  • Bunch Frequency Multiplicationin the

    CLIC Test Facility CTF 3

    R. Corsini, L. Rinolfi, F. Tecker – CERN, SwitzerlandC. Biscari, A. Ghigo, M. Preger– INFN, Italy

    P. Royer– Lausanne University, SwitzerlandA. Ferrari – Uppsala University, Sweden

    Introduction to CTF 3

    Bunch Frequency Multiplication

    Bunch Combination Results

    Conclusions

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://www.cern.ch/http://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • Introduction to CTF 3

    CLIC: CompactLI near Collider (0.5–5 TeV)

    �������

    �������

    ���

    ����������� ��� �������� ��� ��� � � ���

    �!#"%$�&('*)� +!-,

    .+� ,

    ���/� �/0���� � ���1� "� ��� ��� � � ��� �

    two beamacceleration scheme:

    high charge, low energydrive beam(2 GeV)

    produce RF power athigh frequency – 30 GHz

    high gradient – 150 MV/m

    low charge,high energy main beam(1.5 TeV)

    CLIC TestFacility 3 addressesfeasibility issues:test ofdrive beam generation

    combination of bunches byRF deflectors⇒ bunch frequency multiplication

    RF power production at 30 GHz

    test CLIC components

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://cern.ch/ctf3http://www.cern.chhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • Frequency multiplication

    basic principle of drive beam generation

    transform very long pulses into many shortpulses withhigher power and higher frequency

    useRF deflectorsto interleavebunches

    ⇒ double beam power⇒ double beam frequency

    CTF3 deflector, INFN

    CTF3 deflector, CERN

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • Preliminary phase of CTF 3 (2001–2002)

    gun & bunchingsystem

    Linac ( 8 structures )

    matchingsection

    isochronousinjection line

    RF deflectors

    streak camerameasurement

    isochronous ring

    total Length 1.7 µs - av. Pulse Current 0.3 A

    Bunch spacing10 cm (333 ps)6.6 ns 420 ns

    Pulse Length 6.6 nsav. Pulse Current 1.5 A

    Bunch spacing 2 cm (67 ps)

    Beam structurein linac

    (up to 100 Hz)

    Beam structureafter combination

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • Combination by RF deflectors in a ringC L I CC L I C

    Four-Turn Ring InjectionFour-Turn Ring Injection

    3rd

    1st turn

    λ�

    2nd

    λ� /4

    injectionline

    transverse deflector

    field

    localinner orbits

    1���

    deflector 2���

    deflector

    septum

    4rd

    • Want a factor 4 pulse compression &frequency multiplication

    • Use transverse RF deflectorinjection in a ring

    Bunch train combination by RF deflectors

    Basic principle of bunch train combination by RF deflector injection in an isochronous ring

    ��������� �

    ��������������������������

    λ� � �����!"�������� �#

    $%������� &������'���(�)�*�)�������(��

    λ� + � � �����!"�������� �#, ����� -.������� �#�/10

    × λ� =��� �#����2������354)�6������)�± λ� + �

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • CTF3 recombination factor 4 - 1 pulse

    time

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • CTF3 recombination factor 4 - 2 pulses

    time

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • CTF3 recombination factor 4 - 3 pulses

    time

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • CTF3 recombination factor 4 - 4 pulses

    time

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • Recombination factor 4 - beam current

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • CTF3 recombination factor 5

    5 cm)(2nruht5

    o = 0 mc

    t

    λ 1

    /oλ

    bunch distance 333 ps→ 67 psfrequency 3 GHz→ 15 GHz

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/tecker/ctf3/combi5anim.gifhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/

  • Conclusions

    CTF 3 preliminary phase

    bunch frequency multiplication by RF deflectorsdemonstratedfor factors 2 – 5 at low charge

    crucial step for the CLIC study

    CTF 3 initial phase

    drive beam linac is being installed now (higher charge)

    commissioning starts this month

    Acknowledgements:

    R. Corsini, A. Ferrari, L. Rinolfi, P. Royer

    various CERN divisions and groups

    Collaborations:INFN, Frascati, Italy – SLAC, USA – RAL, UK –IN2P3-LAL, France – Uppsala University, Sweden

    Frank Tecker Bunch Frequency Multiplication in the CLIC Test Facility CTF 3 PAC 2003, 15.5.2003

    http://cern.ch/ctf3http://www.cern.chhttp://cern.ch/teckerhttp://ps-div.web.cern.ch/ps-div/CLIC/Welcome.htmlhttp://cern.ch/ctf3http://www-conf.slac.stanford.edu/pac03/