Bulgarian natural gas sector development Regulator’s point of view Petya Ivanova Gas Department SEWRC, Bulgaria [email protected] Sofia, 28-29 March 2012 1 STATE ENERGY AND WATER REGULATORY COMMISSION
Transcript

Bulgarian natural gas sector development – Regulator’s point of

view

Petya Ivanova

Gas Department

SEWRC, Bulgaria

[email protected] Sofia, 28-29 March 2012 1

STATE ENERGY AND WATER REGULATORY COMMISSION

SEWRC’s tasks in conjunction with European legislation

Energy Act and relevant ordinances amendment procedure in order to implement Directive 2009/73/EC; TSOs certifications; TYNDP approval;

Establishment of a Preventive Action Plan and an Emergency Plan in cooperation with MEE in compliance with Regulation (EU) 994/2010 concerning measures to safeguard security of gas supply;

Effective market monitoring in accordance with Regulation (EU) 1227/2011 on wholesale energy market integrity and transparency;

Sofia, 28-29 March 2012

2

STATE ENERGY AND WATER REGULATORY COMMISSION

setting of harmonized principles for tariffs for access to the network, establishment of third-party access services and harmonized principles for capacity-allocation and congestion-management in pursuance of Regulation (EU) 715/2009 requirements;

Entry-exit Tariff system establishing for gas transmission (now for both transmission an distribution is postage stamp tariff system);

Adoption of main commercial conditions for the use of underground gas storage “Chiren” elaborated by SSO as required in Directive 2009/73/EC;

Sofia, 28-29 March 2012

3

STATE ENERGY AND WATER REGULATORY COMMISSION

Transmission and supply of natural gas in Bulgaria – present situation

Bulgartrangaz (BTG) has licenses for gas transmission and gas

storage: both functions of TSO and SSO;

Dedicated transit pipeline system, owned by BTG, transport natural gas

originating from the Russian Federation to Greece, Macedonia and

Turkey; engaged with long term contracts (Transit Agreements);

Supply of natural gas - performed by the public provider Bulgargaz

who has a license for public supply. Bulgargas has long term contracts

with 3 foreign suppliers;

Sofia, 28-29 March 2012

4

STATE ENERGY AND WATER REGULATORY COMMISSION

Natural gas sale prices by the public provider to the end suppliers and

consumers connected to the natural gas transmission network-

regulated by SEWRC;

The price at the entrance at the gas transmission network is calculated

as an average weighted value based on the quantities for the following

quarterly period from imports and from domestic production and their

respective prices;

transmission tariff based on the cost-plus method, allowing BTG to

recover the eligible operating and capital costs (allowed revenue);

consists of a commodity-only charge derived from the allowed revenue

divided by the forecasted transmission volume (1000 cm).

Sofia, 28-29 March 2012 5

STATE ENERGY AND WATER REGULATORY COMMISSION

Tariff system for both transmission an distribution is postage stamp, in

procedure for entry-exit system implementation

Pursuant to Art.17, subparagraph 8 of Ordinance on Natural gas Prices,

sale prices by the public provider to the end suppliers and consumers

connected to the natural gas transmission network could be adjusted

by the Commission based on the extra profit/extra loss due to the

difference between estimated and reported values of the pricing

elements of the previous/ prior period

Sofia, 28-29 March 2012 6

STATE ENERGY AND WATER REGULATORY COMMISSION

Sofia, 28-29 March 2012 7

STATE ENERGY AND WATER REGULATORY COMMISSION

0,00 BGN

100,00 BGN

200,00 BGN

300,00 BGN

400,00 BGN

500,00 BGN

600,00 BGN

700,00 BGN

20

02

Q2

20

02

Q3

20

02

Q4

20

03

Q1

20

03

Q2

20

03

Q3

20

03

Q4

20

04

Q1

20

04

Q2

20

04

Q3

20

04

Q4

20

05

Q1

20

05

Q2

20

05

Q3

20

05

Q4

20

06

Q1

20

06

Q2

20

06

Q3

20

06

Q4

20

07

Q1

20

07

Q2

20

07

Q3

20

07

Q4

20

08

Q1

20

08

Q2

20

08

Q3

20

08

Q4

20

09

Q1

20

09

Q2

20

09

Q3

20

09

Q4

20

10

Q1

20

10

Q2

20

10

Q3

20

10

Q4

20

11

Q1

20

11

Q2

20

11

Q3

20

11

Q4

20

12

Q1

Gas price at the entrance of the gas transmission system and gas price of

public supplier, 2002 - 2011, BGN/1000 cm, without VAT

Price at the entrance of thegas transmission network

Trasnmission tariff

Price of transmission andsupply

Distribution of natural gas

There are 33 licensed gas distribution companies on the territory of Bulgaria which fulfill both functions of gas distribution and supply of last resort

Distribution companies provide natural gas on the territory of 5 regions (Mizia, Dobrudja, Trakia, Dunav and Zapad) and 63 municipalities out of these regions

Since 01.07.2007, all consumers are eligible under the change of the Regulations for providing access to the gas transmission and/or gas distribution networks, approved by SEWRC

“Cap” regulation is used with the goal to create the incentive for the undertakings to reduce their expenses

Sofia, 28-29 March 2012 8

STATE ENERGY AND WATER REGULATORY COMMISSION

distribution network investments

m BGN non-residential residential non-residential residential

Total 248577 39938000 5234 57041 393124 61394

customers consumption

DSOs, 2010

Sofia, 28-29 March 2012 9

STATE ENERGY AND WATER REGULATORY COMMISSION

Average connection charges for gas Non-residential customers: 1245 EUR/customer Residential customers: 253 EUR/customer Average distribution gas charges Non-residential customers: 63.93 EUR/1000 m3 Residential customers: 117.93 EUR/1000 m3 Average end-user gas prices (second quarter of 2011) Wholesale: 284.9 EUR/1000 m3 Non-residential customers: 278.49 EUR/1000 m3 Residential customers: 377.28 EUR/1000 m3

Sofia, 28-29 March 2012 10

STATE ENERGY AND WATER REGULATORY COMMISSION

Potential new sources and routes

Nabucco project - Decision № Р-074/11.02.2008 to exempts the Bulgarian section of the Nabucco pipeline project from the third party regulated access rules, amended by Decision № И1-Р-074/12.01.2009 and by Decision № И2-Р-074/14.05.2009

Interconection Bulgaria – Greece (IBG): 2014

Interconection Bulgaria – Romania (IBR): 2013

Interconection Bulgaria – Serbia (IBS): 2015

Interconection Bulgaria – Turkey (IBT): 2014

Black Sea CNG

Sofia, 28-29 March 2012 11

STATE ENERGY AND WATER REGULATORY COMMISSION

Sofia, 28-29 March 2012 12

Giurgiu

Ruse NIS

2 1

3

4

Komotini

GS GALATA UGS CHIREN

SEE LNG

5

Stara Zagora

IBR

IGB

ITB

Dimitrovgrad

Lozenets

Markoclar Dupnitsa

IBS

8th EU

CORRIDOR

BLACK SEA CNG

INTERCONNECTION GREECE-BULGARIA (IGB)

INTERCONNECTION TURKEY-BULGARIA (ITB)

INTERCONNECTION BULGARIA-ROMANIA (IBR)

INTERCONNECTION BULGARIA-SERBIA (IBS)

BLACK SEA CNG

THANK YOU FOR YOUR ATTENTION!

Petya Ivanova

SEWRC, Bulgaria

www.dker.bg

Sofia, 28-29 March 2012 13