Projects for construction of motorways and expressways in Federation of B&H
Build to connect
Leadership message About JP Autoceste FBiH Development strategy of motorways
Development of any country depends on the development of its transport infrastructure and transport policy is closely related to other policies such as the economic policy, energy policy, social, regional and environmental policies.
Construction of Corridor Vc is the largest and most demanding investment and construction undertaking in Bosnia and Herzegovina.
In the Federation BiH we currently operate 92 km of motorways. Two construction sites are active in the Zenica region. These are Drivuša – Klopče and Klopče Donja Gračanica.
We are about to initiate a new investment cycle in the coming period, valued at 892 mil. € and involving 13 projects on Corridor Vc. Our priority is construction of the most demanding sections, from Međugorje to Počitelj and further in the direction of Mostar, from Zenica Jug to Zenica Sjever and onwards to the municipality of Žepče, and from Sava River at Svilaj to Odžak.
After the 1. Mart tunnel and the Studenčica bridge, structures such as the nearly one kilometre long Počitelj bridge and the 10 kilometre Prenj tunnel will raise the bar one notch higher in the world of serious construction undertakings.
We are about to start the most challenging project in our country, construction of the Konjic – Mostar Sjever motorway. Optimization of the alignment for the Konjic – Mostar Sjever section is complete and utilization of natural terrain features and application of latest tunnel construction technologies in boring through Mt. Prenj will cut the length of the alignment by 18 kilometres and result in savings of approx. 300 mil. €.
Motorway safety, maintenance and traffic control were improved with the construction of the first Maintenance and Traffic Control Centre in Bosnia and Herzegovina, in accordance with the European Commission Directive 2004/54/EC.
In the coming period we are introducing a new billing system to optimize electronic toll collection (ACC service) through creation of new ACC service packages and options for recharging ACC devices via the Internet, SMS, e-banking, etc.
The obligation and clear commitment of JP Autoceste FBiH as a socially responsible company to invest in environmental protection was reconfirmed by the introduction of ISO 14001:2004 standard.
Đenan Salčin, dipl.ecc.Chief Executive Officer (Acting CEO)
Leadership message
Croatia
Bosnia and Herzegovina
Slovenia
Austria
Hungary
Serbia
Montenegro
Slovakia
Corridor Vc is a Pan-European transport corridor which follows European route E73 from Budapest to the port of Ploče (Croatia) via Sarajevo
Bosnia and Herzegovina (B&H) contains the longest section of Corridor Vc with a total length of approximately 335 km
Corridor Vc enjoys strong support from the EU and IFIs
The project has also strong support from all levels of the political spectrum in B&H
High-quality connection between ports on Baltic and Adriatic sea
Goes through the central part of BiH, on the north-south route, along the rivers Bosna and Neretva
85% or 285 kms of the 4. motorway in BiH is 4. in B&H is in Federation of B&H.
Goes through Zenica, Sarajevo and Mostar and most of other economic, cultural and industrial centers in the FBIH covering around 70% of the whole FBiH population relying on its development.
LEGEND
COMPLETEDUNDER CONSTRUCTIONFINANCING SECUREDTO BE CONSTRUCTED
Corridor Vc
Project Alignment
A A
Zenica north - Nemila
Mostar south - Buna
Nemila - Žepče south (Poprikuše)
Konjic - Mostar north
Motorway Žepče south (Poprikuše) - Doboj (Karuše)
Expressway Lašva - Travnik
Travnik Zenica south (Drivu{a)
Zenica north (D. Gra~anica)
Vraca
Nemila
Žepče south
@ep~e north
Doboj south
Tunnel Pe~uj
Od`ak
Svilaj
Kakanj
La{va
Sarajevo
Tuzla
Tar~in
Tunnel Prenj
Konjic
Ov~ari
Mostar south
Mostar north
Buna
Salakovac
Me|ugorje
Po~itelj
Bija~a
Croatia
Croatia
1
Motorway Length: 12 kmFounding source: loanConstruction cost estimation: 162 mil. €*Available documentation: - Main design (in progress) - Environmental permit - Feasibility study
Zenica north - Nemila
12
Motorway Length: 7 kmFounding source: loanConstruction cost estimation: 180 mil. €*Available documentation: - Preliminary design - Environmental permit - Feasibility study
Available documentation: - Preliminary design - Traffic study - in progress
Geological / geotechnical study - in progress
- Environmental impact assessment (EIA) - in progress
- Feasibility study
Phase 2: Salakovac - Mostar north
Motorway Length: 13 kmFounding source: loanModel: Finance / Design / BuildConstruction cost estimation: 164 mil. €*
Nemila - Žepče south (Poprikuše)
2
Motorway Length: 13,7 kmFounding source: loanConstruction cost estimation: 168 mil. €*Available documentation: - Preliminary design - Feasibility study
Available documentation: - Preliminary design - Traffic study - in
progress - Geological /
geotechnical study - in progress
- Environmental impact assessment (EIA) - in progress
- Feasibility study
Mostar south - Buna3
4
4
Total length of motorway section Konjic - Mostar north is 35 km, and it colud be devided in two phases.
Phase 1: Konjic – Salakovac Motorway Length: 22 kmFounding source: loanModel: Finance / Design / BuildConstruction cost estimation: 400 mil. €*LOT 1 Ov~ari - Konjic
106,5 mil. €* (4 km)LOT 2 Konjic - Tunnel Prenj
58,5 mil. €* (7,5 km)LOT 3 Tunnel prenj
235,5 mil. €* (10,5 km)
Konjic – Mostar north
* Construction cost estimation is without VAT
5
5
The expressway route is histrorical roads from the East to the West coming from Serbia trought Sarajevo to the Croatia. This expressway is part of TEN-T core Network. Connecting this expressway with the Corridor 5c, central areas of B&H will get the best traffic link with the Central Europe and Adriatic cost on the South.
Lašva - Travnik Expressway Length: 24 km Founding source: Concession Construction cost
estimation: 183 mil. €*
Available Documentation : - Main design - Enviromental permit - Feasibility study
Expressway Lašva - Travnik
6
7
7
- Motorway Length: 56 km- Founding source: ------ Model: Finance / Design /
Build- Construction cost
estimation: 520 mil. €*
Available Documentation:- Preliminary design- Traffic study - Geological /
geotechnical study- Environmental impact
assessment (EIA)- Feasibility study
Tuzla - Žepče
Projects ready for construction
3
6
- Motorway Length: 38 km- Founding source:
Concession- Model: To be defined- Construction cost
estimation: 344 mil. €*
Available Documentation:- Preliminary design- Environmental permit- Feasibility study
Motorway Žepče south (Poprikuše) - Doboj (Karuše)
Vision
MissionWe build, operate and maintain the road infrastructure of the highest rank, socially and responsibly acting with a particular focus on compliance with environmental and traffic safety.
Our vision is to create road infrastructure of the highest rank, equivalent to the most modern roads in the world.
A A
The value of the new investment cycle is 892 mil. € and involves 13 projects and construction of 88 km of motorway on Corridor Vc.
Motorwayconstructionis a driverof BH economy.
Intense construction of Corridor VC has a significant impact on gross domestic product (GPD) in Federation of BiH, and thereby on employment growth, expansion of the construction sector and higher production of construction materials.
Corridor Vc South Section 11 km Počitelj-Međugorje two active sites Construction of the Počitelj bridge Investment of 100 million EUR w/o VAT
Corridor Vc Zenica region 10 km two active sites one of the most difficult sections Investment of 140 million EUR w/o VAT
Corridor Vc Nort Section 11 km Construction of international border crossing Svilaj Investment of 72 million EUR w/o VAT
Active sites
desig
n & pr
int: n
ashs
tudio
.ba
ContactsPC Motorways FB&H Ltd. Mostar Mostar Headquarters: Braće Fejića bb, 88000 Mostar, Bosnia and HerzegovinaTel: + 387 36 512 300Fax: + 387 36 512 301 Sarajevo Office: Dubrovačka 6, 71000 Sarajevo, Bosnia and HerzegovinaTel: + 387 33 277 900Fax: + 387 33 277 901E-mail: infoºjpautoceste.bawww.jpautoceste.ba