Date post: | 13-Dec-2015 |
Category: |
Documents |
Upload: | janice-horton |
View: | 213 times |
Download: | 0 times |
•the hand-drawn route (must be scanned back in)•cutting out paper circles (must be scanned back in)•Revit (room separation lines)•Excel (use a chart; export to other software)•PowerPoint (shapes and text)•Photoshop (shapes and text)•InDesign (shapes and text)•Illustrator (shapes and text)
workflow
•circles scaled proportionally•titles, maybe areas•solar orientation•adjacencies: primary, secondary, un-necessary•fixed exits (stairs, doors to exterior)•circulation: primary (egress), secondary•visual connection/separation•acoustical connection/separation•public/private•views, sounds, etc from outside IN
what to show
•develop a language•show “vocabulary” in a key
lineweightscolorhatchinglinesarrowsoverlappingsymbols
how to show
•Stage 1: draw proportional bubbleslabeladd graphic elementsmake key
•Stage 2: place bubble over planscalerevise
•Stage 3: block-ify fill in voidsstraighten lines as needed
multi-stage process
•right click and choose Format Data Series…• resizing test: select and context sensitive menu
resizing the bubbles
•trace the Excel chart, or…•pi X radius(squared) = area•so, the radius = square root (area/pi)•in Excel, =SQRT([cell address]/PI())
For hand drawings…
•use the chart from Excelcut an paste in as a photovia PDF if you have Acrobat
•redraw for better controlproportional shapes – trace from Excelformat shapes format lines, etctransparency
•use Grids and Guides•copy slide for a key
PowerPoint
Exit to Street
KEYCirculation
Private
Public
Primary Adjacency
Secondary Adjacency
Acoustical
Visual connection
Sun
Stairs
Separation
•insert into site (capture image)
•manipulate to fit with available egress components (capture image)
•massage into a block diagram (capture an image)
•re-color into a circulation diagram (capture an image)
bursting your bubbles
•Building Code (780 CMR)•Accessibility Code (521 CMR)•American’s with Disabilities Act (ADA)•Universal Design
what’s the difference?
•Building Code (780 CMR) – construction•Accessibility Code (521 CMR) – operation•American’s with Disabilities Act (ADA) – also operation•Universal Design – operation for alternate/changing physical attributes
what’s the difference?
∏construction type
∏occupancy classification
∏maximum allowed, and actual, separation of exits
∏maximum allowed, and actual, length of travel
∏total occupant count
∏plumbing requirements
building code checklist for schematics
Every project: don’t bother including!• door, corridor, and stair minimum dimensions•door push- and pull-clearances•finish material dimensions•toilet room clearances
Project specific constraints•dimensions and clearances of things like service counters and changing rooms
accessibility checklist
•ok, a lot like powerpointgoogle docssliderocket zoho keynote (mac)impress (open office)
•prezi idea map•powtoon uses cartoons•screencast-o-matic, brainshark records slide shows
no PowerPoint!
•presentations on the 21st •no class Friday – upload programming sketch for comments
revised schedule
•Assignment Objective: Create an engaging presentation with information typically needed at the start of new project.
•Format: Non-PowerPoint electronic “show”
Assignment #1: Pre-design presentation
•Site information (location – still or animated, points of egress, site access diagram)
•Building description (photos, plan/section/elevation, SF, age, etc.)
•HVAC/Structure coordination diagram (next class)
•Bubble diagram (including key)
•Detailed programming of three spaces (plan and/or perspective sketches)
•General code analysis (construction type, use group, project specific accessibility issues, separation of exits)
•Occupancy estimate (based on specific occupancy)
•Concept deconstruction (annotated diagram)
•3D concept sketch (may be still or animated)
Content: