BUILD READY PROGRAM
Transcript
Page 1: Build Ready Program

BUILD READY PROGRAM

Page 2: Build Ready Program

Benefits of Build ReadyDrastically Reduce Construction TimeCompanies can build sooner on Build Ready

sites

Reduces the amount of the InvestmentAllows you not to invest money in an actual building, but invest in the theory of the

building

More Flexibility to Potential ClientsThe facility can be designed to fit a clients

needs, rather than a client adjusting to an existing building

Page 3: Build Ready Program

General Requirements for Build ReadySite Preparation

Certified building pad for a minimum 50,000 square foot building. Must be a minimum of

15 acres.

Infrastructure Available on site or within 2,500 lineal feet

of the build ready site. Includes sanitary sewer, domestic water, and 3 phase electric power.

Preliminary Building DesignBuilding plans and colored renderings for marketing purposes

Page 4: Build Ready Program

Build Ready Checklist for ApprovalBy Owner

By Alliance

Page 5: Build Ready Program

Marketing Sheets

Page 6: Build Ready Program

Preliminary Architectural Site Plan

Page 7: Build Ready Program

Preliminary Building Plans

Floor Plan Building Elevations

Page 8: Build Ready Program

High Definition Rendered Images


Recommended