Building Work Committee
Renovation & ExpansionProject Presentation
March 7, 2009
Mason School District
THE TEAM
Mason School DistrictBuilding Committee
Mary McDonald
Bob Bergeron
Fred Greenwood
Bob Hemmer
Bernie O’Grady
The Jordon InstituteEnergy Consultants
Paul Levelle
Kirk Stone
Daniel V Scully Architects
Daniel Scully
Katie Cassidy Sutherland
The Jordon InstituteConstruction Managers
John Gaston
David Bryson
Other Key ContributorsMark Richardson
George & Catherine Schwenk,The Mason Congregational Church
NH DOE& lots of on-lookers! …
TODAY’S OBJECTIVES
To Provide Information• How We Got Here : Needs Assessment & Design Themes• What it looks like : Building Plans Overview• Estimated Cost• Schedule
To Answer Questions• Your thoughts, questions, ideas & overall Feedback• Prepare for March 12th Vote
How We Got Here
Withdrawal from Mascenic School District
Creation of Mason School District
Create Curriculum
Build a Staff
Find a "Home" for students
What We Considered
Building a New School for K thru 12
Build a New Building for K thru 5
Utilize Existing Buildings for K thru 5
Add on to Existing Building for K thru 5
Town Hall
Existing School
Parsonage
Old RoadSchool Lot Line AdjustmentRelocation of Parsonage Lot
Proposed : Site Modification
REQUIRED Life & Safety
ADA Access
Fire Egress
NH Dept. of Education
Structural Repair
Fire Detection Upgrade
Building Code Upgrade
REQUIRED Minimum Space
NH Dept. of Education
Building Code
REQUIRED Kindergarten
NH State Mandate
REQUIRED 5th Grade
Possible Due to Expansion of ExistingSpace to Required Minimum
REQUIRED Administration SpaceREQUIRED Cafeteria
Principal
Superintendent
Staff Roof
Conference Room
Cafeteria
Kitchen
REQUIRED Physical Ed
Computer /ArtExpansion
Utilized forComputer / Media
Room and Art Room
If Population Bubble OccursIt Can Be Utilized As A Larger
Grade Classroom
School / TownShared Space
Expanded Space Can Be Utilized
For School Music Space
Shared With The Town It CanBe Utilized AS A Meeting Space,
Function Hall, Etc.
Proposed Floor Plan
Proposed – Ariel Top View
Proposed : Front Elevation
Proposed : Birdseye Front
Proposed : Birdseye Back
Schedule Outline
Mason School District Bond Appropriation March 12, 2009
Lot line & Site finalization - Parsonage relocated June 2009
Ground Breaks for Addition July 2009
School Starts – Classrooms & MechanicalRoom Complete Admin & SPED in Temps August 2009
Addition Complete June 2010
Renovation of Administration & Building Connection August 2010
Temporary Classrooms removed August 2010
Building Project Completed September 2010
High Performance Certification December 2010 / January 2011
BUDGET
Architectural / Engineering Design$ 577,109
Site / Construction$3,886,425
Total Bond Appropriation$4,274,534
TOTAL DOES NOT DEDUCT NH AID (30%)
TOTAL DOES NOT DEDCUCT GRANT PROPOSALS
TOTAL DOES NOT DEDUCT ECONOMIC STIMULUS OPPORTUNITIES(Possibly as high as 5+%)
Estimated Cost & Potential Aid
How Will This Effect My Taxes
What Your Vote Will Do
YES•Will have the project proceed as presented.•(The action that the Building Committee Endorses)
NO•Will stop all present projects.•Require us to resubmit a plan to the NH Dept. of Ed. •If plan does not meet their approval, they take over the process.•Possible closing of school and require us to tuition K thru 5.•Loss of NH State funding possible.•Loss of Federal Funding.•Present debt due to Mascenic due in full this year.•Tax impact will be significantly higher.•Cost of sending our children to school may be significantly higher.•(This action is NOT endorsed by the Building Committee)
QUESTIONS & DISCUSSIONS