+ All Categories
Home > Documents > Bsc&Bts Config

Bsc&Bts Config

Date post: 14-Apr-2018
Category:
Upload: sidy-elbechir-drame
View: 219 times
Download: 5 times
Share this document with a friend

of 338

Transcript
  • 7/30/2019 Bsc&Bts Config

    1/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Contents

    Issue 03 (2007-05-09) Huawei Technologies Proprietary i

    Contents

    1 Overview of Data Configuration ............................................................................................1-1

    1.1 Data Configuration Principle ................................................................... ..................................................... 1-2

    1.1.1 Data Configuration Methods................................................................................................................1-2

    1.1.2 Data Classification.................................................................... ........................................................... 1-3

    1.2 Operation Authority .................................................................... .................................................................. 1-4

    1.3 Data Configuration Procedure.......................................................................................................................1-4

    1.3.1 Prerequisites.........................................................................................................................................1-4

    1.3.2 Configuration Procedure......................................................................................................................1-5

    1.3.3 Precautions...........................................................................................................................................1-6

    1.4 Starting Data Configuration ................................................................ .......................................................... 1-7

    1.4.1 Displaying the BSC6000 Local Maintenance Terminal Window.........................................................1-7

    1.4.2 Introduction to the BSC6000 Local Maintenance Terminal Window .................................................. 1-9

    2 Configuring BSC Attributes ....................................................................................................2-12.1 Overview of the BSC Attributes Configuration ............................................................ ................................2-2

    2.2 Configuring the BSC Attributes .................................................................... ................................................ 2-2

    2.2.1 Task Description .................................................................... .............................................................. 2-2

    2.2.2 Procedure ....................................................... ...................................................................... ................2-2

    2.2.3 Verification...........................................................................................................................................2-8

    2.2.4 Additional Information.........................................................................................................................2-8

    2.3 Configuring the Line Clock...........................................................................................................................2-9

    2.3.1 Task Description .................................................................... .............................................................. 2-9

    2.3.2 Procedure ....................................................... ...................................................................... ................2-9

    2.3.3 Verification.........................................................................................................................................2-11

    2.3.4 Additional Information.......................................................................................................................2-11

    2.4 Configuring the System Clock ................................................................ .................................................... 2-12

    2.4.1 Task Description .................................................................... ............................................................ 2-12

    2.4.2 Procedure ....................................................... ........................................................................ ............2-12

    2.4.3 Verification.........................................................................................................................................2-14

    2.4.4 Additional Information.......................................................................................................................2-14

    2.5 Configuring the 8K Reference Clock..........................................................................................................2-15

    2.5.1 Task Description .................................................................... ............................................................ 2-15

    2.5.2 Procedure ....................................................... ........................................................................ ............2-15

  • 7/30/2019 Bsc&Bts Config

    2/337

    Contents

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    ii Huawei Technologies Proprietary Issue 03 (2007-05-09)

    2.5.3 Verification.........................................................................................................................................2-17

    2.5.4 Additional Information.......................................................................................................................2-17

    3 Configuring BSC Devices.........................................................................................................3-1

    3.1 Overview of the Device Configuration ............................................................... ..........................................3-33.2 Adding a Cabinet...........................................................................................................................................3-5

    3.2.1 Task Description .................................................................... .............................................................. 3-5

    3.2.2 Procedure ....................................................... ...................................................................... ................3-5

    3.2.3 Verification...........................................................................................................................................3-6

    3.2.4 Additional Information.........................................................................................................................3-6

    3.3 Adding a Subrack ...................................................... .................................................................... ................3-7

    3.3.1 Task Description .................................................................... .............................................................. 3-7

    3.3.2 Procedure ....................................................... ...................................................................... ................3-7

    3.3.3 Verification...........................................................................................................................................3-8

    3.3.4 Additional Information.........................................................................................................................3-9

    3.4 Configuring the Subrack-OSP Mapping........................................................................................................3-9

    3.4.1 Task Description .................................................................... .............................................................. 3-9

    3.4.2 Procedure ....................................................... ...................................................................... ................3-9

    3.4.3 Verification.........................................................................................................................................3-10

    3.4.4 Additional Information.......................................................................................................................3-11

    3.5 Configuring the Attributes of a Fan Box................................................................ ..................................... 3-11

    3.5.1 Task Description .................................................................... ............................................................ 3-11

    3.5.2 Procedure ....................................................... ...................................................................... .............. 3-11

    3.5.3 Verification.........................................................................................................................................3-12

    3.5.4 Additional Information.......................................................................................................................3-12

    3.6 Adding a Power Distribution Box ................................................................. .............................................. 3-13

    3.6.1 Task Description .................................................................... ............................................................ 3-13

    3.6.2 Procedure ....................................................... ........................................................................ ............3-13

    3.6.3 Verification.........................................................................................................................................3-14

    3.6.4 Additional Information.......................................................................................................................3-15

    3.7 Configuring the Attributes of a Power Distribution Box............................................................................ .3-15

    3.7.1 Task Description .................................................................... ............................................................ 3-15

    3.7.2 Procedure ....................................................... ........................................................................ ............3-153.7.3 Verification.........................................................................................................................................3-16

    3.7.4 Additional Information.......................................................................................................................3-16

    3.8 Adding a Board ........................................................... ..................................................................... ...........3-17

    3.8.1 Task Description .................................................................... ............................................................ 3-17

    3.8.2 Procedure ....................................................... ........................................................................ ............3-17

    3.8.3 Verification.........................................................................................................................................3-19

    3.8.4 Additional Information.......................................................................................................................3-19

    3.9 Configuring Board Attributes......................................................................................................................3-20

    3.9.1 Task Description .................................................................... ............................................................ 3-20

  • 7/30/2019 Bsc&Bts Config

    3/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Contents

    Issue 03 (2007-05-09) Huawei Technologies Proprietary iii

    3.9.2 Procedure ....................................................... ........................................................................ ............3-20

    3.9.3 Verification.........................................................................................................................................3-31

    3.9.4 Additional Information.......................................................................................................................3-31

    3.10 Adding a BSC EAC...................................................................................................................................3-32

    3.10.1 Task Description ............................................................. ................................................................. 3-32

    3.10.2 Procedure .............................................................. ......................................................................... ..3-32

    3.10.3 Verification.......................................................................................................................................3-34

    3.10.4 Additional Information.....................................................................................................................3-34

    3.11 Configuring a BSC EAC ....................................................... .................................................................... 3-34

    3.11.1 Task Description...............................................................................................................................3-34

    3.11.2 Procedure ............................................................... .......................................................................... 3-34

    3.11.3 Verification.......................................................................................................................................3-36

    3.11.4 Additional Information.....................................................................................................................3-36

    3.12 Deleting a BSC EAC.................................................................................................................................3-36

    3.12.1 Task Description ............................................................. ................................................................. 3-36

    3.12.2 Procedure .............................................................. ......................................................................... ..3-37

    3.12.3 Verification.......................................................................................................................................3-38

    3.12.4 Additional Information.....................................................................................................................3-38

    3.13 Deleting a Board ...................................................... ...................................................................... ...........3-38

    3.13.1 Task Description ............................................................. ................................................................. 3-38

    3.13.2 Procedure .............................................................. ......................................................................... ..3-38

    3.13.3 Verification.......................................................................................................................................3-39

    3.13.4 Additional Information.....................................................................................................................3-403.14 Deleting a Power Distribution Box ................................................................... ........................................3-40

    3.14.1 Task Description ............................................................. ................................................................. 3-40

    3.14.2 Procedure .............................................................. ......................................................................... ..3-40

    3.14.3 Verification.......................................................................................................................................3-41

    3.14.4 Additional Information.....................................................................................................................3-41

    3.15 Deleting a Subrack ................................................................ .................................................................. ..3-42

    3.15.1 Task Description ............................................................. ................................................................. 3-42

    3.15.2 Procedure .............................................................. ......................................................................... ..3-42

    3.15.3 Verification.......................................................................................................................................3-43

    3.15.4 Additional Information.....................................................................................................................3-43

    3.16 Deleting a Cabinet.....................................................................................................................................3-43

    3.16.1 Task Description ............................................................. ................................................................. 3-43

    3.16.2 Procedure .............................................................. ......................................................................... ..3-44

    3.16.3 Verification.......................................................................................................................................3-45

    3.16.4 Additional Information.....................................................................................................................3-45

    3.17 Checking Cabinet Attributes ........................................................................ ............................................. 3-45

    3.17.1 Task Description ............................................................. ................................................................. 3-45

    3.17.2 Procedure .............................................................. ......................................................................... ..3-45

    3.17.3 Verification.......................................................................................................................................3-46

  • 7/30/2019 Bsc&Bts Config

    4/337

    Contents

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    iv Huawei Technologies Proprietary Issue 03 (2007-05-09)

    3.17.4 Additional Information.....................................................................................................................3-46

    3.18 Checking Subrack Attributes.....................................................................................................................3-46

    3.18.1 Task Description ............................................................. ................................................................. 3-46

    3.18.2 Procedure .............................................................. ......................................................................... ..3-47

    3.18.3 Verification.......................................................................................................................................3-47

    3.18.4 Additional Information.....................................................................................................................3-47

    3.19 Checking Board Attributes .......................................................................... .............................................. 3-48

    3.19.1 Task Description ............................................................. ................................................................. 3-48

    3.19.2 Procedure .............................................................. ......................................................................... ..3-48

    3.19.3 Verification.......................................................................................................................................3-49

    3.19.4 Additional Information.....................................................................................................................3-49

    3.20 Checking the Attributes of a Power Distribution Box...............................................................................3-49

    3.20.1 Task Description ............................................................. ................................................................. 3-49

    3.20.2 Procedure .............................................................. ......................................................................... ..3-49

    3.20.3 Verification.......................................................................................................................................3-50

    3.20.4 Additional Information.....................................................................................................................3-50

    3.21 Checking the Attributes of a Fan Box ................................................................... ....................................3-51

    3.21.1 Task Description ............................................................. ................................................................. 3-51

    3.21.2 Procedure .............................................................. ......................................................................... ..3-51

    3.21.3 Verification.......................................................................................................................................3-52

    3.21.4 Additional Information.....................................................................................................................3-52

    4 Configuring BSC Links.............................................................................................................4-1

    4.1 Overview of the BSC Link Configuration.....................................................................................................4-2

    4.2 Configuring SS7 Signaling Points.................................................................................................................4-2

    4.2.1 Task Description .................................................................... .............................................................. 4-2

    4.2.2 Procedure ....................................................... ...................................................................... ................4-2

    4.2.3 Verification...........................................................................................................................................4-9

    4.2.4 Additional Information.........................................................................................................................4-9

    4.3 Configuring a Subrack Communication Link ...................................................................... .........................4-9

    4.3.1 Task Description .................................................................... .............................................................. 4-9

    4.3.2 Procedure ....................................................... ........................................................................ ............4-10

    4.3.3 Verification.........................................................................................................................................4-124.3.4 Additional Information.......................................................................................................................4-12

    4.4 Configuring an Ater Connection Path .......................................................................... ...............................4-12

    4.4.1 Task Description .................................................................... ............................................................ 4-12

    4.4.2 Procedure ....................................................... ........................................................................ ............4-13

    4.4.3 Verification.........................................................................................................................................4-15

    4.4.4 Additional Information.......................................................................................................................4-15

    4.5 Adding an Ater OML...................................................................................................................................4-16

    4.5.1 Task Description .................................................................... ............................................................ 4-16

    4.5.2 Procedure ....................................................... ........................................................................ ............4-16

  • 7/30/2019 Bsc&Bts Config

    5/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Contents

    Issue 03 (2007-05-09) Huawei Technologies Proprietary v

    4.5.3 Verification.........................................................................................................................................4-19

    4.5.4 Additional Information.......................................................................................................................4-19

    4.6 Deleting an Ater OML.................................................................................................................................4-19

    4.6.1 Task Description .................................................................... ............................................................ 4-19

    4.6.2 Procedure ....................................................... ........................................................................ ............4-20

    4.6.3 Verification.........................................................................................................................................4-21

    4.6.4 Additional Information.......................................................................................................................4-21

    4.7 Modifying an Ater OML .................................................................... ......................................................... 4-21

    4.7.1 Task Description .................................................................... ............................................................ 4-21

    4.7.2 Procedure ....................................................... ........................................................................ ............4-21

    4.7.3 Verification.........................................................................................................................................4-23

    4.7.4 Additional Information.......................................................................................................................4-23

    4.8 Adding an Ater Signaling Link....................................................................................................................4-24

    4.8.1 Task Description .................................................................... ............................................................ 4-24

    4.8.2 Procedure ....................................................... ........................................................................ ............4-24

    4.8.3 Verification.........................................................................................................................................4-28

    4.8.4 Additional Information.......................................................................................................................4-28

    4.9 Deleting an Ater Signaling Link..................................................................................................................4-29

    4.9.1 Task Description .................................................................... ............................................................ 4-29

    4.9.2 Procedure ....................................................... ........................................................................ ............4-29

    4.9.3 Verification.........................................................................................................................................4-30

    4.9.4 Additional Information.......................................................................................................................4-30

    4.10 Configuring an E1 on the A Interface..................................................... ...................................................4-314.10.1 Task Description ............................................................. ................................................................. 4-31

    4.10.2 Procedure .............................................................. ......................................................................... ..4-31

    4.10.3 Verification.......................................................................................................................................4-34

    4.10.4 Additional Information.....................................................................................................................4-34

    4.11 Configuring an SS7 Signaling Link...........................................................................................................4-35

    4.11.1 Task Description...............................................................................................................................4-35

    4.11.2 Procedure ............................................................... .......................................................................... 4-35

    4.11.3 Verification.......................................................................................................................................4-40

    4.11.4 Additional Information.....................................................................................................................4-40

    4.12 Configuring a PCU....................................................................................................................................4-41

    4.12.1 Task Description ............................................................. ................................................................. 4-41

    4.12.2 Procedure .............................................................. ......................................................................... ..4-41

    4.12.3 Verification.......................................................................................................................................4-43

    4.12.4 Additional Information.....................................................................................................................4-43

    4.13 Configuring an E1 on the Pb Interface......................................................................................................4-43

    4.13.1 Task Description ............................................................. ................................................................. 4-43

    4.13.2 Procedure .............................................................. ......................................................................... ..4-43

    4.13.3 Verification.......................................................................................................................................4-47

    4.13.4 Additional Information.....................................................................................................................4-47

  • 7/30/2019 Bsc&Bts Config

    6/337

    Contents

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    vi Huawei Technologies Proprietary Issue 03 (2007-05-09)

    4.14 Configuring a Pb Signaling Link...............................................................................................................4-48

    4.14.1 Task Description ............................................................. ................................................................. 4-48

    4.14.2 Procedure .............................................................. ......................................................................... ..4-48

    4.14.3 Verification.......................................................................................................................................4-51

    4.14.4 Additional Information.....................................................................................................................4-51

    4.15 Configuring a Semipermanent Link................................................................... .......................................4-51

    4.15.1 Task Description ............................................................. ................................................................. 4-51

    4.15.2 Procedure .............................................................. ......................................................................... ..4-51

    4.15.3 Verification.......................................................................................................................................4-54

    4.15.4 Additional Information.....................................................................................................................4-54

    5 Configuring BTS Data ..............................................................................................................5-1

    5.1 Overview of BTS Data Configuration...........................................................................................................5-3

    5.2 Adding a BTS................................................................................................................................................5-3

    5.2.1 Task Description .................................................................... .............................................................. 5-3

    5.2.2 Procedure ....................................................... ...................................................................... ................5-3

    5.2.3 Verification.........................................................................................................................................5-16

    5.2.4 Additional Information.......................................................................................................................5-16

    5.3 Configuring BTS Attributes ................................................................ ........................................................ 5-16

    5.3.1 Task Description .................................................................... ............................................................ 5-16

    5.3.2 Procedure ....................................................... ........................................................................ ............5-16

    5.3.3 Verification.........................................................................................................................................5-18

    5.3.4 Additional Information.......................................................................................................................5-18

    5.4 Configuring the CRC4 Check Switch .................................................................... .....................................5-19

    5.4.1 Task Description .................................................................... ............................................................ 5-19

    5.4.2 Procedure ....................................................... ........................................................................ ............5-19

    5.4.3 Verification.........................................................................................................................................5-22

    5.4.4 Additional Information.......................................................................................................................5-23

    5.5 Setting a BTS to the Active State.................................................................. .............................................. 5-23

    5.5.1 Task Description .................................................................... ............................................................ 5-23

    5.5.2 Procedure ....................................................... ........................................................................ ............5-23

    5.5.3 Verification.........................................................................................................................................5-24

    5.5.4 Additional Information.......................................................................................................................5-255.6 Adding or Deleting a Site Chain..................................................................................................................5-25

    5.6.1 Task Description .................................................................... ............................................................ 5-25

    5.6.2 Procedure ....................................................... ........................................................................ ............5-25

    5.6.3 Verification.........................................................................................................................................5-29

    5.6.4 Additional Information.......................................................................................................................5-29

    5.7 Establishing Connections Between BTS Cabinet Groups...........................................................................5-29

    5.7.1 Task Description .................................................................... ............................................................ 5-29

    5.7.2 Procedure ....................................................... ........................................................................ ............5-29

    5.7.3 Verification.........................................................................................................................................5-32

  • 7/30/2019 Bsc&Bts Config

    7/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Contents

    Issue 03 (2007-05-09) Huawei Technologies Proprietary vii

    5.7.4 Additional Information.......................................................................................................................5-32

    5.8 Adding or Deleting a BTS Board........................................................................... .....................................5-33

    5.8.1 Task Description .................................................................... ............................................................ 5-33

    5.8.2 Procedure ....................................................... ........................................................................ ............5-33

    5.8.3 Verification.........................................................................................................................................5-37

    5.8.4 Additional Information.......................................................................................................................5-37

    5.9 Configuring BTS Board Attributes..............................................................................................................5-38

    5.9.1 Task Description .................................................................... ............................................................ 5-38

    5.9.2 Procedure ....................................................... ........................................................................ ............5-38

    5.9.3 Verification.........................................................................................................................................5-42

    5.9.4 Additional Information.......................................................................................................................5-42

    5.10 Moving a BTS...........................................................................................................................................5-43

    5.10.1 Task Description ............................................................. ................................................................. 5-43

    5.10.2 Procedure .............................................................. ......................................................................... ..5-43

    5.10.3 Verification.......................................................................................................................................5-46

    5.10.4 Additional Information.....................................................................................................................5-46

    5.11 Assigning Abis Timeslots Manually..........................................................................................................5-47

    5.11.1 Task Description...............................................................................................................................5-47

    5.11.2 Procedure ............................................................... .......................................................................... 5-47

    5.11.3 Verification.......................................................................................................................................5-53

    5.11.4 Additional Information.....................................................................................................................5-54

    5.12 Configuring Site Idle Timeslots ........................................................... ..................................................... 5-56

    5.12.1 Task Description ............................................................. ................................................................. 5-565.12.2 Procedure .............................................................. ......................................................................... ..5-56

    5.12.3 Verification.......................................................................................................................................5-58

    5.12.4 Additional Information.....................................................................................................................5-58

    5.13 Configuring BTS Monitor Timeslots ............................................................... .........................................5-58

    5.13.1 Task Description ............................................................. ................................................................. 5-58

    5.13.2 Procedure .............................................................. ......................................................................... ..5-58

    5.13.3 Verification.......................................................................................................................................5-62

    5.13.4 Additional Information.....................................................................................................................5-62

    5.14 Setting a Cabinet Template........................................................................................................................5-62

    5.14.1 Task Description ............................................................. ................................................................. 5-62

    5.14.2 Procedure .............................................................. ......................................................................... ..5-62

    5.14.3 Verification.......................................................................................................................................5-63

    5.14.4 Additional Information.....................................................................................................................5-63

    5.15 Deleting a BTS..........................................................................................................................................5-64

    5.15.1 Task Description ............................................................. ................................................................. 5-64

    5.15.2 Procedure .............................................................. ......................................................................... ..5-64

    5.15.3 Verification.......................................................................................................................................5-66

    5.15.4 Additional Information.....................................................................................................................5-66

  • 7/30/2019 Bsc&Bts Config

    8/337

    Contents

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    viii Huawei Technologies Proprietary Issue 03 (2007-05-09)

    6 Configuring Cell Data...............................................................................................................6-1

    6.1 Overview of Cell Data Configuration ................................................................. ..........................................6-2

    6.2 Adding a Cell.................................................................................................................................................6-2

    6.2.1 Task Description .................................................................... .............................................................. 6-2

    6.2.2 Procedure ....................................................... ...................................................................... ................6-3

    6.2.3 Verification.........................................................................................................................................6-13

    6.2.4 Additional Information.......................................................................................................................6-13

    6.3 Configuring Cell Attributes.........................................................................................................................6-14

    6.3.1 Task Description .................................................................... ............................................................ 6-14

    6.3.2 Procedure ....................................................... ........................................................................ ............6-14

    6.3.3 Verification.........................................................................................................................................6-33

    6.3.4 Additional Information.......................................................................................................................6-33

    6.4 Configuring Adjacent Cells.........................................................................................................................6-34

    6.4.1 Task Description .................................................................... ............................................................ 6-34

    6.4.2 Procedure ....................................................... ........................................................................ ............6-34

    6.4.3 Verification.........................................................................................................................................6-38

    6.4.4 Additional Information.......................................................................................................................6-38

    6.5 Adding TRXs ....................................................... ............................................................... ........................6-39

    6.5.1 Task Description .................................................................... ............................................................ 6-39

    6.5.2 Procedure ....................................................... ........................................................................ ............6-39

    6.5.3 Verification.........................................................................................................................................6-42

    6.5.4 Additional Information.......................................................................................................................6-42

    6.6 Configuring Channel Attributes .................................................................... .............................................. 6-436.6.1 Task Description .................................................................... ............................................................ 6-43

    6.6.2 Procedure ....................................................... ........................................................................ ............6-43

    6.6.3 Verification.........................................................................................................................................6-45

    6.6.4 Additional Information.......................................................................................................................6-45

    6.7 Deleting a TRX ............................................................... ........................................................................... .6-47

    6.7.1 Task Description .................................................................... ............................................................ 6-47

    6.7.2 Procedure ....................................................... ........................................................................ ............6-47

    6.7.3 Verification.........................................................................................................................................6-48

    6.7.4 Additional Information.......................................................................................................................6-486.8 Deleting a Cell.............................................................................................................................................6-49

    6.8.1 Task Description .................................................................... ............................................................ 6-49

    6.8.2 Procedure ....................................................... ........................................................................ ............6-49

    6.8.3 Verification.........................................................................................................................................6-50

    6.8.4 Additional Information.......................................................................................................................6-50

    6.9 Adding a 2G External Cell .................................................................... ...................................................... 6-51

    6.9.1 Task Description .................................................................... ............................................................ 6-51

    6.9.2 Procedure ....................................................... ........................................................................ ............6-51

    6.9.3 Verification.........................................................................................................................................6-55

    6.9.4 Additional Information.......................................................................................................................6-55

  • 7/30/2019 Bsc&Bts Config

    9/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Contents

    Issue 03 (2007-05-09) Huawei Technologies Proprietary ix

    6.10 Configuring the Attributes of a 2G External Cell......................................................................................6-56

    6.10.1 Task Description ............................................................. ................................................................. 6-56

    6.10.2 Procedure .............................................................. ......................................................................... ..6-56

    6.10.3 Verification.......................................................................................................................................6-58

    6.10.4 Additional Information.....................................................................................................................6-58

    6.11 Deleting a 2G External Cell ...................................................................... ................................................ 6-59

    6.11.1 Task Description...............................................................................................................................6-59

    6.11.2 Procedure ............................................................... .......................................................................... 6-59

    6.11.3 Verification.......................................................................................................................................6-60

    6.11.4 Additional Information.....................................................................................................................6-60

    6.12 Adding a 3G External Cell .................................................................... .................................................... 6-61

    6.12.1 Task Description ............................................................. ................................................................. 6-61

    6.12.2 Procedure .............................................................. ......................................................................... ..6-61

    6.12.3 Verification.......................................................................................................................................6-65

    6.12.4 Additional Information.....................................................................................................................6-65

    6.13 Configuring the Attributes of a 3G External Cell......................................................................................6-66

    6.13.1 Task Description ............................................................. ................................................................. 6-66

    6.13.2 Procedure .............................................................. ......................................................................... ..6-66

    6.13.3 Verification.......................................................................................................................................6-68

    6.13.4 Additional Information.....................................................................................................................6-68

    6.14 Deleting a 3G External Cell ...................................................................... ................................................ 6-69

    6.14.1 Task Description ............................................................. ................................................................. 6-69

    6.14.2 Procedure .............................................................. ......................................................................... ..6-696.14.3 Verification.......................................................................................................................................6-70

    6.14.4 Additional Information.....................................................................................................................6-70

    7 Maintaining Data .......................................................................................................................7-1

    7.1 Overview of Data Maintenance Operations ...................................................................... ............................7-2

    7.2 Exporting Network Parameters............................................................. ........................................................ 7-2

    7.2.1 Task Description .................................................................... .............................................................. 7-2

    7.2.2 Procedure ....................................................... ...................................................................... ................7-2

    7.2.3 Verification...........................................................................................................................................7-4

    7.2.4 Additional Information.........................................................................................................................7-47.3 Importing Network Parameters ................................................................... .................................................. 7-5

    7.3.1 Task Description .................................................................... .............................................................. 7-5

    7.3.2 Procedure ....................................................... ...................................................................... ................7-5

    7.3.3 Verification...........................................................................................................................................7-6

    7.3.4 Additional Information.........................................................................................................................7-6

    7.4 Configuring Cell Parameters in Batches ............................................................ ...........................................7-7

    7.4.1 Task Description .................................................................... .............................................................. 7-7

    7.4.2 Procedure ....................................................... ...................................................................... ................7-7

    7.4.3 Verification.........................................................................................................................................7-14

  • 7/30/2019 Bsc&Bts Config

    10/337

    Contents

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    x Huawei Technologies Proprietary Issue 03 (2007-05-09)

    7.4.4 Additional Information.......................................................................................................................7-14

    7.5 Backing Up Local Data...............................................................................................................................7-15

    7.5.1 Task Description .................................................................... ............................................................ 7-15

    7.5.2 Procedure ....................................................... ........................................................................ ............7-15

    7.5.3 Verification.........................................................................................................................................7-16

    7.5.4 Additional Information.......................................................................................................................7-16

    7.6 Backing Up GBAM Data ............................................................... ............................................................. 7-16

    7.6.1 Task Description .................................................................... ............................................................ 7-16

    7.6.2 Procedure ....................................................... ........................................................................ ............7-17

    7.6.3 Verification.........................................................................................................................................7-23

    7.6.4 Additional Information.......................................................................................................................7-23

    7.7 Loading and Restoring GBAM Data...........................................................................................................7-24

    7.7.1 Task Description .................................................................... ............................................................ 7-24

    7.7.2 Procedure ....................................................... ........................................................................ ............7-24

    7.7.3 Verification.........................................................................................................................................7-27

    7.7.4 Additional Information.......................................................................................................................7-27

    7.8 Checking Data Consistency and Synchronizing Data.................................................................. ...............7-28

    7.8.1 Task Description .................................................................... ............................................................ 7-28

    7.8.2 Procedure ....................................................... ........................................................................ ............7-28

    7.8.3 Verification.........................................................................................................................................7-31

    7.8.4 .Additional Information ................................................................ .....................................................7-31

    7.9 Formatting SMU Files.................................................................................................................................7-32

    7.9.1 Task Description .................................................................... ............................................................ 7-327.9.2 Procedure ....................................................... ........................................................................ ............7-32

    7.9.3 Verification.........................................................................................................................................7-35

    7.9.4 Additional Information.......................................................................................................................7-35

    7.10 Opening a Local Data File .......................................................................... ..............................................7-35

    7.10.1 Task Description ............................................................. ................................................................. 7-35

    7.10.2 Procedure .............................................................. ......................................................................... ..7-36

    7.10.3 Verification.......................................................................................................................................7-36

    7.10.4 Additional Information.....................................................................................................................7-37

    7.11 Refreshing LMT Data................................................................................................................................7-37

    7.11.1 Task Description...............................................................................................................................7-37

    7.11.2 Procedure ............................................................... .......................................................................... 7-37

    7.11.3 Verification.......................................................................................................................................7-38

    7.11.4 Additional Information.....................................................................................................................7-38

    7.12 Browsing Configuration Data ............................................................ ....................................................... 7-38

    7.12.1 Task Description ............................................................. ................................................................. 7-38

    7.12.2 Procedure .............................................................. ......................................................................... ..7-38

    7.12.3 Verification.......................................................................................................................................7-40

    7.12.4 Additional Information.....................................................................................................................7-40

    7.13 Exporting Equipment Archive Information...............................................................................................7-41

  • 7/30/2019 Bsc&Bts Config

    11/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Contents

    Issue 03 (2007-05-09) Huawei Technologies Proprietary xi

    7.13.1 Task Description ............................................................. ................................................................. 7-41

    7.13.2 Procedure .............................................................. ......................................................................... ..7-41

    7.13.3 Verification.......................................................................................................................................7-42

    7.13.4 Additonal Information......................................................................................................................7-42

  • 7/30/2019 Bsc&Bts Config

    12/337

    Figures

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    xii Huawei Technologies Proprietary Issue 03 (2007-05-09)

    Figures

    Figure 1-1 Online data configuration .................................................................... .............................................1-3

    Figure 1-2 Basic procedure for data configuration.............................................................................................1-5

    Figure 1-3 Login dialog box...............................................................................................................................1-7

    Figure 1-4 BSC Management dialog box...........................................................................................................1-8Figure 1-5 BSC6000 Local Maintenance Terminal window...................................................................... ........1-9

    Figure 1-6 Configuration menu........................................................................................................................1-10

    Figure 1-7 Management Tree tab page.............................................................................................................1-11

    Figure 1-8 BSC Device Panel tab page .................................................................. ..........................................1-12

    Figure 2-1 Choosing Configure BSC Attributes.................................................................................................2-3

    Figure 2-2 Configuring the basic data of the BSC .............................................................. ...............................2-3

    Figure 2-3 Configuring the flow control data.....................................................................................................2-4

    Figure 2-4 Configuring the timer data................................................................................................................2-5

    Figure 2-5 Configuring the software parameters................................................................................................2-6

    Figure 2-6 Configuring the user resource binding..............................................................................................2-7

    Figure 2-7 Configuring the SCCP ..................................................................... ................................................. 2-8

    Figure 2-8 Choosing Configure Line Clock .................................................................... .................................2-10

    Figure 2-9 Configuring the line clock ................................................................... ...........................................2-10

    Figure 2-10 Choosing Configure System Clock...............................................................................................2-12

    Figure 2-11 Configuring the system clock ............................................................. ..........................................2-13

    Figure 2-12 Choosing Configure 8K Reference Clock ...................................................................... ..............2-16

    Figure 2-13 Configuring the GSCU 8K reference clock ................................................................... ...............2-17

    Figure 3-1 Configuring BSC devices ................................................................ ................................................. 3-4

    Figure 3-2 Choosing Add BSC Cabinet .................................................................... .........................................3-5

    Figure 3-3 Adding a cabinet ................................................................ ............................................................... 3-6

    Figure 3-4 Choosing Add Subrack ........................................................... .......................................................... 3-7

    Figure 3-5 Adding a subrack .............................................................. ................................................................ 3-8

  • 7/30/2019 Bsc&Bts Config

    13/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Figures

    Issue 03 (2007-05-09) Huawei Technologies Proprietary xiii

    Figure 3-6 Choosing Configure Subrack-OSP Mapping..................................................................................3-10

    Figure 3-7 Configuring the subrack-OSP mapping .................................................. ........................................ 3-10

    Figure 3-8 Choosing Configure Fan Box Attributes.........................................................................................3-11

    Figure 3-9 Configuring the fan box..................................................................................................................3-12

    Figure 3-10 Choosing Add Power Distribution Box ............................................................. ...........................3-13

    Figure 3-11 Adding a power distribution box...................................................................................................3-14

    Figure 3-12 Choosing Configure Power Distribution Box Attributes .............................................................. 3-15

    Figure 3-13 Configuring the attributes of a power distribution box.................................................................3-16

    Figure 3-14 Choosing Add Board.....................................................................................................................3-18

    Figure 3-15 Adding a board..............................................................................................................................3-18

    Figure 3-16 Choosing Configure Board Attributes (GSCU) ................................................................... .........3-20

    Figure 3-17 Configure Board Attributes dialog box (GSCU)........................................................................... 3-21

    Figure 3-18 Configuring ports (GSCU)............................................................................................................3-21

    Figure 3-19 Choosing Configure Board Attributes (GSCU) ................................................................... .........3-22

    Figure 3-20 Configure Board Attributes dialog box (GSCU)........................................................................... 3-23

    Figure 3-21 Choosing Configure Board Attributes (GXPUM) ............................................................... .........3-23

    Figure 3-22 Configure Board Attributes dialog box (GXPUM).......................................................................3-24

    Figure 3-23 Choosing Configure Board Attributes (GEIUB)........................................................................... 3-25

    Figure 3-24 Configure Board Attributes dialog box (GEIUB)................................................................. ........3-25

    Figure 3-25 Configuring ports (GEIUB)..........................................................................................................3-26

    Figure 3-26 Choosing Configure Board Attributes (GOIUB) .................................................................. ........3-26

    Figure 3-27 Configure Board Attributes dialog box (GOIUB)......................................................................... 3-27

    Figure 3-28 Configuring the attributes of the sub board .......................................................................... ........3-28

    Figure 3-29 Configuring ports (GOIUB)..........................................................................................................3-29

    Figure 3-30 Choosing Configure Board Attributes (GDPUC) ................................................................ .........3-29

    Figure 3-31 Configure Board Attributes dialog box (GDPUC)........................................................................3-30

    Figure 3-32 Configuring DSP attributes...........................................................................................................3-31

    Figure 3-33 Choosing Configure BSC EAC ............................................................ ........................................3-32

    Figure 3-34 Add BSC EAC dialog box.................................................................. ..........................................3-33

    Figure 3-35 Adding a BSC EAC ..................................................................... ................................................. 3-33

    Figure 3-36 Choosing Configure BSC EAC ............................................................ ........................................3-35

    Figure 3-37 Configuring the switches for a BSC EAC ........................................................................... .........3-35

    Figure 3-38 Configuring the BSC EAC analog and alarm threshold ............................................................... 3-36

  • 7/30/2019 Bsc&Bts Config

    14/337

    Figures

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    xiv Huawei Technologies Proprietary Issue 03 (2007-05-09)

    Figure 3-39 Choosing Delete BSC EAC............................................................ .............................................. 3-37

    Figure 3-40 Deleting a BSC EAC ....................................................... ............................................................. 3-37

    Figure 3-41 Choosing Delete Board.................................................................................................................3-39

    Figure 3-42 Deleting a board............................................................................................................................3-39

    Figure 3-43 Choosing Delete Power ...................................................... .......................................................... 3-40

    Figure 3-44 Deleting a power distribution box.................................................................................................3-41

    Figure 3-45 Choosing Delete Subrack..............................................................................................................3-42

    Figure 3-46 Deleting a subrack ........................................................... ............................................................. 3-43

    Figure 3-47 Choosing Delete Cabinet ............................................................... ............................................... 3-44

    Figure 3-48 Deleting a cabinet ........................................................... .............................................................. 3-44

    Figure 3-49 Checking cabinet attributes...........................................................................................................3-46

    Figure 3-50 Checking subrack attributes..........................................................................................................3-47

    Figure 3-51 GDPUC attributes.........................................................................................................................3-48

    Figure 3-52 Checking the attributes of a power distribution box................................................................. ....3-50

    Figure 3-53 Checking fan box attributes ............................................................................ ..............................3-51

    Figure 4-1 Choosing Configure SS7 Signaling Point.........................................................................................4-3

    Figure 4-2 OSP tab page.....................................................................................................................................4-3

    Figure 4-3 Adding an OSP .................................................. ........................................................... ....................4-4

    Figure 4-4 DSP tab page.....................................................................................................................................4-6

    Figure 4-5 Adding an DSP .................................................. ........................................................... ....................4-6

    Figure 4-6 STP tab page.....................................................................................................................................4-8

    Figure 4-7 Adding an STP..................................................................................................................................4-8

    Figure 4-8 Choosing Configure Subrack Communication Link.......................................................................4-10

    Figure 4-9 Configuring the subrack communication link.................................................................................4-11

    Figure 4-10 Add Subrack Communication Link dialog box.............................................................................4-11

    Figure 4-11 Choosing Configure Ater Connection Path...................................................................................4-13

    Figure 4-12 Configure Ater Connection Path dialog box.................................................................................4-14

    Figure 4-13 Adding an Ater connection path....................................................................................................4-14

    Figure 4-14 Choosing Add Ater OML..............................................................................................................4-17

    Figure 4-15 Configure Ater OML dialog box...................................................................................................4-17

    Figure 4-16 Adding an Ater OML................................................................ .................................................... 4-18

    Figure 4-17 Choosing Delete Ater OML..........................................................................................................4-20

    Figure 4-18 Configure Ater OML dialog box...................................................................................................4-20

  • 7/30/2019 Bsc&Bts Config

    15/337

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide Figures

    Issue 03 (2007-05-09) Huawei Technologies Proprietary xv

    Figure 4-19 Choosing Modify Ater OML .................................................................... ....................................4-22

    Figure 4-20 Configure Ater OML dialog box...................................................................................................4-22

    Figure 4-21 Modifying the Ater OML..............................................................................................................4-23

    Figure 4-22 Choosing Add Ater Signaling Link...............................................................................................4-25

    Figure 4-23 Add Ater Signaling Linkdialog box .................................................................... .........................4-26

    Figure 4-24 Adding an Ater signaling link ......................................................................... ..............................4-27

    Figure 4-25 Added Ater signaling link ..................................................................... ........................................4-28

    Figure 4-26 Choosing Delete Ater Signaling Link.................................................................... .......................4-29

    Figure 4-27 Deleting an Ater signaling link ................................................................. ....................................4-30

    Figure 4-28 Choosing Configure A Interface E1..............................................................................................4-32

    Figure 4-29 Configure A Interface E1 dialog box ..................................................................... .......................4-32

    Figure 4-30 Adding an E1 on the A interface .................................................................. .................................4-33

    Figure 4-31 Configuring the CIC attributes ................................................................. ....................................4-34

    Figure 4-32 Choosing Configure SS7 Signaling Link......................................................................................4-36

    Figure 4-33 Configure SS7 Signaling Link dialog box .................................................................... ................4-37

    Figure 4-34 Adding an SS7 signaling link........................................................................................................4-38

    Figure 4-35 MTP3 tab page..............................................................................................................................4-39

    Figure 4-36 Choosing Configure PCU.............................................................. ............................................... 4-41

    Figure 4-37 Configure PCU dialog box .......................................................... ................................................. 4-42

    Figure 4-38 Adding a PCU...............................................................................................................................4-42

    Figure 4-39 Choosing Configure Pb Interface E1 ............................................................................ ................4-44

    Figure 4-40 Configure Pb Interface E1dialog box ................................................................. .........................4-45

    Figure 4-41 Configuring the attributes of the E1 on the Pb interface...............................................................4-45

    Figure 4-42 Configuring the CIC attributes ................................................................. ....................................4-47

    Figure 4-43 Choosing Configure Pb Signaling Link........................................................................................4-48

    Figure 4-44 Configure Pb Signaling Link dialog box .................................................................. ....................4-49

    Figure 4-45 Adding a Pb signaling link............................................................................................................4-50

    Figure 4-46 Choosing Configure Semipermanent Link ........................................................................ ...........4-52

    Figure 4-47 Configure Semipermanent Link dialog box..................................................................................4-53

    Figure 4-48 Adding a semipermanent link ................................................................. ......................................4-53

    Figure 5-1 Choosing Add Site (1) .................................................................... .................................................. 5-5

    Figure 5-2 Choosing Add Site (2) .................................................................... .................................................. 5-5

    Figure 5-3 Add Site dialog box .......................................................... ................................................................ 5-6

  • 7/30/2019 Bsc&Bts Config

    16/337

    Figures

    HUAWEI BSC6000 Base Station Controller

    Data Configuration Guide

    xvi Huawei Technologies Proprietary Issue 03 (2007-05-09)

    Figure 5-4 Add Site dialog box .......................................................... ................................................................ 5-6

    Figure 5-5 Setting parameters .................................................................. .......................................................... 5-7

    Figure 5-6 Added BTS in the Site View box .................................................................. ....................................5-8

    Figure 5-7 Updated information in the Add Site dialog box .................................................................... ..........5-9

    Figure 5-8 Adding a cell.....................................................................................................................................5-9

    Figure 5-9 Added cell in the Cell View box ........................................................................ .............................5-10

    Figure 5-10 Configuring cell attributes ................................................................. ........................................... 5-11

    Figure 5-11 Set Cell Attributes dialog box...................


Recommended