WELCOME TO THE NEW TRENTON CENTRAL HIGH SCHOOL
400 CHAMBERS STREET
TRENTON, NJ 08609
Presented by:
Dwayne Mosley, Facilities Administrator
June 17, 2019
1
BUILDINGS AND GROUNDS DEPARTMENT
Mission Statement:
All Students will graduate with a vision for their future, motivated to learn continually and prepared to succeed in their choice of college or career
2
Design-Build ConstructionThe new Trenton Central High School will be a 350,000 square-foot school designed to educate 1,850 students in grades levels 10 through 12. The estimate cost to construct the school was $155 million dollars.
Current ActivitiesThe following activities are currently underway:• Submissions to the Department of Community Affairs for final plumbing and electrical approvals.• Contractors are continuing to address construction and final punch-list items.
Key Dates• Construction NTP (Project Start-up) – Complete (10/14/16)• Substantial Completion (TCO)– Pending (7/15/19)• School Opening – September 2019
STATUS UPDATE
THE NEW TRENTON CENTRTAL HIGH SCHOOL
Summer Activities
3
➢ June➢ Boxes to be distributed➢ School Closing - Districtwide➢ Summer Movers Begin
➢ July➢ Relocation of curriculum items from various school locations➢ Building Systems & Equipment Trainings (Mechanics, Custodians, & some
School Staff).
➢ August➢ Terminate lease with Catholic Diocese (520 & 544 Chestnut Avenue and 171
Division Street).➢ Scheduled site walk-through(s) of The New TCHS facility (TBOE Board,
Administration, Community Stakeholders and interested public).
➢ September
➢ Grand Opening – The New Trenton Central High School
NOTE - Ribbon-Cutting Ceremony (TBD) by the NJSDA
THE NEW TRENTON CENTRAL HIGH SCHOOL
PROGRESS
6
From The Old TCHS
5
To The New TCHS
6
CLASSROOMS
7
COSMETOLOGY
THE NEW TRENTON CENTRAL HIGH SCHOOL
8
Culinary Kitchen
9
THE NEW TRENTON CENTRAL HIGH SCHOOL
Auditorium
10
THE GYNASIUM
11
Auxiliary Gymnasium
THE NEW TRENTON CENTRTAL HIGH SCHOOL
12
The Outside Amphitheatre
Q & A
13