VISION
we are dedicated to providing
extraordinary quality and
services in every domain of our
expertise. We shall achieve this
by:
• Providing high-quality
services and ensuring that we
have a stable and motivated
work force – one which
exhibits true passion to excel.
• Following & exhibiting globally
acceptable quality standards
in operations, management
and customer relationship,
which guarantees value
creation for all stakeholders
and ultimately quality
construction / infrastructure
to the society at large.
MISSION
• Focus on providing services in
accordance with globally acceptable
practices without compromising on
safety.
• Carry out on-site execution of turnkey
projects in line with established
Company quality policy and strict
adherence to client specifications, whilst
ensuring 100% customer satisfaction.
• Create a culture that excites its
workforce and pursues excellence
through innovation, differentiation and
continual learning.
• To ensure inclusive growth for all
stakeholders of the organization, with
special emphasis on the work-life
balance of its employees.
• To double revenues & profits every four
years.
OBJECTIVES
The common objectives driving
individual and organizational
performance in the Group are:
• Minimize Time, Cost and
Investment;
• Comply with:
• Statutory Requirements /
Applicable Laws
• Contractual Terms &
Conditions, Specifications
and Drawings
• Standard Operating
Procedures
• Enable Internal and External
Customer Satisfaction
Established in 1996
ISO 9001
ISO 14001
OHSAS
18001
State-of-the-art
Equipment and
Manufacturing
Facility
55 acres
Manufacturing
Units 1 & 2
Power
Projects
Oil Refineries
Offshore
Platforms,
Pontoons &
Launching
Trusses
Stadiums
Steel Buildings
Airport Terminals
Malls
Proximity to
Port & Easy
Handling of
ODC Cargo
Exports to
Middle East,
Africa, Europe,
America
Capacity:
Structures - 40000 MTA
Pipe - 66000 MTA
Management
Mr. Vinayak Kulkarni (Chairman)
Mr. Sanjay Kulkarni (Managing Director)
Mr. Ajay Kulkarni (Director)
DIVISIONS
CONSTRUCTION
• Water
• Urban Infra
• Energy
• Industrial
MANUFACTURING STEEL STRUCTURES & PIPE DIVISION
Custom Build Structures for
• Power Projects
• Water / Waste Water
• Oil & Gas
• Ports & Jetties
• Offshore Applications
• Urban Infrastructure
CS Pipes & Tubulars for
• Water / Waste Water
• Dredging
• Structural Purposes
CLIENTELE
and many more…
CORPORATE
STRUCTURE
CONSTRUCTION
DIVISION
INTEGRATED
SERVICES
ASSURANCE
SERVICES
MANUFACTURING
DIVISION
Head Office
Manufacturing
Units
Projects
Head Office
Zones
Projects
Head Office
Zones
Projects
Integrated Services • Contracts • Finance & Accounts • CS & Legal • Purchase • HR • Administration • IT & ERP
Assurance Services • Budget Control • QA/QC • HSE • Customer
Relationship • Audits
STANDARD OPERATING PROCEDURE (SOP)
CORPORATE APEX MANUAL
OPERATIONS MANUAL
BD & PROPOSALS
FINANCE & ACCOUNTS
ADMINISTRATION & COMPLIANCES
HUMAN RESOURCE
SUBCONTRACT LABOUR
ENGINEERING / FORMWORK
PLANT & MACHINERY
INFORMATION TECHNOLOGY
PURCHASE
STORE
PLANNING & MONITORING
QUANTIFICATION & BILLING
CONTRACTS MANAGEMENT
HEALTH, SAFETY & ENVIRONMENT
QA/QC
INTERNAL AUDIT
BUDGET CONTROL
ROLES & RESPONSIBILITIES
Timely decisions &
actions in an
informed manner
Capability to scale up
the manufacturing
output to meet increase
in demand
Capability to scale up the
construction output to
meet increase in
demand
Robust
Delivery
Mechanism
Time Cost Quality
MANUFACTURING
Key Strengths
CAPACIT'E CONSTRUCTION
Young but well
experienced
Management
Professionals with domain expertise,
complementing well established processes
Accredited with
ISO certifications
State-of-the-art facility
and equipment for
manufacture of steel
structures
Lean Manufacturing for
waste control and
productivity increase
Proven track record of steel structures for Urban
Infra, Energy, Marine, Water etc.
State-of-the-art System
Formwork, Plant &
Machinery for concrete
structures
Lean Construction for
waste control and
productivity increase
Quick mobilization of resources and close monitoring of project
performance
Steel &
Concrete
Combo
Offering
Turnkey Solution
AREA & MANUFACTURING FACILITIES
• Total Plant Area : 160,000 sq meters
• Covered Area : 18,000 sq meters
HANDLING FACILITIES
• Total number of EOTs : 11 Nos. of 10 MT each
• Maximum EOT handling : 110 MT
capacity
• Traveling Cranes : 2 nos. x 5 MT each
• Open yard assemble : 250 MT
capacity
• Mobile Cranage capacity : 11 no. x 12 MT each
UNIT - I UNIT - II
AREA & MANUFACTURING FACILITIES
• Total Plant Area : 50,000 sq meters
• Covered Area : 10,000 sq meters
HANDLING FACILITIES
• Total number of EOTs : 9 Nos. of 40 MT each
• Maximum EOT handling : 360 MT
capacity
• Traveling Cranes : 2 nos. x 5 MT each
• Open yard assemble : Up to 300 MT
capacity
• Mobile Cranage capacity : 2 no. x 12 MT each
Manufacturing Capacities : CBS – 40000 MT Pipe – 66000 MT
Manufacturing
CNC Cutting Processing Dimensions 3.2 mm X 12.5mm X100 mm
CNC Plate Processing Length Dimensions • 2500 mm – 6000 mm
Width Dimensions • 400 mm - 3100 mm
Manufacturing
Beam Formation Processing Dimensions • Flange – 1000 mm x 80 mm x 12000 mm • Web - 2500 mm x 50 mm x 12000mm
Beam Straightening M/C Details • Make: Wuxi Yang Tong • No. of Units: 2 Nos. • Type: CNC • Speed: 2 Meters/Min
Manufacturing
Welding of Beam in process • Welding Speed: 0.24 – 2.4 Mtr/Min • Return Speed: 3.0 Mtr/Min • Power Source: 12000 Amps
Manufacturing Automated SAW Welding Set up • Flange Width: 150mm – 1000mm • Flange Thickness: 6mm – 80mm • Web Height: 200mm – 2000mm • Web Thick: 6mm – 50mm
Manufacturing
CNC Beam Drilling Dimensions • Flange Width – 42 mm – 600 mm • Web Height - 80 mm - 1220mm • Max. Drill Dia. – 40mm
CNC Band SAW Dimensions & Capacity • Beam Size Handling Capacity – Up to 1250mm • Sawing Capacity: 90 Deg. From Centre
Energy
Client Qty. (MT) Components
L&T – MHI Power Boilers Pvt. Ltd. (660 MW Super Critical TP)
16403 Primary Steel Structures & Top Girder Steel Structure Primary Steel – Air Pre Heater Structure,
Secondary Boiler Supporting Structure
Ansaldo Caldaie Boilers ( 320 t/hr Boiler )
1395 Primary Steel Structure, Supply of Boiler Main Steel Structure
BHEL (upto 1000 MW)
15500 Supply of Boiler Components – Complete Boiler inclusive of Columns , Auto Welded Beam & Boxes, Ducts, General Fabrication items
DOOSAN (800 MW Super Critical TP)
15000 Boiler Primary Structure & Ceiling Girders
RELIANCE INDUSTRIES LTD. 9000 Pipe Racks & Technological Structures for Gasification Plant Jamnagar Refinery Expansion Phase 3
Technip 2281 CDU/VDU Heater of Phase III Exp. Project of MRPL – Mangalore
Essar / GR Engg
3500 Equipment Support Structures for Reactor Regenerator Integrated Refinery Expansion BPCL, Kochi
Offshore & Marine
Client Project Name/Reference Location Qty. (MT) Components
Saipem / SPME Oman – Algeria Fertilizer Project
Algeria 6000 • Axis Loading Platform • Mooring Rails , Trussel,
Accesories
Qatar Dredging Dumb Barge Qatar 650 • Dumb Barge for Ballast Activity for Dredgers
Boskalis (Netherlands) Supply of Pontoons Middle East 2000 • Pontoons for Sinker Lines for Dredging Activity
Dredging International Jan de nul
(Netherlands) Van – Ooard
(Netherlands)
Dredging Activity across Multi locations
Middle East & Europe
4000 • Sinker & Floating Pipes • Pontoons
HCC Bandra-Worli Sea Link Project Mumbai, India 15000 • Launchin g Truss, Pile Drives, Service Platforms,
Offshore & Marine
• End Client: Sonatrach, Algeria • Grade: ASTM A572 Gr.50 • Scope: Fabrication of Cap Beams, Longitudinal /Transverse Beams
for trestles & loading platforms • Critical Points: Charpy V-Notch Test @ -40 Deg.
M/s Saipem: Algeria Oman Fertilizer Project
Offshore & Marine
Blasting in process
Loading of Components
Stacking
M/s Saipem: Algeria Oman Fertilizer Project
Offshore & Marine
• Truss with a dimension of 5m x 4m x 110 m was fabricated in 11 Segments, assembled and erected at a height of 30 meters.
• High tensile steel with thickness up to 100 mm was fabricated
Launching Truss for Worli-Bandra Sea Link - Mumbai
Offshore & Marine
• Fabrication, Erection & Launching of 66.5 Mtr x 5.3 Mtr x 6 Mtr –Pontoons / Barge
• Manufactured in a record time of 100 days for the Client
Barge Construction for Qatar Dredging Corporation
Urban Infra
Client Project Name/Reference
Location Qty. (MT) Components
Wadhva Developers, The Capital Mumbai, India 2000 • Iconic Steel Structures
Lodha Altmount 1 Mumbai, India 3000 • Steel High Rise
Sunshine Builders Sunshine Towers Mumbai, India 2250 • Steel High Rise (42 Storied)
GMS GMS Corporate Headquarters Mumbai, India 1800 • Iconic Steel Structures
Mumbai Cricket Association
Subhroto Roy Cricket Stadium Pune, India 4000 • Stadium Pavilion Structure
Airport Authority of India/ GMR / GVK
Airport Terminal Buildings 1. Mumbai 2. Amritsar 3. Ahmedabad 4. New Delhi
5000 • Terminal Buildings
Urban Infra The Capital, BKC, Mumbai
• Complex Architectural Egg shaped facade in 3 dimensional bending.
• CSL supplied the steel frame structure and erected with a Top Down approach.
Urban Infra
Name of the Project
: Construction of HIGH RISE tower “ONE ALTAMOUNT” – comprising of 3B + Gr + 43 Floors + Crown (Composite Structure)
Location : Altamount Road, Mumbai
Client : M/s. Futurtech Constructions and Precast Pvt. Ltd (Lodha Group)
Architect : M/s. Hadi Teherani Architecture (Germany) & M/s. Access Architects (India)
Consultant : M/s. Magnusson Klemencic Associates. (USA) & M/s. Sterling Engineering Consultant (India)
Scope of Work
: RCC works and structural steel work with Steel decking (CSL a Joint Venture Partner of Capacite Yongnam JV)
Completion Period
: 20 months
Built Up Area
: Approx. 4 Lakh Sqft
Altmount 1, Mumbai
Urban Infra
• Unique Box Column & Fully Bolted structure.
• Tallest Steel
Commercial Building in India ever made
• Erected in record 24
Months timeline.
Sunshine Towers, Mumbai
Urban Infra GMS, Mumbai
• Complex structure Design ever built in India.
• Heavy Structural
Steel members 700 x 700 mm Box sections fabricated at Plant.
• Structural Steel
frame enveloped with critical Aluminium Façade system
• Architects – Ar. James Law (Hong Kong)
Urban Infra Subrato Roy Stadium, Pune
• Columns are Plate formed with cruciform cross stiffeners.
• Critical element of the structure was Height. Erection was done at the height of 60M
• The Racker Beam with a cantilever of 25m was one of the unique component.
Urban Infra Amritsar Airport
• Scope for Modular Expansion of Terminal Building at Amritsar Airport
• Structural steel work of up to 40m x 37.5mts span executed.
• Flair Arms of Length up to 16mts erected
Urban Infra Ahmedabad Airport
• The scope containing work of city side façade structure having span of 48mtrs .
• The structural distance of 210mtrs is on flare arms supports place at 15mtrs distance each.
Urban Infra
Project : IGIMS, Patna
Scope : Construction of College Building Administrative Building
Library Boys Hostel
D-Type & E-Type Residential Quarters Site Development Work
Urban Infra Nagpur Metro : Depo Construction at Mihan & Higna
View of stabling line, Internal cleaning,
with main building
Nagpur Metro work
started recently, Site Mobilization in-progress;
Industrial
Client Project Name Location Qty(MT) Components
NCC Posco(M) – CR Plant Maharashtra 5000 Fabrication & Erection of Main CR Plant
M+W Cadbury Plant Tamil Nadu 912 Fabrication & Erection of main processing
building
CCI Cement Terminal Maharashtra 500 Fabricating & Erecting Bucket Elevator Tower
• 2MTPA of CRCA Plant • Fabrication of Built- up
Structures were from plates.
Industrial POSCO Cold Rolling Mill, Mangoan, Maharashtra
Project was awarded
by CIMMCO BIRLA
Ltd
Industrial Erecting bulk Cement Terminal and Fabricating & Erecting Bucket Elevator Tower
Project was awarded
by CIMMCO BIRLA
Ltd
Water Client Project Name Location Value
(INR in Cr.) Components / Scope
Navi Mumbai Municipal Corporation
Navi Mumbai Water Supply Scheme
Navi Mumbai, India
55.68 a) Basic Design b) Detailed Engineering c) Manufacturing, Coating, Supply, Transportation, Unloading, Shifting, Stacking, Lowering of MS Pipeline (Inside Cement Mortar Lining outside Tape Coated) dia ranging from 518mm to 2050mm d) Total 40.4 KM Cross Country Pipeline
Municipal Corporation of Greater Mumbai
Aghai to Jamboli MS Water Main Project
Mumbai (India) 103.97 Manufacturing, Fabrication, Supply of MS Pipeline of dia 3000mm – 5.4 KM
Municipal Corporation of Greater Mumbai
Jamboli to Chinchavali MS Water Main Project
Mumbai (India)
119.82 Manufacturing, Fabrication, Supply of MS Pipeline of dia 3000mm – 9.4 KM
Municipal Corporation of Greater Mumbai
Pogaon to Gundavali MS Water Main Project
Mumbai (India)
61.78 Manufacturing, Fabrication, Supply of MS Pipeline of dia 3000mm – 4.5 KM
Municipal Corporation of Greater Mumbai
Tansa Section I: MS Pipeline Project
Mumbai (India)
88.03 Manufacturing, Fabrication, Supply, Laying, Jointing, Testing & Commissioning of MS Pipeline of dia 300mm to 2750mm
Municipal Corporation of Greater Mumbai
Tansa Section II: MS Pipeline Project
Mumbai (India)
78 Manufacturing, Fabrication, Supply of MS Pipeline of dia 300mm to 2750mm
PHED Nagaur Water Supply Scheme
Mumbai (India)
145 Manufacturing, Fabrication, Supply of MS Pipeline of dia 300mm to 1200mm – 132KM
Project was awarded
by CIMMCO BIRLA
Ltd
Water Mumbai III & Mumbai IV Water Supply Schemes
Client
• Municipal Corporation of Greater Mumbai
Scope of Work
• Manufacturing & Laying of 3000mm dia MS Pipeline – 150 Kms
Project was awarded
by CIMMCO BIRLA
Ltd
Water Nagour Bikaner Water Supply Scheme
Dia 1250 mm x 140 Kms
Offices & Manufacturing Units
North Zone Office @
Gurgaon
South Zone Office @
Bengaluru
Manufacturing Unit 1
Plot No. 424, Village Kondla, Taluka
Wada,
District – Thane, Maharashtra, India
Manufacturing Unit 2
Plot No: 288/B, Manor‐Wada Road, Wada
District – Thane, Maharashtra, India
Thank You
219-228, 2nd Floor, B-wing,
Shrikant Chambers,
Adjacent to R. K. Studios,
Sion-Trombay Road,
Chembur, Mumbai - 400071,
Maharashtra, India.
T. +91-22 4246 4666
www.csli.in