Date post: | 14-Apr-2018 |
Category: |
Documents |
Upload: | sidy-elbechir-drame |
View: | 219 times |
Download: | 5 times |
of 338
7/30/2019 Bsc&Bts Config
1/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Contents
Issue 03 (2007-05-09) Huawei Technologies Proprietary i
Contents
1 Overview of Data Configuration ............................................................................................1-1
1.1 Data Configuration Principle ................................................................... ..................................................... 1-2
1.1.1 Data Configuration Methods................................................................................................................1-2
1.1.2 Data Classification.................................................................... ........................................................... 1-3
1.2 Operation Authority .................................................................... .................................................................. 1-4
1.3 Data Configuration Procedure.......................................................................................................................1-4
1.3.1 Prerequisites.........................................................................................................................................1-4
1.3.2 Configuration Procedure......................................................................................................................1-5
1.3.3 Precautions...........................................................................................................................................1-6
1.4 Starting Data Configuration ................................................................ .......................................................... 1-7
1.4.1 Displaying the BSC6000 Local Maintenance Terminal Window.........................................................1-7
1.4.2 Introduction to the BSC6000 Local Maintenance Terminal Window .................................................. 1-9
2 Configuring BSC Attributes ....................................................................................................2-12.1 Overview of the BSC Attributes Configuration ............................................................ ................................2-2
2.2 Configuring the BSC Attributes .................................................................... ................................................ 2-2
2.2.1 Task Description .................................................................... .............................................................. 2-2
2.2.2 Procedure ....................................................... ...................................................................... ................2-2
2.2.3 Verification...........................................................................................................................................2-8
2.2.4 Additional Information.........................................................................................................................2-8
2.3 Configuring the Line Clock...........................................................................................................................2-9
2.3.1 Task Description .................................................................... .............................................................. 2-9
2.3.2 Procedure ....................................................... ...................................................................... ................2-9
2.3.3 Verification.........................................................................................................................................2-11
2.3.4 Additional Information.......................................................................................................................2-11
2.4 Configuring the System Clock ................................................................ .................................................... 2-12
2.4.1 Task Description .................................................................... ............................................................ 2-12
2.4.2 Procedure ....................................................... ........................................................................ ............2-12
2.4.3 Verification.........................................................................................................................................2-14
2.4.4 Additional Information.......................................................................................................................2-14
2.5 Configuring the 8K Reference Clock..........................................................................................................2-15
2.5.1 Task Description .................................................................... ............................................................ 2-15
2.5.2 Procedure ....................................................... ........................................................................ ............2-15
7/30/2019 Bsc&Bts Config
2/337
Contents
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
ii Huawei Technologies Proprietary Issue 03 (2007-05-09)
2.5.3 Verification.........................................................................................................................................2-17
2.5.4 Additional Information.......................................................................................................................2-17
3 Configuring BSC Devices.........................................................................................................3-1
3.1 Overview of the Device Configuration ............................................................... ..........................................3-33.2 Adding a Cabinet...........................................................................................................................................3-5
3.2.1 Task Description .................................................................... .............................................................. 3-5
3.2.2 Procedure ....................................................... ...................................................................... ................3-5
3.2.3 Verification...........................................................................................................................................3-6
3.2.4 Additional Information.........................................................................................................................3-6
3.3 Adding a Subrack ...................................................... .................................................................... ................3-7
3.3.1 Task Description .................................................................... .............................................................. 3-7
3.3.2 Procedure ....................................................... ...................................................................... ................3-7
3.3.3 Verification...........................................................................................................................................3-8
3.3.4 Additional Information.........................................................................................................................3-9
3.4 Configuring the Subrack-OSP Mapping........................................................................................................3-9
3.4.1 Task Description .................................................................... .............................................................. 3-9
3.4.2 Procedure ....................................................... ...................................................................... ................3-9
3.4.3 Verification.........................................................................................................................................3-10
3.4.4 Additional Information.......................................................................................................................3-11
3.5 Configuring the Attributes of a Fan Box................................................................ ..................................... 3-11
3.5.1 Task Description .................................................................... ............................................................ 3-11
3.5.2 Procedure ....................................................... ...................................................................... .............. 3-11
3.5.3 Verification.........................................................................................................................................3-12
3.5.4 Additional Information.......................................................................................................................3-12
3.6 Adding a Power Distribution Box ................................................................. .............................................. 3-13
3.6.1 Task Description .................................................................... ............................................................ 3-13
3.6.2 Procedure ....................................................... ........................................................................ ............3-13
3.6.3 Verification.........................................................................................................................................3-14
3.6.4 Additional Information.......................................................................................................................3-15
3.7 Configuring the Attributes of a Power Distribution Box............................................................................ .3-15
3.7.1 Task Description .................................................................... ............................................................ 3-15
3.7.2 Procedure ....................................................... ........................................................................ ............3-153.7.3 Verification.........................................................................................................................................3-16
3.7.4 Additional Information.......................................................................................................................3-16
3.8 Adding a Board ........................................................... ..................................................................... ...........3-17
3.8.1 Task Description .................................................................... ............................................................ 3-17
3.8.2 Procedure ....................................................... ........................................................................ ............3-17
3.8.3 Verification.........................................................................................................................................3-19
3.8.4 Additional Information.......................................................................................................................3-19
3.9 Configuring Board Attributes......................................................................................................................3-20
3.9.1 Task Description .................................................................... ............................................................ 3-20
7/30/2019 Bsc&Bts Config
3/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Contents
Issue 03 (2007-05-09) Huawei Technologies Proprietary iii
3.9.2 Procedure ....................................................... ........................................................................ ............3-20
3.9.3 Verification.........................................................................................................................................3-31
3.9.4 Additional Information.......................................................................................................................3-31
3.10 Adding a BSC EAC...................................................................................................................................3-32
3.10.1 Task Description ............................................................. ................................................................. 3-32
3.10.2 Procedure .............................................................. ......................................................................... ..3-32
3.10.3 Verification.......................................................................................................................................3-34
3.10.4 Additional Information.....................................................................................................................3-34
3.11 Configuring a BSC EAC ....................................................... .................................................................... 3-34
3.11.1 Task Description...............................................................................................................................3-34
3.11.2 Procedure ............................................................... .......................................................................... 3-34
3.11.3 Verification.......................................................................................................................................3-36
3.11.4 Additional Information.....................................................................................................................3-36
3.12 Deleting a BSC EAC.................................................................................................................................3-36
3.12.1 Task Description ............................................................. ................................................................. 3-36
3.12.2 Procedure .............................................................. ......................................................................... ..3-37
3.12.3 Verification.......................................................................................................................................3-38
3.12.4 Additional Information.....................................................................................................................3-38
3.13 Deleting a Board ...................................................... ...................................................................... ...........3-38
3.13.1 Task Description ............................................................. ................................................................. 3-38
3.13.2 Procedure .............................................................. ......................................................................... ..3-38
3.13.3 Verification.......................................................................................................................................3-39
3.13.4 Additional Information.....................................................................................................................3-403.14 Deleting a Power Distribution Box ................................................................... ........................................3-40
3.14.1 Task Description ............................................................. ................................................................. 3-40
3.14.2 Procedure .............................................................. ......................................................................... ..3-40
3.14.3 Verification.......................................................................................................................................3-41
3.14.4 Additional Information.....................................................................................................................3-41
3.15 Deleting a Subrack ................................................................ .................................................................. ..3-42
3.15.1 Task Description ............................................................. ................................................................. 3-42
3.15.2 Procedure .............................................................. ......................................................................... ..3-42
3.15.3 Verification.......................................................................................................................................3-43
3.15.4 Additional Information.....................................................................................................................3-43
3.16 Deleting a Cabinet.....................................................................................................................................3-43
3.16.1 Task Description ............................................................. ................................................................. 3-43
3.16.2 Procedure .............................................................. ......................................................................... ..3-44
3.16.3 Verification.......................................................................................................................................3-45
3.16.4 Additional Information.....................................................................................................................3-45
3.17 Checking Cabinet Attributes ........................................................................ ............................................. 3-45
3.17.1 Task Description ............................................................. ................................................................. 3-45
3.17.2 Procedure .............................................................. ......................................................................... ..3-45
3.17.3 Verification.......................................................................................................................................3-46
7/30/2019 Bsc&Bts Config
4/337
Contents
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
iv Huawei Technologies Proprietary Issue 03 (2007-05-09)
3.17.4 Additional Information.....................................................................................................................3-46
3.18 Checking Subrack Attributes.....................................................................................................................3-46
3.18.1 Task Description ............................................................. ................................................................. 3-46
3.18.2 Procedure .............................................................. ......................................................................... ..3-47
3.18.3 Verification.......................................................................................................................................3-47
3.18.4 Additional Information.....................................................................................................................3-47
3.19 Checking Board Attributes .......................................................................... .............................................. 3-48
3.19.1 Task Description ............................................................. ................................................................. 3-48
3.19.2 Procedure .............................................................. ......................................................................... ..3-48
3.19.3 Verification.......................................................................................................................................3-49
3.19.4 Additional Information.....................................................................................................................3-49
3.20 Checking the Attributes of a Power Distribution Box...............................................................................3-49
3.20.1 Task Description ............................................................. ................................................................. 3-49
3.20.2 Procedure .............................................................. ......................................................................... ..3-49
3.20.3 Verification.......................................................................................................................................3-50
3.20.4 Additional Information.....................................................................................................................3-50
3.21 Checking the Attributes of a Fan Box ................................................................... ....................................3-51
3.21.1 Task Description ............................................................. ................................................................. 3-51
3.21.2 Procedure .............................................................. ......................................................................... ..3-51
3.21.3 Verification.......................................................................................................................................3-52
3.21.4 Additional Information.....................................................................................................................3-52
4 Configuring BSC Links.............................................................................................................4-1
4.1 Overview of the BSC Link Configuration.....................................................................................................4-2
4.2 Configuring SS7 Signaling Points.................................................................................................................4-2
4.2.1 Task Description .................................................................... .............................................................. 4-2
4.2.2 Procedure ....................................................... ...................................................................... ................4-2
4.2.3 Verification...........................................................................................................................................4-9
4.2.4 Additional Information.........................................................................................................................4-9
4.3 Configuring a Subrack Communication Link ...................................................................... .........................4-9
4.3.1 Task Description .................................................................... .............................................................. 4-9
4.3.2 Procedure ....................................................... ........................................................................ ............4-10
4.3.3 Verification.........................................................................................................................................4-124.3.4 Additional Information.......................................................................................................................4-12
4.4 Configuring an Ater Connection Path .......................................................................... ...............................4-12
4.4.1 Task Description .................................................................... ............................................................ 4-12
4.4.2 Procedure ....................................................... ........................................................................ ............4-13
4.4.3 Verification.........................................................................................................................................4-15
4.4.4 Additional Information.......................................................................................................................4-15
4.5 Adding an Ater OML...................................................................................................................................4-16
4.5.1 Task Description .................................................................... ............................................................ 4-16
4.5.2 Procedure ....................................................... ........................................................................ ............4-16
7/30/2019 Bsc&Bts Config
5/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Contents
Issue 03 (2007-05-09) Huawei Technologies Proprietary v
4.5.3 Verification.........................................................................................................................................4-19
4.5.4 Additional Information.......................................................................................................................4-19
4.6 Deleting an Ater OML.................................................................................................................................4-19
4.6.1 Task Description .................................................................... ............................................................ 4-19
4.6.2 Procedure ....................................................... ........................................................................ ............4-20
4.6.3 Verification.........................................................................................................................................4-21
4.6.4 Additional Information.......................................................................................................................4-21
4.7 Modifying an Ater OML .................................................................... ......................................................... 4-21
4.7.1 Task Description .................................................................... ............................................................ 4-21
4.7.2 Procedure ....................................................... ........................................................................ ............4-21
4.7.3 Verification.........................................................................................................................................4-23
4.7.4 Additional Information.......................................................................................................................4-23
4.8 Adding an Ater Signaling Link....................................................................................................................4-24
4.8.1 Task Description .................................................................... ............................................................ 4-24
4.8.2 Procedure ....................................................... ........................................................................ ............4-24
4.8.3 Verification.........................................................................................................................................4-28
4.8.4 Additional Information.......................................................................................................................4-28
4.9 Deleting an Ater Signaling Link..................................................................................................................4-29
4.9.1 Task Description .................................................................... ............................................................ 4-29
4.9.2 Procedure ....................................................... ........................................................................ ............4-29
4.9.3 Verification.........................................................................................................................................4-30
4.9.4 Additional Information.......................................................................................................................4-30
4.10 Configuring an E1 on the A Interface..................................................... ...................................................4-314.10.1 Task Description ............................................................. ................................................................. 4-31
4.10.2 Procedure .............................................................. ......................................................................... ..4-31
4.10.3 Verification.......................................................................................................................................4-34
4.10.4 Additional Information.....................................................................................................................4-34
4.11 Configuring an SS7 Signaling Link...........................................................................................................4-35
4.11.1 Task Description...............................................................................................................................4-35
4.11.2 Procedure ............................................................... .......................................................................... 4-35
4.11.3 Verification.......................................................................................................................................4-40
4.11.4 Additional Information.....................................................................................................................4-40
4.12 Configuring a PCU....................................................................................................................................4-41
4.12.1 Task Description ............................................................. ................................................................. 4-41
4.12.2 Procedure .............................................................. ......................................................................... ..4-41
4.12.3 Verification.......................................................................................................................................4-43
4.12.4 Additional Information.....................................................................................................................4-43
4.13 Configuring an E1 on the Pb Interface......................................................................................................4-43
4.13.1 Task Description ............................................................. ................................................................. 4-43
4.13.2 Procedure .............................................................. ......................................................................... ..4-43
4.13.3 Verification.......................................................................................................................................4-47
4.13.4 Additional Information.....................................................................................................................4-47
7/30/2019 Bsc&Bts Config
6/337
Contents
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
vi Huawei Technologies Proprietary Issue 03 (2007-05-09)
4.14 Configuring a Pb Signaling Link...............................................................................................................4-48
4.14.1 Task Description ............................................................. ................................................................. 4-48
4.14.2 Procedure .............................................................. ......................................................................... ..4-48
4.14.3 Verification.......................................................................................................................................4-51
4.14.4 Additional Information.....................................................................................................................4-51
4.15 Configuring a Semipermanent Link................................................................... .......................................4-51
4.15.1 Task Description ............................................................. ................................................................. 4-51
4.15.2 Procedure .............................................................. ......................................................................... ..4-51
4.15.3 Verification.......................................................................................................................................4-54
4.15.4 Additional Information.....................................................................................................................4-54
5 Configuring BTS Data ..............................................................................................................5-1
5.1 Overview of BTS Data Configuration...........................................................................................................5-3
5.2 Adding a BTS................................................................................................................................................5-3
5.2.1 Task Description .................................................................... .............................................................. 5-3
5.2.2 Procedure ....................................................... ...................................................................... ................5-3
5.2.3 Verification.........................................................................................................................................5-16
5.2.4 Additional Information.......................................................................................................................5-16
5.3 Configuring BTS Attributes ................................................................ ........................................................ 5-16
5.3.1 Task Description .................................................................... ............................................................ 5-16
5.3.2 Procedure ....................................................... ........................................................................ ............5-16
5.3.3 Verification.........................................................................................................................................5-18
5.3.4 Additional Information.......................................................................................................................5-18
5.4 Configuring the CRC4 Check Switch .................................................................... .....................................5-19
5.4.1 Task Description .................................................................... ............................................................ 5-19
5.4.2 Procedure ....................................................... ........................................................................ ............5-19
5.4.3 Verification.........................................................................................................................................5-22
5.4.4 Additional Information.......................................................................................................................5-23
5.5 Setting a BTS to the Active State.................................................................. .............................................. 5-23
5.5.1 Task Description .................................................................... ............................................................ 5-23
5.5.2 Procedure ....................................................... ........................................................................ ............5-23
5.5.3 Verification.........................................................................................................................................5-24
5.5.4 Additional Information.......................................................................................................................5-255.6 Adding or Deleting a Site Chain..................................................................................................................5-25
5.6.1 Task Description .................................................................... ............................................................ 5-25
5.6.2 Procedure ....................................................... ........................................................................ ............5-25
5.6.3 Verification.........................................................................................................................................5-29
5.6.4 Additional Information.......................................................................................................................5-29
5.7 Establishing Connections Between BTS Cabinet Groups...........................................................................5-29
5.7.1 Task Description .................................................................... ............................................................ 5-29
5.7.2 Procedure ....................................................... ........................................................................ ............5-29
5.7.3 Verification.........................................................................................................................................5-32
7/30/2019 Bsc&Bts Config
7/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Contents
Issue 03 (2007-05-09) Huawei Technologies Proprietary vii
5.7.4 Additional Information.......................................................................................................................5-32
5.8 Adding or Deleting a BTS Board........................................................................... .....................................5-33
5.8.1 Task Description .................................................................... ............................................................ 5-33
5.8.2 Procedure ....................................................... ........................................................................ ............5-33
5.8.3 Verification.........................................................................................................................................5-37
5.8.4 Additional Information.......................................................................................................................5-37
5.9 Configuring BTS Board Attributes..............................................................................................................5-38
5.9.1 Task Description .................................................................... ............................................................ 5-38
5.9.2 Procedure ....................................................... ........................................................................ ............5-38
5.9.3 Verification.........................................................................................................................................5-42
5.9.4 Additional Information.......................................................................................................................5-42
5.10 Moving a BTS...........................................................................................................................................5-43
5.10.1 Task Description ............................................................. ................................................................. 5-43
5.10.2 Procedure .............................................................. ......................................................................... ..5-43
5.10.3 Verification.......................................................................................................................................5-46
5.10.4 Additional Information.....................................................................................................................5-46
5.11 Assigning Abis Timeslots Manually..........................................................................................................5-47
5.11.1 Task Description...............................................................................................................................5-47
5.11.2 Procedure ............................................................... .......................................................................... 5-47
5.11.3 Verification.......................................................................................................................................5-53
5.11.4 Additional Information.....................................................................................................................5-54
5.12 Configuring Site Idle Timeslots ........................................................... ..................................................... 5-56
5.12.1 Task Description ............................................................. ................................................................. 5-565.12.2 Procedure .............................................................. ......................................................................... ..5-56
5.12.3 Verification.......................................................................................................................................5-58
5.12.4 Additional Information.....................................................................................................................5-58
5.13 Configuring BTS Monitor Timeslots ............................................................... .........................................5-58
5.13.1 Task Description ............................................................. ................................................................. 5-58
5.13.2 Procedure .............................................................. ......................................................................... ..5-58
5.13.3 Verification.......................................................................................................................................5-62
5.13.4 Additional Information.....................................................................................................................5-62
5.14 Setting a Cabinet Template........................................................................................................................5-62
5.14.1 Task Description ............................................................. ................................................................. 5-62
5.14.2 Procedure .............................................................. ......................................................................... ..5-62
5.14.3 Verification.......................................................................................................................................5-63
5.14.4 Additional Information.....................................................................................................................5-63
5.15 Deleting a BTS..........................................................................................................................................5-64
5.15.1 Task Description ............................................................. ................................................................. 5-64
5.15.2 Procedure .............................................................. ......................................................................... ..5-64
5.15.3 Verification.......................................................................................................................................5-66
5.15.4 Additional Information.....................................................................................................................5-66
7/30/2019 Bsc&Bts Config
8/337
Contents
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
viii Huawei Technologies Proprietary Issue 03 (2007-05-09)
6 Configuring Cell Data...............................................................................................................6-1
6.1 Overview of Cell Data Configuration ................................................................. ..........................................6-2
6.2 Adding a Cell.................................................................................................................................................6-2
6.2.1 Task Description .................................................................... .............................................................. 6-2
6.2.2 Procedure ....................................................... ...................................................................... ................6-3
6.2.3 Verification.........................................................................................................................................6-13
6.2.4 Additional Information.......................................................................................................................6-13
6.3 Configuring Cell Attributes.........................................................................................................................6-14
6.3.1 Task Description .................................................................... ............................................................ 6-14
6.3.2 Procedure ....................................................... ........................................................................ ............6-14
6.3.3 Verification.........................................................................................................................................6-33
6.3.4 Additional Information.......................................................................................................................6-33
6.4 Configuring Adjacent Cells.........................................................................................................................6-34
6.4.1 Task Description .................................................................... ............................................................ 6-34
6.4.2 Procedure ....................................................... ........................................................................ ............6-34
6.4.3 Verification.........................................................................................................................................6-38
6.4.4 Additional Information.......................................................................................................................6-38
6.5 Adding TRXs ....................................................... ............................................................... ........................6-39
6.5.1 Task Description .................................................................... ............................................................ 6-39
6.5.2 Procedure ....................................................... ........................................................................ ............6-39
6.5.3 Verification.........................................................................................................................................6-42
6.5.4 Additional Information.......................................................................................................................6-42
6.6 Configuring Channel Attributes .................................................................... .............................................. 6-436.6.1 Task Description .................................................................... ............................................................ 6-43
6.6.2 Procedure ....................................................... ........................................................................ ............6-43
6.6.3 Verification.........................................................................................................................................6-45
6.6.4 Additional Information.......................................................................................................................6-45
6.7 Deleting a TRX ............................................................... ........................................................................... .6-47
6.7.1 Task Description .................................................................... ............................................................ 6-47
6.7.2 Procedure ....................................................... ........................................................................ ............6-47
6.7.3 Verification.........................................................................................................................................6-48
6.7.4 Additional Information.......................................................................................................................6-486.8 Deleting a Cell.............................................................................................................................................6-49
6.8.1 Task Description .................................................................... ............................................................ 6-49
6.8.2 Procedure ....................................................... ........................................................................ ............6-49
6.8.3 Verification.........................................................................................................................................6-50
6.8.4 Additional Information.......................................................................................................................6-50
6.9 Adding a 2G External Cell .................................................................... ...................................................... 6-51
6.9.1 Task Description .................................................................... ............................................................ 6-51
6.9.2 Procedure ....................................................... ........................................................................ ............6-51
6.9.3 Verification.........................................................................................................................................6-55
6.9.4 Additional Information.......................................................................................................................6-55
7/30/2019 Bsc&Bts Config
9/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Contents
Issue 03 (2007-05-09) Huawei Technologies Proprietary ix
6.10 Configuring the Attributes of a 2G External Cell......................................................................................6-56
6.10.1 Task Description ............................................................. ................................................................. 6-56
6.10.2 Procedure .............................................................. ......................................................................... ..6-56
6.10.3 Verification.......................................................................................................................................6-58
6.10.4 Additional Information.....................................................................................................................6-58
6.11 Deleting a 2G External Cell ...................................................................... ................................................ 6-59
6.11.1 Task Description...............................................................................................................................6-59
6.11.2 Procedure ............................................................... .......................................................................... 6-59
6.11.3 Verification.......................................................................................................................................6-60
6.11.4 Additional Information.....................................................................................................................6-60
6.12 Adding a 3G External Cell .................................................................... .................................................... 6-61
6.12.1 Task Description ............................................................. ................................................................. 6-61
6.12.2 Procedure .............................................................. ......................................................................... ..6-61
6.12.3 Verification.......................................................................................................................................6-65
6.12.4 Additional Information.....................................................................................................................6-65
6.13 Configuring the Attributes of a 3G External Cell......................................................................................6-66
6.13.1 Task Description ............................................................. ................................................................. 6-66
6.13.2 Procedure .............................................................. ......................................................................... ..6-66
6.13.3 Verification.......................................................................................................................................6-68
6.13.4 Additional Information.....................................................................................................................6-68
6.14 Deleting a 3G External Cell ...................................................................... ................................................ 6-69
6.14.1 Task Description ............................................................. ................................................................. 6-69
6.14.2 Procedure .............................................................. ......................................................................... ..6-696.14.3 Verification.......................................................................................................................................6-70
6.14.4 Additional Information.....................................................................................................................6-70
7 Maintaining Data .......................................................................................................................7-1
7.1 Overview of Data Maintenance Operations ...................................................................... ............................7-2
7.2 Exporting Network Parameters............................................................. ........................................................ 7-2
7.2.1 Task Description .................................................................... .............................................................. 7-2
7.2.2 Procedure ....................................................... ...................................................................... ................7-2
7.2.3 Verification...........................................................................................................................................7-4
7.2.4 Additional Information.........................................................................................................................7-47.3 Importing Network Parameters ................................................................... .................................................. 7-5
7.3.1 Task Description .................................................................... .............................................................. 7-5
7.3.2 Procedure ....................................................... ...................................................................... ................7-5
7.3.3 Verification...........................................................................................................................................7-6
7.3.4 Additional Information.........................................................................................................................7-6
7.4 Configuring Cell Parameters in Batches ............................................................ ...........................................7-7
7.4.1 Task Description .................................................................... .............................................................. 7-7
7.4.2 Procedure ....................................................... ...................................................................... ................7-7
7.4.3 Verification.........................................................................................................................................7-14
7/30/2019 Bsc&Bts Config
10/337
Contents
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
x Huawei Technologies Proprietary Issue 03 (2007-05-09)
7.4.4 Additional Information.......................................................................................................................7-14
7.5 Backing Up Local Data...............................................................................................................................7-15
7.5.1 Task Description .................................................................... ............................................................ 7-15
7.5.2 Procedure ....................................................... ........................................................................ ............7-15
7.5.3 Verification.........................................................................................................................................7-16
7.5.4 Additional Information.......................................................................................................................7-16
7.6 Backing Up GBAM Data ............................................................... ............................................................. 7-16
7.6.1 Task Description .................................................................... ............................................................ 7-16
7.6.2 Procedure ....................................................... ........................................................................ ............7-17
7.6.3 Verification.........................................................................................................................................7-23
7.6.4 Additional Information.......................................................................................................................7-23
7.7 Loading and Restoring GBAM Data...........................................................................................................7-24
7.7.1 Task Description .................................................................... ............................................................ 7-24
7.7.2 Procedure ....................................................... ........................................................................ ............7-24
7.7.3 Verification.........................................................................................................................................7-27
7.7.4 Additional Information.......................................................................................................................7-27
7.8 Checking Data Consistency and Synchronizing Data.................................................................. ...............7-28
7.8.1 Task Description .................................................................... ............................................................ 7-28
7.8.2 Procedure ....................................................... ........................................................................ ............7-28
7.8.3 Verification.........................................................................................................................................7-31
7.8.4 .Additional Information ................................................................ .....................................................7-31
7.9 Formatting SMU Files.................................................................................................................................7-32
7.9.1 Task Description .................................................................... ............................................................ 7-327.9.2 Procedure ....................................................... ........................................................................ ............7-32
7.9.3 Verification.........................................................................................................................................7-35
7.9.4 Additional Information.......................................................................................................................7-35
7.10 Opening a Local Data File .......................................................................... ..............................................7-35
7.10.1 Task Description ............................................................. ................................................................. 7-35
7.10.2 Procedure .............................................................. ......................................................................... ..7-36
7.10.3 Verification.......................................................................................................................................7-36
7.10.4 Additional Information.....................................................................................................................7-37
7.11 Refreshing LMT Data................................................................................................................................7-37
7.11.1 Task Description...............................................................................................................................7-37
7.11.2 Procedure ............................................................... .......................................................................... 7-37
7.11.3 Verification.......................................................................................................................................7-38
7.11.4 Additional Information.....................................................................................................................7-38
7.12 Browsing Configuration Data ............................................................ ....................................................... 7-38
7.12.1 Task Description ............................................................. ................................................................. 7-38
7.12.2 Procedure .............................................................. ......................................................................... ..7-38
7.12.3 Verification.......................................................................................................................................7-40
7.12.4 Additional Information.....................................................................................................................7-40
7.13 Exporting Equipment Archive Information...............................................................................................7-41
7/30/2019 Bsc&Bts Config
11/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Contents
Issue 03 (2007-05-09) Huawei Technologies Proprietary xi
7.13.1 Task Description ............................................................. ................................................................. 7-41
7.13.2 Procedure .............................................................. ......................................................................... ..7-41
7.13.3 Verification.......................................................................................................................................7-42
7.13.4 Additonal Information......................................................................................................................7-42
7/30/2019 Bsc&Bts Config
12/337
Figures
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
xii Huawei Technologies Proprietary Issue 03 (2007-05-09)
Figures
Figure 1-1 Online data configuration .................................................................... .............................................1-3
Figure 1-2 Basic procedure for data configuration.............................................................................................1-5
Figure 1-3 Login dialog box...............................................................................................................................1-7
Figure 1-4 BSC Management dialog box...........................................................................................................1-8Figure 1-5 BSC6000 Local Maintenance Terminal window...................................................................... ........1-9
Figure 1-6 Configuration menu........................................................................................................................1-10
Figure 1-7 Management Tree tab page.............................................................................................................1-11
Figure 1-8 BSC Device Panel tab page .................................................................. ..........................................1-12
Figure 2-1 Choosing Configure BSC Attributes.................................................................................................2-3
Figure 2-2 Configuring the basic data of the BSC .............................................................. ...............................2-3
Figure 2-3 Configuring the flow control data.....................................................................................................2-4
Figure 2-4 Configuring the timer data................................................................................................................2-5
Figure 2-5 Configuring the software parameters................................................................................................2-6
Figure 2-6 Configuring the user resource binding..............................................................................................2-7
Figure 2-7 Configuring the SCCP ..................................................................... ................................................. 2-8
Figure 2-8 Choosing Configure Line Clock .................................................................... .................................2-10
Figure 2-9 Configuring the line clock ................................................................... ...........................................2-10
Figure 2-10 Choosing Configure System Clock...............................................................................................2-12
Figure 2-11 Configuring the system clock ............................................................. ..........................................2-13
Figure 2-12 Choosing Configure 8K Reference Clock ...................................................................... ..............2-16
Figure 2-13 Configuring the GSCU 8K reference clock ................................................................... ...............2-17
Figure 3-1 Configuring BSC devices ................................................................ ................................................. 3-4
Figure 3-2 Choosing Add BSC Cabinet .................................................................... .........................................3-5
Figure 3-3 Adding a cabinet ................................................................ ............................................................... 3-6
Figure 3-4 Choosing Add Subrack ........................................................... .......................................................... 3-7
Figure 3-5 Adding a subrack .............................................................. ................................................................ 3-8
7/30/2019 Bsc&Bts Config
13/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Figures
Issue 03 (2007-05-09) Huawei Technologies Proprietary xiii
Figure 3-6 Choosing Configure Subrack-OSP Mapping..................................................................................3-10
Figure 3-7 Configuring the subrack-OSP mapping .................................................. ........................................ 3-10
Figure 3-8 Choosing Configure Fan Box Attributes.........................................................................................3-11
Figure 3-9 Configuring the fan box..................................................................................................................3-12
Figure 3-10 Choosing Add Power Distribution Box ............................................................. ...........................3-13
Figure 3-11 Adding a power distribution box...................................................................................................3-14
Figure 3-12 Choosing Configure Power Distribution Box Attributes .............................................................. 3-15
Figure 3-13 Configuring the attributes of a power distribution box.................................................................3-16
Figure 3-14 Choosing Add Board.....................................................................................................................3-18
Figure 3-15 Adding a board..............................................................................................................................3-18
Figure 3-16 Choosing Configure Board Attributes (GSCU) ................................................................... .........3-20
Figure 3-17 Configure Board Attributes dialog box (GSCU)........................................................................... 3-21
Figure 3-18 Configuring ports (GSCU)............................................................................................................3-21
Figure 3-19 Choosing Configure Board Attributes (GSCU) ................................................................... .........3-22
Figure 3-20 Configure Board Attributes dialog box (GSCU)........................................................................... 3-23
Figure 3-21 Choosing Configure Board Attributes (GXPUM) ............................................................... .........3-23
Figure 3-22 Configure Board Attributes dialog box (GXPUM).......................................................................3-24
Figure 3-23 Choosing Configure Board Attributes (GEIUB)........................................................................... 3-25
Figure 3-24 Configure Board Attributes dialog box (GEIUB)................................................................. ........3-25
Figure 3-25 Configuring ports (GEIUB)..........................................................................................................3-26
Figure 3-26 Choosing Configure Board Attributes (GOIUB) .................................................................. ........3-26
Figure 3-27 Configure Board Attributes dialog box (GOIUB)......................................................................... 3-27
Figure 3-28 Configuring the attributes of the sub board .......................................................................... ........3-28
Figure 3-29 Configuring ports (GOIUB)..........................................................................................................3-29
Figure 3-30 Choosing Configure Board Attributes (GDPUC) ................................................................ .........3-29
Figure 3-31 Configure Board Attributes dialog box (GDPUC)........................................................................3-30
Figure 3-32 Configuring DSP attributes...........................................................................................................3-31
Figure 3-33 Choosing Configure BSC EAC ............................................................ ........................................3-32
Figure 3-34 Add BSC EAC dialog box.................................................................. ..........................................3-33
Figure 3-35 Adding a BSC EAC ..................................................................... ................................................. 3-33
Figure 3-36 Choosing Configure BSC EAC ............................................................ ........................................3-35
Figure 3-37 Configuring the switches for a BSC EAC ........................................................................... .........3-35
Figure 3-38 Configuring the BSC EAC analog and alarm threshold ............................................................... 3-36
7/30/2019 Bsc&Bts Config
14/337
Figures
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
xiv Huawei Technologies Proprietary Issue 03 (2007-05-09)
Figure 3-39 Choosing Delete BSC EAC............................................................ .............................................. 3-37
Figure 3-40 Deleting a BSC EAC ....................................................... ............................................................. 3-37
Figure 3-41 Choosing Delete Board.................................................................................................................3-39
Figure 3-42 Deleting a board............................................................................................................................3-39
Figure 3-43 Choosing Delete Power ...................................................... .......................................................... 3-40
Figure 3-44 Deleting a power distribution box.................................................................................................3-41
Figure 3-45 Choosing Delete Subrack..............................................................................................................3-42
Figure 3-46 Deleting a subrack ........................................................... ............................................................. 3-43
Figure 3-47 Choosing Delete Cabinet ............................................................... ............................................... 3-44
Figure 3-48 Deleting a cabinet ........................................................... .............................................................. 3-44
Figure 3-49 Checking cabinet attributes...........................................................................................................3-46
Figure 3-50 Checking subrack attributes..........................................................................................................3-47
Figure 3-51 GDPUC attributes.........................................................................................................................3-48
Figure 3-52 Checking the attributes of a power distribution box................................................................. ....3-50
Figure 3-53 Checking fan box attributes ............................................................................ ..............................3-51
Figure 4-1 Choosing Configure SS7 Signaling Point.........................................................................................4-3
Figure 4-2 OSP tab page.....................................................................................................................................4-3
Figure 4-3 Adding an OSP .................................................. ........................................................... ....................4-4
Figure 4-4 DSP tab page.....................................................................................................................................4-6
Figure 4-5 Adding an DSP .................................................. ........................................................... ....................4-6
Figure 4-6 STP tab page.....................................................................................................................................4-8
Figure 4-7 Adding an STP..................................................................................................................................4-8
Figure 4-8 Choosing Configure Subrack Communication Link.......................................................................4-10
Figure 4-9 Configuring the subrack communication link.................................................................................4-11
Figure 4-10 Add Subrack Communication Link dialog box.............................................................................4-11
Figure 4-11 Choosing Configure Ater Connection Path...................................................................................4-13
Figure 4-12 Configure Ater Connection Path dialog box.................................................................................4-14
Figure 4-13 Adding an Ater connection path....................................................................................................4-14
Figure 4-14 Choosing Add Ater OML..............................................................................................................4-17
Figure 4-15 Configure Ater OML dialog box...................................................................................................4-17
Figure 4-16 Adding an Ater OML................................................................ .................................................... 4-18
Figure 4-17 Choosing Delete Ater OML..........................................................................................................4-20
Figure 4-18 Configure Ater OML dialog box...................................................................................................4-20
7/30/2019 Bsc&Bts Config
15/337
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide Figures
Issue 03 (2007-05-09) Huawei Technologies Proprietary xv
Figure 4-19 Choosing Modify Ater OML .................................................................... ....................................4-22
Figure 4-20 Configure Ater OML dialog box...................................................................................................4-22
Figure 4-21 Modifying the Ater OML..............................................................................................................4-23
Figure 4-22 Choosing Add Ater Signaling Link...............................................................................................4-25
Figure 4-23 Add Ater Signaling Linkdialog box .................................................................... .........................4-26
Figure 4-24 Adding an Ater signaling link ......................................................................... ..............................4-27
Figure 4-25 Added Ater signaling link ..................................................................... ........................................4-28
Figure 4-26 Choosing Delete Ater Signaling Link.................................................................... .......................4-29
Figure 4-27 Deleting an Ater signaling link ................................................................. ....................................4-30
Figure 4-28 Choosing Configure A Interface E1..............................................................................................4-32
Figure 4-29 Configure A Interface E1 dialog box ..................................................................... .......................4-32
Figure 4-30 Adding an E1 on the A interface .................................................................. .................................4-33
Figure 4-31 Configuring the CIC attributes ................................................................. ....................................4-34
Figure 4-32 Choosing Configure SS7 Signaling Link......................................................................................4-36
Figure 4-33 Configure SS7 Signaling Link dialog box .................................................................... ................4-37
Figure 4-34 Adding an SS7 signaling link........................................................................................................4-38
Figure 4-35 MTP3 tab page..............................................................................................................................4-39
Figure 4-36 Choosing Configure PCU.............................................................. ............................................... 4-41
Figure 4-37 Configure PCU dialog box .......................................................... ................................................. 4-42
Figure 4-38 Adding a PCU...............................................................................................................................4-42
Figure 4-39 Choosing Configure Pb Interface E1 ............................................................................ ................4-44
Figure 4-40 Configure Pb Interface E1dialog box ................................................................. .........................4-45
Figure 4-41 Configuring the attributes of the E1 on the Pb interface...............................................................4-45
Figure 4-42 Configuring the CIC attributes ................................................................. ....................................4-47
Figure 4-43 Choosing Configure Pb Signaling Link........................................................................................4-48
Figure 4-44 Configure Pb Signaling Link dialog box .................................................................. ....................4-49
Figure 4-45 Adding a Pb signaling link............................................................................................................4-50
Figure 4-46 Choosing Configure Semipermanent Link ........................................................................ ...........4-52
Figure 4-47 Configure Semipermanent Link dialog box..................................................................................4-53
Figure 4-48 Adding a semipermanent link ................................................................. ......................................4-53
Figure 5-1 Choosing Add Site (1) .................................................................... .................................................. 5-5
Figure 5-2 Choosing Add Site (2) .................................................................... .................................................. 5-5
Figure 5-3 Add Site dialog box .......................................................... ................................................................ 5-6
7/30/2019 Bsc&Bts Config
16/337
Figures
HUAWEI BSC6000 Base Station Controller
Data Configuration Guide
xvi Huawei Technologies Proprietary Issue 03 (2007-05-09)
Figure 5-4 Add Site dialog box .......................................................... ................................................................ 5-6
Figure 5-5 Setting parameters .................................................................. .......................................................... 5-7
Figure 5-6 Added BTS in the Site View box .................................................................. ....................................5-8
Figure 5-7 Updated information in the Add Site dialog box .................................................................... ..........5-9
Figure 5-8 Adding a cell.....................................................................................................................................5-9
Figure 5-9 Added cell in the Cell View box ........................................................................ .............................5-10
Figure 5-10 Configuring cell attributes ................................................................. ........................................... 5-11
Figure 5-11 Set Cell Attributes dialog box...................