4.2.13 Exterior of Alexis Bistro.
Internship Training and Report Page !16
Figure 4.2.14 Photo taken for reference of position of pipes.
13 14 15
181716
Figure 4.2.15 Measuring roof structures and dimension of pipes.
YKS SALES GALLERY
Isola KLCC Show Gallery | Jalan Yap Kwan Seng, 50450 Kuala Lumpur | Sales Gallery
The sales gallery is located in Jalan Yap Kwan Seng. It is built for the purpose of promoting Isola
KLCC which will be located across the street, with the land area of 0.37 acres, consisting 4 towers
and serve as a residential building. The tower is designed by Unit One Design as well as its sales
gallery.
I have involved in the arrangement the interior accessorising and the lighting adjustment
with Loh Wei Shuen and Lee Yih, with the guidance of Mr. John Ding and Ar. Ken Wong. We were
instructed to be observant of the details and surrounding, and position accessories we have prepared
earlier based on our observations to create a harmony atmosphere. Later, we were responsible for
setting the lightings, the built in spotlights, to have proper light rays to generate a proper ambiance.
Internship Training and Report Page !17
Figure 4.2.16 Reflected Ceiling drawn.
As a result, I have understood the importance of context, detailing and interior design, where
architecture is about meeting of skin and skeleton. I have leant that the interior ambience is to be
met to allow user to have best experiences.
Internship Training and Report Page !18
Figure 4.2.17 Interior with completed accessorising.
Figure 4.2.18 Documentation of accessories.
4.3 Contract Documentation
KEPONG
Fortune Perdana Lakeside Residence | Jalan Metro Perdana 6, Off Jalan Kepong, Mukim Batu,
Kuala Lumpur | Service Apartment
The building is placed in Jalan Kepong, developed by Asian PAC Holding Berhad. It serves as a
service apartment consisting 4 blocks, with 6 levels of podium and 28 of floors above ground. The
common area includes wading pool, multipurpose and barbecues area, yoga deck etc. It has
residential units as well as retail units.
I was appointed to make amendments to the tender drawings that was drawn by my
colleagues previously. The drawings include reflected ceiling plan, door and window schedule and
key plans. Later, I was requested to produce section drawings for bathroom, gym and lift lobby as
well as construction details of roof structures. Besides that, as or the bathroom drawings, I was
asked to amend the dimension of the sanitary wares was well as their position according to the
finalise decision. I have also been given task to create a hoarding signage board for the construction
site by referring to previous signboard’s drawings.
By committing to this job, I have learnt new skill in AutoCAD which is creating and using
‘Block’ for conveniency of amending drawings. I have also gained understanding of flat roof
structure, its materiality and construction, as well as the standard requirements of a signage board,
which is needed to be presented at the gate of a construction site.
Internship Training and Report Page !19
Internship Training and Report Page !20
Figure 4.3.1 Roof details.
Figure 4.3.2 Sections of bathroom.
Internship Training and Report Page !21
1200
100
300
300 3100 300
150
4950
1600
150
100
300
100
300
10030
010
0300 10
0300
300
100
300
4000
100
300
100
5015050150
PANDANGAN HADAPAN 1: 25 KERATAN 1 1: 25
BH REALTY SDN.BHD. CO. (CO.NO:107179-X)
Tel: 603-2786 3388 Fax: 603-2786 2282Tingkat 12, Menara SMI, No. 6, Lorong P. Ramlee,50250 Kuala Lumpur, Malaysia
CADANGAN PEMBANGUNAN PERDAGANGAN 34 TINGKAT YANG MENGANDUNGI :I. 1 BLOK PANGSAPURI SERVIS 27 TINGKAT
(462 UNIT)II. 6 TINGKAT PODIUM DAN KEDAI (38 UNIT)
DI ARAS BAWAH DAN TINGKAT 1III. 1 UNIT PENCAWANG ELEKTRIK DI ARAS BAWAHVI. 4 TINGKAT TEMPAT LETAK KERETA DI ARAS BAWAH, 2, 3, 4 DAN 5
V. KEMUDAHAN PENDUDUK DI TINGKAT 6DI ATAS PT 22637 (LOT 63582), JALAN METRO PERDANA 6, OFF JALAN KEPONG, MUKIM BATU,KUALA LUMPURUNTUK TETUAN:BH REALTY SDN. BHD.
SCALE :
AND IS NOT TO BE REPRODUCED WITHOUT THEIR PERMISSION
REV DATE :
PROJECT :
DRAWING :
DATE :
DWG NO. REVISION DWN BY :
INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE COPYRIGHT OFUNIT ONE DESIGN SDN BHD
DO NOT SCALE ALL DIMENSIONS TO BE CONFIRMED ON SITE
unit oneD4-U1-12 No. 1 Jalan Dutamas 1Kuala Lumpur 50480 Malaysia
telephone : 603 - 6411 6122 | fax : 603 - 6411 6133e : [email protected] | w : www.unitone.com.my
unit one design sdn bhd
DRAWING STATUS : FOR INFORMATION
FOR CONSTRUCTIONFOR TENDER
711.KEPONG B3
20/01/2017
RM
- - -
718-CD-10-001
SIGNBOARD-1
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
Figure 4.3.3 Signage board.
SCALE :
AND IS NOT TO BE REPRODUCED WITHOUT THEIR PERMISSION
REV DATE :
PROJECT :
DRAWING :
DATE :
DWG NO. REVISION DWN BY :
INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE COPYRIGHT OFUNIT ONE DESIGN SDN BHD
DO NOT SCALE ALL DIMENSIONS TO BE CONFIRMED ON SITE
unit oneD4-U1-12 No. 1 Jalan Dutamas 1Kuala Lumpur 50480 Malaysia
telephone : 603 - 6411 6122 | fax : 603 - 6411 6133e : [email protected] | w : www.unitone.com.my
unit one design sdn bhd
DRAWING STATUS :FOR INFORMATION
FOR CONSTRUCTIONFOR TENDER
711 - KEPONG B3
17/01/2017
--
KINDERGARTEN- FLOOR PLAN, SECTION 01 & 02
-- @ A1 / 1:100 @ A3
711.TD.04.210
RQ
2
1
SEC 02
--.--
SE
C 0
1
--.--
9350
6551 2799
1800
2400
1800
1800
1197
7
1800
3151
6122
2704
19742950
1100
600
1000
200mm THICK RC STRUCTURE WITHPLASTER AND PAINTED ON BOTH SIDE
150mm THICK BRICK WALL WITHPLASTER AND PAINTED ON BOTH SIDE
1000mm WIDTH BOMBA-APPROVED1-HOUR FIRE-RATED SINGLE LEAFMETAL FRAME SOLID TIMBER DOOR,IN SPRAY PAINTEDFINISH.
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
2 1
10946
327132004475
100
2400
1050
4200
3200
1000
LEVEL 07
LEVEL 06
250mm THICK RC STRUCTURE WITHPLASTER AND PAINTED ON BOTH SIDE
RC CONCRETE SLAB
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
RQ
4200
3200
1000
9350
3400 2824
LEVEL 07
LEVEL 06
250mm THICK RC STRUCTURE WITHPLASTER AND PAINTED ON BOTH SIDE
RC CONCRETE SLAB
1800
2400
2400
SCALE 1 : 100
FLOOR PLAN
SCALE 1 : 100
SECTION 01SCALE 1 : 100
SECTION 02
1000mm WIDTH BOMBA-APPROVED1-HOUR FIRE-RATED SINGLE LEAFMETAL FRAME SOLID TIMBER DOOR,IN SPRAY PAINTEDFINISH.
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXED
WINDOW WITH 8.35mm THK CLEARFLOAT GLASS
1800mm POWDER-COATED ALUMINUMFRAME CASEMENT & FIXEDWINDOW WITH 8.35mm THK CLEARFLOAT GLASS
4050
1350
2700
4050
1350
2700
3127
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
Figure 4.3.4 Drawings of gym.
EWIC
Eco World International Centre | Jalan Hang Tuah, 55100 Kuala Lumpur, Malaysia | Sales Gallery
The project is located along side with the project BBCC in Jalan Hang Tuah. It is a international
sales gallery and is part of the Bukit Bintang City Centre sales gallery, which consists of three
storeys above ground. The spaces inside includes display gallery, reception, discussion room bar,
boardroom, open office etc.
The assigned job scope in this project is to digitalise sketches and drafting of interior
furnitures designed and customised by Unit One Design as well as the reflected ceiling plan. We
were to produce plan, elevations, sections and construction details based on drafts given, including
its dimensions, materials, annotations etc. by using AutoCAD. Then, we were given standard title
block to to place with the drawings and print them out to be further inspect and confirmation.
Through committing into this job, I have learnt knowledge about Plot Style, one of the
function of AutoCAD. I have understood that each project has it very own Plot Style which will be
used by contributors to standardise the line weights and line types of the series of drawings. I have
also learnt several construction of furnitures, standard dimensions of some structure and component
as well as materials suitable for them. Besides that, I have realise the importance of detailing in
architecture, importance of creating a harmony interior while designing the exterior.
Internship Training and Report Page !22
Internship Training and Report Page !23
FEB
201
7
JL
1:20
B-C
F 03
- PL
AN
1239
.WD
.20-
050
PR
OJE
CT:
DR
AW
ING
TIT
LE:
DR
AW
ING
No.
for i
nfor
mat
ion
for t
ende
r
for c
onst
ruct
ion
DA
TE :
SC
ALE
:
DW
N B
Y :
dwg status
RE
VIS
ION
:D
ATE
:
revi
sion
- CO
NTR
AC
TOR
TO
INFO
RM
AR
CH
ITE
CT
OF
AN
Y D
ISC
RE
PA
NC
IES
IN D
RA
WIN
GS
- DO
NO
T S
CA
LE.
ALL
DIM
EN
SIO
NS
TO
BE
CO
NFI
RM
ED
ON
SIT
E
1239
.EW
ICun
it on
eun
it on
e de
sign
sdn
bhd
D4-
1-12
, Sol
aris
Dut
amas
Jala
n D
utam
as 1
5048
0 K
uala
Lum
pur
Mal
aysi
a
INFO
RM
ATI
ON
CO
NTA
INE
D IN
TH
IS D
RA
WIN
G IS
TH
E S
OLE
CO
PY
RIG
HT
OF
UN
IT O
NE
DE
SIG
N S
DN
BH
D A
ND
IS N
OT
TO B
ER
EP
RO
DU
CE
D W
ITH
OU
T TH
EIR
PE
RM
ISS
ION
tel :
03
6411
612
2 f
ax :
03 6
411
6133
emai
l: m
ailb
ox@
unito
ne.c
om.m
yw
eb :
ww
w.u
nito
ne.c
om.m
y
PLAN 01Scale 1:20
PLAN 02Scale 1:20
150 2100 150 150 2100 150
4800
5012
0050
200
200
200
200
200
200
5012
0050
150 2100 150 150 2100 1504800
150
150
det 04
ele 01
ele 02
SEC 02
SEC 01
solid oak top
25 x 50 MS RHSto be spray painted
20-051
20-051
20-051
20-051
20-052
Figure 4.3.5 Plan for one of the interior furniture.
FEB
201
7
JL
1:2
B-C
F 01
- D
ETA
IL1,
2, 3
, 4
1239
.WD
.20-
052
PR
OJE
CT:
DR
AW
ING
TIT
LE:
DR
AW
ING
No.
for i
nfor
mat
ion
for t
ende
r
for c
onst
ruct
ion
DA
TE :
SC
ALE
:
DW
N B
Y :
dwg status
RE
VIS
ION
:D
ATE
:
revi
sion
- CO
NTR
AC
TOR
TO
INFO
RM
AR
CH
ITE
CT
OF
AN
Y D
ISC
RE
PA
NC
IES
IN D
RA
WIN
GS
- DO
NO
T S
CA
LE.
ALL
DIM
EN
SIO
NS
TO
BE
CO
NFI
RM
ED
ON
SIT
E
1239
.EW
ICun
it on
eun
it on
e de
sign
sdn
bhd
D4-
1-12
, Sol
aris
Dut
amas
Jala
n D
utam
as 1
5048
0 K
uala
Lum
pur
Mal
aysi
a
INFO
RM
ATI
ON
CO
NTA
INE
D IN
TH
IS D
RA
WIN
G IS
TH
E S
OLE
CO
PY
RIG
HT
OF
UN
IT O
NE
DE
SIG
N S
DN
BH
D A
ND
IS N
OT
TO B
ER
EP
RO
DU
CE
D W
ITH
OU
T TH
EIR
PE
RM
ISS
ION
tel :
03
6411
612
2 f
ax :
03 6
411
6133
emai
l: m
ailb
ox@
unito
ne.c
om.m
yw
eb :
ww
w.u
nito
ne.c
om.m
y
DETAIL 01 DETAIL 03
DETAIL 02 DETAIL 04
50
20
solid oak top
25 25 25
25 x 50 MS RHSto be spray painted
25 x 50 MS RHSto be spray painted
solid oak top150
50
25 25 25
100
150
25
50
25 25 25
25 x 50 MS RHSto be spray painted
wheel with brake
25 x 50 MS RHSto be spray painted
25 x 50 MS RHSto be spray painted
Figure 4.3.6 Details.
Internship Training and Report Page !24
PROJECT:
DRAWING TITLE:
DRAWING No.
for information
for tender
for construction
DATE :
SCALE :
DWN BY :
dwg status
REVISION : DATE :
revision- CONTRACTOR TO INFORM ARCHITECT OF ANY DISCREPANCIES IN DRAWINGS- DO NOT SCALE. ALL DIMENSIONS TO BE CONFIRMED ON SITE
1239.EWIC
FEB 2017
JL
unit oneunit one design sdn bhd
D4-1-12, Solaris DutamasJalan Dutamas 1
50480 Kuala Lumpur Malaysia
INFORMATION CONTAINED IN THIS DRAWING IS THE SOLECOPYRIGHT OF UNIT ONE DESIGN SDN BHD AND IS NOT TO BEREPRODUCED WITHOUT THEIR PERMISSION
tel : 03 6411 6122 fax : 03 6411 6133email: [email protected]
web : www.unitone.com.my
1:125GF - REFLECTED CEILING PLAN
1239.WD.03-210
DROP OFF
up
exposed slab4150mm AFFL
new 12mm thkmoisture resistantfibrous plaster celiling- 2700mm AFFL -painted in 2 coat of ICIDulux paint
LEGEND100x50mm m.s. U channelfitted with lighting track -suspended at 3000mm AFFL
20mm Ø G.I. conduitsuspended at 3200mm AFFL
100x50mm G.I. trunkingsuspended at 3250mm AFFL
Flexible G.I. hose to connect toG.I. conduit
All G.I. and m.s. component to behand painted in 2 layers ofselected ICI Dulux paintAll exposed slab surface to bepainted in 2 layers of selected ICIDulux paint
G.I. junction box
selected pendant light - to besupplied by client - IDcontractor to install
selected track lightQty: 13
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
Figure 4.3.7 Elevation.
- -
1:50
1239.WD.07-022
MF B-FW02 - ELEVATION3, 4
1239.EWIC
FEB 2017
JLINFORMATION CONTAINED IN THIS DRAWING IS THE SOLECOPYRIGHT OF UNIT ONE DESIGN SDN BHD AND IS NOT TO BEREPRODUCED WITHOUT THEIR PERMISSION
25 25 25 25 25 25 25 25 251390 600 900 900 1200 600 6006015 750
1200
1100
1500
Elevation 3 Elevation 4
Module 30 Module 6 Module 12 Module 12 Module 18 Module 6 Module 6 Module 32
Module 29 Module 5 Module 11 Module 11 Module 5 Module 5 Module 31
Module 26 Module 2 Module 8 Module 8 Module 2 Module 2
Module 28 Module 4 Module 10 Module 4 Module 4
Module 26 Module 2 Module 8 Module 8 Module 14 Module 2 Module 2
Module 27 Module 3 Module 9 Module 9 Module 3 Module 3
Module 25 Module 1 Module 7 Module 7 Module 13 Module 1 Module 1
Module 30 Module 6 Module 12 Module 12 Module 18 Module 6 Module 6 Module 32
Module 28 Module 4 Module 10 Module 4 Module 4
Module 28 Module 4 Module 10 Module 4 Module 4
Module 28 Module 4 Module 10 Module 4 Module 4
Module 28 Module 4 Module 10 Module 4 Module 4
Module 28 Module 4 Module 10 Module 4 Module 4
Module 28 Module 4 Module 10 Module 4 Module 4Module 10
Module 10
2529
2025
970
2573
077
077
025
770
2597
025
570
25
370
370
2525
2577
025
770
2577
025
770
2525
Figure 4.3.8 Reflected Ceiling Plan.
ISSUE SHEET
Eco World International Centre | Jalan Hang Tuah, 55100 Kuala Lumpur, Malaysia | Sales Gallery
I was appointed to compile completed drawings of EWIC in order to be issue out to the contractors
and clients, thus, creating issue sheets for the compiled documents.
The compiled documents were requested to duplicated into few copies, which includes one
set of blue paper copy for office purposes, two sets yellow paper copy for contractors and one set of
white copy to be hand over to the client. The drawings are required to be titled with assigned
drawing numbers and arranged according to them for conveniency of further examination and
documentation. Each series of number also represent different sets of drawing for different
component of the interior.
By completing this job, I have learnt the importance of proper management and record-
keeping of projects and works. I have also gain knowledge on methods of more systematic
documentation as well as the idea of clear data compilation for conveniency of contractors and
clients use.
Internship Training and Report Page !25
5.0 CONCLUSION In conclusion, through committing in to this module, the experiences here have taught me more
than I could have imagined. By getting into this position, I have also gain better understanding of
my skills and where my career path will lead me to. It is a challenging task but it definitely gave me
some beneficial lessons.
Throughout my internship at Unit One Design, I was fortunate to have firsthand experiences
and learnt about varieties of elements that goes into a project, the basic process of planning of a
project, its development and completion, as well as how hard work and detailing goes into every
stage. Another lesson I have achieved was the types of work an Architect has to perform, which in
turn, has given me with more insight into the variety of roles and responsibilities that an Architect
should perform.
Reflecting back to my first day during the internship, it was one of the memorable days of
my time at Unit One Design. After being led to our working space, I assigned to help in keying in
work schedules and declines into an online application, which has shown me the importance of
planning in this company as well as their well management. This instantly made me feel confident
and definite about learning and experiencing more with the professionals.
Besides that, I observed that workplace was relatively distinct from what I had discover
working at Unit One Design. There are interior designer, project architect, project director and
others all working in one office. This range of people have different strengths and qualifications and
by cooperating with each other and organising job in sync together, progress of work flows
smoothly and are able to complete their work efficiently. Their friendliness and positive ambience
have also created a good atmosphere in the environment.
Throughout the few weeks I also had the opportunity to go for site visit. This is another
aspect which I was grateful I had the chance to be involved. I had the opportunity to go on site on to
the Bukit Bintang City Centre, Isola KLCC Sales Gallery, Alexis Bistro and Serai Condominium.
My responsibilities were to observe, data collection for reference, base drawings production, site
measurement and interior accessing. This was probably the most enjoyable part of my internship
Internship Training and Report Page !26
experience at Unit One Design because I was able to see the work that I was working on brought to
real-life. This has enabled me to understand importance stages of a project.
For addition, I have become more familiar with my skill set for using software like
SketchUp and AutoCAD. Thus, giving support towards further development of my studies and
career.
Last but but not least, I have learnt that attitude and commitment is the most important thing
of all. It is the mindset to learnt, to strive your best at every given job, to try and to not scared of
making mistakes that brings you forward. As I move on to graduation, I believe attitude with
experiences will preps me for the real world.
Overall, my internship experience at Unit One Design was positive and great. I could not
thank everyone more for giving me such amazing guidance and opportunity to learn from people
who are expertise in architecture throughout these 10 weeks.
Internship Training and Report Page !27
6.0 APPENDIX
Internship Training and Report Page !28
Figure 5.1 Project: Kepong. Dimensions of chosen sanitary wares.
Figure 5.2 Project: Alexis. Amendments for Alexis Bistro kitchen’s reflected ceiling plan.
Internship Training and Report Page !29
Figure 5.4 Project: Alexis. Sketches of reflected ceiling plan of Alexis Bistro’s kitchen.
Figure 5.3 Project: Alexis. Sketches of reflected ceiling plan of Alexis Bistro’s kitchen.
Internship Training and Report Page !30
Figure 5.5 Project: Serai. Sketches drew for collecting data.
Figure 5.6 Project: Serai. Base drawings with sketches.
Internship Training and Report Page !31
Figure 5.7 Project: EWIC. Sketches given to be digitalise by using AutoCAD.
Figure 5.8 Project: EWIC. Sketches given to be digitalise by using AutoCAD.
Internship Training and Report Page !32
Figure 5.9 Project: EWIC. Sketches of reflected ceiling plan of EWIC given to be digitalise by using AutoCAD.
Figure 5.10 Project: EWIC. Sketch given to be digitalise by using AutoCAD.
Internship Training and Report Page !33
Figure 5.11 A hardcopy of work schedule done by using Smart Sheet.
Figure 5.12 Issue sheet.
Internship Training and Report Page !35
LOG SHEET -WEEK 1
ARC2625 Log Sheet-WK1 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure
Prepare preliminary project evaluations, programs and feasibility studies OTHER:
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems
11.0 9.0 9.0 9.0 10.0
Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 11.0 9.0 9.0 9.0 10.0 0.0 48.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
JALAN KEPONG, KUALA LUMPUR
UNIT ONE DESIGN TAN JO LYNN0318518
KEPONG
Internship Training and Report Page !36
LOG SHEET -WEEK 2
ARC2625 Log Sheet-WK2 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure
Prepare preliminary project evaluations, programs and feasibility studies OTHER:
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems
9.0 10.0 8.0 10.0 10.0 8.5
Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 9.0 10.0 8.0 10.0 10.0 8.5 55.5
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
KAPAS CONDOMINIUM JALAN METRO PERDANA 6, KUALA LUMPUR
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
JALAN KEPONG, KUALA LUMPUR
UNIT ONE DEISGN TAN JO LYNNAR KEN WONG 0318518KEPONG
Internship Training and Report Page !37
LOG SHEET -WEEK 3
ARC2625 Log Sheet-WK3 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure
Prepare preliminary project evaluations, programs and feasibility studies OTHER:
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems
10.0 9.0 8.0 8.0
Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 10.0 9.0 8.0 8.0 0.0 0.0 35.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
JALAN HANG TUAH, KUALA LUMPUR
UNIT ONE DESIGN TAN JO LYNNAR KEN WONG 0318518EWIC
Internship Training and Report Page !38
LOG SHEET -WEEK 4
ARC2625 Log Sheet-WK4 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure 4.0
Prepare preliminary project evaluations, programs and feasibility studies OTHER:
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems
8.0 5.0
Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 0.0 0.0 0.0 8.0 9.0 0.0 17.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
BBCC SHOW UNIT JALAN HANG TUAH, KUALA LUMPUR
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
JALAN HANG TUAH, KUALA LUMPUR
UNIT ONE DESIGN TAN JO LYNNAR KEN WONG 0318518EWIC
Internship Training and Report Page !39
LOG SHEET -WEEK 5
ARC2625 Log Sheet-WK5 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure
Prepare preliminary project evaluations, programs and feasibility studies OTHER:
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems
8.0 8.0 8.0 10.0
Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 8.0 8.0 8.0 0.0 10.0 0.0 34.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
YKS SALES GALLERY JALAN YAP KWAN SENG, KUALA LUMPUR BBCC SHOW UNIT JALAN HANG TUAH, KUALA LUMPUR
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
JALAN HANG TUAH, KUALA LUMPUR
UNIT ONE DESIGN TAN JO LYNNAR KEN WONG 0318518EWIC
Internship Training and Report Page !40
LOG SHEET -WEEK 6
ARC2625 Log Sheet-WK6 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure 4.0 4.0 4.0
Prepare preliminary project evaluations, programs and feasibility studies OTHER:
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems
6.0 4.0 11.0 5.0 8.0 8.0
Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 10.0 8.0 11.0 9.0 8.0 8.0 54.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
MESUI JALAN MESUI, BUKIT BINTANG
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
BANGSAR
UNIT ONE DESIGN TAN JO LYNNAR KEN WONG 0318518SERAI
Internship Training and Report Page !41
LOG SHEET -WEEK 7
ARC2625 Log Sheet-WK7 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure
Prepare preliminary project evaluations, programs and feasibility studies OTHER: Interior Design
9.0 9.0 9.0 12.0 14.0 8.0
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 9.0 9.0 9.0 12.0 14.0 8.0 61.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
JALAN YAP KWAN SENG, KUALA LUMPUR
UNIT ONE DESIGN TAN JO LYNN AR. KEN WONG 0318518YKS SALES GALLERY
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
Internship Training and Report Page !42
LOG SHEET -WEEK 8
ARC2625 Log Sheet-WK8 Page11
Company Name StudentSupervising Architect Stu.NoProject 1Site Location Project 2Site Location Project 3Site Location
StagesMon Tues Wed Thurs Fri Sat Sun
Schematic Design Sketching, 3D modeling and Rendering
Prepare presentation drawings
Aware of site conditions: Site Visit, Study and Measure
Prepare preliminary project evaluations, programs and feasibility studies OTHER: Interior Design
10.0 8.0 8.0 9.0 9.0 13.0
Permit Application Aware of different local authorities
Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists
Participate in permit application
OTHER:
Contract DocumentationPrepare architectural drawings with regard to location,building elements, finishes, fittings and systems Participate or co-ordinate meetings with consultants
Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process
OTHER:
Contract AdministrationAware of OR observe a standard form of construction contract
OTHER:
Total: 10.0 8.0 8.0 9.0 9.0 0.0 44.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
JALAN HANG TUAH, KUALA LUMPUR
UNIT ONE DESIGN TAN JO LYNN MR. JOHN DING 0318518BBCC SALES GALLERY
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etcYou might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to youEach Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file