+ All Categories
Home > Documents > BSR Final

BSR Final

Date post: 15-Apr-2017
Category:
Upload: gishan-sanjeewa
View: 213 times
Download: 1 times
Share this document with a friend
41
230458122.xls.ms_office/cover 1/41 BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR BSR MAHO. BSR BUILDING SCHEDULE OF RATES P.M. JAYANTHA KIRIMETIYAWA "SHAMALEE BRIDAL & DESIGNS" IHALAGAMA ROAD KIRIMETIYAWA
Transcript
Page 1: BSR Final

230458122.xls.ms_office/cover 1/41

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR

BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

BSR BSR BSR BSR

BSR BSR BSR BSR

BSR BSR BSR BSR

BSR BSR BSR BSR

BSR BSR BSR BSR

BSR BSR BSR BSR BSR BSR BSR BSR BSR

MAHO.

BSR

BUILDING SCHEDULE OF RATES

P.M. JAYANTHA KIRIMETIYAWA

"SHAMALEE BRIDAL & DESIGNS"

IHALAGAMA ROAD

KIRIMETIYAWA

Page 2: BSR Final

\\vboxsrv\conversion_tmp\scratch_1\230458122.xls.ms_office230458122.xls.ms_office 2/41

INTRODUCTORY NOTES

1 EXCAVATION

2 ANTI TERMITE TREATEMENT

3 EARTH WORK

4 EARTH WORK SUPPORT

5 CONCRETE

6 TIMBER FORMWORK

7 STEEL REINFORCEMENT

8 BRICK WORK

9 HOLLOW BLOCK MASONARY

10 RANDOME RUBBLE MASONARY

11 PRESSED TILING

12 WALL TILING & TERRAZZO TILES

13 ROOFING

14 ROOF PLUMBING

15 CEILING

16 DOORS & WINDOWS

17 IRONMONGERY

18 PLASTERING

19 PAINTING & DECORATING

20 PLUMBING-PVC

21 EXTERNAL DRAINAGE

22 PLUMBING-CI

23 MANHOLE & GULLEYS

24 SANITORY FITTINGS

25 GUTTERS & DOWNPIPES

CONTENTS PAGE No.I N D E X

Page 3: BSR Final

230458122.xls.ms_office NOTE-1 3/41

-01-

NOTE

MARK-UP OF 35% ON BASIC RATES AS OVERHEAD & PROFIT ALLOWANCE

THE RATES IN THIS BSR ANALYSIS ARE THE BASIC RATES

THIS RATE IS COMPOUNDED TAKING IN TO ACCOUNT,

1.THE MARKET PRICE ON THE MATERIALS THAT MAKE UP THE ITEM OF WORK.

2.THE COST OF TRANSPORT OF EACH MATERIAL TO THE SITE

3.THE WEGES OF THE LABOUR RWQUIRED IN CARRYING-OUT THE WORK, AND

4.THE COST OF ANY PLANT REQUIRED.

IN CARRYIN-OUT A WORK, BESIDES THE BASIC COST,THERE ARE OTHER COSTS THAT HAVE TO BE INCURRED BY THE

CONTRACTOR. THIS COSTS CANNOT BE CONSIDERED AS DIRECT PRODUCTIVE WORK.THIS COSTS CANNOT BE

CALCULATED IN TERMS OF MATERIALS & LABOUR COST ARE TERMED AS OVERHEADS ON A JOB. AND, CAN BE

GROUPED UNDER MAIN SUB HEADS THUS...

1. JOB-OVERHEAD S - THAT VARY WITH AND ARE COUSED DIRECTLY TO THE INDIVIDUAL JOB.

2.GENERAL OVERHEAD - WIHICH INCLUDE COSTS OF MAINTAINING AN OFFICE,WORK SHOP & YARD IN WHICH TO

DO BUSINESS WHETHER OR NOT THERE IS A JOB UNDER WAY & SUCH EXPENSES ARE CONTINUOUS & MAY BE

SHARED BY THE JOB TURNOVER.

THE COMMON ITEM THAT MAKE UP THIS OVERHEADS ARE LISTED IN IN NEXT PAGES OF THE ANALYSIS. THE

OVERHEAD ITEM INVILVED IN A JOB IS ASSESSED AS A PERCENTAGE OF THE BASIC COST OF THE JOB.THESE

PRCENTAGES HAVE BEEN ARRIVED AT FROM RECORDS OF EXPENDITURE INCURRED IN SUCH ACTIVITIES OVER A

PERIOD OF TIME.

FROM THE DETAILS IN NEXT PAGES IT WILL BE SEEN THAT THE JOB OVERHEADS IS ABOUT 25% OF THE BASIC COST

OF THE WORK.

PROFIT

10% OF THE BASIC COST IS ALLOWD AS PROFIT ANDTOTAL MARK-UP OF THE BASIC COST IS 35%.

(25% FOR JOB OVERHEAD + 10% FOR PROFITS)

THUS IT WILL BE SEEN THAT ON THE BASIC COST OF A WORK , A CONTRACTOR IS ALLOWED A MARK-UP OF 35% OF

WHICH 25% IS IS THE COST OF SERVICING THE CONTRACT AND, 10% AS CONTRACTO'R PROFIT.

IT WILL BE SEEN THAT THE 25% OVERHEADS IS MADE UP OF 19% AS JOB OVERHEADS & 6% AS GENERAL

OVERHEADS.

THE JOB OVERHEADS ARE INCURRED AT THE SITE & ARE APPLICABLE TO TO ALL CLASSES OF CONTRACTORS.

THE GENARAL OVERHEADS HOWEVER , WILL DIPEND ON THE SIZE OF THE CONTRACTORS ORGANISATION AND

THE FACILITIES MAINTAINED BY THE ORGANISATION.

THUS ANY REDUCTION IN THE OVERHEADS ALLOWANCE TO A CONTRACTOR COULD ONLY WITHIN THIS 6% AS

GENERAL OVERHEADS & THAT ANY REDUCTION WILL BE MARGINAL.

Page 4: BSR Final

230458122.xls.ms_office NOTE-1 4/41

-02-

THIS COMMITTEE IS OF THE OPINION THAT ALL CONTRACTORS(IRRESPECTIVE OF SIZE OF THERE ORGANISATION)

SHOULD BE ALLOWED A MARK-UP OF 35% ON THE BASIC COST AS OVERHEADS & PROFIT ALLOWANCE.

ORIGINALY THIS MINISTRY HAD SAID THE MARK-UP AS 30% (IN 1.78) AND ON REPRESENTATION MADE, IT WAS

INCREASED TO 35%(IN THE YEAR 1979-1980) & LATER IT WAS REDUCED TO 25% AND AGAIN TO 22% ETC. WE

BELIEVE THAT THIS WAS ONE OF THE…………………… OF THE DETERIORATION OF THE STANDARD OF BUILDING WORK.

IN ORDER TO ENSURE QUALITY & STRICT COMPLIANCE WITH SPECIFICATION, THE COMMITTEE RECOMMENDED

35% MARK-UP ON THE BASIC RATES.

Page 5: BSR Final

230458122.xls.ms_officeNOTE-2 5/41

MATERIAL & LABOUR ANALYSIS FOR BUILDING WORK

ANALYSIS FOR BASIC RATES

THE MATERIAL & LABOUR COMPORNENT REQUIRED FOR THE VARIOUS ITEM OF WORK INCUDING THE MINIMAL

PLANT REQUIRED FOR SAME IS DETAILED IN THE ANALYSIS OF THE BASIC RATES WHICH HAVE BEEN INCLUDED IN

THE FOLLOWING PAGES.

BASIC RATE

THE BASIC RATE IS ANALYSED UNDER THE FOLLOWING HEADINGS.

(A)- MATERIALS

THE QUANTITIES OF MATERIAL REQUIRED FOR THE ITEMS ARE COMPUTED FROM KNOWN DATA & EXPERIENCE.

THEIR TOTAL VALUE IS CALCULATED ON THE BASIC OF CURRENT COST OF PURCASE AT SOURCES OF SUPPLY.

UNLESS OTHERWISE STATED WESTAGE IS ALLOWED IN THE NORMS.

Page 6: BSR Final

230458122.xls.ms_office 230458122.xls.ms_office/EXCAVATION 6/41

EXCAVATION

PER SQUARE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 10.00 DAYS 650.00 6,500.00

RATE PER 10 SQUARE 6,500.00

650.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 0.63 DAYS 650.00 406.25

406.25

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00

650.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 2.25 DAYS 650.00 1,462.50

RATE PER 1 CUBE 1,462.50

1,462.50

REMOVING TOP SOIL TO A DEPTH NOT EXCEEDING 6" & DEPOSITTING AS DIRECTED WITHIN SITE001

CONSIDER AN AREA OF 10.00 SQRS. OR 5.00 CUBES OF EXCAVATION

RATE PER 1 CUBE

003

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOFT/LOOSE SOIL FROM 0'-00" TO 5'-00"

DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK

SUPPORT TO BE PAID SEPARATELY WHERE NECESSARY)

RATE PER 01 SQUARE

002EXCAVATION OVER SITE REDUCED LEVEL, IN ANY MATERIAL EXCEPT ROCK REQUIRING BLASTING

INCLUDING DEPOSITING & LEVELING AS DIRECTED UP TO DISTANCE NOT EXCEEDING 30'-00"

RATE PER 1 CUBE

RATE PER 1 CUBE

004EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN ORDINARY SOIL FROM 0'-00" TO 5'-00" DEEP

& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

Page 7: BSR Final

230458122.xls.ms_office 230458122.xls.ms_office/EXCAVATION 7/41

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 3.50 DAYS 650.00 2,275.00

RATE PER 1 CUBE 2,275.00

2,275.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 3.00 DAYS 650.00 1,950.00

RATE PER 1 CUBE 1,950.00

1,950.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 2.50 DAYS 650.00 1,625.00

RATE PER 1 CUBE 1,625.00

1,625.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

BLASTING POWDER 0.75 lbs. 650.00 487.50

FUSE 10.00 l.Ft. 60.00 600.00

JUMPER STEEL 1.00 lbs. 150.00 150.00

FUEL & FORGE (20% OF MATE.COST) 247.50

SKILLED LABOURER 1.00 DAYS 1,000.00 1,000.00

UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00

RATE PER 1 CUBE 3,785.00

3,785.00

005EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD/DENSE SOIL FROM 0'-00" TO 5'-00"

DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

RATE PER 1 CUBE

007EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOPFT DISTINTEGRATED ROCK UP TO DEPTH

OF 5'-00"& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

RATE PER 1 CUBE

006

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN MUD/WET SOIL FROM 0'-00" TO 5'-00" DEEP

& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK

SUPPORT & DEWATERINGTO BE PAID SEPARATELY WHERE NECESSARY)

RATE PER 1 CUBE

RATE PER 1 CUBE

008EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD ROCK UP TO DEPTH OF 5'-00"&

DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

Page 8: BSR Final

230458122.xls.ms_officeBACKFILL 8/41BACKFILLING & COMPACTING

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00

RATE PER 01 CUBE 650.00

650.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

IMPORTED MATERIAL 1.00 CUBE 150.00 150.00

ALLOW FOR 15% FOR

COMPACTION0.15 CUBE 150.00 22.50

-

LABOURE

UN-SKILLED LABOURER 1.25 DAY 600.00 750.00

RATE PER 1 CUBE 922.50

922.50

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00

RATE PER 01 CUBE 1,300.00

1,300.00

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

IMPORTED MATERIAL 1.00 CUBE 150.00 150.00

ALLOW FOR 15% FOR

COMPACTION0.15 CUBE 150.00 22.50

-

LABOURE

UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00

RATE PER 1 CUBE 1,372.50

1,372.50

RATE PER 1 CUBE

013FILLING UNDER FLOORS INCLUDING LEVELING,WATERING & COMPACTING IN 3" LAYERS

WITH AVAILABLE & SELECTED EARTH AT SITE.

011 BACKFILLING TO TRENCH WITH SELECTED EARTH AVAILABLE AT SITE

RATE PER 01 CUBE

012 BACKFILLING TO TRENCH WITH IMPORTED MATERIAL

RATE PER 01 CUBE

014FILLING UNDER FLOORS INCLUDING LEVELING,WATERING & COMPACTING IN 3" LAYERS

WITH IMPORTED & SELECTED EARTH .

RATE PER 1 CUBE

Page 9: BSR Final

230458122.xls.ms_officeCONCRETE 9/41

CONCRETE019

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CEMENT 13.00 50kg BAGS 760.00 9,880.00

SAND 0.53 CUBE 6,500.00 3,445.00

1-1/2" METAL 0.92 CUBE 6,000.00 5,520.00

WATER 110.00 GALs. 15.00 1,650.00

MACHINARY

CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00

LABOURE

SKILLED LABOURER 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00

25,395.00

25,395.00

8,973.50

NOTE A. WATER AVAILABLE AT SITE

B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER

C. SAND-INCLUDES 15% FOR BULKING

020

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CEMENT 14.00 50kg BAGS 760.00 10,640.00

SAND 0.60 CUBE 6,500.00 3,900.00

1-1/2" METAL 0.90 CUBE 6,500.00 5,850.00

WATER 110.00 GALs. 15.00 1,650.00

MACHINARY

CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00

LABOURE

SKILLED LABOURER 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00

26,940.00

26,940.00

9,519.43

NOTE A. WATER AVAILABLE AT SITE

B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER

C. SAND-INCLUDES 15% FOR BULKING

021

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CEMENT 18.00 50kg BAGS 760.00 13,680.00

SAND 0.50 CUBE 6,500.00 3,250.00

1-1/2" METAL 0.88 CUBE 7,000.00 6,160.00

WATER 120.00 GALs. 15.00 1,800.00

MACHINARY

CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00

LABOURE

SKILLED LABOURER 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00

29,790.00

29,790.00

10,526.50

NOTE A. WATER AVAILABLE AT SITE

B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER

C. SAND-INCLUDES 15% FOR BULKING

MIXING COPNCRETE 1:2-1/2:5(1")

RATE PER 1 CUBE

RATE PER 1 CUBE

RATE PER 1 m3

MIXING COPNCRETE 1:3:6(1-1/2")

RATE PER 1 CUBE

RATE PER 1 m3

RATE PER 1 CUBE

MIXING COPNCRETE 1:2:4(3/4")

RATE PER 1 CUBE

RATE PER 1 CUBE

RATE PER 1 m3

Page 10: BSR Final

230458122.xls.ms_officeCONCRETE 10/41

022

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CEMENT 23.00 50kg BAGS 760.00 17,480.00

SAND 0.42 CUBE 6,500.00 2,730.00

1-1/2" METAL 0.82 CUBE 7,000.00 5,740.00

WATER 150.00 GALs. 15.00 2,250.00

MACHINARY

CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00

LABOURE

SKILLED LABOURER 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00

33,100.00

33,100.00

11,696.11

NOTE A. WATER AVAILABLE AT SITE

B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER

C. SAND-INCLUDES 15% FOR BULKING

023

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CEMENT 31.00 50kg BAGS 760.00 23,560.00

SAND 0.44 CUBE 6,500.00 2,860.00

1-1/2" METAL 0.96 CUBE 7,000.00 6,720.00

WATER 200.00 GALs. 15.00 3,000.00

MACHINARY

CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00

LABOURE

SKILLED LABOURER 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00

41,040.00

41,040.00

14,501.77

NOTE A. WATER AVAILABLE AT SITE

B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER

C. SAND-INCLUDES 15% FOR BULKING

024

PER SQUARE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.17 CUBE 21,695.00 3,615.83

ADD FOR WASTAGE 15% 542.38

LABOURE

SKILLED LABOURER 0.13 DAY 900.00 112.50

UN-SKILLED LABOURER 0.50 DAY 600.00 300.00

4,570.71

NOTE:-

025

PER SQUARE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.25 CUBE 21,695.00 5,423.75

ADD FOR WASTAGE 10% 542.38

LABOURE

SKILLED LABOURER 0.13 DAY 900.00 112.50

UN-SKILLED LABOURER 0.75 DAY 600.00 450.00

6,528.63

MIXING COPNCRETE 1:1-1/2:3(3/4")

RATE PER 1 CUBE

RATE PER 1 CUBE

RATE PER 1 m3

MIXING COPNCRETE 1:12(3/4")

RATE PER 1 CUBE

RATE PER 1 CUBE

RATE PER 1 m3

2" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"

RATE PER 1 SQUARE

FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/6 DAY UNSKILLED LABOURER FOR EACH

ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.

3" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"

RATE PER 1 SQUARE

Page 11: BSR Final

230458122.xls.ms_officeCONCRETE 11/41

NOTE:-

026

PER SQUARE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.50 CUBE 21,695.00 10,847.50

ADD FOR WASTAGE 5% 542.38

LABOURE

SKILLED LABOURER 0.50 DAY 900.00 450.00

UN-SKILLED LABOURER 1.25 DAY 600.00 750.00

12,589.88

NOTE:-

B. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

027

PER 0.45 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.45 CUBE 25,290.00 11,380.50

ADD FOR WASTAGE 10% 1,138.05

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

CURING

JUTE HESSIAN 10.00 SQ.FT. 25.00 250.00

WATER 170.00 GALS. 15.00 2,550.00

UN-SKILLED LABOURER 1.00 DAY 600.00 600.00

20,418.55

45,374.56

16,033.41

NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.

B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.

C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.

E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

028

PER 0.45 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.45 CUBE 25,290.00 11,380.50

ADD FOR WASTAGE 10% 1,138.05

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

CURING

JUTE HESSIAN 80.00 SQ.FT. 25.00 2,000.00

WATER 140.00 GALS. 15.00 2,100.00

UN-SKILLED LABOURER 0.50 DAY 600.00 300.00

21,418.55

47,596.78

16,818.65

NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.

B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.

C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.

E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/4 DAY UNSKILLED LABOURER FOR EACH

ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.

6" TK. CEMENT CONCRETE FLOOR(MASS CONCRETE)

RATE PER 1 SQUARE

A.WATER AVAILABLE AT SITE

CEMENT CONCRETE IN 4.5"X6" COLUMNS IN GROUND FLOOR

RATE PER 0.45 CUBE

RATE PER 1.00 CUBE

D.WATER AVAILABLE AT SITE

CEMENT CONCRETE IN 6"X6" COLUMNS IN GROUND FLOOR

RATE PER 0.45 CUBE

RATE PER 1.00 CUBE

D.WATER AVAILABLE AT SITE

RATE PER 1 m3

RATE PER 1 m3

CO

NSI

DER

24

No

s. C

OLU

MN

S, 4

.5"X

6"

EAC

H 1

0'-

00

" H

IGH

.(0

.45

CU

BE)

CO

NSI

DER

18

No

s. C

OLU

MN

S, 6

"X6

" EA

CH

10

'-0

0"

HIG

H.(

0.4

5C

UB

E)

Page 12: BSR Final

230458122.xls.ms_officeCONCRETE 12/41

029

PER 0.45 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.45 CUBE 25,290.00 11,380.50

ADD FOR WASTAGE 10% 1,138.05

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

CURING

JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00

WATER 100.00 GALS. 15.00 1,500.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

20,918.55

46,485.67

16,426.03

NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.

B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.

C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.

E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

030

PER 0.50 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.50 CUBE 25,290.00 12,645.00

ADD FOR WASTAGE 5% 632.25

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

CURING

JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00

WATER 100.00 GALS. 15.00 1,500.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

22,177.25

44,354.50

15,672.97

NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.

B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.

C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.

E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

031

PER 0.51 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.51 CUBE 25,290.00 12,897.90

ADD FOR WASTAGE 5% 644.90

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

RATE PER 0.50 CUBE

RATE PER 1.00 CUBE

CEMENT CONCRETE IN 9"X9" COLUMNS IN GROUND FLOOR

RATE PER 0.45 CUBE

RATE PER 1 m3

D.WATER AVAILABLE AT SITE

CO

NSI

DER

5N

os.

CO

LUM

NS,

12

"X1

2"

EAC

H 1

0'-

00

" H

IGH

.C

ON

SID

ER 8

No

s. C

OLU

MN

S, 9

"X9

" EA

CH

10

'-0

0"

HIG

H.(

0.4

5C

UB

E)

RATE PER 1.00 CUBE

RATE PER 1 m3

D.WATER AVAILABLE AT SITE

CEMENT CONCRETE IN 12"X12" COLUMNS IN GROUND FLOOR

CEMENT CONCRETE IN 13.5"X13.5" COLUMNS IN GROUND FLOOR

CO

NSI

DER

4N

os.

CO

LUM

NS,

13

.5"X

13

.5"

EAC

H 1

0'-

00

"

HIG

H.(

0.5

1C

UB

E)

Page 13: BSR Final

230458122.xls.ms_officeCONCRETE 13/41

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

CURING

JUTE HESSIAN 45.00 SQ.FT. 25.00 1,125.00

WATER 100.00 GALS. 15.00 1,500.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

22,567.80

44,250.58

15,636.25

NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.

B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.

C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.

E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

032

PER 0.45 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.45 CUBE 25,290.00 11,380.50

ADD FOR WASTAGE 10% 1,138.05

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 90.00 SQ.FT. 25.00 2,250.00

WATER 180.00 GALS. 15.00 2,700.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

24,468.55

54,374.56

19,213.62

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

033

PER 0.45 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.45 CUBE 25,290.00 11,380.50

ADD FOR WASTAGE 10% 1,138.05

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 75.00 SQ.FT. 25.00 1,875.00

WATER 150.00 GALS. 15.00 2,250.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

23,643.55

52,541.22

18,565.80

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

034

PER 0.45 CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 0.45 CUBE 25,290.00 11,380.50

ADD FOR WASTAGE 10% 1,138.05

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

D.WATER AVAILABLE AT SITE

CEMENT CONCRETE IN 6"X6" BEAMS 1st FLOOR LEVEL

CO

NSI

DER

18

0 L

.FT.

OF

BEA

MS

6"X

6".

(0.4

5C

UB

E)

RATE PER 0.45 CUBE(180L.FT.)

RATE PER 1.00 CUBE

RATE PER 1 m3

CO

NSI

DER

4N

os.

CO

LUM

NS,

13

.5"X

13

.5"

EAC

H 1

0'-

00

"

HIG

H.(

0.5

1C

UB

E)

RATE PER 0.50 CUBE

RATE PER 1.00 CUBE

RATE PER 1 m3

CEMENT CONCRETE IN 9"X6" BEAMS 1st FLOOR LEVEL

CO

NSI

DER

12

0 L

.FT.

OF

BEA

MS

9"X

6".

(0.4

5C

UB

E)

RATE PER 0.45 CUBE(120L.FT.)

RATE PER 1.00 CUBE

RATE PER 1 m3

CEMENT CONCRETE IN 9"X9" BEAMS 1st FLOOR LEVEL

CO

NSI

DER

80

L.F

T. O

F B

EAM

S 9

"X9

".(0

.45

CU

BE)

Page 14: BSR Final

230458122.xls.ms_officeCONCRETE 14/41

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00

WATER 120.00 GALS. 15.00 1,800.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

22,818.55

50,707.89

17,917.98

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

035

PER 50 CU.FT.

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 50.00 CU.FT. 252.90 12,645.00

ADD FOR WASTAGE 10% 1,264.50

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 30.00 SQ.FT. 25.00 750.00

WATER 90.00 GALS. 15.00 1,350.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

23,009.50

460.19

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

036

PER 50 CU.FT.

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 50.00 CU.FT. 252.90 12,645.00

ADD FOR WASTAGE 10% 1,264.50

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 25.00 SQ.FT. 25.00 625.00

WATER 90.00 GALS. 15.00 1,350.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

22,884.50

457.69

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

037

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 45.00 CU.FT. 252.90 11,380.50

ADD FOR WASTAGE 10% 1,138.05

CO

NSI

DER

80

L.F

T. O

F B

EAM

S 9

"X9

".(0

.45

CU

BE)

RATE PER 0.45 CUBE(80L.FT.)

RATE PER 1.00 CUBE

RATE PER 1 m3

CO

NSI

DER

5"

TK. S

LAB

10

'-0

0"X

12

'-0

0",

VO

LUM

E O

F

CO

NC

RET

E 5

0.0

0 C

U. F

T.

RATE PER 50 CU.FT.(120 SQ.FT.)

RATE PER 1.00 CU.FT.

CEMENT CONCRETE IN 4.5"X6" LINTOLS IN GROUYND FLOOR

CO

NSI

DER

24

0 L

.FT.

(4

5 C

U…

FT.)

5" TK. R.C.C. FLOOR SLAB IN 1st FLOOR

6" TK. R.C.C. FLOOR SLAB IN 1st FLOORC

ON

SID

ER 6

" TK

. SLA

B 1

0'-

00

"X1

0'-

00

" P

AN

EL,

VO

LUM

E O

F C

ON

CR

ETE

50

.00

CU

. FT.

RATE PER 50 CU.FT.(100 SQ.FT.)

RATE PER 1.00 CU.FT.

Page 15: BSR Final

230458122.xls.ms_officeCONCRETE 15/41

ADD FOR WASTAGE 10% 113.81

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 10.00 SQ.FT. 25.00 250.00

WATER 90.00 GALS. 15.00 1,350.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

21,232.36

471.83

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

038

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 45.00 CU.FT. 252.90 11,380.50

ADD FOR WASTAGE 10% 1,138.05

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00

WATER 90.00 GALS. 15.00 1,350.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

22,368.55

497.08

279.61

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

039

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 45.00 CU.FT. 252.90 11,380.50

ADD FOR WASTAGE 10% 1,138.05

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 55.00 SQ.FT. 25.00 1,375.00

WATER 90.00 GALS. 15.00 1,350.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

22,243.55

494.30

370.73

RATE PER 45 CU.FT.(240 L.FT.)

RATE PER 1.00 CU.FT.

CO

NSI

DER

24

0 L

.FT.

(4

5 C

U…

FT.)

CEMENT CONCRETE IN 9"X9" LINTOLS IN GROUYND FLOOR

RATE PER 45 CU.FT.(80 L.FT.)

RATE PER 1.00 CU.FT.

CEMENT CONCRETE IN 9"X12" LINTOLS IN GROUYND FLOOR

RATE PER 45 CU.FT.(60L.FT.)

RATE PER 1.00 CU.FT.

RATE PER 01 L.FT.

CO

NSI

DER

60

L.F

T. (

45

CU

…FT

.)RATE PER 01 L.FT.

CO

NSI

DER

80

L.F

T. (

45

CU

…FT

.)

Page 16: BSR Final

230458122.xls.ms_officeCONCRETE 16/41

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

040

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

MATERIALS

CONCRETE 45.00 CU.FT. 252.90 11,380.50

ADD FOR WASTAGE 10% 1,138.05

MACHINARY

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00

LABOURE

MASON 1.00 DAY 900.00 900.00

CARPENTER 1.00 DAY 900.00 900.00

SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

CURING

JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00

WATER 90.00 GALS. 15.00 1,350.00

UN-SKILLED LABOURER 1.50 DAY 600.00 900.00

21,868.55

485.97

607.46

NOTE:- A. WATER AVAILABLE AT SITE

B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

RATE PER 1.00 CU.FT.

RATE PER 01 L.FT.

CO

NSI

DER

36

L.F

T. (

45

CU

…FT

.)

CEMENT CONCRETE IN 12"X15" LINTOLS IN GROUYND FLOOR

RATE PER 45 CU.FT.(36 L.FT.)

Page 17: BSR Final

230458122.xls.ms_officeCONCRETE 17/41

MIXING COPNCRETE 1:2-1/2:5(1")

MIXING COPNCRETE 1:3:6(1-1/2")

MIXING COPNCRETE 1:2:4(3/4")

Page 18: BSR Final

230458122.xls.ms_officeCONCRETE 18/41

MIXING COPNCRETE 1:1-1/2:3(3/4")

MIXING COPNCRETE 1:12(3/4")

2" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"

3" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"

Page 19: BSR Final

230458122.xls.ms_officeCONCRETE 19/41

6" TK. CEMENT CONCRETE FLOOR(MASS CONCRETE)

CEMENT CONCRETE IN 4.5"X6" COLUMNS IN GROUND FLOOR

CEMENT CONCRETE IN 6"X6" COLUMNS IN GROUND FLOOR

Page 20: BSR Final

230458122.xls.ms_officeCONCRETE 20/41

CEMENT CONCRETE IN 9"X9" COLUMNS IN GROUND FLOOR

CEMENT CONCRETE IN 12"X12" COLUMNS IN GROUND FLOOR

CEMENT CONCRETE IN 13.5"X13.5" COLUMNS IN GROUND FLOOR

Page 21: BSR Final

230458122.xls.ms_officeCONCRETE 21/41

CEMENT CONCRETE IN 6"X6" BEAMS 1st FLOOR LEVEL

CEMENT CONCRETE IN 9"X6" BEAMS 1st FLOOR LEVEL

CEMENT CONCRETE IN 9"X9" BEAMS 1st FLOOR LEVEL

Page 22: BSR Final

230458122.xls.ms_office FORM WORK 22/41

FORM WORK

041

PER SQ.FT.

(a).MAKING MOULD

1.MATERIALS

1" TK. CLASS II TIMBER 18.15 SQ.FT. 75 1,361.25

2"X2" CLASS II TIMBER FOR YOKES 17.1 L.FT. 25 427.50

2"X1" CLASS II TIMBER FOR BATTENS 16.12 L.FT. 16 257.92

WIRE NAILS 0.75 kgs. 110 82.50

2.FABRICATIONS

LABOURE

CARPENTER 0.50 DAY 900.00 450.00

UN-SKILLED LABOURER 0.50 DAY 600.00 300.00

TOTAL COST 2,879.17

ALLOW IN 4 USES COST 2,879.17

ALLOW IN 4 USES COST OF MOULD PER USE A 719.79

(b). ASSEMBLING(PER USE)

1.MATERIALS

16mmX18" LONG BOLTS(20 USE) 12 Nos. 18.5 222.00

MOULD OIL 0.5 Lts. 160 80.00

4"X2" PROPS 35 L.FT. 33 1,155.00

LABOURE

CARPENTER 0.25 DAY 900.00 225.00

UN-SKILLED LABOURER 0.25 DAY 600.00 150.00

COST OF ASSEMBLING PER USE B 1,832.00

©. DESMANTELING,CLEANING & REPAIRING(PER USE)

LABOURE

CARPENTER 0.25 DAY 900.00 225.00

UN-SKILLED LABOURER 0.25 DAY 600.00 150.00

COST OF DESMANTELING (PER USE) C 375.00

TOTAL COST PER USE 2,926.79

2,926.79

SAWN TIMBER FORM WORK TO 9"X9" CEMENT CONCRETE COLUMN IN GROUND FLOOR

CO

NSI

DER

CO

LUM

N L

ENG

TH O

F 5

'-0

0"

C

ON

CR

ETE

AR

EA 1

5.0

0 S

Q.F

T.

A+B+C

RATE PER SQUARE

Page 23: BSR Final

230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 23/41

BRICK WORK045 BRICK WORK IN CEMENT-SAND 1:5 IN FOUNDATION UP TO DPC

PER CUBE

MATERIALS

BRICKS 1450 Nos. 6.50 9,425.00

WASTAGE 5% 471.25

CEMENT/50kg 4 Bgs. 840.00 3,360.00

SAND 0.25 CUBE 5,500.00 1,375.00

WATER 150 GALs. 15.00 2,250.00

LABOURE

MASON 3.00 DAY 900.00 2,700.00

UN-SKILLED LABOURER 4 DAY 600.00 2,400.00

21,981.25

046 BRICK WORK IN CEMENT-SAND 1:8 IN FOUNDATION UP TO DPC

PER CUBE

MATERIALS

BRICKS 1450 Nos. 6.50 9,425.00

WASTAGE 5% 471.25

CEMENT/50kg 2.33 Bgs. 840.00 1,960.00

SAND 0.375 CUBE 5,500.00 2,062.50

WATER 150 GALs. 15.00 2,250.00

LABOURE

MASON 3.00 DAY 900.00 2,700.00

UN-SKILLED LABOURER 4 DAY 600.00 2,400.00

21,268.75

047 BRICK WORK IN CEMENT-SAND 1:5 IN 4.5" TK. BRICK WALL IN GROUND FLOOR

PER SQUARE

MATERIALS

BRICKS 550 Nos. 6.50 3,575.00

WASTAGE 5% 178.75

CEMENT/50kg 1.3 Bgs. 840.00 1,092.00

SAND 0.1 CUBE 5,500.00 550.00

WATER 50 GALs. 15.00 750.00

LABOURE

MASON 1.50 DAY 900.00 1,350.00

UN-SKILLED LABOURER 2 DAY 600.00 1,200.00

SCAFFOLDING 5% ON LABOURE 127.50

8,823.25

048 BRICK WORK IN CEMENT-SAND 1:5 IN 9" TK. BRICK WALL IN GROUND FLOOR

PER SQUARE

MATERIALS

BRICKS 1090 Nos. 6.50 7,085.00

WASTAGE 5% 354.25

CEMENT/50kg 3 Bgs. 840.00 2,520.00

SAND 0.2 CUBE 5,500.00 1,100.00

WATER 115 GALs. 15.00 1,725.00

LABOURE

MASON 2.25 DAY 900.00 2,025.00

UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00

SCAFFOLDING 3% ON LABOURE 128.25

17,187.50

049 BRICK WORK IN CEMENT-SAND 1:5 IN 13.5" TK. IN SUPERSTRUCTURE IN GROUND FLOOR

PER SQUARE

MATERIALS

BRICKS 1630 Nos. 6.50 10,595.00

WASTAGE 5% 529.75

CEMENT/50kg 4.5 Bgs. 840.00 3,780.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 170 GALs. 15.00 2,550.00

LABOURE

MASON 3.50 DAY 900.00 3,150.00

UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00

SCAFFOLDING 2% ON LABOURE 129.00

25,683.75

RATE PER CUBE

RATE PER CUBE

PER SQUARE

PER SQUARE

PER SQUARE

Page 24: BSR Final

230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 24/41

050 BRICK WORK IN CEMENT-SAND 1:8 IN 9" TK. WALL IN SUPERSTRUCTURE IN GROUND FLOOR

PER SQUARE

MATERIALS

BRICKS 1090 Nos. 6.50 7,085.00

WASTAGE 5% 354.25

CEMENT/50kg 1.75 Bgs. 840.00 1,470.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 115 GALs. 15.00 1,725.00

LABOURE

MASON 2.25 DAY 900.00 2,025.00

UN-SKILLED LABOURER 3 DAY 600.00 1,800.00

SCAFFOLDING 3% ON LABOURE 114.75

16,224.00

051 4.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR

(FACINF TO BRICK WORK MEASURED SEPARATELY)

PER SQUARE

MATERIALS

BRICKS 550 Nos. 18.00 9,900.00

WASTAGE 2% 198.00

CEMENT/50kg 1.2 Bgs. 840.00 1,008.00

SAND 0.08 CUBE 5,500.00 440.00

WATER 30 GALs. 15.00 450.00

LABOURE

MASON 1.50 DAY 900.00 1,350.00

UN-SKILLED LABOURER 2 DAY 600.00 1,200.00

SCAFFOLDING 5% ON LABOURE 127.50

14,673.50

052 9" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR

(FACINF TO BRICK WORK MEASURED SEPARATELY)

PER SQUARE

MATERIALS

BRICKS 1090 Nos. 18.00 19,620.00

WASTAGE 4% 784.80

CEMENT/50kg 2.5 Bgs. 840.00 2,100.00

SAND 0.18 CUBE 5,500.00 990.00

WATER 100 GALs. 15.00 1,500.00

LABOURE

MASON 2.25 DAY 900.00 2,025.00

UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00

SCAFFOLDING 3% ON LABOURE 213.75

29,483.55

053 13.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR

(FACINF TO BRICK WORK MEASURED SEPARATELY)

PER SQUARE

MATERIALS

BRICKS 1630 Nos. 18.00 29,340.00

WASTAGE 2% 586.80

CEMENT/50kg 4.5 Bgs. 840.00 3,780.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 50 GALs. 15.00 750.00

LABOURE

MASON 3.75 DAY 900.00 3,375.00

UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00

SCAFFOLDING 2% ON LABOURE 133.50

42,915.30

054 EXTRA OVER FOR FACING INCLUDING RAISED POINTING 1/8" TK. IN CEMENT-SAND 1:1 MIXTURE IN GROUND FLOOR

PER SQUARE

MATERIALS

CEMENT/50kg 0.5 Bgs. 840.00 420.00

SAND 0.01 CUBE 5,500.00 55.00

PER SQUARE

PER SQUARE

PER SQUARE

PER SQUARE

Page 25: BSR Final

230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 25/41

WATER 10 GALs. 15.00 150.00

ACID 0.1 GALs. 90.00 9.00

LABOURE

MASON 5.00 DAY 900.00 4,500.00

UN-SKILLED LABOURER 3.5 DAY 600.00 2,100.00

7,234.00

055 3" TK. FLOOR PAVED IN LIME MORTAR 2:5 IN GROUND FLOOR

PER SQUARE

MATERIALS

BRICKS 350 Nos. 6.00 2,100.00

SLAKED LIME 60 kg 25.00 1,500.00

SAND 0.11 CUBE 5,500.00 605.00

WATER 45 GALs. 15.00 675.00

LABOURE

MASON 1.50 DAY 900.00 1,350.00

UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00

7,730.00

056

FOR 10 L.FT'

MATERIALS

BRICKS 120 Nos. 6.00 720.00

CEMENT/50kg 0.5 BAGS 840.00 420.00

SAND 0.05 CUBE 5,500.00 275.00

WATER 15 GALs. 15.00 225.00

LABOURE

MASON 0.50 DAY 900.00 450.00

UN-SKILLED LABOURER 0.5 DAY 600.00 300.00

2,390.00

239.00

057

FOR 10 L.FT'

MATERIALS

BRICKS 140 Nos. 6.00 840.00

CEMENT/50kg 0.8 BAGS 840.00 672.00

SAND 0.05 CUBE 5,500.00 275.00

WATER 20 GALs. 15.00 300.00

LABOURE

MASON 1.25 DAY 900.00 1,125.00

UN-SKILLED LABOURER 1.25 DAY 600.00 750.00

3,962.00

396.20

058

FOR 10 L.FT'

MATERIALS

BRICKS 110 Nos. 6.00 660.00

CEMENT/50kg 0.7 BAGS 840.00 588.00

SAND 0.04 CUBE 5,500.00 220.00

WATER 15 GALs. 15.00 225.00

LABOURE

MASON 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 1.25 DAY 600.00 750.00

3,343.00

334.30

PER 10 L. FT.

PER 01 L. FT.

BRICK DRAINS IN CEMENT & SAND 1:5 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES

WITHOUT RAMP INCLUDING NECESSARY EXCAVATION.

PER 10 L. FT.

PER 01 L. FT.

STEPS 1'-1.5"X0'-6" IN BRICK IN CEMENT & SAND 1:5 WITH .5" TK. CEMENT & SAND 1:2 RENDERING INCLUDING NECESSARY EXCAVATION

PER 10 L. FT.

PER 01 L. FT.

BRICK DRAINS IN CEMENT & SAND 1:5, 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES

WITH 1"-6" RAMP INCLUDING NECESSARY EXCAVATION.

PER SQUARE

PER SQUARE

Page 26: BSR Final

230458122.xls.ms_office 230458122.xls.ms_officeBRICK WORK 26/41

059

PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X8")

MATERIALS

BLOCKS 112 Nos. 18.00 2,016.00

WASTAGE 5% 100.80

CEMENT/50kg 0.75 BAGS 840.00 630.00

SAND 0.06 CUBE 5,500.00 330.00

WATER 15 GALs. 15.00 225.00

LABOURE

MASON 1.50 DAY 900.00 1,350.00

UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00

SCAFOLDING 3% ON LABOURER 85.50

6,237.30

060

PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X4")

MATERIALS

BLOCKS 112 Nos. 18.00 2,016.00

WASTAGE 5% 100.80

CEMENT/50kg 0.4 BAGS 840.00 336.00

SAND 0.03 CUBE 5,500.00 165.00

WATER 15 GALs. 15.00 225.00

LABOURE

MASON 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 2 DAY 600.00 1,200.00

SCAFOLDING 5% ON LABOURER 105.00

5,047.80

8" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)

PER SQUARE

4" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)

PER SQUARE

Page 27: BSR Final

RANDOME RUBBLE MASONARY

061

PER CUBE (14" THICK)

MATERIALS

6"X9" RUBBLE 1.3 CUBE 1,750.00 2,275.00

CEMENT/50kg 5 BAGS 840.00 4,200.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 100 GALs. 15.00 1,500.00

LABOURE

MASON 4.00 DAY 900.00 3,600.00

UN-SKILLED LABOURER 6 DAY 600.00 3,600.00

16,825.00

062

PER CUBE (14" THICK)

MATERIALS

6"X9" RUBBLE 1.3 CUBE 1,750.00 2,275.00

CEMENT/50kg 5 BAGS 840.00 4,200.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 100 GALs. 15.00 1,500.00

LABOURE

MASON 4.50 DAY 900.00 4,050.00

UN-SKILLED LABOURER 7 DAY 600.00 4,200.00

SCAFOLDING 3% ON LABOURER 247.50

18,122.50

RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN FOUNDATION

PER CUBE

RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN SUPERSTRUCTURE

PER CUBE

Page 28: BSR Final
Page 29: BSR Final
Page 30: BSR Final
Page 31: BSR Final

0

Page 32: BSR Final

TILING063

PER SQUAREMATERIALS

8"X8" PRESSED TILE 225 Nos. 75.00 16,875.00

ADD FOR WASTAGE 5% 843.75

CEMENT/50kg 1.25 BAGS 840.00 1,050.00

SAND 0.07 CUBE 5,500.00 385.00

VAX POLISH 113.40 Grms - lb GRAMS

COLOURED PIGMENT 113.40 Grms - 1 453.59237

COTTON WAST 1000 Grms -

LABOURE

MASON 4.00 DAY 900.00 3,600.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING

25,453.75

064

PER SQUAREMATERIALS

6"X6" GLAZEDD TILE 400 Nos. 45.00 18,000.00

ADD FOR WASTAGE 10% 1,800.00

CEMENT/50kg 2.5 BAGS 840.00 2,100.00

SAND 0.11 CUBE 5,500.00 605.00

WHITE CEMENT 450 Grms -

VAX POLISH 113.40 Grms - lb GRAMS

COLOURED PIGMENT 113.40 Grms - 1 453.59237

COTTON WAST 1000 Grms -

LABOURE

MASON 4.00 DAY 900.00 3,600.00

UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00

UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 CLEANING

28,805.00

065

PER SQUAREMATERIALS

12"X12" TERRAZZO TILE 100 Nos. - -

ADD FOR WASTAGE 5% -

CEMENT/50kg 1.25 BAGS 840.00 1,050.00

SAND 0.07 CUBE 5,500.00 385.00

COLOURED PIGMENT 1000 Grms -

VAX POLISH 226.80 Grms - lb GRAMS

COLOURED PIGMENT 907.18 Grms - 1 453.59237

COTTON WAST 1000 Grms -

LABOURE

MASON 4.00 DAY 900.00 3,600.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING

7,135.00 PER SQUARE

PRESSED FLOOR TILES BEDDED IN .5" CEMENT MORTAR 1:2 & POINTING IN NEET CEMENT IN GROUND FLOOR

PER SQUARE

GLAZED TILES FIXED TO WALLS INCLUDING BEDDING IN CEMENT MORTAR 1:2 & RAKING IN GROUND LOOR

(SPECIALS MEASURED SEPARATELY)

PER SQUARE

TERRAZZO FLOOR TILES ON .5" TK. CEMENT & SEND 1:2 IN GROUND FLOOR.

Page 33: BSR Final
Page 34: BSR Final
Page 35: BSR Final

0

Page 36: BSR Final

230458122.xls.ms_office ROOFING 36/41

ROOFING

066

PER 6.00 SQUARES

MATERIALS

TIMBER 34 CU.FT. - -

ADD FOR WASTAGE 10% -

2"X1" REEPERS 660 L.FT. -

ADD FOR WASTAGE 5% -

WIRE NAILS 6" 4 kg -

WIRE NAILS 2" 1.00 kg -

LABOURE

CARPENTER 7.00 DAY 900.00 6,300.00

UN-SKILLED LABOURER 8.00 DAY 600.00 4,800.00

11,100.00

1,850.00

067

(TIMBER FRAME WORK & RIDGE COVERING MEASURED SEPARATELY)PER 6.00 SQUARES

MATERIALS

TILES 750 Nos. 45.00 33,750.00

LABOURE

CARPENTER 3.00 DAY 900.00 2,700.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

38,250.00

6,375.00

068

PER 3.600 SQUARES

MATERIALS

LIMBER PURLING 13.25 CU.FT. -

ADD FOR WASTAGE 10% -

LABOURE

CARPENTER 2.50 DAY -

UN-SKILLED LABOURER 3.00 DAY -

-

-

PER 1.00 SQUARE

TIMBER FRAME WORK FOR CORRUGATED ASBESTOS SHEET ROOF IN SINGLE

STORY BUILDING

PER 3.6 SQUARE

PER 1.00 SQUARE

TIMBER FRAME WORK FOR CALICUT TILE ROOF IN SINGLE STORY BUILDING

CONSISTING OF WALL PLATE,BEAM,RIDGE PLATE,RAFTERS ETC.(PRESERVATIVE

TREATMENR TO BE MEASURED SEPARATELY)

PER 6.00 SQUARE

PER 1.00 SQUARE

ROOF COVERING WITH CALICUT PATTERN CLAY TILES IN SINGLE STORY

BUILDING

PER 6.00 SQUARE

230458122.xls.ms_office ROOFING 36/41

Page 37: BSR Final

230458122.xls.ms_office ROOFING 37/41

069

(TIMBER FRAME WORK & RIDGE COVERING MEASURED SEPARATELY)PER 3.6 SQUARES

MATERIALS

CORU. ASB. SHEETS 420 SQ.FT. -

ROOFING SCREW & WASHERS 72 Nos. -

LABOURE -

CARPENTER 1.00 DAY 900.00 900.00

UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00

2,100.00

583.33

070

PER SQUARE

MATERIALS

HALF ROUND CLAY TILES 650 Nos. -

LABOURE -

UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00

1,200.00

071

PER 13'-4" LENGTH

MATERIALS

3'-8" LONG RIDGING 4 PAIRS -

ROOFING SCREW BOLTS 16 Nos. -

LABOURE -

CARPENTER 0.25 DAY 900.00 225.00

UN-SKILLED LABOURER 0.25 DAY 600.00 150.00

375.00

28.13

072

PER 12'-00" L.FT.

MATERIALS

RIDGE TILES 9 Nos. -

CEMENT/50kg 0.33 BAGS -

SAND 0.02 CUBE -

SLAKED LIME 7.5 kg -

COLOURING POWDER 250 GRAM -

LABOURE -

MASON 0.25 DAY 900.00 225.00

UN-SKILLED LABOURER 0.25 DAY 600.00 150.00

375.00

ROOF COVERING WITH CORRUGATED ASBSETOS SHEETS IN SINGLE STORY

BUILDING

PER 3.60 SQUARE

PER 1.00 SQUARE

ONE LAYER HALF ROUND CLAY TILES OVER ASBESTOS ROOF COVERING

RIDGE COVERING WITH CALICUT PATTERN RIDGE T ILES BEDDED IN CEMENT

LIME MORTAR 1:1:4

ASBESTOS CLOSE FITTINGS RIDGING FIXED COMPLETE WITH ROOFING SCREWS

OR BOLTS (HOOKS)

PER 1.00 SQUARE

PER 13'-4" RIDGING

PER 1-00" RIDGING

PER 12'-00" RIDGING

230458122.xls.ms_office ROOFING 37/41

Page 38: BSR Final

230458122.xls.ms_office ROOFING 38/41

31.25

073

PER 100 L.FT.

MATERIALS

1" PLANKS 75 SQ.FT. -

ADD FOR WASTAGE 5% -

1.5" BRASS SCREWS 70 Nos. -

LABOURE -

CARPENTER 3.00 DAY 900.00 2,700.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

ADD FOR SCAFOLDING 5% ON LABOURE 225.00

4,725.00

47.25

074

PER 100 L.FT.

MATERIALS

1" PLANKS 75 SQ.FT. -

ADD FOR WASTAGE 5% -

1.5" BRASS SCREWS 50 Nos. -

LABOURE -

CARPENTER 3.00 DAY 900.00 2,700.00

UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00

ADD FOR SCAFOLDING 5% ON LABOURE 225.00

4,725.00

47.25

075 ROOF PLUMBING

CONSIDER 15'-00"

MATERIALS

G.I.SHEETS 8'X4' 2 Nos. -

WOOD PRESERVATIVE 0.25 GAL. -

CEMENT/50kg 0.1 BAGS -

SLAKED LIME 25 GRAM -

SAND 0.01 CUBE -

PLANKS 50 SQ.FT. -

1.5" WIRE NAILS 1 kg -

LABOURE

a. FIXED BOARDING & APPLYING WOOD PRESERVATIVE

CARPENTER 1.00 DAY 900 900.00

UN-SKILLED LABOURER 1.00 DAY 600 600.00

b.MAKING & FIXING G.I. SHEETS

TINKER 0.5 DAY 750 375.00

PER 1-00" RIDGING

3/4"X9" HIGH VALANCE BORD FIXED WITH BRASS SCREWS TO END OF RAFTERS

(FOE TILE ROOFING)

3/4"X9" HIGH BARGE BORD FIXED WITH BRASS SCREWS AT 2'-00" CENTERS TO

SIDES OF RAFTERS (FOE TILE ROOFING)

PER 100 L.FT.

PER 1.00 L.FT.

PER 100 L.FT.

PER 1.00 L.FT.

18 B.W.G. (1.2mm) GALVENIZED IRON SHEETS VALLY GUTTER 3'-00" GIRTH OVERALL

ONCE BENT WITH END LAPS NOT LESS THAN 9" WIDTH INCLUDING 3/4" TONGUED &

GROOVED PLANKS LAID TO SLOP & PROFILE ON TIMBER MEMBERS.

230458122.xls.ms_office ROOFING 38/41

Page 39: BSR Final

230458122.xls.ms_office ROOFING 39/41

UN-SKILLED LABOURER 0.5 DAY 600 300.00

c. BUILDING SIDES

MASON 0.25 DAY 900 225.00

UN-SKILLED LABOURER 0.5 DAY 600 300.00

2,700.00

180.00

076

CONSIDER 15'-00" L.FT.

MATERIALS

G.I.SHEETS 8'X4' 1 Nos. -

CEMENT/50kg 0.05 BAGS -

SAND 0.01 CUBE -

SOLDERING LEAD 0.5 kg -

LABOURE -

CUTTING.BENDING, SOLDERING & FIXING -

TINKER 0.5 DAY -

MASON 0.125 DAY -

UN-SKILLED LABOURER 0.75 DAY -

-

-

077

PER 1.95 SQUARE

MATERIALS

CLASS I TIMBER 8 CU.FT. -

2" WIRE NAILS 0.5 kg -

FIBER/PLASTIC PLUGS 26 Noa. -

CEMENT/50kg 0.5 BAGS -

SAND 0.02 CUBE -

2" BRUSH 1 Noa. -

THINNER 0.33 GLS. -

LABOURE -

CARPENTER 2.50 DAY -

MASON 0.5 DAY -

UN-SKILLED LABOURER 1.5 DAY -

ADD FOR SCSFOLDING 3% ON LABOURE -

-

-

PER 01 L.FT.

PER 15 L.FT.

RATE FOR 1.00 SQUARE

18 B.W.G. (1.2mm) GALVENIZED IRON FLASHING 1'-6" GIRTH OVERALL 3 TIMES BENT

WITH END LAPS NOT LESS THAN 6" . LEAD SOLDERD,TURNED & TRUNKED UP TO NOT

LESS THAN 6" IN TO CASE CUT IN WALL & POINTED IN CEMENT MORTAR 1:2 LOWER

END DRESSED OVER ROOF COVER ING NOT LESS THAN 1'-00" WIDE

PER 15 L.FT.

PER 01 L.FT.

TIMBER FRAME WORK FOR 4'-00"X4'-00" FLAT ASBESTOS CEILING OF 4"X2" JOIST &

2"X2" BEARERS IN CLASS I TIMBER.

RATE FOR 1.95 SQUARE

230458122.xls.ms_office ROOFING 39/41

Page 40: BSR Final

230458122.xls.ms_office ROOFING 40/41

078

PER 1.95 SQUARE

MATERIALS

FLAT ASBESTOS SHEETS 210 SQ.FT. -

HALMILLA COVER MOULD 2"X2" 60 L.FT. -

1.5"X1.5" HALMILLA BEADINGS 125 L.FT. -

CLOUT NAILS 250 GRAMS -

1.5" BRASS SCREWS 8 DOZ -

LABOURE -

CARPENTER 1.5 DAY -

UN-SKILLED LABOURER 2 DAY -

ADD FOR SCSFOLDING 3% -

-

-

079

CONSIDER ROOM 15'-00"X13'-00"

FOR 1.95 SQUARS

MATERIALS

4"X2" TIMBER JOIST 115 L.FT. -

6"X3/4" LUNUMIDELLA PLANKS 215 SQ.FT. -

CEMENT 1.5 kg -

SAND 0.04 CUBE -

BRASS NAILS 1.5" 4 kg -

LABOURE

MAKING HOLES,FIXING JOIST & MAKING GOOD

MASON 1 DAY -

CARPENTER 1 DAY -

UN-SKILLED LABOURER 3 DAY -

FIXING CEILING BOARDS

CARPENTER 3 DAY -

UN-SKILLED LABOURER 4 DAY -

ADD FOR SCSFOLDING 3% -

-

-

3/4" TK. TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED

HORIZONTEL ON 4"X2" CLASS I TIMBER JOIST AT 2'-00" CENTERS WITH 1.5"

BRASS NAILS.

RATE FOR 1.95 SQUARE

RATE FOR 1.00 SQUARE

HORIZONTAL CEILING LINING USING 4'-00"X4'-00" FLAT ASBESTOS CEMENT

SHEET FIXED WITH & COVER MOULDING ON TIMBER FRAME WORK(TIMBER

FRAME WORK & PAINTING MEASURED SEPARATELY)

RATE FOR 1.95 SQUARE

RATE FOR 1.00 SQUARE

230458122.xls.ms_office ROOFING 40/41

Page 41: BSR Final

230458122.xls.ms_office ROOFING 41/41

080

CONSIDER 15'-00"X12'-00" 1.80 SQUARS

MATERIALS

CEILING PLANKS 220 SQ.FT.

2"X1/4" TIMBER STRIPS 40 L.FT.

3/4" NAILS 2 kg

1.5" BRASS NAILS 4 kg

LABOURE

CARPENTER 3 DAY -

UN-SKILLED LABOURER 6 DAY

ADD FOR SCSFOLDING 3% -

-

- RATE FOR 1.00 SQUARE

3/4" X6" WIDE TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED

TO UNDER SIDE OF TOOF RAFTERS,(EXISTING) WITH 1.5" BRASS NAILS,

INCLUDING LEVELING WITH TIMBER STRIPS WHERE NECESSARY.

RATE FOR 1.95 SQUARE

230458122.xls.ms_office ROOFING 41/41


Recommended