BUILDING STRONG®PORTLAND DISTRICT 1
BUILDING STRONG®PORTLAND DISTRICT 2
BiOp Performance Standards for Dam Passage Survival
RPA RM&E Actions - Strategy 2 (Hydrosystem RM&E):Monitor average Dam Passage Survival (S̅�Dam) of juvenile run-of-river spring and summer migrants.•Action Agencies operate to achieve and maintain performance standards of:
Spring: S̅�Dam ≥ 96% (SE ≤ 1.5%) across all dams for yearling Chinook and steelhead
Summer: S̅�Dam ≥ 93% (SE ≤ 1.5%) across all dams for subyearling fall Chinook salmon
BUILDING STRONG®PORTLAND DISTRICT 3
2012 OBJECTIVESSnake River Performance Standard Tests
• Little Goose Dam Spring – Measure S̅�Dam and Route-Specific S̅ at 30% spill
Summer – Measure S̅�Dam and Route-Specific S̅ at 30% spill
• Lower Monumental Dam Spring – Measure S̅�Dam and Route-Specific S̅ at Gas Cap spill
Summer – Measure S̅�Dam and Route-Specific S̅ at 17k spill
BUILDING STRONG®PORTLAND DISTRICT 4
2012 OBJECTIVESLower Columbia River Performance Standard Tests• McNary Dam
Spring – Measure S̅�Dam and Route-Specific S̅ at 40% spill Summer – Measure S̅�Dam and Route-Specific S̅ at 50% spill
• John Day Dam Spring – Measure S̅�Dam at 30% and 40% spill Summer – Measure S̅�Dam at 30% and 40% spill
• The Dalles Dam Summer – Measure S̅�Dam at 40% spill
• Bonneville Dam Summer – Measure S̅�Dam at 85k day/Gas Cap night and 95k spill
BUILDING STRONG®PORTLAND DISTRICT 5
Data provided by Columbia River DART
10-yr Avg Outflow (2002-11)
2012 WATER YEAROutflow at The Dalles Dam
Outflow (kcfs)
BUILDING STRONG®PORTLAND DISTRICT 6
2012 STUDY DESIGNFish Selection Criteria
• Run-of-River fish collected at Juvenile Fish Facilities, selected for tagging based on criteria: Species: yearling Chinook (CH1), yearling steelhead (STH),
subyearling Chinook (CH0) No previous PIT-tag or active tag Alive with no severe or lethal injuries, diseases, etc. Forklength ≥ 95.0 mm
• Low rejection rate: 3.2-7.0%
BUILDING STRONG®PORTLAND DISTRICT 7
• Comparison of tagged fish vs. run-of-river fish Length and run timing similar (representative test group)
• Snake River - # tagged & released Spring (April 28 – May 28): CH1 = 6,199, STH = 6,202 Summer (June 4 – July 8): CH0 = 10,963
• Lower Columbia River - # tagged & released Spring (April 26 – June 1): CH1 = 5,848, STH = 5,838 Summer (June 12 – July 21): CH0 = 14,164
2012 RESULTS
BUILDING STRONG®PORTLAND DISTRICT 8
2012 RESULTSLittle Goose Dam
• Target spring & summer spill rate (4/3-8/31): 30%
CH1, STH4/28-5/28
Avg daily spill = 31.8%
CH06/4-7/8
Avg daily spill = 38.1%
Target spill (%) Actual Spill (%)Outflow (kcfs)
BUILDING STRONG®PORTLAND DISTRICT 9
Metric Yearling Chinook Salmon Juvenile Steelhead Subyearling Chinook Salmon
Dam Passage Survival
98.2%(SE 0.8%)
99.5%(SE 0.8%)
95.4%(SE 0.9%)
BRZ-BRZ Survival 98.1%(SE 0.8%)
99.4%(SE 0.8%)
94.5%(SE 1.0%)
SPE (%)* 65.3% 56.1% 72.5%
FPE (%) 96.3% 98.0% 95.1%
FB Residence median (h) 2.6 2.7 2.8
TR Egress median (h) 0.6 0.7 0.8
2012 RESULTSLittle Goose Dam
*SPE = % passed spillway, including spillway weirs
BUILDING STRONG®PORTLAND DISTRICT 10
2012 RESULTS Lower Monumental Dam
Target spill rate: Spring (4/3-6/20) = Gas Cap (~20-29k); Summer (6/21-8/31) = 17k.
June 21
Target spill (17k) Actual Spill (kcfs)Outflow (kcfs)
CH1, STH4/28-5/28
Avg daily spill = 31.5k
CH06/4-7/8
Avg daily spill = 25.4k
BUILDING STRONG®PORTLAND DISTRICT 11
Metric Yearling Chinook Salmon
Juvenile Steelhead
Subyearling Chinook Salmon
Dam Passage Survival
98.7%(SE 0.9%)
98.3%(SE 0.2%)
97.9%(SE 0.8%)
BRZ-BRZ Survival 98.6%(SE 0.9%)
98.2%(SE 0.2%)
97.2%(SE 0.8%)
SPE (%)* 78.9% 65.9% 83.6%
FPE (%) 94.8% 96.5% 92.4%
FB Residence median (h) 2.4 2.2 2.6
TR Egress median (h) 0.4 0.4 0.5
2012 RESULTS Lower Monumental Dam
*SPE = % passed spillway, including spillway weirs
BUILDING STRONG®PORTLAND DISTRICT 12
2012 RESULTS McNary Dam
Target spill rate: Spring (4/10-6/11) = 40%; Summer (6/12-8/31) = 50%.
Target spill (%) Actual Spill (%)Outflow (kcfs)
CH1, STH4/26-6/1
Avg daily spill= 50.6%
CH06/12-7/21
Avg daily spill = 60.9%
BUILDING STRONG®PORTLAND DISTRICT 13
Metric Yearling Chinook Salmon Juvenile Steelhead Subyearling Chinook Salmon
Dam Passage Survival
96.2%(SE 1.4%)
99.1%(SE 1.8%)
97.5%(SE 1.1%)
BRZ-BRZ Survival 96.0%(SE 1.4%)
98.8%(SE 1.8%)
97.3%(SE 1.1%)
SPE (%)* 72.5% 83.2% 78.3%
FPE (%) 96.8% 97.7% 90.9%
FB Residence median (h) 1.8 1.8 1.8
TR Egress (h) 0.4 0.3 0.4
2012 RESULTS McNary Dam
*SPE = % passed spillway, including spillway weirs
BUILDING STRONG®PORTLAND DISTRICT 14
2012 RESULTS John Day Dam
Target spring & summer spill rates (4/10-8/31): alternating blocks of 30% and 40%
Target spill (%) Actual Spill (%)Outflow (kcfs)
CH1, STH4/26-6/1
Avg daily spill= 37.3%
CH06/12-7/21
Avg daily spill = 38.0%
BUILDING STRONG®PORTLAND DISTRICT 15
Metric Yearling Chinook Salmon Juvenile Steelhead Subyearling Chinook Salmon
Dam Passage Survival
96.7%(SE 0.7%)
97.4%(SE 0.3%)
94.1%(SE 0.3%)
BRZ-BRZ Survival 96.6%(SE 0.7%)
96.9%(SE 0.3%)
93.9%(SE 0.3%)
SPE (%)* 74.6% 74.5% 69.6%
FPE (%) 92.7% 97.0% 85.8%
FB Residence median (h) 1.2 2.4 1.0
TR Egress (h) 0.5 0.5 0.5
2012 RESULTS John Day Dam
*SPE = % passed spillway, including spillway weirs
BUILDING STRONG®PORTLAND DISTRICT 16
John Day Dam – Dam Passage SurvivalSecond year of study
BUILDING STRONG®PORTLAND DISTRICT 17
2012 RESULTS The Dalles Dam (Summer only)
• Target spring & summer spill rate (4/10-8/31): 40%
Target spill (%) Actual Spill (%)Outflow (kcfs)
CH06/12-7/21
Avg daily spill = 40.5%
BUILDING STRONG®PORTLAND DISTRICT 18
Metric Subyearling Chinook Salmon
Dam Passage Survival
94.7%(SE 0.6%)
BRZ-BRZ Survival 94.6%(SE 0.6%)
SPE (%) 70.7%
FPE (%) 78.4%
FB Residence median (h) 1.1
TR Egress median (h) 0.2
2012 RESULTS The Dalles Dam
BUILDING STRONG®PORTLAND DISTRICT 19
2012 RESULTS Bonneville Dam (Summer only)
Target summer spill rates (6/16-7/21) = alternating blocks of 85k day/120k night and 95 kcfs all hours
Target spill (kcfs) Actual Spill (kcfs)Outflow (kcfs)
CH06/12-7/21
Avg daily spill = 147.2k
BUILDING STRONG®PORTLAND DISTRICT 20
Metric Subyearling Chinook Salmon
Dam Passage Survival
97.4%(SE 0.7%)
BRZ-BRZ Survival 97.4%(SE 0.5%)
SPE (%) 54.3%
FPE (%) 69.7%
FB Residence median (h) 0.5
TR Egress (h) 0.4
2012 RESULTS Bonneville Dam
BUILDING STRONG®PORTLAND DISTRICT 21
2012 SUMMARYSnake and Lower Columbia River Performance Standard Tests
• 14 Survival Tests Implemented (6 SR, 8 LCR) All 14 achieved BiOp Survival Standards (9 of these did so with single-release estimates) 13 of 14 achieved BiOp Precision Level Standard
• Spill Targets Difficult to Attain Due to High FlowsTDA and JDA within target range but JDA did not get enough 30% treatments to detect differencesAll other projects spilled higher than targetLGS, LMN: Comparison of early spring (higher flows) vs. late spring (lower flows) showed no difference in dam survival
BUILDING STRONG®PORTLAND DISTRICT 22
Next Steps
• Planned 2013 Performance Standard Testing
LGS – Summer (CH0)
LMN – Summer (CH0)
BUILDING STRONG®PORTLAND DISTRICT 23
Metric Yearling Chinook Salmon Juvenile Steelhead Subyearling Chinook Salmon
Spillway Weir (surface spill)
% Passed = 44%
% Survival = 100.4%
% Passed = 40%
% Survival = 100.1%
% Passed = 48%
% Survival = 96.2%
Spillway (deep spill)
% Passed = 21%
% Survival = 94.9%
% Passed = 16%
% Survival = 99.2%
% Passed = 25%
% Survival = 94.2%
JBS% Passed = 31%
% Survival = 98.8%
% Passed = 42%
% Survival = 99.7%
% Passed = 23%
% Survival = 98.1%
Turbine% Passed = 4%
% Survival = 87.0%
% Passed = 2%
% Survival = 80.6%
% Passed = 5%
% Survival = 81.3%
2012 RESULTSLittle Goose Dam – Route-Specific
BUILDING STRONG®PORTLAND DISTRICT 24
Metric Yearling Chinook Salmon Juvenile Steelhead Subyearling Chinook Salmon
Spillway Weir (surface spill)
% Passed = 62%
% Survival = 99.8%
% Passed = 53%
% Survival = 99.1%
% Passed = 58%
% Survival = 98.6%
Spillway (deep spill)
% Passed = 17%
% Survival = 94.6%
% Passed = 13%
% Survival = 97.4%
% Passed = 25%
% Survival = 97.9%
JBS*% Passed = 16%
% Survival = 100.7%
% Passed = 31%
% Survival = 99.1%
% Passed = 9%
% Survival = 101.2%
Turbine% Passed = 5%
% Survival = 93.2%
% Passed = 3%
% Survival = 81.4%
% Passed = 8%
% Survival = 89.9%
2012 RESULTSLower Monumental Dam – Route-Specific
*JBS Outfall flume relocated in 2012: extended downstream ~650 meters and into channel ~110 meters.
BUILDING STRONG®PORTLAND DISTRICT 25
Metric Yearling Chinook Salmon Juvenile Steelhead Subyearling Chinook Salmon
Spillway Weir (surface spill)
% Passed = 8.1%
% Survival = 97.6%
% Passed = 21.5%
% Survival = 97.6%
n/a
(no spillway weir in summer)
Spillway(deep spill)
% Passed = 62.3%
% Survival = 97.1%
% Passed = 55.4%
% Survival = 100.1%
% Passed = 76.3%
% Survival = 98.0%
JBS*% Passed = 23.4%
% Survival = 93.6%
% Passed = 13.4%
% Survival = 101.5%
% Passed = 12.2%
% Survival = 100.8%
Turbine% Passed = 3.1%
% Survival = 95.5%
% Passed = 2.1%
% Survival = 83.1%
% Passed = 8.9%
% Survival = 88.1%
2012 RESULTSMcNary Dam – Route-Specific
*JBS Outfall flume replaced and relocated in 2012.