50
Click to edit Master title style 6/7/22 1 College of Public Administration [ PA1 ] INTRODUCTION TO PUBLIC ADMINISTRATION GROUP 4: BUDGETARY SYSTEM ( Budget Process in the National Government ) 1 Reported By: DIMARUCOT, OMAR N.
Transcript
Page 1: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

College of Public Administration

[ PA1 ] INTRODUCTION TO PUBLIC ADMINISTRATION

GROUP 4:

BUDGETARY SYSTEM( Budget Process in the National Government )

1

Reported By:

DIMARUCOT, OMAR N.

Page 2: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

The Budget Cycle

Page 3: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 3

The Budget Cycle

• There are four phases in managing the National Budget:

Budget Preparation Budget Legislation Budget Execution Budget Accountability

• During the preparation phase, the Executive prepares the proposed National Budget. This is followed by the legislation phase where the Congress authorizes the General Appropriations Act.  In the execution phase, agencies utilize their approved budgets and during the accountability phase, the executive monitors and evaluates the use of the budget.

Page 4: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 4

Page 5: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Budget Preparation

Page 6: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 6

Budget PreparationThis starts with the Budget Call and ends with the President’s submission of the proposed budget to Congress.

What is the Budget Call?What is Early Preparation?What is Stakeholder Engagement?What is “Bottom-Up” Budgeting?What are Technical Budget Hearings?What is the Executive Review?What is Consolidation, Validation, and

Confirmation?What is a Presentation to President and

Cabinet?What is the President’s Budget?

Page 7: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 7

1. The Budget Call

• At the beginning of the budget preparation year, the Department of Budget and Management (DBM) issues the National Budget Call to all agencies (including state universities and colleges) and a separate Corporate Budget Call to all GOCCs and GFIs.

• The Budget Call contains budget parameters (including macroeconomic and fiscal targets and agency budget ceilings) as set beforehand by the Development Budget Coordination Committee (DBCC); and policy guidelines and procedures in the preparation and submission of agency budget proposals.

Budget Preparation

Page 8: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 8

Early Preparation

• Under the Aquino Administration, the DBM has established a new tradition of beginning the Budget Preparation phase earlier, to ensure that the National Budget is enacted on time. Under the new Budget Preparation Calendar, the Budget Call is issued in December (versus around April in the past); and the submission of the President’s budget a day after the State of the Nation Address (in contrast to earlier practice where it is submitted during the late in the 30-day window that the Constitution prescribes).

Budget Preparation

Page 9: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 9

2. Stakeholder Engagement

• A new feature in budget preparations which seeks to increase citizen participation in the budget process, departments and agencies are tasked to partner with civil society organizations (CSOs) and other citizen-stakeholders as they prepare their agency budget proposals.

• This new process, which was piloted in the preparation of the 2012 National Budget, is now being expanded towards institutionalization.

Budget Preparation

Page 10: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 10

Departments and GOCCs Mandated to Conduct CSO Consultations

Budget Preparation

ORIGINAL SET (Piloted in 2012) NEW SET (Starting 2013)

Department of HealthDepartment of EducationDepartment of Social Welfare and DevelopmentDepartment of Public Works and HighwaysDepartment of AgricultureDepartment of Agrarian ReformNational Food AuthorityNational Housing AuthorityNational Home Mortgage and Finance Corp.

Department of TourismDepartment of Transportation and CommunicationDepartment of Interior and Local GovernmentDepartment of JusticeDepartment of Labor and EmploymentDepartment of Environment and Natural ResourcesLight Rail Transit AuthorityNational Electrification AdministrationNational Irrigation Administration

Note: All other departments and agencies are highly encouraged to undertake the process.

Page 11: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 11

“Bottom-Up” Budgeting

• For the first time in history, the National Budget for 2013 will be prepared using a breakthrough “bottom-up” approach. As opposed to the conventional way of allocating resources from top to bottom, grassroots communities will be engaged in designing the National Budget.

Budget Preparation

• The Aquino government, through the Cabinet Cluster on Human Development and Poverty Reduction, has identified 300 to 400 of the poorest municipalities and will engage these in crafting community-level poverty reduction and empowerment plans. This initial salvo of “bottom-up” budgeting will focus on rural development programs and the conditional cash transfer program, and will thus involve DA, DAR, DENR, DSWD, DepEd and DoH. These agencies will then include the community plans in their proposed budgets.

Page 12: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 12

3. Technical Budget Hearings

• These are conducted after departments and agencies submit their Agency Budget Proposals to the DBM. Here, agencies defend their proposed budgets before a technical panel of DBM, based on performance indicators on output targets and absorptive capacity. DBM bureaus then review the agency proposals and prepare recommendations.

Budget Preparation

Page 13: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 13

4. Executive Review

• The recommendations are presented before an Executive Review Board which is composed of the DBM Secretary and senior officials.

• Deliberations here entail a careful prioritization of programs and corresponding support, vis-à-vis the priority agenda of the national government.

• Implementation issues are also discussed and resolved.

Budget Preparation

Page 14: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 14

5. Consolidation, Validation and Confirmation

• DBM then consolidates the recommended agency budgets and recommendations into a National Expenditure Program and a Budget of Expenditures and Sources of Financing (BESF).

• As part of the consolidating process, the deliberations by the DBCC will determine the agency and sectoral allocation of the approved total expenditure ceiling, in line with the macroeconomic and fiscal program. Heads of major departments are invited to this meeting.

Budget Preparation

Page 15: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 15

6. Presentation to President and Cabinet

• The proposed budget is presented by DBM, together with the DBCC, to the President and Cabinet for further refinements or reprioritization. After the President and Cabinet approve the proposed National Expenditure Plan, the DBM prepares and finalizes the budget documents to be submitted to Congress.

Budget Preparation

Page 16: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 16

7. The President’s Budget

• The budget preparation phase ends with the submission of the proposed national budget — the “President’s Budget” — to Congress.

• The President’s Budget consists of the following documents, which help legislators analyze the contents of the proposed budget:

Budget Preparation

Page 17: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 17

7. The President’s Budget

• President’s Budget Message (PBM)This is where the President explains the policy framework and priorities in the budget.

• Budget of Expenditures and Sources of Financing (BESF)Mandated by the Constitution, this contains the macroeconomic assumptions, public sector context (including overviews of LGU and GOCC financial positions), breakdown of the expenditures and funding sources for the fiscal year and the two previous years.

• National Expenditure Program (NEP)This contains the details of spending for each department and agency by program, activity or project, and is submitted in the form of a proposed General Appropriations Act.

• Details of Selected Programs and ProjectsThis contains a more detailed disaggregation of key programs, projects and activities in the NEP, especially those in line with the national government’s development plan.

• Staffing SummaryThis contains a summary of the staffing complement of each department and agency, including number of positions and amounts allocated for the same.

Budget Preparation

Page 18: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Budget Legislation

Page 19: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 19

Budget Legislation• Alternatively called the “Budget Authorization

phase,” this starts upon the House Speaker’s receipt of the President’s Budget and ends with the President’s enactment of the General Appropriations Act.

What are House Deliberations?What are Senate Deliberations?What are Bicameral Deliberations?What is Ratification and Enrollment?What is the Veto Message?What is Enactment?What are Reenacted Budgets?

Page 20: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 20

1. House Deliberations

• The House of Representatives, in plenary, assigns the President’s Budget to the House Appropriations Committee. The Committee and its Sub-Committees then schedule and conduct hearings on the budgets of the departments and agencies and scrutinize their respective programs and projects. It then crafts the General Appropriations Bill (GAB).

• In plenary session, the GAB is sponsored, presented and defended by the Appropriations Committee and Sub-Committee Chairmen. As in all other laws, the GAB is approved on Second and Third Reading before transmission to the Senate. (Note: In the First Reading, the President’s Budget is assigned to the Appropriations Committee.)

Budget Legislation

Page 21: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 21

2. Senate Deliberations

• As in the House process, the Senate conducts its own committee hearings and plenary deliberations on the GAB. Budget deliberations in the Senate formally start after the House of Representatives transmits the GAB. For expediency, however, the Senate Finance Committee and Sub-Committees usually start hearings on the GAB even as House deliberations are ongoing.

• The Committee submits its proposed amendments to the GAB to plenary only after it has been formally transmitted by the House.

Budget Legislation

Page 22: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 22

3. Bicameral Deliberations• Once both Houses of Congress have finished their

deliberations, they will each constitute a panel to the Bicameral Conference Committee. This committee will then discuss and harmonize the conflicting provisions of the House and Senate Versions of the GAB. A Harmonized Version of the GAB is thus produced.

Budget Legislation

Page 23: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 23

4. Ratification and Enrollment

• The Harmonized or “Bicam” Version is then submitted to both Houses, which will then vote to ratify the final GAB for submission to the President. Once submitted to the President for his approval, the GAB is considered enrolled.

Budget Legislation

Page 24: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 24

5. The Veto Message• The President and DBM then review the GAB and

prepare a Veto Message, where budget items subjected to direct veto or conditional implementation are identified, and where general observations are made. Under the Constitution, the GAB is the only legislative measure where the President can impose a line-veto (in all other cases, a law is either approved or vetoed in full).

Budget Legislation

Page 25: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 25

6. Enactment• When the GAA is not enacted before the fiscal year

starts, the previous year’s GAA is automatically reenacted. This means that agency budgets for programs, activities and projects remain the same. Funding for programs or projects that have already been terminated is realigned for other expenditures. Because reenactments are tedious and prone to abuse, the Aquino Administration—with the support of Congress—has committed to ensure the timely enactment of a new GAA every year.

Budget Legislation

Page 26: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 26

Reenacted Budgets

Budget Preparation

• When the GAA is not enacted before the fiscal year starts, the previous year’s GAA is automatically reenacted. This means that agency budgets for programs, activities and projects remain the same.

• Funding for programs or projects that have already been terminated is realigned for other expenditures. Because reenactments are tedious and prone to abuse, the Aquino Administration—with the support of Congress—has committed to ensure the timely enactment of a new GAA every year.

Page 27: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Budget Execution

Page 28: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 28

Budget Execution• This is where the people’s money is actually spent. As soon

as the GAA is enacted, the government can implement its priority programs and projects.

What are the Release Guidelines and Program?

What are Budget Execution Documents?What is Allotment and Cash Release

Programming?What is Allotment Release?What are Incurring Obligations?What does the GAA as Allotment Release

mean?What are Cash Allocations?What is Disbursement?

Page 29: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 29

1. Release Guildelines and Program

• The budget execution phase begins with DBM’s issuance of guidelines on the release and utilization of funds.

Budget Execution

Page 30: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 30

2. Budget Execution Documents (BEDs)

• Agencies are required to submit their BEDs at the start of budget execution. These documents outline agency plans and performance targets. These BEDs include the physical and financial plan, monthly cash program, estimate of monthly income, and list of obligations that are not yet due and demandable.

Budget Execution

Page 31: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 31

3. Allotment and Cash Release Programming

• To ensure that releases fit the approved Fiscal Program, the DBM prepares an Allotment Release Program (ARP) to set a limit for allotments issued to an agency and on the aggregate.

• The ARP of each agency corresponds to the total amount of the agency-specific budget under the GAA, as well as Automatic Appropriations. A Cash Release Program (CRP) is also formulated alongside that to set a guide for disbursement levels for the year and for every month. 

Budget Execution

Page 32: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 32

4. Allotment Release• Allotments, which authorize an

agency to enter into an obligation, are either released by DBM to all agencies comprehensively through the Agency Budget Matrix (ABM) and individually via Special Allotment Release Orders (SAROs).

Budget Execution

Page 33: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 33

4. Allotment Release• Agency Budget Matrix (ABM)

This document disaggregates all programmed appropriations for each agency into two main expenditure categories: “not needing clearance” and “needing clearance.”

The ABM is the comprehensive allotment release document for appropriations which do not need clearance, or those which have already been itemized and fleshed out in the GAA.

Budget Execution

Page 34: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 34

4. Allotment Release• Allotment Release Orders

(SAROs)

Items identified as “needing clearance” are those which require the approval of the DBM or the President, as the case may be (for instance, lump sum funds and confidential and intelligence funds).

For such items, an agency needs to submit a Special Budget Request to the DBM with supporting documents. Once approved, a SARO is issued.

Budget Execution

Page 35: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 35

5. Incurring Obligations• In implementing programs,

activities and projects, agencies incur liabilities on behalf of the government. Obligations are liabilities legally incurred, which the government will pay for.

• There are various ways that an agency “obligates:” for example, when it hires staff (an obligation to pay salaries), receives billings for the use of utilities, or enters into a contract with an entity for the supply of goods or services.

Budget Execution

Page 36: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 36

The GAA as Allotment Release

• The Aquino Administration plans to design the annual General Appropriations Act as the comprehensive allotment release document itself. This is being pursued in order to significantly speed-up the process of releasing the Budget and implementing the programs and projects that it funds.

• The 2013 National Budget, currently being prepared, is being designed in such way. This entails the disaggregation of all budget items into full detail, as well as the elimination of all lump-sum funds, save for a few exceptions such as the Calamity Fund. In other words, this reform significantly reduces the need for SAROs.

Budget Execution

Page 37: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 37

6. Cash Allocation• To authorize an agency to pay

the obligations it incurs, DBM issues a disbursement authority.

• Most of the time, it takes the form of a Notice of Cash Allocation (NCA); and in special cases, the Non-Cash Availment Authority (NCAA) and Cash Disbursement Ceiling (CDC).

Budget Execution

Page 38: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 38

6. Cash Allocation• Notice of Cash Allocation

(NCA) This is a cash authority issued

periodically by the DBM to the operating units of agencies to cover their cash requirements.

The NCA specifies the maximum amount of cash that can be withdrawn from a government servicing bank for the period indicated.

The release of NCAs by DBM is based on an agency’s submission of its Monthly Cash Program and other required documents.

Budget Execution

Page 39: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 39

6. Cash Allocation• Others Disbursement

Authorities. 

In contrast to NCAs, Non-Cash Availment Authority (NCAA) are issued to authorize non-cash disbursements.

Cash Disbursement Ceiling (CDC) are meanwhile issued to departments with overseas operations, allowing them to use income collected by their foreign posts for their operating requirements.

Budget Execution

Page 40: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 40

7. Disbursement• This is the final step of the budget execution

phase, where government monies are actually spent. The Modified Disbursement Scheme is mostly used, where disbursements of national government agencies chargeable against the Treasury are made through government servicing banks, such as the Land Bank of the Philippines.

• The budget process, of course, does not end when government agencies spend public funds: each and every peso must be accounted for to ensure that is used properly, contributing to the achievement of socio-economic goals.

Budget Execution

Page 41: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Budget Accountability

Page 42: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 42

Budget Accountability• This phase happens alongside the Budget

Execution phase. • Through Budget Accountability, the DBM monitors the

efficiency of fund utilization, assesses agency performance and provides a vital basis for reforms and new policies.

What are Performance Targets and Outcomes?

What are Budget Accountability Reports (BARs)?

What does No Report, No Release mean?What does Review of Agency Performance

mean?What is an Audit?What is the Performance-Based Incentive

System?

Page 43: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 43

1. Performance and Target Outcomes

• Agencies are held accountable not only for how these use public funds ethically, but also on how these attain performance targets and outcomes using available resources.

• These performance measures are set alongside the preparation of the National Budget; and these are indicated in the OPIF Book of Outputs.

• Prior to the execution of the enacted National Budget, these performance targets are firmed up during the preparation of BEDs.

Budget Accountability

Page 44: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 44

2. Budget Accountability Reports (BARs)

• Submitted by agencies on a monthly and quarterly basis, BARs are required reports that show how agencies used their funds and identify their corresponding physical accomplishments.

• These include quarterly physical and financial reports of operations; quarterly income reports, a monthly statement of allotments, obligations and balances; and monthly report of disbursements.

Budget Accountability

Page 45: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 45

No Report, No Release

Budget Preparation

• Starting 2012, the DBM will be withholding certain fund releases to agencies if these fail to submit their Budget Accountability Reports. In particular, these will be funds from the Miscellaneous Personnel Benefits Fund (MPBF) for compensation adjustments under the Salary Standardization Law, provisions for unfilled positions and employee clothing allowances.

• These funds to be withheld are only limited to agencies’ MPBF allotments so that only the agencies are penalized and that the implementation of critical programs and projects will not be disrupted. Errant and compliant agencies will also be posted online for public scrutiny.

Page 46: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 46

3. Review of Agency Performance

• The DBM regularly reviews the financial and physical performance of agencies. Actual utilization of funds and physical accomplishments, as indicated in the agencies’ BARs, are evaluated against their targets as identified via OPIF and in the agencies’ BEDs. Agency Performance Reviews (APRs) are conducted quarterly or every semester, as the case may be.

• An annual Budget Performance Assessment Review (BPAR) is conducted to determine each agency’s accomplishments and performance by the year-end. The DBM regularly reports results to the President.

Budget Accountability

Page 47: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 47

4. Audit

• Auditing is not within the DBM’s jurisdiction, and is instead lodged under the Commission on Audit (COA). Nonetheless, auditing is critical in ensuring agency accountability in the use of public funds.

• The DBM uses COA’s audit reports in confirming agency performance, determining budgetary levels for agencies and addressing issues in fund usage.

Budget Accountability

Page 48: BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT

Click to edit Master title style

7/13/2013 48

5. Performance-Based Incentive System

• The Department of Budget and Management (DBM) is also in the process of establishing a performance-based incentive system — which will recognize and reward good performance among government employees — to help improve the efficiency of service delivery across all government institutions.

Budget Accountability


Recommended