Projects for construction of motorways and expressways in Federation of B&H Build to connect
Transcript
  • Projects for construction of motorways and expressways in Federation of B&H

    Build to connect

  • Leadership message About JP Autoceste FBiH Development strategy of motorways

    Development of any country depends on the development of its transport infrastructure and transport policy is closely related to other policies such as the economic policy, energy policy, social, regional and environmental policies.

    Construction of Corridor Vc is the largest and most demanding investment and construction undertaking in Bosnia and Herzegovina.

    In the Federation BiH we currently operate 92 km of motorways. Two construction sites are active in the Zenica region. These are Drivuša – Klopče and Klopče Donja Gračanica.

    We are about to initiate a new investment cycle in the coming period, valued at 892 mil. € and involving 13 projects on Corridor Vc. Our priority is construction of the most demanding sections, from Međugorje to Počitelj and further in the direction of Mostar, from Zenica Jug to Zenica Sjever and onwards to the municipality of Žepče, and from Sava River at Svilaj to Odžak.

    After the 1. Mart tunnel and the Studenčica bridge, structures such as the nearly one kilometre long Počitelj bridge and the 10 kilometre Prenj tunnel will raise the bar one notch higher in the world of serious construction undertakings.

    We are about to start the most challenging project in our country, construction of the Konjic – Mostar Sjever motorway. Optimization of the alignment for the Konjic – Mostar Sjever section is complete and utilization of natural terrain features and application of latest tunnel construction technologies in boring through Mt. Prenj will cut the length of the alignment by 18 kilometres and result in savings of approx. 300 mil. €.

    Motorway safety, maintenance and traffic control were improved with the construction of the first Maintenance and Traffic Control Centre in Bosnia and Herzegovina, in accordance with the European Commission Directive 2004/54/EC.

    In the coming period we are introducing a new billing system to optimize electronic toll collection (ACC service) through creation of new ACC service packages and options for recharging ACC devices via the Internet, SMS, e-banking, etc.

    The obligation and clear commitment of JP Autoceste FBiH as a socially responsible company to invest in environmental protection was reconfirmed by the introduction of ISO 14001:2004 standard.

    Đenan Salčin, dipl.ecc.Chief Executive Officer (Acting CEO)

    Leadership message

    Croatia

    Bosnia and Herzegovina

    Slovenia

    Austria

    Hungary

    Serbia

    Montenegro

    Slovakia

  • Corridor Vc is a Pan-European transport corridor which follows European route E73 from Budapest to the port of Ploče (Croatia) via Sarajevo

    Bosnia and Herzegovina (B&H) contains the longest section of Corridor Vc with a total length of approximately 335 km

    Corridor Vc enjoys strong support from the EU and IFIs

    The project has also strong support from all levels of the political spectrum in B&H

    High-quality connection between ports on Baltic and Adriatic sea

    Goes through the central part of BiH, on the north-south route, along the rivers Bosna and Neretva

    85% or 285 kms of the 4. motorway in BiH is 4. in B&H is in Federation of B&H.

    Goes through Zenica, Sarajevo and Mostar and most of other economic, cultural and industrial centers in the FBIH covering around 70% of the whole FBiH population relying on its development.

    LEGEND

    COMPLETEDUNDER CONSTRUCTIONFINANCING SECUREDTO BE CONSTRUCTED

    Corridor Vc

    Project Alignment

  • A A

    Zenica north - Nemila

    Mostar south - Buna

    Nemila - Žepče south (Poprikuše)

    Konjic - Mostar north

    Motorway Žepče south (Poprikuše) - Doboj (Karuše)

    Expressway Lašva - Travnik

    Travnik Zenica south (Drivu{a)

    Zenica north (D. Gra~anica)

    Vraca

    Nemila

    Žepče south

    @ep~e north

    Doboj south

    Tunnel Pe~uj

    Od`ak

    Svilaj

    Kakanj

    La{va

    Sarajevo

    Tuzla

    Tar~in

    Tunnel Prenj

    Konjic

    Ov~ari

    Mostar south

    Mostar north

    Buna

    Salakovac

    Me|ugorje

    Po~itelj

    Bija~a

    Croatia

    Croatia

    1

    Motorway Length: 12 kmFounding source: loanConstruction cost estimation: 162 mil. €*Available documentation: - Main design (in progress) - Environmental permit - Feasibility study

    Zenica north - Nemila

    12

    Motorway Length: 7 kmFounding source: loanConstruction cost estimation: 180 mil. €*Available documentation: - Preliminary design - Environmental permit - Feasibility study

    Available documentation: - Preliminary design - Traffic study - in progress

    Geological / geotechnical study - in progress

    - Environmental impact assessment (EIA) - in progress

    - Feasibility study

    Phase 2: Salakovac - Mostar north

    Motorway Length: 13 kmFounding source: loanModel: Finance / Design / BuildConstruction cost estimation: 164 mil. €*

    Nemila - Žepče south (Poprikuše)

    2

    Motorway Length: 13,7 kmFounding source: loanConstruction cost estimation: 168 mil. €*Available documentation: - Preliminary design - Feasibility study

    Available documentation: - Preliminary design - Traffic study - in

    progress - Geological /

    geotechnical study - in progress

    - Environmental impact assessment (EIA) - in progress

    - Feasibility study

    Mostar south - Buna3

    4

    4

    Total length of motorway section Konjic - Mostar north is 35 km, and it colud be devided in two phases.

    Phase 1: Konjic – Salakovac Motorway Length: 22 kmFounding source: loanModel: Finance / Design / BuildConstruction cost estimation: 400 mil. €*LOT 1 Ov~ari - Konjic

    106,5 mil. €* (4 km)LOT 2 Konjic - Tunnel Prenj

    58,5 mil. €* (7,5 km)LOT 3 Tunnel prenj

    235,5 mil. €* (10,5 km)

    Konjic – Mostar north

    * Construction cost estimation is without VAT

    5

    5

    The expressway route is histrorical roads from the East to the West coming from Serbia trought Sarajevo to the Croatia. This expressway is part of TEN-T core Network. Connecting this expressway with the Corridor 5c, central areas of B&H will get the best traffic link with the Central Europe and Adriatic cost on the South.

    Lašva - Travnik Expressway Length: 24 km Founding source: Concession Construction cost

    estimation: 183 mil. €*

    Available Documentation : - Main design - Enviromental permit - Feasibility study

    Expressway Lašva - Travnik

    6

    7

    7

    - Motorway Length: 56 km- Founding source: ------ Model: Finance / Design /

    Build- Construction cost

    estimation: 520 mil. €*

    Available Documentation:- Preliminary design- Traffic study - Geological /

    geotechnical study- Environmental impact

    assessment (EIA)- Feasibility study

    Tuzla - Žepče

    Projects ready for construction

    3

    6

    - Motorway Length: 38 km- Founding source:

    Concession- Model: To be defined- Construction cost

    estimation: 344 mil. €*

    Available Documentation:- Preliminary design- Environmental permit- Feasibility study

    Motorway Žepče south (Poprikuše) - Doboj (Karuše)

  • Vision

    MissionWe build, operate and maintain the road infrastructure of the highest rank, socially and responsibly acting with a particular focus on compliance with environmental and traffic safety.

    Our vision is to create road infrastructure of the highest rank, equivalent to the most modern roads in the world.

  • A A

    The value of the new investment cycle is 892 mil. € and involves 13 projects and construction of 88 km of motorway on Corridor Vc.

    Motorwayconstructionis a driverof BH economy.

  • Intense construction of Corridor VC has a significant impact on gross domestic product (GPD) in Federation of BiH, and thereby on employment growth, expansion of the construction sector and higher production of construction materials.

  • Corridor Vc South Section 11 km Počitelj-Međugorje two active sites Construction of the Počitelj bridge Investment of 100 million EUR w/o VAT

    Corridor Vc Zenica region 10 km two active sites one of the most difficult sections Investment of 140 million EUR w/o VAT

    Corridor Vc Nort Section 11 km Construction of international border crossing Svilaj Investment of 72 million EUR w/o VAT

    Active sites

    desig

    n & pr

    int: n

    ashs

    tudio

    .ba

  • ContactsPC Motorways FB&H Ltd. Mostar Mostar Headquarters: Braće Fejića bb, 88000 Mostar, Bosnia and HerzegovinaTel: + 387 36 512 300Fax: + 387 36 512 301 Sarajevo Office: Dubrovačka 6, 71000 Sarajevo, Bosnia and HerzegovinaTel: + 387 33 277 900Fax: + 387 33 277 901E-mail: infoºjpautoceste.bawww.jpautoceste.ba