+ All Categories
Home > Documents > BUDGET 2015-16 AT A GLANCE

BUDGET 2015-16 AT A GLANCE

Date post: 01-Jan-2017
Category:
Upload: doantruc
View: 212 times
Download: 0 times
Share this document with a friend
21
BUDGET 2015-16 AT A GLANCE (In Crore Rupees) Item Budget Estimates 2014-15 Revised Estimates 2014-15 Budget Estimates 2015-16 1 2 3 4 Opening Balance *4589.68 *4589.68 4693.53 1. Consolidated Fund (I) Receipts (a) Revenue Receipts 226418.77 223997.46 249880.23 (b) Capital Receipts (i) Receipts from loans (ii) Recovery of Loans and Advances #43662.94 490.96 #34163.54 540.68 #46579.62 263.40 Total- (b)- Capital Receipts 44153.90 34704.22 46843.02 total-1- Receipts 270572.67 258701.68 296723.25 (II) Expenditure (a) Revenue Expenditure 197424.88 191590.23 215756.18 (b) Capital Expenditure (i) Capital Outlay (ii) Repayment of Loans (iii) Loans and Advances 55986.16 #19383.88 1909.67 59094.55 #10383.88 2234.17 63154.26 #20983.89 2792.99 Total- (b)- Capital Expenditure 77279.71 71712.60 86931.14 Total-2- Expenditure 274704.59 263302.83 302687.32 Deficit (-)/Surplus (+) of Consolidated fund (-)4131.92 (-)4601.15 (-)5964.07 2. Contingency Fund (net) 0.00 (-)125.00 0.00 3. Public Account (net) 4570.00 4830.00 6055.00 Net Result of All Transactions 438.08 103.85 90.93 Closing Balance 5027.76 4693.53 4784.46 *As per the state's account in RBI. #This includes Rs. 10,000.00 crore of Ways and Means Advance by RBI for 2014-15, Rs. 1,000.00 crore as per revised estimate for 2014-15 and Rs. 10,000.00 crore for 2015-16.
Transcript
Page 1: BUDGET 2015-16 AT A GLANCE

BUDGET 2015-16 AT A GLANCE

(In Crore Rupees)

Item Budget Estimates

2014-15

Revised Estimates

2014-15

Budget Estimates

2015-16

1 2 3 4

Opening Balance *4589.68 *4589.68 4693.53

1. Consolidated Fund

(I) Receipts

(a) Revenue Receipts 226418.77 223997.46 249880.23

(b) Capital Receipts (i) Receipts from loans

(ii) Recovery of Loans and Advances

#43662.94

490.96

#34163.54

540.68

#46579.62

263.40

Total- (b)- Capital Receipts 44153.90 34704.22 46843.02

total-1- Receipts 270572.67 258701.68 296723.25

(II) Expenditure

(a) Revenue Expenditure 197424.88 191590.23 215756.18

(b) Capital Expenditure

(i) Capital Outlay (ii) Repayment of Loans

(iii) Loans and Advances

55986.16 #19383.88

1909.67

59094.55 #10383.88

2234.17

63154.26 #20983.89

2792.99

Total- (b)- Capital Expenditure 77279.71 71712.60 86931.14

Total-2- Expenditure 274704.59 263302.83 302687.32

Deficit (-)/Surplus (+) of Consolidated

fund

(-)4131.92 (-)4601.15 (-)5964.07

2. Contingency Fund (net) 0.00 (-)125.00 0.00

3. Public Account (net) 4570.00 4830.00 6055.00

Net Result of All Transactions 438.08 103.85 90.93

Closing Balance 5027.76 4693.53 4784.46

*As per the state's account in RBI. #This includes Rs. 10,000.00 crore of Ways and Means Advance by RBI for

2014-15, Rs. 1,000.00 crore as per revised estimate for 2014-15 and Rs. 10,000.00 crore for 2015-16.

Page 2: BUDGET 2015-16 AT A GLANCE

(2)

Salient Feature of the Budget 2015-16

The size of budget for the year 2015-16 is of Rs. 302687.32

crore, which is 10.2 percent higher than the year 2014-15.

Adequate arrangement of resources has been made for

financing the budget of this size, which includes an increase

of about 13.5 percent in the state's own tax revenue as

compared to the year 2014-15.

The budget includes new schemes of Rs. 9388.79 crore.

The development agenda for year 2015-16 has three main

points. One, participatory development to improve the

infrastructure facilities to increase growth rate of the state

on one hand, while on the other to ensure that its benefits

were delivered to farmers, poor, labourers, women,

minorities etc. Second, use of latest techniques in the

effective implementation of programmes and schemes.

Third, effective and transparent administration.

For the all round development and welfare of the farmers, it

is necessary to emphasise the need of businesses related

with farmers. So, the government has expressed its

commitment to take year 2015-16 as „Kisan Varsh‟.

Agriculture and Farmer

The growth rate of the state has been assessed at five per

cent on the basis of the estimates of year 2013-14, which is

better than the country‟s growth rate of 4.7 per cent.

Decision taken to declare year 2015-16 as „Kisan Varsh‟ to

ensure their prosperity.

To make youths having agricultural education self sufficient

and for the welfare of the farmers, a new scheme is being

launched. Under it, these youths would set up „one stop

shops‟, which will be known as „agri junction‟. The

government would provide a subsidy of five per cent on the

interest of the loan provided for the purpose by the bank.

Page 3: BUDGET 2015-16 AT A GLANCE

(3)

About 1000 agri junction will be set up during the fiscal

2015-16.

Rs. 50 crore have been arranged to encourage the use of

hybrid seeds and Rs. 81 crore arranged for the subsidy on

certified seeds to ensure better productivity.

Rs. 100 crore arranged for the storage of chemical

fertilizers.

The farmers are being provided free irrigation facilities. For

that, an amount of Rs. 200 crore arranged.

The private tubewells of the farmers will be energised

immediately after receiving the request during the year

2015-16.

About Rs. 7000 crore scheme being prepared for feeder

separation to ensure 16 hour power supply in rural areas

and 8 hour supply in agricultural sector.

An arrangement of Rs. 100 crore made in the budget to

implement Lohia Gramin Parivahan Sewa to provide cheap

transport service in the rural areas.

A target of 626.64 lakh M.T. of foodgrain production and

13.03 lakh M.T. of oilseeds production set for the year

2015-16 for the development of agriculture sector.

About Rs. 3.55 crore arranged to provide grant subsidy to

encourage oilseed production.

A seed distribution target of 63.10 lakh quintals set for the

year 2015-16. Out of it, target of distribution of 11 lakh

quintals of seeds for the kharif and 52.10 lakh quintals of

seeds for rabi set.

A budget of Rs. 778 crore arranged under National

Agriculture Development Scheme for the year 2015-16.

Rs. 600 crore arranged under the farmer accident insurance

scheme.

Page 4: BUDGET 2015-16 AT A GLANCE

(4)

Rs. 180 crore arranged under National Crop Insurance

Programme.

Rs. 150 crore arranged to provide crop loans on lesser

interest rates to the farmers. Rs. 114 crore arranged for

Bhoomi Sena Yojna.

New agricultural degree colleges being set up at Azamgarh

and Lakhimpur Kheri districts besides, the development of

infrastructure facilities in agricultural universities. Besides,

two new hostels are being set up at Agriculture University,

Kanpur. An amount of Rs. 96 crore arranged for the fiscal

2015-16 for the purpose.

Rs. 1152 crore arranged by sugar mills to pay dues of sugar

farmers. Rs. 442 crore arranged to reimburse society

commission of the cane societies.

Rs. 250 crore budget arranged for the setting up of new

sugar mill of 3500 TCD capacity, co-generation and distillery

plant in place of Cooperative Sugar Mill, Sathiyaon.

A target of reclamation of 1.30 lakh hectares of sodic land

set.

Rs. 168 crore budget arranged for land reclamation and

related activities for sodic land.

A reclamation target of 15000 hectare of sodic land set.

Income of about 45000 farmers would increase from it.

Rs. 1029 crore arranged for 16 non-licencee district

cooperative banks for the year 2015-16 by the government.

Rs. 50 crore arranged for the Kamdhenu scheme.

About Rs. 3 crore arranged for automatic milk collection

unit.

Animal Husbandry

A target of setting up of 10 units of broiler parent farming

and 90 units of commercial layers farmings has been set up

under the Poultry Development Policy 2013 of the state

Page 5: BUDGET 2015-16 AT A GLANCE

(5)

government for the fiscal 2015-16. It would help in

producing 302 crore eggs and 191700 quintals of meat

every year in the state.

National Livestock Insurance Scheme proposed for the year

2015-16.

Fisheries

About 200 hectares of land covered by water, which is

useless for agriculture, would be developed into ponds and

used for fish breeding.

Members/active fishermen of 2 lakh societies will be covered

under fishermen accident insurance scheme to provide social

security to the fishing community and fishermen. This

scheme will be based on free of cost premium.

A budget of Rs. 21 crore arranged for the construction of

750 fishermen houses like Lohia Awas.

Rural Development

A budget of Rs. 2617 crore arranged for the construction

and upgrading of roads under Pradhanmantri Gram Sadak

Yojna.

An arrangement of Rs. 106 crore for the construction/

reconstruction of inter rural roads under cane development

department.

Budgetary provision of Rs. 550 crore for the arrangement of

CC roads, KC drains and inter-locking tiles in 2100 revenue

villages under Dr. Ram Manohar Lohia Samagra Gram Vikas

Yojna.

Budgetary provision of Rs. 1000 crore Lohia Gramin Awas

Yojna. This scheme will be implemented with an amount of

Rs. 1500 crore loan from HUDCO through Uttar Pradesh

Gramin Awas Parishad.

Proposal for about Rs. 3033 crore for the financial year of

2015-16 for Indira Awas Yojna.

Page 6: BUDGET 2015-16 AT A GLANCE

(6)

Budgetary provision of about Rs. 1900 crore for National

Rural Drinking Water Programme.

Budgetary provision of Rs. 1533 crore in financial year of

2015-16 under “Swachchh Bharat Mission Yojna”.

An arrangement of Rs. 16 crore for the construction of

toilets and bathrooms on the basis of pilot project in rural

areas.

Proposal for budgetary provision of Rs. 773 crore in the

budget of 2015-16 to fill the critical gaps for the

development works in 35 districts of the state under

backward area subsidy fund programme.

Proposal for budgetary provision of Rs. 756 crore for

assembly area development fund (Vidhayak Nidhi).

Proposal for arrangement of Rs. 100 crore for the

development of cremation grounds in rural areas of the

state.

For Women

Mahila Samman Kosh has been constituted to prevent

harassment of women and their empowerment. Budgetary

provision of Rs. 100 crore for this fund.

Women Power Line-1090 started for the first time in the

state. Decision to start women help line in every district has

been taken.

An arrangement of Rs. 11 crore for establishing “Asha Jyoti

Kendra” in 11 districts with a view to providing health relief

to women of economically weaker sections.

An arrangement of Rs. 300 crore for Kanya Vidyadhan

Yojna.

Budgetary provision of Rs. 637 crore for subsidy scheme for

destitute widow women and education of their children.

Page 7: BUDGET 2015-16 AT A GLANCE

(7)

An arrangement of Rs. 244 crore for the construction of

hostels for the security and facility of girls studying in

schools.

Modernisation Schemes

An arrangement of Rs. 500 crore for laying underground

electricity distribution lines in cities.

An amount of Rs. 20 crore proposed for e-District projects.

Digitisation of land-maps and revenue record rooms of

collectorate and tehsils to be made.

Budgetary provision of Rs. 65 crore for digitisation of files of

Allahabad High Court and its Lucknow Bench.

Decision to start “Samvedan Bima Helpline” with view to

providing information regarding different insurance

schemes.

An amount of Rs. 300 crore has been earmarked to

strengthen dial-100 system to inform police through phone

regarding criminal incidents. After the implementation of

this scheme police will be informed about criminal incidents

by dialling 100 from anywhere in the state.

An amount of Rs. 73 crore for installing jammers in jails.

Keeping in view the importance and popularity of toll-free

number-108 ambulance Samajwadi Swasthya Seva, an

amount of Rs. 168 crore earmarked in this budget under

emergency medical transport services.

Budgetary provision of Rs. 42 crore for the purchase of 500

additional ambulances.

Electricity

A target has been fixed to ensure the power supply of

minimum 16 hours in rural areas and 22 to 24 hours in

urban areas from October 2016.

Page 8: BUDGET 2015-16 AT A GLANCE

(8)

A target for increasing the availability of electricity to 21000

MW from about 10000 MW at present has been fixed for

additional power supply in rural and urban areas.

About 550 new 33/11 KV power sub-stations have to be

built for strengthening the power distribution, besides the

construction of 33 KV, 11 KV sub-stations and LT lines. An

amount of Rs. 6000 crore proposed for this work.

A target to complete electrification works in 01 lakh villages

and Majras in the year of 2015-16 under rural electrification

scheme.

An arrangement of Rs. 14,504 crore for the projects of

energy sector and Rs. 11,260 crore for maintenance works.

In this way, a total of Rs. 25,764 crore has been earmarked

in the budget.

Public Works

An arrangement of Rs. 12,181 crore for the construction of

roads and bridges and special schemes for Purvanchal and

Bundelkhand.

Budget provision of Rs. 3005 crore for the maintenance of

districts and other roads.

An arrangement of Rs. 370 crore under RIDF scheme for the

broadening/strengthening of main roads in rural areas/other

district roads.

Budgetary provision of Rs. 1000 crore to link district head

quarters with four lanes.

Proposal for completion of construction of 80 long bridges

and 20-railway over bridges.

An arrangement of Rs. 712 crore for the strengthening and

widening of important roads of the state after identifying a

core road network.

An arrangement of Rs. 675 crore for widening/strengthening

of such state highways which are still single/1.5 lane.

Page 9: BUDGET 2015-16 AT A GLANCE

(9)

Budgetary arrangement of Rs. 2358 crore for widening and

strengthening of state highways, main district roads and

other district roads having more traffic density.

An arrangement of Rs. 370 crore for the roads being

constructed in 7 district of Uttar Pradesh on Indo-Nepal

border.

An arrangement of Rs. 253 crore for the special projects

under special area programme and 72 crore for special

schemes of Bundelkhand.

Irrigation

Keeping in view the pressure of increasing traffic and

problem of congestion an arrangement of Rs. 100 crore

made for the construction of 6-lane road project from

Faizabad road to Gosaiganj-Mohanlal ganj road on Sharda

Sahayak Feeder Canal.

A target of water to tail end of 9682 canals has been fixed

against 9772 tails projected for Kharif crop 1422, out of

which water reached to 9364 tails. A target of water to the

10,040 tails has been fixed against the projected number of

10,183 tails in Rabi 1422, which is the maximum so far.

An arrangement of Rs. 310 crore for Dr. Ram Manohar Lohia

tube well scheme.

Minor Irrigation

An arrangement of Rs. 36 crore for free of cost boring

scheme.

An arrangement of Rs. 76 crore for mid deep tube well

scheme.

An arrangement of Rs. 13 crore for deep boring scheme.

Urban Development

An arrangement of Rs. 300 crore for the construction of

alleviated approach road and fly-over in sangam area of

Allahabad.

Page 10: BUDGET 2015-16 AT A GLANCE

(10)

Budgetary provision of Rs. 550 crore for Naya Savera Nagar

Vikas Yojna.

An arrangement of Rs. 100 crore for the development of

cremation grounds in urban areas.

Budgetary provision of Rs. 800 crore under JNNURMM

scheme of infrastructure development in urban areas.

An arrangement of Rs. 600 crore for the project of Agra

drinking water supply project.

An arrangement of Rs. 150 crore under Adarsh Nagar Yojna,

Rs. 249 crore for urban sewerage and water drainage,

Rs. 354 crore for urban drinking water programme and

Rs. 100 crore for urban road improvement schemes.

An arrangement of Rs. 310 crore for construction of CC

roads, interlocking tiles and drains in slums and minority

dominated slums of urban areas of the state.

Housing and Urban planning

Budgetary provision of Rs. 600 crore for development area

of the all development authorities and infrastructure facilities

in urban areas of the state.

Provision of Rs. 200 crore for setting up of Jai Prakash

Narayan International Centre.

Development/construction work of 3578 plots/buildings has

been completed till December 2014 under “Sabke Liye Awas

Yojna”. Development/construction work of 20,868 plots/

buildings is in progress.

Environment Conservation

An arrangement of Rs. 126 crore for the distribution of 6000

solar photovoltaic pumps on subsidy to small and marginal

farmers to save diesel/electricity for irrigation in the state.

Proposal for Rs. 50 crore for the modernisation of slaughter

houses.

Page 11: BUDGET 2015-16 AT A GLANCE

(11)

Proposal for construction of about Rs. 7000 crore projects in

26 cities on the banks of Ganga River by the year of 2020 in

phased manner. An arrangement of Rs. 359 crore for the

works to be done by National Ganga River Basin Authority.

An arrangement of Rs. 75 crore for river pollution control

programme and Rs. 50 crore lake conservation scheme.

An arrangement of Rs. 200 crore for the scheme of making

21 cities of the state slum-free under “Rajiv Awas Yojna”.

An arrangement of Rs. 38 crore for setting up of solar street

lights at public places in rural areas.

An arrangement of about Rs. 66 crore for 20 MW grid

connected solar power project in Bundelkhand.

An arrangement of Rs. 34 crore for providing solar power

pack for light, fan and other domestic equipments for poor in

rural areas.

The cost of toilet construction has been increased from

Rs. 10,000 to Rs. 12,000 in rural areas under “Swachchh

Bharat Mission Yojna”. Budgetary provision of Rs. 1533 crore

made for the scheme.

An arrangement of Rs. 300 crore for the scheme of providing

battery operated rickshaws to rickshaw-pullers in urban

areas.

A budgetary provision of Rs. 400 crore for channelisation of

Gomti River by cleaning the river and better environment in

near-by areas.

An arrangement of Rs. 100 crore for the implementation of

solid waste management scheme on PPP mode.

With a view to encourage the use of cycle for movement in

cities, cycle tracks are being constructed in Agra and

Lucknow after which these tracks will be constructed in

other cities also.

An arrangement of Rs. 50 crore for clean school green

school scheme for government boys/girls inter colleges.

Page 12: BUDGET 2015-16 AT A GLANCE

(12)

World-Level Infrastructure

Provision of Rs. 425 crore for Lucknow metro rail project.

Besides, decision to run metro in Agra, Kanpur, Varanasi

and Meerut also.

Implementation of 11 km. long metro rail expansion project

worth Rs. 1838 crore in Ghaziabad city.

Rs. 3000 crore arranged for the construction of Lucknow to

Agra Expressway (Green field).

A cricket stadium with a capacity of 50,000 spectators is

under construction at Lucknow at a cost of Rs. 360 crore.

A world level 8-cycle track velodrome and a cycling academy

would be set up in Lucknow to provide training in cycling

and for international competitions at a cost of Rs. 168 crore.

Rs. 33 crore to be spent on the modernisation of Green Park

stadium at Kanpur.

Foundation of a high level Rs. 854 crore cancer institute has

already been laid in Lucknow. For that, 100 acres of land at

Chak Ganjaria Farm and a budget of Rs. 111 crore has been

arranged.

Besides, decision has been taken to set up another cancer

institute at Kannauj.

Rs. 100 crore earmarked for the construction of new annexe

building of secretariat.

Rs. 10 crore arranged for renovation of Vidhan Bhawan.

A 6-lane elevated national highway will be constructed in

Ghaziabad, which would ease traffic between Delhi and

Meerut. It will be the longest elevated national highway of

the country.

Other Schemes and Programmes

Water management, irrigation facilities and drinking water

works are being carried out in the form of package on the

basis of sectoral approach in Jhansi, Lalitpur, Jaluan,

Page 13: BUDGET 2015-16 AT A GLANCE

(13)

Mahoba, Hamirpur, Banda and Chirtrakoot districts under

Bundelkhand package. Horticulture development, dairy

development, animal husbandry and agricultural marketing

programmes have also been included to increase the income

of the farmers. A budget of Rs. 800 crore has been arranged

for the purpose.

Rs. 1000 crore arranged for rapid economic development

scheme.

Rs. 235 crore earmarked for the construction of residential

and non-residential buildings at division/district/tehsil levels.

Rs. 289 crore arranged for the development of facilities of

sports infrastructure.

Social Security

A budget of Rs. 2727 crore arranged to benefit 45 lakh

beneficiaries under Samajwadi Pension Yojna by extending

its cover.

Rs. 1613 crore arranged for old age/kisan pension scheme.

About 43 lakh beneficiaries to be benefitted by the scheme.

Decision taken to increase the pension of Misa/DIR/political

prisoners from Rs. 6000 to 10,000 per month.

Decision also taken to increase the pension of the freedom

fighters/their dependents from Rs. 8811 to Rs. 12,000 per

month.

The aid amount under national family benefit scheme

increased from Rs. 20,000 to 30,000. An amount of

Rs. 420 crore arranged for the purpose.

An amount of Rs. 2776 crore arranged for minority welfare

schemes.

An amount of Rs. 324 crore proposed to provide pension to

disabled persons under disabled pension scheme.

An amount of Rs. 60 crore arranged for the construction of

remaining works of Shakuntala Mishra Punarvas

Page 14: BUDGET 2015-16 AT A GLANCE

(14)

Vishwavidyalaya and Rs. 27 crore earmarked for the

integrated education of disabled children.

Rs. 300 crore budget arranged for „Aasra yojna‟. About

8,000 families to be benefitted by it.

Rs. 200 crore arranged for the development of

cemetery/cremation grounds of minority community.

Rs. 44 crore arranged for invertors run by solar energy for

power loom weavers of Varanasi.

Education

Rs. 2100 crore earmarked for the reimbursement of

scholarship and fees of SC students.

Rs. 723 crore arranged for the reimbursement of scholarship

and fees of general students.

Rs. 1092 crore arranged for the reimbursement of

scholarship and fees of backward class students.

Rs. 977 crore arranged for the reimbursement of scholarship

and fees of minority students.

Rs. 285 crore arranged under the modernisation scheme for

Madarsa/Maqtab.

Rs. 42 crore arranged to take 146 new Alia level permanent

recognised Madarsas on grant-in-aid list.

Rs. 200 crore arranged for the development of infrastructure

facilities in senior primary schools run by UP Basic Education

Board.

Rs. 100 crore arranged for the distribution of laptops to

meritorious students.

Basic Education

About Rs. 9977 crore proposed for Education for All

Programme.

About Rs. 1696 crore annual action plan for mid-day-meal

scheme proposed.

Page 15: BUDGET 2015-16 AT A GLANCE

(15)

Construction of 7000 additional class rooms and boundary

walls of 20,000 schools proposed.

Secondary Education

Rs. 1463 crore arranged for UP National Secondary

Education Campaign.

Rs. 350 crore to be spent on the setting up of 100 model

schools.

Rs. 200 crore to be spent on construction and maintenance

of hostels in Kastoorba Gandhi schools.

Rs. 50 crore arranged for the completion of pending works in

government higher secondary schools and Rs. 60 crore

earmarked for infrastructure facilities.

Higher Education

Target to start teaching work at the earliest by completing

unfinished construction works on 13 government degree

colleges. On completion there will be about 50 government

degree colleges in the state. A budgetary provision of

Rs. 7 crore made for this purpose.

For providing basic facilities, Rs. 134 crore is proposed for

state universities and 78 crore for government degree

colleges.

A provision of Rs. 5 crore made for restoration work of the

Sampurnanand Sanskrit University.

Technical Education

New degree colleges, one each in Devipatan and Basti

divisions, will be opened under the National Higher

Education Campaign.

Setting up of a skill development and design institute is

proposed at Unnao for providing better opportunities of

employment to the students in the state by honing their

skill.

Page 16: BUDGET 2015-16 AT A GLANCE

(16)

New polytechnics will be setup at Karnailganj tehsil of Gonda

district and Milkipur tehsil of Faizabad district.

Construction work starts on IIIT on PPP mode at Chak

Ganjaria in Lucknow district for promoting private

investment.

Vocational Education & Skill Development

20 new government industrial training institutes will be

setup in unserved tehsils/development blocks to increase

the opportunities of training.

Solar energy plants will be setup in 40 government industrial

training institutes in remote areas of the state to ensure

uninterrupted power supply to them.

Investment Atmosphere & Industrial Development

The process for setting up of industrial units in the state has

been simplified and "Nivesh Mitra Yojana" and "Industrial

Grievances Redressal System" have been introduced.

The government has constituted NRI department for solving

the problems of original NRIs of the state. The NRIs will be

given information through a new website about the steps

being taken for development of the state to encourage them

for capital investment in the state.

Dadri-Noida-Ghaziabad Investment area and Meerut/

Muzaffarnagar Industrial Area have been identified in Uttar

Pradesh under the 1483 Km long Delhi-Mumbai Industrial

Corridor.

Plan to develop a new township as a smart city in an area of

over 2100 acres under the new Green Field Integrated

Township being developed in Kanpur (Trans Ganga Project).

Under the new Green Field Integrated Township being

developed at Naini (Allahabad), a state university in an area

of 40 acres and an IT Park in an area of 10 acres will be

developed.

Page 17: BUDGET 2015-16 AT A GLANCE

(17)

A provision of about Rs. 26 crore is proposed under the

Chief Minister Gramodyog Rozgar scheme, under which 3000

village industrial units will be setup and employment for

about 60000 will be generated.

A provision of Rs. 150 crore has been made for ensuring

power supply at the subsidised rates to powerloom weavers

also as is admissible to the farmers.

A provision of Rs. 30 crore to provide assistance as per the

Textile Industry Policy-2014 to the entrepreneurs engaged in

textile and spinning sector.

It is proposed to setup electronics manufacturing clusters

(EMC), one each under the Yamuna Express-Way and

Greater Noida Industrial Development Authorities.

A provision of Rs. 50 crore has been made for Carpet Bazaar

at Bhadohi.

Law & Order

Initiative has been taken for setting up a Hi-Tech control

rooms to increase efficiency of Police force.

Ultra-modern control rooms have started functioning in

Kanpur Nagar and Lucknow. Testing work is in progress for

setting up of control rooms in Ghaziabad and Allahabad

districts.

Decision has been taken to setup ultra-modern police control

rooms in Varanasi and Agra districts.

A provision of Rs. 50 crore for introducing city surveillance

system in the state.

Toll- free traffic help line number 1073 has been setup for

giving information about road accidents in all the districts of

the state.

A provision of Rs. 50 crore has been made for integrated

traffic management system under the traffic arrangements

in major cities of the state.

Page 18: BUDGET 2015-16 AT A GLANCE

(18)

Adequate resources have been ensured for construction of

about 4290 houses for police personnel.

Medical Education

Target to start outdoor patient services in the Medical

College, Banda also.

A provision of Rs. 5 crore has been made for setting up of a

medical college in Chandauli district.

Medical & Health

A provision of about Rs. 587 crore for medicines during

2015-16.

A provision of Rs. 225 crore for purchase of equipments

under the scheme of providing specific medical facilities in

urban areas.

An amount of Rs. 394 crore is proposed for different

construction works.

Provision of Rs. 50 crore for setting up of 100- bed hospitals

in different districts.

An amount of Rs. 25 crore is proposed for setting up of

300-bed joint hospitals in Bareilly, Moradabad and Devipatan

divisional headquarters.

Provision of Rs. 10 crore for expansion of the Dr. Shyama

Prasad Mukherjee Civil Hospital in Lucknow.

An amount of Rs. 194 crore is proposed for construction of

buildings of primary health centres and community health

centres.

Provision of Rs. 15 crore for construction of independent

power feeders for 46 government hospitals.

Rs. 5840 crore is proposed for family welfare programme.

Tourism

Decision to ensure effective development of "Maitraiya

Project".

Page 19: BUDGET 2015-16 AT A GLANCE

(19)

Creation and up-gradation of basic tourism infrastructural

facilities in 02 important tourism sectors namely Agra-Brij

Corridor and Buddhist circuit of the state under the World

Bank aided Pro-Poor Tourism Development Project.

It is proposed to link Lucknow, Allahabad, Varanasi and Agra

with air services under the first phase of the scheme for

linking major places of the state with air services.

Law & Justice

A provision of Rs. 200 crore for new buildings of Lucknow

Bench of Allahabad High Court being constructed at Gomti

Nagar in Lucknow.

A budgetary provision of Rs. 100 crore for construction of

residential buildings for judicial officers.

A provision of Rs. 300 crore is proposed for construction of

non-residential buildings of district courts.

For Advocates

An amount of Rs. 40 crore is proposed for welfare of

advocates.

A budgetary provision of Rs. 5 crore for providing financial

assistance to young advocates.

Fiscal Services

A total receipt of Rs. 52,673 crore by way of commercial tax

is estimated in 2015-16, which is 10.9 percent higher than

the year 2014-15.

A total receipt of Rs. 17,500 crore by way of excise duty is

estimated in 2015-16, which is 20.7 percent higher than the

year 2014-15.

A total receipt of Rs. 14836 crore is estimated by way of

stamp and registration fee, which is 16.6 percent higher

than the year 2014-15.

Page 20: BUDGET 2015-16 AT A GLANCE

(20)

A revenue receipt of Rs. 4,658 crore by way of motor vehicle

tax is estimated in 2015-16, which is 17.9 percent higher

than the year 2014-15.

Fiscal Scenario

The state government is ensuring compliance of the financial

liabilities and budget management act. The state is

consistently maintaining revenue surplus. It is estimated

that the fiscal deficit would be 2.96 percent of the gross

state domestic product. The borrowings of the state are

estimated as 27.5 percent of the gross state domestic

product. It is proposed that the state government will take

loan within the limit fixed for borrowings. This is the reason

why the state has remained consistently successful in

maintaining the fiscal stability.

Receipts

Total receipts of Rs. 296723.25 crore are estimated in the

year 2015-16.

Total receipts include Rs. 249880.23 crore by way of

revenue receipts and Rs. 46843.02 crore by way of capital

receipts.

Revenue receipts include Rs. 178644.11 crore as share of

the tax revenue, in which Rs. 86729.11 crore is included as

the state's share in central taxes.

Expenditure

A total expenditure of Rs. 302687.23 crore is estimated.

Total expenditure includes Rs. 215756.18 crore by way of

revenue expenditure and Rs. 86931.14 crore by way of

capital expenditure.

A provision of Rs. 106720.42 crore has been made to meet

the plan expenditure.

Revenue Surplus

Page 21: BUDGET 2015-16 AT A GLANCE

(21)

A revenue surplus of Rs. 34124.05 crore is estimated in

2015-16.

Fiscal Deficit

A fiscal deficit of Rs. 31559.80 crore is estimated in 2015-

16, which is 2.96 percent of the gross state domestic

product.

Consolidated Fund

After deducting total expenditure from the receipts of

consolidated funds, a deficit of Rs. 5964.07 crore is

estimated.

Public Account

Net receipts of Rs. 6055 crore is estimated from public

account.

Net Result of All Transaction

Net result of Rs. 90.93 crore from all transaction is

estimated in 2015-16.

Closing Balance

The closing balance for the year 2015-16 is estimated

around 4784.46 crores in which opening balance of 4693.53

crore has been taken into account.

*******************


Recommended